Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commanding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Ascent, Transition, Entry, and Abort Guidance Algorithm Design for the X-33 Vehicle

One of the primary requirements for X-33 is that it be capable of flying autonomously. That is, onboard computers must be capable of commanding the entire flight from launch to landing, including cases where a single engine failure abort occurs. Guidance algorithms meeting these requirements have been tested in simulation and have been coded into prototype flight software. These algorithms must be sufficiently robust to account for vehicle and environmental dispersions, and must issue commands that result in the vehicle operating, within all constraints. Continual tests of these algorithms (and modifications as necessary) will occur over the next year as the X-33 nears its first flight. This paper describes the algorithms in use for X-33 ascent, transition, and entry flight, as well as for the powered phase of PowerPack-out (PPO) aborts (equivalent in thrust impact to losing an engine). All following discussion refers to these phases of flight when discussing guidance. The paper includes some trajectory results and results of dispersion analysis.

Hanson, John M.↗

Pioneer Venus Orbiter Ultraviolet Spectrometer: Operations and Data Analysis

The Pioneer Venus spacecraft orbited Venus 5,055 times between 4th December 1978 and 6th October 1992, before entering Venus' atmosphere and burning up on the latter date. On 255 of these orbits, science operations were suspended because of superior conjunction (Venus' proximity to the Sun as seen from Earth). Of the remaining 4800 orbits, about 85% yielded good-quality OUVS science data; 15% were lost to various problems, including loss of uplink (commands) to and downlink (data) from the spacecraft, errors in commanding OUVS, and one or other of the two instrument anomalies mentioned below.

Stewart, A. I. F.↗

AAH Cage Out-Link and In-Link Antenna Characterization

This final report encapsulates the accomplishments of the third year of work on an Advanced Biotelemetry System (ABTS). Overall MU/ABTS project objectives are to provide a biotelemetry system that can collect data from and send commands to an implanted biotransceiver. This system will provide for studies of rodent development in space. The system must be capable of operating in a metal animal cage environment. An important goal is the development of a small, "smart", micropower, implantable biotransceiver with eight-channel data output and single channel command input capabilities with the flexibility for easy customization for a variety of physiologic investigations. The NASA Ames/Marquette University Joint Research work has been devoted to the system design of such a new state of the art biotelemetry system, having multiple physiologic inputs, and bi-directional data transfer capabilities. This work has provided a successful prototype system that connects, by two-way radio links, an addressable biotelemetry system that provides communication between an animal biotelemeter prototype and a personal computer. The operational features of the prototype system are: (1) two-way PCM communication with implanted biotelemeter; (2) microcontroller based biotelemeter; (3) out-link: wideband FSK (60 kBaud); (4) in-link: OOK (2.4 kbaud); (5) septum antenna arrays (In/Out-Links); and (6) personal computer data interface. The important requirement of this third year's work, to demonstrate two-way communication with transmit and receive antennas inside the metal animal cage, has been successfully accomplished. The advances discussed in this report demonstrate that the AAH cage antenna system can provide Out-link and In-link capability for the ABTS bi-directional telemetry system, and can serve as a benchmark for project status. Additions and enhancements to the most recent (April 1997) prototype cage and antenna have been implemented. The implementation, testing, and documentation was accomplished at the Biotelemetry Laboratory at Marquette University with Out-Link (slot) antenna design assistance was provided.

Jeutter, Dean C.↗

AAH Cage Out-Link and In-Link Antenna Characterization

This final report encapsulates the accomplishments of the third year of work on an Advanced Biotelemetry System (ABTS). Overall MU/ABTS project objectives are to provide a biotelemetry system that can collect data from and send commands to an implanted biotransceiver. This system will provide for studies of rodent development in space. The system must be capable of operating in a metal animal cage environment. An important goal is the development of a small, "smart", micropower, -channel data output and single channel command implantable biotransceiver with eight input capabilities with the flexibility for easy customization for a variety of physiologic investigations. The NASA Ames/Marquette University Joint Research work has been devoted to the system design of such a new state of the art biotelemetry system, having multiple physiologic inputs, and bi-directional data transfer capabilities. This work has provided a successful prototype system that connects, by two-way radio links, an addressable biotelemetry system that provides communication between an animal biotelemeter prototype and a personal computer. The operational features of the prototype system are listed below: Two-Way PCM Communication with Implanted Biotelemeter Microcontroller Based Biotelemeter Out-Link: Wideband FSK (60 kbaud) In-Link: OOK (2.4 kbaud) Septum Antenna Arrays (In/Out-Links) Personal Computer Data Interface The important requirement of this third year's work, to demonstrate two-way communication with transmit and receive antennas inside the metal animal cage, has been successfully accomplished. The advances discussed in this report demonstrate that the AAH cage antenna system can provide Out-link and In-link capability for the ABTS bi-directional telemetry system, and can serve as a benchmark for project status.

Jeutter, Dean C.↗

STS-88 Day 04 Highlights

On this forth day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei are awakened to the sounds of "Somewhere Over the Rainbow," requested by Commander Bob Cabana's daughter, Sarah. With the three-story-high Unity connecting module latched upright in the shuttle's payload bay, Cabana takes manual control of the shuttle as it moves to within about a half-mile of Zarya. Cabana and Sturckow execute a sequence of maneuvers that will bring Endeavour directly above the module. Currie uses the robotic arm to capture the module. She then positions Zarya above Unity's docking mechanism.

Source record↗

STS-88 Day 03 Highlights

On this third day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev check out the various tools they will use during the three scheduled spacewalks to be conducted later in the flight. They then begin an early set-up of the Shuttle's airlock in preparation for that first spacewalk. Newman and Russian cosmonaut Sergei Krikalev take part in an on-line interview by the New York Times. Currie is seen placing Unity just inches above the extended outer ring on Endeavour's docking mechanism, enabling Commander Bob Cabana to fire downward maneuvering jets to lock the shuttle's docking system to one of two Pressurized Mating Adapters (PMA's) attached to Unity.

Source record↗

STS-93 Flight Day 1 Highlights and Crew Activities

On this first day of the STS-93 Columbia mission, the flight crew, Commander Eileen Collins, Pilot Jeff Ashby and Mission Specialists Cady Coleman, Steve Hawley and Michael Tognini deployed the Chandra X-Ray Observatory into space. This was done after a full night of work and preparation. Chandra will study the invisible, and often violent mysteries of x-ray astronomy. Commander Collins maneuvered Columbia to a safe distance away from the telescope as an internal timer counted down to the first of a two-phase ignition of the Inertial Upper Stage. After switching to internal battery power until its solar rays are deployed, the telescope reaches an oval orbit one-third the distance to the Moon to conduct its astronomical observations. Since Chandra is safely on its way and the major objective of their mission is successfully completed, the astronauts end their long day and begin an eight hour sleep period.

Source record↗

Optimal Variable-Structure Control Tracking of Spacecraft Maneuvers

An optimal control approach using variable-structure (sliding-mode) tracking for large angle spacecraft maneuvers is presented. The approach expands upon a previously derived regulation result using a quaternion parameterization for the kinematic equations of motion. This parameterization is used since it is free of singularities. The main contribution of this paper is the utilization of a simple term in the control law that produces a maneuver to the reference attitude trajectory in the shortest distance. Also, a multiplicative error quaternion between the desired and actual attitude is used to derive the control law. Sliding-mode switching surfaces are derived using an optimal-control analysis. Control laws are given using either external torque commands or reaction wheel commands. Global asymptotic stability is shown for both cases using a Lyapunov analysis. Simulation results are shown which use the new control strategy to stabilize the motion of the Microwave Anisotropy Probe spacecraft.

John L. Crassidis↗

Development and Implementation of a Load-Controlled Friction Stir Welder

Lockheed Martin Michoud Space Systems, under contract to NASA/MSFC, has developed and implemented a friction stir weld tool that uses the magnitude of the spindle axial load to control the weld process. This tool was used during the process development phase and the assembly of a full-scale External Tank barrel section. Both position and load transducers are incorporated into the welder. The control algorithm allows either the position or load transducer to provide the command variable in a closed loop system. Initially, the position transducer was used to actively control the weld process and the axial load on the spindle was monitored and collected via data acquisition hardware. As part of the process development, the axial load was implemented as the command variable in the closed loop. The spindle position is monitored and used to set limits on spindle travel. A zero set point algorithm has also been developed for establishing the spindle position at the start of the weld process. In its current state, the welder operates in a dual mode in which the position control is used to plunge the pin tool to a specified depth at the initiation of the weld. The load control is then used to control the weld process. This control algorithm has been used to assemble a 27.5-ft diameter, 2195-T8 barrel using hardware designed for NASA's Space Transportation System External Tank.

Loftus, Z.↗

A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule for acquiring images of the "best" 250 scenes daily for refreshing the global archive. It then equitably distributes the remaining resources for acquiring up to 430 scenes to satisfy requests by international subscribers. The image scheduler selects candidate scenes based on priority and age of the requests, and predicted cloud cover and sun angle at each scene. It also selects these scenes to avoid instrument constraint violations and maximizes efficiency of resource usage by encouraging acquisition of scenes in clusters. Of particular interest to the mission planners, it produces the resulting schedule in a reasonable time, typically within 15 minutes.

Potter, William↗

Optimal Output Trajectory Redesign for Invertible Systems

Given a desired output trajectory, inversion-based techniques find input-state trajectories required to exactly track the output. These inversion-based techniques have been successfully applied to the endpoint tracking control of multijoint flexible manipulators and to aircraft control. The specified output trajectory uniquely determines the required input and state trajectories that are found through inversion. These input-state trajectories exactly track the desired output; however, they might not meet acceptable performance requirements. For example, during slewing maneuvers of flexible structures, the structural deformations, which depend on the required state trajectories, may be unacceptably large. Further, the required inputs might cause actuator saturation during an exact tracking maneuver, for example, in the flight control of conventional takeoff and landing aircraft. In such situations, a compromise is desired between the tracking requirement and other goals such as reduction of internal vibrations and prevention of actuator saturation; the desired output trajectory needs to redesigned. Here, we pose the trajectory redesign problem as an optimization of a general quadratic cost function and solve it in the context of linear systems. The solution is obtained as an off-line prefilter of the desired output trajectory. An advantage of our technique is that the prefilter is independent of the particular trajectory. The prefilter can therefore be precomputed, which is a major advantage over other optimization approaches. Previous works have addressed the issue of preshaping inputs to minimize residual and in-maneuver vibrations for flexible structures; Since the command preshaping is computed off-line. Further minimization of optimal quadratic cost functions has also been previously use to preshape command inputs for disturbance rejection. All of these approaches are applicable when the inputs to the system are known a priori. Typically, outputs (not inputs) are specified in tracking problems, and hence the input trajectories have to be computed. The inputs to the system are however, difficult to determine for non-minimum phase systems like flexible structures. One approach to solve this problem is to (1) choose a tracking controller (the desired output trajectory is now an input to the closed-loop system and (2) redesign this input to the closed-loop system. Thus we effectively perform output redesign. These redesigns are however, dependent on the choice of the tracking controllers. Thus the controller optimization and trajectory redesign problems become coupled; this coupled optimization is still an open problem. In contrast, we decouple the trajectory redesign problem from the choice of feedback-based tracking controller. It is noted that our approach remains valid when a particular tracking controller is chosen. In addition, the formulation of our problem not only allows for the minimization of residual vibration as in available techniques but also allows for the optimal reduction fo vibrations during the maneuver, e.g., the altitude control of flexible spacecraft. We begin by formulating the optimal output trajectory redesign problem and then solve it in the context of general linear systems. This theory is then applied to an example flexible structure, and simulation results are provided.

Devasia, S.↗

Autonomous Navigation Using Celestial Objects

In the twenty-first century, National Aeronautics and Space Administration (NASA) Enterprises envision frequent low-cost missions to explore the solar system, observe the universe, and study our planet. Satellite autonomy is a key technology required to reduce satellite operating costs. The Guidance, Navigation, and Control Center (GNCC) at the Goddard Space Flight Center (GSFC) currently sponsors several initiatives associated with the development of advanced spacecraft systems to provide autonomous navigation and control. Autonomous navigation has the potential both to increase spacecraft navigation system performance and to reduce total mission cost. By eliminating the need for routine ground-based orbit determination and special tracking services, autonomous navigation can streamline spacecraft ground systems. Autonomous navigation products can be included in the science telemetry and forwarded directly to the scientific investigators. In addition, autonomous navigation products are available onboard to enable other autonomous capabilities, such as attitude control, maneuver planning and orbit control, and communications signal acquisition. Autonomous navigation is required to support advanced mission concepts such as satellite formation flying. GNCC has successfully developed high-accuracy autonomous navigation systems for near-Earth spacecraft using NASA's space and ground communications systems and the Global Positioning System (GPS). Recently, GNCC has expanded its autonomous navigation initiative to include satellite orbits that are beyond the regime in which use of GPS is possible. Currently, GNCC is assessing the feasibility of using standard spacecraft attitude sensors and communication components to provide autonomous navigation for missions including: libration point, gravity assist, high-Earth, and interplanetary orbits. The concept being evaluated uses a combination of star, Sun, and Earth sensor measurements along with forward-link Doppler measurements from the command link carrier to autonomously estimate the spacecraft's orbit and reference oscillator's frequency. To support autonomous attitude determination and control and maneuver planning and control, the orbit determination accuracy should be on the order of kilometers in position and centimeters per second in velocity. A less accurate solution (one hundred kilometers in position) could be used for acquisition purposes for command and science downloads. This paper provides performance results for both libration point orbiting and high Earth orbiting satellites as a function of sensor measurement accuracy, measurement types, measurement frequency, initial state errors, and dynamic modeling errors.

Folta, David↗

STS-93 Post Flight Presentation

An overview of Flight STS-93 is presented. The primary objective of the STS-93 mission was to deploy the Advanced X-Ray Astrophysics Facility (AXAF), also known as the Chandra X-ray Observatory. The mission flew on the Columbia Shuttle, on July 22, 1999. This facility is the most sophisticated X-ray observatory ever built. Other payloads on STS-93 were: (1) the Midcourse Space Experiment (MSX), (2) Shuttle Ionospheric Modification with Pulsed Local Exhaust (SIMPLEX), (3) Southwest Ultraviolet Imaging System (SWUIS), (4) Gelation of Sols: Applied Microgravity Research (GOSAMR), Space Tissue Loss-B (STL-B), (5) Light Weight Flexible Solar Array Hinge (LFSAH), (6) Cell Culture Module (CCM), and (7) the Shuttle Amateur Radio Experiment-II (SAREX-II), (8) EarthKam, (9) Plant Growth Investigations in Microgravity (PGIM), (10) Commercial Generic Bioprocessing Apparatus (CGBA), (11) Micro-Electrical Mechanical System (MEMS), and (12) the Biological Research in Canisters (BRIC). The crew was: Eileen M. Collins, Mission Commander, the first female shuttle commander; Jeffrey S. Ashby, Pilot; Steven A. Hawley , Mission Specialist; Catherine G. Coleman, Mission Specialist; Michel Tognini (CNES), Mission Specialist. The video contains views of life aboard the space shuttle. This mission featured both a night launching and a night landing at the Kennedy Space Center.

Source record↗

The Biolink Implantable Telemetry System

Most biotelemetry applications deal with the moderated data rates of biological signals. Few people have studied the problem of transcutaneous data transmission at the rates required by NASA's Life Sciences-Advanced BioTelemetry System (LS-ABTS). Implanted telemetry eliminate the problems associated with wire breaking the skin, and permits experiments with awake and unrestrained subjects. Our goal is to build a low-power 174-216MHz Radio Frequency (RF) transmitter suitable for short range biosensor and implantable use. The BioLink Implantable Telemetry System (BITS) is composed of three major units: an Analog Data Module (ADM), a Telemetry Transmitter Module (TTM), and a Command Receiver Module (CRM). BioLink incorporates novel low-power techniques to implement a monolithic digital RF transmitter operating at 100kbps, using quadrature phase shift keying (QPSK) modulation in the 174-216MHz ISM band. As the ADM will be specific for each application, we focused on solving the problems associated with a monolithic implementation of the TTM and CRM, and this is the emphasis of this report. A system architecture based on a Frequency-Locked Loop (FLL) Frequency Synthesizer is presented, and a novel differential frequency that eliminates the need for a frequency divider is also shown. A self sizing phase modulation scheme suitable for low power implementation was also developed. A full system-level simulation of the FLL was performed and loop filter parameters were determined. The implantable antenna has been designed, simulated and constructed. An implant package compatible with the ABTS requirements is also being proposed. Extensive work performed at 200MHz in 0.5um complementary metal oxide semiconductors (CMOS) showed the feasibility of integrating the RF transmitter circuits in a single chip. The Hajimiri phase noise model was used to optimize the Voltage Controlled Oscillator (VCO) for minimum power consumption. Two test chips were fabricated in a 0.5pm, 3V CMOS process. Measured phase noise for a 1.5mW, 200MHz ring oscillator VCO is -80dBc/Hz at 100KHZ offset, showing good agreement with the theory. We also propose a novel superregenerative receiver architecture for implementing the command receiver. The superregenerative receiver's simplicity, low cost, and low power consumption has made it the receiver of choice for short-distance data communications, remote control and home automation. We present the design of a superregenerative AM receiver implemented in a 0.5um CMOS technology that operates at 433.92MHz and dissipates only 300uW. Further work entails detailed transistor-level design of the FLL and superregenerative receiver and a monolithic implementation of an implantable transceiver in 0.5um CMOS technology.

Betancourt-Zamora, Rafael J.↗

STS-93 Mission Highlights Resource Tape

The STS-93 flight crew, Commander Eileen M. Collins, Pilot Jeffrey S. Ashby, and Mission Specialists Steven A. Hawley, Catherine G. Coleman, and Michel Tognini are seen performing pre-launch activities such as crew suit-up, and ride out to the launch pad for an early morning launch. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the White Room for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once on-orbit the primary objective is to deploy the Advanced X-ray Astrophysics Facility. Throughout the presentation, the astronauts take turns narrating particular aspects of the mission with which they are involved. Coleman and Tognini command Chandra to spring-eject from its cradle in the payload bay. The crew then work on the various experiments being carried out in flight. They successfully set up the first observatory using the Southwest Ultraviolet Imaging System (SWUIS). The SWUIS is used to image planets and other solar system bodies in order to explore their atmospheres and surfaces in the ultraviolet (UV) region of the spectrum. Tognini conducts a ham radio conversation with Jean-Pierre Haignere on the Mir Space Station. Towards the end of the mission Ashby, Hawley and Tognini set up an exercise treadmill and the Treadmill Vibration Information System (TVIS). The live footage ends with the reentry of Columbia into the Earth's Atmosphere. The night landing includes touchdown, deployment of the drag chute and crew departure from the vehicle.

Source record↗

STS-103: Flight Day 6 Highlights and Crew Activities Report

Discovery's astronauts (Mission Commander, Curtis L. Brown; Pilot, Scott J. Kelly; Mission Specialists, Steven L. Smith, C. Michael Foale, and John M. Grunsfeld; and (ESA) Mission Specialists, Claude Nicollier and Jean-Francois Clervoy) deliver a Christmas present to the world, putting the Hubble Space Telescope back into service after 24 hours and 33 minutes of repairs and upgrades that make the orbital observatory more capable than ever. European Space Agency Astronaut Jean-Francois Clervoy uses the shuttle's robot arm to release the telescope at 5:03 p.m. CST, then places the arm into an upright salute as Commander Curt Brown fires Discovery's steering jets to begin separating from the telescope. The telescope's re-deployment takes place at an altitude of 370 statute miles as the two spacecraft fly over the South Pacific's coral sea northeast of Australia. At 5:39 CST, Brown executes a second steering jet burn, lowering Discovery's orbit slightly, so that it will begin orbiting faster than the telescope and move away at just under 6 statute miles per orbit. Afterward, each of the seven astronauts on board calls down holiday wishes from space in several languages.

Source record↗

STS-96: Crew Arrival at the KSC Shuttle Landing Facility

The crew (Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev) arrive via fighter jets and assemble. A brief speech about the crew's duties during their mission is given by Commander Rominger.

Source record↗

STS-95: Post Landing and Crew Walkaround of the Orbiter at the Shuttle Landing Facility

After landing, the STS-95 crew (Commander Curtis L. Brown, Pilot Steven W. Lindsey, Mission Specialists Scott E. Parazynski, Stephen K. Robinson, Pedro Duque, Payload Specialists Chiaki Mukai and the legendary John H. Glenn) descend from the Space Shuttle. Commander Brown congratulates the crew and team photos are taken. The crew does a walkaround inspection of the spacecraft, then boards the bus for departure from the facility.

Source record↗