SLH Timing Belt Powertrain (Final Technical Report)

The main goal of this proposal was to develop and test a novel powertrain solution for the SLH hydroEngine, a low-cost, efficient low-head hydropower technology. Nearly two-thirds of U.S. renewable electricity is produced by hydropower (EIA 2010). According to the U.S. Department of Energy; this amount could be increased by 50% with small hydropower plants, often using already-existing dams (Hall 2004). There are more than 80,000 existing dams, and of these, less than 4% generate power (Blankinship 2009). In addition, there are over 800 irrigation districts in the U.S., many with multiple, non-power, low-head drops. These existing, non-power dams and irrigation drops could be retrofitted to produce distributed, baseload, renewable energy with appropriate technology. The problem is that most existing dams are low-head, or less than 30 feet in height (Ragon 2009). Only about 2% of the available low-head hydropower resource in the U.S. has been developed, leaving more than 70 GW of annual mean potential low-head capacity untapped (Hall 2004). Natel Energy, Inc. is developing a low-head hydropower turbine that operates efficiently at heads less than 6 meters and is cost-effective for deployment across multiple low-head structures. Because of the unique racetrack-like path taken by the prime-movers in the SLH, a flexible powertrain is required. Historically, the only viable technological solution was roller chain. Despite the having the ability to easily attach blades, roller chain is characterized by significant drawbacks, including high cost, wear, and vibration from chordal action. Advanced carbon- fiber-reinforced timing belts have been recently developed which, coupled with a novel belt attachment system developed by Natel Energy, result in a large reduction in moving parts, reduced mass and cost, and elimination of chordal action for increased fatigue life. The work done in this project affirmatively addressed each of the following 3 major uncertainties concerning a timing-belt based hydroEngine powertrain: 1. Can a belt handle the high torques and power loads demanded by the SLH? (Yes.) 2. Can the SLH blades be mounted to belt with a connection that can withstand the loads encountered in operation? (Yes.) 3. Can the belt, with blade attachments, live through the required cyclic loading? (Yes.) The research adds to the general understanding of sustainable small hydropower systems by using innovative system testing to develop and demonstrate performance of a novel powertrain solution, enabling a new type of hydroelectric turbine to be commercially developed. The technical effectiveness of the methods investigated has been shown to be positive through an extensive design and testing process accommodating many constraints and goals, with a major emphasis on high cycle fatigue life. Economic feasibility of the innovations has been demonstrated through many iterations of design for manufacturability and cost reduction. The project is of benefit to the public because it has helped to develop a solution to a major problem -- despite the large available potential for new low-head hydropower, high capital costs and high levelized cost of electricity (LCOE) continue to be major barriers to project development. The hydroEngine represents a significant innovation, leveraging novel fluid mechanics and mechanical configuration to allow lower-cost turbine manufacture and development of low head hydropower resources.

13 HYDRO ENERGY↗

Final Report for Clean, Reliable, Affordable Energy that Reflects the Values of the Pinoleville Pomo Nation

This report aims to present and analyze information on the potential of renewable energy power systems and electric vehicle charging near the Pinoleville Pomo Nation in Ukiah, California to provide an environmentally-friendly, cost-effective energy and transportation options for development. For each renewable energy option we examine, solar, wind, microhydro, and biogas in this case, we compiled technology and cost information for construction, estimates of energy capacity, and data on electricity exports rates.

09 BIOMASS FUELS↗

Effects of Climate Change on Federal Hydropower: Report to Congress

This is a formal Department of Energy report to Congress. It outlines the findings of an assessment directed by Congress in Section 9505 of the SECURE Water Act of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities.

13 HYDRO ENERGY↗

Iowa Hill Pumped Storage Project Investigations - Final Technical Report

This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

13 HYDRO ENERGY↗

2017 Hydropower Market Report

The U.S. hydropower fleet represents 7% of total electricity generation installed capacity (as of the end of 2016) and produces 6.3% of electricity (2014-2016 average). In addition, 43 pumped storage hydropower (PSH) plants with a total capacity of 21.6 GW provide 95% of utility-scale electrical energy storage in the United States. The U.S. fleet is the third largest in the world for both hydropower and PSH.

13 HYDRO ENERGY↗

Role of Alternative Energy Sources: Hydropower Technology Assessment

This report discusses the role of hydropower in meeting the energy needs of the United States (U.S.). This includes an analysis of key issues related to hydropower and, where applicable, the modeling of the environmental and cost aspects of hydropower. Conventional hydropower is a significant source of electricity in the U.S. In 2009, conventional hydropower in the United States produced 253 terawatt-hours of electricity, equivalent to 72 percent of total renewable power generation or 6.9 percent of the total power generation in the United States during that year. The capacity of installed hydropower has remained relatively flat since 2000 (near 77 GW). The resource base for very large hydropower sites in the U.S. has already been developed. However, many smaller conventional hydropower sites, such as those with capacities up to 400 MW, are still available along with upgrades to existing facilities. Newer technologies for generating hydropower are emerging. For example, hydrokinetic systems harness the energy that is contained in water as it moves past a fixed point by employing in stream turbines that typically resemble small scale horizontal axis wind turbines. New hydrokinetic turbines are currently being installed along the Mississippi River system.

13 HYDRO ENERGY↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗

Department of Energy Water Power Technologies Office Cyber Response & Recovery Flipbook [Slides]

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Cyber Response & Recovery Flipbook is to be used at a hydroelectric plant to quickly respond to an anomalous event. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a report on the processes of building this flip book based on a large set of existing guidance. The second, a handy guide of hydroelectric and cyber guidance in responding to the cyber and physical systems within a hydroelectric plant. And the third is a correlated alignment of the steps an hydroelectric plant operator would take for both a cyber incident as well as an emergency response process if the event rises to a cyber incident affecting the safe and reliable operations of a hydroelectric plant.

13 HYDRO ENERGY↗

Hydroelectric Cybersecurity Response and Recovery Overview

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Cyber Response & Recovery Overview document discusses the process of defining how a hydroelectric plant might respond to and recover from an anomalous event. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a handy flip book that guides an operator in the midst of a cyber event through the R&R process of the incident and if the event warrants, through an emergency action plan to recover the plant itself. The second, a handy guide of hydroelectric and cyber guidance in responding to the cyber and physical systems within a hydroelectric plant. And the third is a correlated alignment of the steps an hydroelectric plant operator would take for both a cyber incident as well as an emergency response process if the event rises to a cyber incident affecting the safe and reliable operations of a hydroelectric plant.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

WPTO Comprehensive References [Poster]

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Cyber Comprehensive Reference list is to be used at a hydroelectric plant to quickly go to appropriate sources during the response and recovery of a cyber incident. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a report on the processes of building a R&R flip book based on a large set of existing guidance. The second, a handy flip book meant to be distributed to hydroelectric plants to assist them during a cybersecurity incident occurring on a hydroelectic plant. And the third is a correlated alignment of the steps an hydroelectric plant operator would take for both a cyber incident as well as an emergency response process if the event rises to a cyber incident affecting the safe and reliable operations of a hydroelectric plant.

13 HYDRO ENERGY↗