High Resolution X-ray Imaging

NAG5-5020 covered a period of 7.5 years during which a great deal of progress was made in x-ray optical techniques under this grant. We survived peer review numerous times during the effort to keep the grant going. In 1994, when the grant started we were actively pursuing the application of spherical mirrors to improving x-ray telescopes. We had found that x-ray detectors were becoming rapidly more sophisticated and affordable, but that x-ray telescopes were only being improved through the intense application of money within the AXAF program. Clearly new techniques for the future were needed. We were successful in developing and testing at the HELSTF facility in New Mexico a four reflection coma-corrected telescope made from spheres. We were able to demonstrate 0.3 arcsecond resolution, almost to the diffraction limit of the system. The community as a whole was, at that time, not particularly interested in looking past AXAF (Chandra) and the effort needed to evolve. Since we had reached the diffraction limit using non-Wolter optics we then decided to see if we could build an x-ray interferometer in the laboratory. In the lab the potential for improved resolution was substantial. If synthetic aperture telescopes could be built in space, then orders of magnitude improvement would become feasible. In 1998 NASA, under the direction of Dr Nick White of Goddard, started a study to assess the potential and feasibility of x-ray interferometry in space. My work became of central interest to the committee because it indicated that such was possible. In early 1999 we had the breakthrough that allowed us build a practical interferometer. By using flats and hooking up with the Marshall Space Flight Center facilities we were able to demonstrate fringes at 1.25keV on a one millimeter baseline. This actual laboratory demonstration provided the solid proof of concept that NASA needed. As the year progressed the future of x-ray astronomy jelled around the Maxim program. Maxim is a set of two major x-ray astronomy missions based on the concepts I developed and demonstrated under this SR&T grant. The first Maxim is to image the sky at 100 micro-arcsecond resolution. That is one thousand times higher resolution than Hubble. The full Maxim has the ultimate goal of imaging the event horizon of a black hole in an active galactic nucleus (ALAN). This will require 0.1 micro-arcsecond resolution - one million times higher than Hubble! Nonetheless, using the techniques developed under this grant, it has become possible. Maxim Pathfinder is now in the NASA planning for a new start in approximately 20 10. The full Maxim is carried as a vision mission for the post 2015 timeframe. Finally, this grant is the evolved version of the SR&T grant we carried during the 1980s and up to 1994. At that point in time this grant was also working on x-ray optics, but concentrating on x-ray spectroscopy. The techniques developed by 1990 were not chosen for use on Chandra or XMM-Newton because they were too new. During the last year, however, the Constellation-X mission recognized the need for better spectroscopy techniques and tapped our expertise. We were able to support the initial work on Con-X through this program. It now appears that the off-plane mount will be used in Con-X, increasing performance and decreasing cost and risk.

Cash, Webster↗

The CERES S'COOL Project: Operational but not Routine

The first Clouds and the Earth's Radiant Energy System (CERES) instrument has been returning useful data on Earth's radiation budget from the Tropical Rainfall Measuring Mission (TRMM) spacecraft since late 1997. Validation of the initial data is now intensively underway. As one component of this validation, the CERES Students Cloud Observations On-Line (S'COOL) project has been operational since April 1998 - the 2nd CERES validation month. S'COOL involves school children in over 140 schools in 15 countries on 5 continents in making and reporting observations and measurements which they and CERES scientists can then compare to the satellite retrievals. The project is planned to continue through the life of the CERES Project (nominally 15 years), and new participants are invited to join on a continuous basis. This paper will report on the first year of the operational phase of the project, during which a number of exciting events occurred (a demonstration of the project to First Lady Hillary Rodham Clinton, and visits by CERES personnel to participating schools, among others). It will further report on some of the noteworthy observations and comparisons which have been made possible by this project. We have found that schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper will also report on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students minds as a result of their active participation.

Chambers, Lin H.↗

The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

Kickstart Your Federal Microgrid Resiliency Project: Financing Opportunities and Best Practices

Recent high-impact events such as hurricanes and wildfires have resulted in the loss of utility grid power to federal sites, highlighting the need for energy system resilience. To sustain critical functions, site loads may need to operate during an electric grid outage or at least have power restored quickly after the event. A microgrid can provide reliable backup power to critical loads when electric utility power is interrupted, and may also provide value during normal operations.

DER↗

Direct Observation of Cosmic Strings Via Their Strong Gravitational Lensing Effect. 1. Predictions for High Resolution Imaging Surveys

We use current theoretical estimates for the density of long cosmic strings to predict the number of strong gravitational lensing events in astronomical imaging surveys as a function of angular resolution and survey area. We show that angular resolution is the single most important factor, and that interesting limits on the dimensionless string tension G{mu}/c{sup 2} can be obtained by existing and planned surveys. At the resolution of the Hubble Space Telescope (0'.14), it is sufficient to survey of order a square degree -- well within reach of the current HST archive -- to probe the regime G{mu}/c{sup 2} {approx} 10{sup -8}. If lensing by cosmic strings is not detected, such a survey would improve the limit on the string tension by an order of magnitude on that available from the cosmic microwave background. At the resolution (0'.028) attainable with the next generation of large ground based instruments, both in the radio and the infra-red with adaptive optics, surveying a sky area of order ten square degrees will allow us to probe the G{mu}/c{sup 2} {approx} 10{sup -9} regime. These limits will not be improved significantly by increasing the solid angle of the survey.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel – 19002

ABSTRACT In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO2) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO2, the container remained in storage. Treatment and disposal of the NaK and KO2 container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands–on instruction associated with: • Hazards associated with handling and using sodium and NaK • Proper personal protection equipment, spill control techniques, and first aid • Common design approaches for buildings, systems, and equipment used to contain sodium and NaK • What to expect in the event of a water reaction and how to respond • How to properly prepare for a fire and contain/extinguish small metal fires • A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability.

99 GENERAL AND MISCELLANEOUS↗

Nuclear Effects in Neutrino Detection

Although the interactions of neutrinos with elementary particles are described with impressive precision by the Standard Model, neutrino-nucleus reactions remain less well understood. Improvements in our knowledge of neutrino-nucleus scattering will be an important requirement for the success of future experimental efforts involving neutrinos at both low ($\sim$\SI{10}{\MeV}) and medium ($\sim$\SI{1}{\GeV}) energies. In the low energy regime, the planned DUNE experiment will attempt to observe neutrinos from a nearby core-collapse supernova using liquid argon time projection chambers (LArTPCs). Unlike other large neutrino detectors, which are primarily sensitive to electron antineutrinos, DUNE will observe mostly charged current absorptions of electron neutrinos on \isotope[40]{Ar} in response to a supernova, providing a unique window into the physics of stellar collapse. Despite the importance of low-energy neutrino-nucleus reactions to DUNE's supernova physics goals, prior to the work presented in this thesis, no thorough consideration of the many possible final states generated by neutrino-argon scattering, including those involving the emission of nucleons or heavier nuclear fragments, had yet been attempted in the literature for the energy range of interest for supernova neutrinos. To aid DUNE's supernova physics program, this thesis presents a detailed theoretical model of low-energy neutrino-argon scattering. This model has been implemented within a new event generator called MARLEY (Model of Argon Reaction Low Energy Yields) which may be used to simulate realistic $\isotope[40]{Ar}(\nu_e,e^-)\isotope[40]{K}^*$ events for LArTPC supernova neutrino sensitivity studies. At medium energies, large theoretical uncertainties in predictions of neutrino-induced neutron production present a problem for precision neutrino oscillation experiments, attempts to discover the Diffuse Supernova Neutrino Background, and searches for proton decay. To const rain the widely-varying predictions of current nuclear model! s, the Accelerator Neutrino Neutron Interaction Experiment (ANNIE) collaboration plans to make a systematic measurement of neutron production by neutrino interactions in water. Because the ANNIE experimental hall is located only \SI{100}{\meter} away from the Fermilab Booster Neutrino Beam target, background neutrons correlated in time with the beam could potentially interfere with this proposed measurement. As a first step toward ANNIE's ultimate physics goals, this thesis presents an analysis of background neutron rates as a function of position within the ANNIE detector. These rates are found to be small enough for the neutron yield measurements to proceed as planned.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SU-C-BRF-01: Correlation of DIBH Breath Hold Amplitude with Dosimetric Sparing of Heart and Left Anterior Descending Artery in Left Breast Radiotherapy

Purpose: A 7.4% increase in major coronary events per 1 Gy increase in mean heart dose has been reported from the population-based analysis of radiation-induced cardiac toxicity following treatment of left sided breast cancer. Deep inhalation breath-hold (DIBH) is clinically utilized to reduce radiation dose to heart and left anterior descending artery (LAD). We investigated the correlation of dose sparing in heart and LAD with internal DIBH amplitude to develop a quantitative predictive model for expected dose to heart and LAD based on internal breath hold amplitude. Methods: A treatment planning study (Prescription Dose = 50 Gy) was performed on 50 left breast cancer patients underwent DIBH whole breast radiotherapy. Two CT datasets, free breathing (FB) and DIBH, were utilized for treatment planning and for determination of the internal anatomy DIBH amplitude (difference between sternum position at FB and DIBH). The heart and LAD dose between FB and DIBH plans was compared and dose to the heart and LAD as a function of breath hold amplitude was determined. Results: Average DIBH amplitude using internal anatomy was 13.9±4.2 mm. The DIBH amplitude-mean dose reduction correlation is 20%/5mm (0.3 Gy/5mm) for the heart and 18%/5mm (1.1 Gy/5mm) for LAD. The correlation with max dose reduction is 12%/5mm (3.8 Gy/5mm) for the heart and 16%/5mm (3.2 Gy/5mm) for LAD. We found that average dose reductions to LAD from 6.0±6.5 Gy to 2.0±1.6 Gy with DIBH (4.0 Gy reduction: -67%, p < 0.001) and average dose reduction to the heart from 1.3±0.7 Gy to 0.7±0.2 Gy with DIBH (0.6 Gy reduction: -46%, p < 0.001). That suggests using DIBH may reduce the risk of the major coronary event for left sided breast cancer patients. Conclusion: The correlation between breath hold amplitude and dosimetric sparing suggests that dose sparing linearly increases with internal DIBH amplitude.

60 APPLIED LIFE SCIENCES↗

Post Launch Calibration and Testing of the Geostationary Lightning Mapper on GOES-R Satellite

The Geostationary Operational Environmental Satellite R (GOES-R) series is the planned next generation of operational weather satellites for the United States National Oceanic and Atmospheric Administration (NOAA). The National Aeronautics and Space Administration (NASA) is procuring the GOES-R spacecraft and instruments with the first launch of the GOES-R series planned for October 2016. Included in the GOES-R Instrument suite is the Geostationary Lightning Mapper (GLM). GLM is a single-channel, near-infrared optical detector that can sense extremely brief (800 s) transient changes in the atmosphere, indicating the presence of lightning. GLM will measure total lightning activity continuously over the Americas and adjacent ocean regions with near-uniform spatial resolution of approximately 10 km. Due to its large CCD (1372x1300 pixels), high frame rate, sensitivity and onboard event filtering, GLM will require extensive post launch characterization and calibration. Daytime and nighttime images will be used to characterize both image quality criteria inherent to GLM as a space-based optic system (focus, stray light, crosstalk, solar glint) and programmable image processing criteria (dark offsets, gain, noise, linearity, dynamic range). In addition ground data filtering will be adjusted based on lightning-specific phenomenology (coherence) to isolate real from false transients with their own characteristics. These parameters will be updated, as needed, on orbit in an iterative process guided by pre-launch testing. This paper discusses the planned tests to be performed on GLM over the six-month Post Launch Test period to optimize and demonstrate GLM performance.

validation↗

Post Launch Calibration and Testing of the Geostationary Lightning Mapper on the GOES-R Satellite

The Geostationary Operational Environmental Satellite R (GOES-R) series is the planned next generation of operational weather satellites for the United States National Oceanic and Atmospheric Administration (NOAA). The National Aeronautics and Space Administration (NASA) is procuring the GOES-R spacecraft and instruments with the first launch of the GOES-R series planned for October 2016. Included in the GOES-R Instrument suite is the Geostationary Lightning Mapper (GLM). GLM is a single-channel, near-infrared optical detector that can sense extremely brief (800 microseconds) transient changes in the atmosphere, indicating the presence of lightning. GLM will measure total lightning activity continuously over the Americas and adjacent ocean regions with near-uniform spatial resolution of approximately 10 km. Due to its large CCD (1372x1300 pixels), high frame rate, sensitivity and onboard event filtering, GLM will require extensive post launch characterization and calibration. Daytime and nighttime images will be used to characterize both image quality criteria inherent to GLM as a space-based optic system (focus, stray light, crosstalk, solar glint) and programmable image processing criteria (dark offsets, gain, noise, linearity, dynamic range). In addition ground data filtering will be adjusted based on lightning-specific phenomenology (coherence) to isolate real from false transients with their own characteristics. These parameters will be updated, as needed, on orbit in an iterative process guided by pre-launch testing. This paper discusses the planned tests to be performed on GLM over the six-month Post Launch Test period to optimize and demonstrate GLM performance.

validation↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) because of storm runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work was intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. The meteorological station collected air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content data. The maximum, minimum, and average or total values (as appropriate) for each of these parameters were recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrologic station were also recorded for each 10-minute interval. This report presents the data collected from these stations during fiscal year (FY) 2019. During the FY2019 reporting period, the warmest months were June, July, and August and the coldest were December and February. The highest monthly solar radiation (i.e., sunshine) values were recorded in June, July, and August, whereas December through February had the lowest solar radiation values. Monthly mean wind speeds were highest in the spring (April) and early summer (June). Winds were predominantly from the north, except in February, July, August, and September when winds were mostly from the west. The monthly average relative humidity ranged from 17 percent to approximately 60 percent. Humidity was lowest in the summer and highest in the winter. Monthly total precipitation ranged from 0.0 during August and September to 2.22 inches (in) (56.39 millimeters [mm]) in February. Total precipitation for FY2019 was 7.83 in (198.88 mm). During the reporting period, a single, nonzero, flow event was recorded at the flume. This occurred over two days between March 6 and 7, 2019, in response to 1.16 in (29.46 mm) of precipitation falling within 9.3 hours on March 6, 2019. This event produced a peak water depth of 0.39 in (0.99 centimeters [cm]) in the flume, and runoff was measured for approximately 23.5 hours. However, the maximum recorded flow depth was less than the limit for flow discharge and velocity that can be calculated for the six-inch (15 cm) throat of a Parshall flume. The runoff event produced insufficient flow velocities through the natural channel to cause local erosion and transport of bedload materials. No bedload samples were collected for radiological analysis. Observing meteorological and environmental conditions that lead to storm runoff will help identify the parameters and threshold conditions that should be incorporated into post-closure monitoring plans for this and similar Soils CAU sites. Routine monitoring of meteorological and hydrologic parameters at the Smoky Site CA has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition was completed and the meteorological and runoff monitoring stations were removed from the Smoky Site on October 15, 2019.

54 ENVIRONMENTAL SCIENCES↗

Towards Risk-Informed Performance-Based Emergency Planning: Review of Regulation, Guidance, and Methods

At a fundamental level, nuclear facility safety is built upon the concept of defense-in-depth (DID), which entails multiple, independent layers of protection for public health and safety. Within the DID structure, emergency preparedness (EP) is the last layer of defense and provides reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. Over several decades, the EP regulatory framework has evolved in response to lessons learned from actual events, experience with maintaining and testing EP capabilities, and advances in a wide range of technologies. Furthering this evolution, recent developments in risk-informed performance-based (RIPB) design and licensing approaches provide an opportunity to leverage insights regarding the attributes of the specific facility and site to inform EP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel - 19002

In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO{sub 2}) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO{sub 2}, the container remained in storage. Treatment and disposal of the NaK and KO{sub 2} container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands-on instruction associated with: - Hazards associated with handling and using sodium and NaK; - Proper personal protection equipment, spill control techniques, and first aid; - Common design approaches for buildings, systems, and equipment used to contain sodium and NaK; - What to expect in the event of a water reaction and how to respond; - How to properly prepare for a fire and contain/extinguish small metal fires; - A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AOI2 - Initial Engineering, Testing, and Design of a Commercial-Scale Postcombustion CO 2 Capture System on an Existing Coal-Fired Generating Unit (Project Carbon)

The continued long-term use of North Dakota lignite is likely dependent on creating a business case for carbon capture, utilization, and storage (CCUS) that also addresses society’s desire to reduce carbon emissions. CCUS coupled with enhanced oil recovery appears to be the most feasible option for utilities to sustain and grow the lignite industry. Establishing a market where lignite-powered utilities provide carbon dioxide (CO 2 ) to oil producers depends upon having a cost-effective method to capture CO 2 . The application of CO 2 capture technology to lignite-fired flue gas has challenges in addition to the cost of capture, including the effects of the buildup of heat-stable salts, aerosol formation, degradation of solvents or solid sorbents, or subsequent solvent loss. Lignite, especially North Dakota lignite, presents its own set of challenges that include the combination of high sodium, sulfur, and ash contents; NO x reduction; and footprint limitations. Project Carbon was designed to address these technical barriers and provide pre-FEED (preliminary front-end engineering and design) information necessary for additional commercial demonstrations to move forward. A long-term pilot-scale evaluation of Mitsubishi Heavy Industries’ (MHI’s) KS-1™ solvent at Minnkota Power Cooperative’s lignite-fired Milton R. Young Station Unit 2 (MRY2) was a major objective of the project. The purpose of the test was to demonstrate the technology’s compatibility with MRY2’s flue gas over an extended period of time. During the long-term test, aerosol sampling and measurement were performed, and a pilot-scale baghouse was tested to determine the effect of bag material and operation on aerosol concentrations in the flue gas. Project engineering and design work were performed to support the other major project objective: a pre-FEED study of CO 2 capture at MRY2. Finally, a techno-economic assessment (TEA) of the application of CO 2 capture to MRY2 was performed. This project was performed over a period of 28 months, with a total budget of $12,700,000. The U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory, through the Energy & Environmental Research Center’s (EERC’s) Cooperative Agreement, the North Dakota Industrial Commission, and industry partners ALLETE and Minnkota Power Cooperative, funded the project. The pilot-scale test system at MRY2 performed very well for the continuous test period of 83 days. The CO 2 capture plant achieved stable operation while utilizing MHI’s KS-1™ solvent and the MHI amine emission reduction unit. No major concerns were encountered when capturing CO 2 from lignite-fired flue gas. Challenges were encountered because the cooling water temperature was warmer than needed for the capture system to operate efficiently. This affected the ability of the solvent to capture CO 2 and promoted solvent loss through solvent entrainment caused by high CO 2 gas temperature within a cyclone separator. The KS-1™ solvent and the lignite-derived flue gas were analyzed during the long-term test. Analysis of the solvent indicates that, although some metals and heat-stable salts increased over the course of the long-term test, they were at levels that can be treated with filtration and reclaiming and do not pose a concern for effective solvent operation. Fourier transform infrared (FTIR) spectrometry was successfully used to determine the composition of the lignite-derived flue gas as well as concentrations of select components of the flue gas at various locations within the EERC’s CO 2 capture system. The formation of aerosols during the capture process is of interest, as are approaches for their reduction, especially in a baghouse. Testing of aerosol removal was performed using the EERC’s portable baghouse. It was found that both Ryton and polytetrafluoroethylene (PTFE) membrane bags were effective at reducing the level of aerosols during steady-state operation. During backpulse events, however, the amount of aerosols passing through the bags was an order of magnitude lower for the Ryton bags than the PTFE membrane bags. The testing showed that proper design of the baghouse air-to-cloth ratio as well as minimization of backpulsing can dramatically reduce the amount of aerosols that pass through the bags and remain in the flue gas stream exiting a baghouse system. A technology maturation plan (TMP) was performed to enable successful development of the Kansai Mitsubishi Carbon Dioxide Recovery® (KM CDR®) Process for application to a combustion flue gas for which the process has not yet been demonstrated. In the TMP, new challenges to the MHI CO 2 capture technology during its application to MRY2 were identified. These challenges included capture from lignite-fired (as opposed to subbituminous coal-fired) flue gas, a larger scope than previous applications of the technology, and implementation in a colder climate that could affect process and equipment operability. Because MRY2 is located where stack icing in the winter could be problematic, a rime icing study was performed. Rime icing modeling indicated that, under both 100% and 50% operating loads, there is a potential for many icing events during any given part of the year in which below-freezing weather conditions exist. The models showed that a critical amount of rime ice could be formed at the stack top during two or more events per year. CO 2 capture plant stack height and location will need to be determined in order to minimize the formation of rime ice. It was found that the integration of the MHI CO 2 capture process into the normal operation of the MRY2 steam turbine is a viable alternative to a cogeneration facility to provide steam and power for the carbon capture facility. The research performed under this project showed that CO 2 capture at a lignite-fired power plant can successfully be performed. No known fatal flaws that would prevent the continued development of the MRY2 CO 2 capture facility were identified during the pre-FEED study. A TEA performed following DOE methodology shows that applying capture technology to MRY2 may not only meet but exceed the DOE-recognized state-of-the-art baseline.

20 FOSSIL-FUELED POWER PLANTS↗

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating grid stress and reliability in future electricity grids across a range of demand, generation mix, and weather trends

The reliability of power grids in the future will depend on how system planners account for the integration of new technologies, extreme weather events, and uncertainties in demand growth from increased electrification and data centers. This study introduces an open-source, multisectoral, multiscale modeling framework that projects grid stress and reliability trends between 2020 and 2055 in the Western Interconnection of the United States. The framework integrates global to national energy-water-land dynamics with power plant siting and hourly grid operations modeling. We analyze future wholesale electricity price shocks and unserved energy events across eight scenarios spanning a range of population growth and economic change, generation mixes, and weather conditions. Our results show future grids with high percentage of non-renewable generation and strong economic growth are characterized by higher reliability and lower wholesale electricity prices than lower growth scenarios because of larger reliance on dispatchable generators and lower fossil fuel extraction costs. Scenarios with high percentage of renewable resources have lower median but more volatile wholesale electricity prices as well as more frequent and severe unserved energy events compared to scenarios relying more on dispatchable generators. These events occur because higher proportion of solar and wind energy causes net demand curves to deepen during midday (duck curves get progressively severe), exacerbating the challenge of meeting demand during summer evening peaks. This study suggests that robust and co-optimized transmission and energy storage planning could help maintain low wholesale electricity prices and high reliability levels in future electricity grids across uncertainties in generation mixes.

Electric grid reliability↗

Monitoring data transfer latency in CMS computing operations

During the first LHC run, the CMS experiment collected tens of Petabytes of collision and simulated data, which need to be distributed among dozens of computing centres with low latency in order to make efficient use of the resources. While the desired level of throughput has been successfully achieved, it is still common to observe transfer workflows that cannot reach full completion in a timely manner due to a small fraction of stuck files which require operator intervention.For this reason, in 2012 the CMS transfer management system, PhEDEx, was instrumented with a monitoring system to measure file transfer latencies, and to predict the completion time for the transfer of a data set. The operators can detect abnormal patterns in transfer latencies while the transfer is still in progress, and monitor the long-term performance of the transfer infrastructure to plan the data placement strategy.Based on the data collected for one year with the latency monitoring system, we present a study on the different factors that contribute to transfer completion time. As case studies, we analyze several typical CMS transfer workflows, such as distribution of collision event data from CERN or upload of simulated event data from the Tier-2 centres to the archival Tier-1 centres. For each workflow, we present the typical patterns of transfer latencies that have been identified with the latency monitor.We identify the areas in PhEDEx where a development effort can reduce the latency, and we show how we are able to detect stuck transfers which need operator intervention. Lastly, we propose a set of metrics to alert about stuck subscriptions and prompt for manual intervention, with the aim of improving transfer completion times.

97 MATHEMATICS AND COMPUTING↗

Streak camera meeting summary

Streak cameras are important for high-speed data acquisition in single event experiments, where the total recorded information (I) is shared between the number of measurements (M) and the number of samples (S). Topics of this meeting included: streak camera use at the national laboratories; current streak camera production; new tube developments and alternative technologies; and future planning. Each topic is summarized in the following sections.