Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Development of the Mathematics of Learning Curve Models for Evaluating Small Modular Reactor Economics

The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well known based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs.

small modular reactors (SMRs)↗

Development of the Mathematics of Learning Curve Models for Evaluating Small Modular Reactor Economics

The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well known based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs. Thus, SMR deployment cost estimates can be modeled using learning curve theory to provide some insight into how and when SMRs would be competitive with both the GW-class reactors and other mutual competitors. However, assuming static learning curve behavior for all aspects of SMR construction is likely an invalid approach—not all components and systems in SMRs will be subject to learning, and those that are subject to learning may not learn at the same rate. A learning curvebased model must be capable of tracking these unique behaviors. At the same time, the behavior of the aggregated and integrated SMR deployment is a more useful metric for discussion and comparison—ultimately, the most useful learning curve information is that which describes power plant deployment as a whole. Therefore, the goal of SMR component and systems learning modeling includes a method to produce an overall power plant learning model. This report describes the mathematics of learning curves that can be used for estimating unit cost in future production for individual components and aggregated systems. All necessary assumptions are provided to support the derivations presented. Future work will demonstrate the implementation of this methodology and provide example calculations of SMR cost

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling Principles for Dual Participation by Energy Storage as a Transmission and Market Asset

Because the electric transmission system is sized to meet the highest levels of customer demand, much of its designed capacity goes unused during average operating conditions. As a uniquely flexible and scalable asset capable of providing multiple grid services, energy storage can be deployed to support the transmission system and then also provide services to energy markets when not needed for transmission. This paper reviews the technical barriers in transmission planning practices and energy market design that prevent the realization of dual-use energy storage projects that provide both regulated transmission and competitive market services. Current practices create barriers against the identification of energy storage in the transmission planning process and against the participation of a regulated transmission asset in competitive energy markets. A review of regional transmission plans identifies best practices for including energy storage in the planning process by directing planners to proactively identify such projects or by providing clear mechanisms for stakeholders to propose them. Creating a market participation model for dual-use energy storage assets requires establishing when an asset will be allowed to participate in the market, how it will participate in the market, and where it will recover its costs. In answering these questions, key principles must be satisfied, such as prioritizing reliability, incrementally building on existing market design, and balancing competing objectives. Several policy options exist for satisfying those principles, giving grid operators and stakeholders significant flexibility in developing a dual-use participation model in accordance with regional policies and conditions. By objectively framing the issue and identifying policy options, this paper may inform subsequent proceedings on dual-use energy storage and be a resource to regional market operators, utilities, developers, regulators, policymakers, and other stakeholders as they collectively work on this complex issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pathways for practical high-energy long-cycling lithium metal batteries

Lithium (Li)-ion batteries play a critical role in modern day technologies, but their specific energy (Wh kg-1) and energy density (Wh L-1) are approaching the maximum practically achievable values based on existing manufacturing processes with the conventional cathode and anode materials. Developing the next generation rechargeable batteries with a specific energy higher than 300 Wh kg-1, up to 500 Wh kg-1, is a significant challenge. This paper discusses the pathways to build the next generation 500 Wh kg-1 rechargeable Li battery based on Li metal anode and a high nickel-content lithium nickel-manganese-cobalt oxide (high-Ni NMC) cathode. The fundamental requirements and practical technical approaches will be explored to hopefully address this grand challenge. In particular, we discuss the detailed cell level requirements and parameters to achieve high energy density, as well as the significant scientific challenges and potential solutions, including but not limited to enable the direct utilization of Li metal anode with high efficiency and long-term cycling stability, dendrite-free Li metal deposition, high utilization of the cathode materials with high mass loading and reasonable electrode thickness along with minimum parasitic weight in the cathode side. The cell level understanding and validation of the materials properties for high performance and control of interfacial reactions across the whole cell will be explored. New concepts in emerging multifunctional materials and electrolytes/additives and their implications will also be discussed.

lithium metal anode, lithium nickel manganese coba↗

Rate capability and Ragone plots for phase change thermal energy storage

Phase change materials can improve the efficiency of energy systems by time shifting or reducing peak thermal loads. The value of a phase change material is defined by its energy and power density—the total available storage capacity and the speed at which it can be accessed. These are influenced by material properties but cannot be defined with these properties alone. In this work, we show the close link between energy and power density by developing thermal rate capability and Ragone plots, a framework widely used to describe the trade-off between energy and power in electrochemical storage systems (that is, batteries). Our results elucidate how material properties, geometry and operating conditions influence the performance of phase change thermal storage. This research sets a clear framework for comparing thermal storage materials and devices and can be used by researchers and designers to increase clean energy use with storage.

25 ENERGY STORAGE↗

Safety envelope for load tolerance of structural element design based on multi-stage testing

Structural elements, such as stiffened panels and lap joints, are basic components of aircraft structures. For aircraft structural design, designers select predesigned elements satisfying the design load requirement based on their load-carrying capabilities. Therefore, estimation of safety envelope of structural elements for load tolerances would be a good investment for design purpose. In this article, a method of estimating safety envelope is presented using probabilistic classification, which can estimate a specific level of failure probability under both aleatory and epistemic uncertainties. An important contribution of this article is that the calculation uncertainty is reflected in building a safety envelope using Gaussian process, and the effect of element test data on reducing the calculation uncertainty is incorporated by updating the Gaussian process model with the element test data. It is shown that even one element test can significantly reduce the calculation uncertainty due to lacking knowledge of actual physics, so that conservativeness in a safety envelope is significantly reduced. The proposed approach was demonstrated with a cantilever beam example, which represents a structural element. The example shows that calculation uncertainty provides about 93% conservativeness against the uncertainty due to a few element tests. As a result, it is shown that even a single element test can increase the load tolerance modeled with the safety envelope by 20%.

42 ENGINEERING↗

A Plasma Rocket Demonstration on the International Space Station

The Advanced Space Propulsion Laboratory at the NASA Johnson Space Center has been engaged in the development of a magneto-plasma rocket for several years. This type of rocket could be used in the future to propel interplanetary spacecraft. One feature of this concept is the ability to vary its specific impulse so that it can be operated in a mode that maximizes propellant efficiency or a mode that maximizes thrust. For this reason the system is called the Variable Specific Impulse Magneto-plasma Rocket or VASIMR. This ability to vary specific impulse and thrust will allow for optimum low thrust interplanetary trajectories and results in shorter trip times than is possible with fixed specific impulse systems while preserving adequate payload margins. In the development of the VASIMR technology, a series of ground-based experiments and space demonstrations are envisioned. A ground-based experiment of a low-power VASIMR prototype rocket is currently underway at the Advanced Space Propulsion Laboratory. The next step is a proposal to build and fly a 25-kilowatt VASIMR rocket as an external payload on the International Space Station. This experiment will provide an opportunity to demonstrate the performance of the rocket in space and measure the induced environment. The experiment will also utilize the space station for its intended purpose as a laboratory with vacuum conditions that cannot be matched by any laboratory on Earth. The VASIMR experiment will also blaze the trail for the wider application of advanced electric propulsion on the space station. An electric propulsion system like VASIMR, if provided with sufficient electrical power, could provide continuous drag force compensation for the space station. Drag compensation would eliminate the need for reboosting the station, an operation that will consume about 60 metric tons of propellant in a ten-year period. In contrast, an electric propulsion system would require very little propellant. In fact, a system like VASIMR can use waste hydrogen from the station's life support system as its propellant. This waste hydrogen is otherwise dumped overboard. Continuous drag compensation would also improve the microgravity conditions on the station. So electric propulsion can reduce propellant delivery requirements and thereby increase available payload capacity and at the same time improve the conditions for scientific research.

Petro, Andrew J.↗

Design of a Commercial Scale Accelerator Driven Subcritical Aqueous Assembly

SHINE Medical Technologies is working towards producing a reliable, domestic supply of medical isotopes, including molybdenum-99 (Mo-99), xenon-133, and iodine 131, without using highly enriched uranium. Approximately 88% of Mo-99 decays to technetium-99m, which is the most widely used medical isotope in the world, accounting for approximately 80% of all nuclear medicine procedures. A novel aqueous, subcritical nuclear assembly has been designed by SHINE Medical Technologies. The assembly can produce medical radioisotopes in significant quantities for U.S. and foreign needs. The assembly produces isotopes without using a reactor, instead using a fusion-based neutron source coupled to a fission-based aqueous assembly. The subcritical nature of the aqueous assembly has safety and licensing benefits, including the elimination of the reactor control system and elimination of high level waste. SHINE plans to construct eight subcritical assemblies with a plant capacity of greater than 3000 6-day Curies, which is more than one-quarter of the world's Mo-99 requirements. From a nuclear design standpoint, the aqueous subcritical assembly needs to be able to generate sufficient fission power to meet the production capacity requirements while remaining subcritical at all times with an acceptable margin. To address these conflicting design goals, a simple nuclear design and reactivity control philosophy has been developed that allows for high power operation with a high degree of safety. A fusion-driven subcritical fission assembly has been designed by SHINE Medical Technologies to provide a reliable, domestic supply of medical isotopes. Nuclear models have been created and show that the assembly can be started up, operated, and shutdown in a safe manner without active reactivity control systems. A unique reactivity control strategy allows SHINE to operate the aqueous subcritical assembly at much higher power levels than would otherwise be practical, while still retaining the benefits of subcritical operation and avoiding the need for complex subcritical measurement techniques. Based on the current design, the subcritical target is capable of generating significant fission power (on the order of 100 kW) when being driven by a simple, low-cost deuterium-tritium accelerator, enabling the SHINE facility to supply over one-fourth of the worldwide demand of Mo- 99. SHINE has recently been issued a construction permit by the U.S. Nuclear Regulatory Commission to build the commercial facility in Janesville, WI, with eight subcritical assemblies and the associated production equipment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of combined hydrogen, heat, and power as a bridge to a hydrogen transition.

Combined hydrogen, heat, and power (CHHP) technology is envisioned as a means to providing heat and electricity, generated on-site, to large end users, such as hospitals, hotels, and distribution centers, while simultaneously producing hydrogen as a by-product. The hydrogen can be stored for later conversion to electricity, used on-site (e.g., in forklifts), or dispensed to hydrogen-powered vehicles. Argonne has developed a complex-adaptive-system model, H2CAS, to simulate how vehicles and infrastructure can evolve in a transition to hydrogen. This study applies the H2CAS model to examine how CHHP technology can be used to aid the transition to hydrogen. It does not attempt to predict the future or provide one forecast of system development. Rather, the purpose of the model is to understand how the system works. The model uses a 50- by 100-mile rectangular grid of 1-square-mile cells centered on the Los Angeles metropolitan area. The major expressways are incorporated into the model, and local streets are considered to be ubiquitous, except where there are natural barriers. The model has two types of agents. Driver agents are characterized by a number of parameters: home and job locations, income, various types of 'personalities' reflective of marketing distinctions (e.g., innovators, early adopters), willingness to spend extra money on 'green' vehicles, etc. At the beginning of the simulations, almost all driver agents own conventional vehicles. They drive around the metropolitan area, commuting to and from work and traveling to various other destinations. As they do so, they observe the presence or absence of facilities selling hydrogen. If they find such facilities conveniently located along their routes, they are motivated to purchase a hydrogen-powered vehicle when it becomes time to replace their present vehicle. Conversely, if they find that they would be inconvenienced by having to purchase hydrogen earlier than necessary or if they become worried that they would run out of fuel before encountering a facility, their motivation to purchase a hydrogen-powered vehicle decreases. At vehicle purchase time, they weigh this experience, as well as other factors such as social influence by their peers, fuel cost, and capital cost of a hydrogen vehicle. Investor agents build full-service hydrogen fueling stations (HFSs) at different locations along the highway network. They base their decision to build or not build a station on their (imperfect) estimates of the sales the station would immediately generate (based on hydrogen-powered vehicle traffic past the location and other factors), as well as the growth in hydrogen sales they could expect throughout their investment horizon. The interaction between driver and investor agents provides the basis for growth in both the number of hydrogen vehicles and number of hydrogen stations. For the present report, we have added to this mix smaller, 'bare-bones' hydrogen dispensing facilities (HDFs) of the type that owners of CHHP facilities could provide to the public. The locations of these stations were chosen to match existing facilities that might reasonably incorporate CHHP plants in the future. Unlike the larger commercial stations, these facilities are built according to exogenously supplied timetables, and no attempt has been made to model the financial basis for the facilities. Rather, our objective is to understand how the presence of these additional stations might facilitate the petroleum-to-hydrogen transition. We discuss a base case in which the HDFs are not present, and then investigate the effects of introducing HDFs in various numbers; according to different timetables; with various production capacities; and with hydrogen selling at prices above, equal to, and below the commercial stations selling price. We conclude that HDFs can indeed be helpful in accelerating a petroleum-to-hydrogen transition. Placed in areas where investors might not be willing to install large for-profit HFSs, HDFs can serve as a bridge until demand for hydrogen increases to the point where larger stations are viable. For drivers to use them, however, HDFs must sell hydrogen at a price competitive with that of the larger HFSs. Because the marginal cost of producing hydrogen is expected to be higher for small capacities, HDFs may be uncompetitive without (possibly substantial) subsidies or other means to allow them to sell hydrogen at a price below the actual cost to produce and distribute it. Fortunately, HDFs do not need to be subsidized for very long. In our model, installing HDFs only as the demand for hydrogen increased was effective; then closing down all HDFs after five years into the transition made virtually no difference to the resultant accelerated outcome. Even installing much smaller numbers of HDFs only in the second and third years of the simulation and then closing them at the end of the fifth year was helpful.

08 HYDROGEN↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

Developing a roadmap for carbon capture, and storage in Oklahoma by assessing the viability of stacked storage

Abstract The Intergovernmental Panel on Climate Change concludes that CO 2 capture and storage (CCS) is critical for climate‐stabilizing energy transitions. In CCS, captured CO 2 is sequestered in saline aquifers within sedimentary basins. The CO 2 storage capacity and the rate of injection are functions of the geology of the saline aquifer, which is uncertain. To minimize impacts of this uncertainty, CCS projects could include backup plans, such as co‐locating geologic CO 2 storage (GCS) sites with or near existing CO 2 ‐enhanced oil recovery (CO 2 ‐EOR) operations. These “stacked storage” projects could hedge against uncertainty in the saline formation performance because captured CO 2 could be injected into either location in the event of unexpected events (e.g., the injectivity decreases). Here, we investigate the possibility and ramifications of developing CCS networks in Oklahoma that are amendable to stacked storage. We find that stacked storage is possible in Oklahoma but the counties with the lowest‐cost saline storage resources do not have existing CO 2 ‐EOR operations. At the systems level, we find it is slightly more expensive (e.g., $1/tCO 2 to $5/tCO 2 ) to site GCS in counties with CO 2 ‐EOR projects. This increased expense is largely due to increased CO 2 transportation costs because hundreds of km of additional pipeline is required to capture CO 2 from the lowest‐cost sources. Overall, our results suggest that it is optimal to build more pipelines and avoid injecting CO 2 in some of the lowest‐cost saline storage resources, to enable capturing CO 2 from the least‐cost sources. © 2023 Society of Chemical Industry and John Wiley & Sons, Ltd.

42 ENGINEERING↗

High-Burnup BWR LOCA Burst Analysis Using High-Fidelity Multiphysics Simulations

The US nuclear industry is looking to improve on the operating economics of the current fleet of light-water reactors (LWRs). One way of achieving this is by operating fuel to higher burnup. In pressurized water reactors (PWRs), relaxing the current burnup limit will allow for cycle length extensions and power uprates; in boiling water reactors (BWRs) it may allow for improved fuel utilization and reduced feed assemblies, as well as more efficient power uprates and increased capacity factors that will support the Administration’s Executive Order to facilitate 5 GW of power uprates at existing nuclear facilities. However, one of the key limitations to operating fuel to higher burnup is the risk of fuel fragmentation, relocation, and dispersal (FFRD). Recognizing the high interest in extending burnup limits, the US Nuclear Regulatory Commission (NRC) has issued Draft Regulatory Guide DG-1434, which defines an approach that would be acceptable to the NRC for addressing FFRD risk. The approach defined will require better understanding of the phenomena leading to FFRD as well as best-estimate simulation methods to understand FFRD risk in high-burnup cores. The Nuclear Energy Advanced Modeling and Simulation program is supporting the FFRD industry challenge problem through development of state-of-the-art, high-fidelity modeling and simulation LWR analysis capabilities; namely, the BISON fuel performance code and the VERA core simulator software. These tools, along with the US NRC TRACE system analysis code, have been utilized for analysis of FFRD risk in both PWR and BWR cores in recent years. The work documented in this report addresses the lack of high-fidelity research for BWRs and builds on a previous activity where the framework has been applied to Cycles 16 through 18 of Limerick Unit 1, a BWR/4, with introduction of 8 high-burnup lead use assemblies (HBLUAs) that were representative of the 8 HBLUAs loaded into Limerick Unit 2 in 2021. VERA was used in this previous activity to model rod-by-rod depletion in these cycles, and its solution was used to initialize a TRACE simulation of a large-break loss-of-coolant accident (LBLOCA) at the end of Cycle 18. In the work documented in this report, the TRACE model was improved by refining the core mesh and utilizing a new feature that allows for capturing the full 3D VERA power distribution in the model. This allows for a more detailed solution for setting BISON boundary conditions. Furthermore, the solutions from VERA and TRACE were used to set up and perform BISON simulations of about 1,000 rods sampled from the core, including all burnup levels. Utilizing two cladding burst models, it was shown that no fuel rods were predicted to burst during the postulated LBLOCA transient. Additionally, a sensitivity study was performed by artificially increasing linear heat rate during the postulated LBLOCA to identify parameters that correlate with rod burst susceptibility. Burnup, fission gas release, and hoop strain were all found to be positively correlated with rod burst susceptibility. Small-break loss-of-coolant accident (SBLOCA) analyses were also performed; these analyses predicted cladding temperature increases that were bounded by the LBLOCA cladding temperatures for all small break sizes studied for this plant. However, future refinements to the plant response assumptions during the SBLOCA could impact the predicted cladding response. Finally, a benchmark study was performed between CTF and TRACE for LOCA conditions to better qualify CTF for BWR LOCA modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Improved Design for Air Removal from Aerospace Fluid Loop Coolant Systems

Aerospace applications with requirements for large capacity heat removal (launch vehicles, platforms, payloads, etc.) typically utilize a liquid coolant fluid as a transport media to increase efficiency and flexibility in the vehicle design. An issue with these systems however, is susceptibility to the presence of noncondensable gas (NCG) or air. The presence of air in a coolant loop can have numerous negative consequences, including loss of centrifugal pump prime, interference with sensor readings, inhibition of heat transfer, and coolant blockage to remote systems. Hardware ground processing to remove this air is also cumbersome and time consuming which continuously drives recurring costs. Current systems for maintaining the system free of air are tailored and have demonstrated only moderate success. An obvious solution to these problems is the development and advancement of a passive gas removal device, or gas trap, that would be installed in the flight cooling system simplifying the initial coolant fill procedure and also maintaining the system during operations. The proposed device would utilize commercially available membranes thus increasing reliability and reducing cost while also addressing both current and anticipated applications. In addition, it maintains current pressure drop, water loss, and size restrictions while increasing tolerance for pressure increases due to gas build-up in the trap.

Ritchie, Stephen M. C.↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗

Enabling CCS via Low-temperature Geothermal Energy Integration for Fossil-fired Power Generation

Here, among the key barriers to commercial scale deployment is the cost associated with CO 2 capture. This is particularly true for existing large, fossil-fired assets that account for a large fraction of the electricity generation fleet in developed nations, including the U.S. Fitting conventional combustion technologies with CO 2 capture systems can carry an energy penalty of thirty percent or more, resulting in an increased price of power to the grid, as well as an overall decrease in net plant output. Taken together with the positive growth in demand for electricity, this implies a need for accelerated capital build-out in the power generation markets to accommodate both demand growth and decreased output at retrofitted plants. In this paper, the authors present the results of a study to assess the potential to use geothermal energy to provide boiler feedwater preheating, capturing efficiency improvements designed to offset the losses associated with CO 2 capture. Based on NETL benchmark cases and subsequent analysis of the application using site-specific data from the North Valmy power plant, several cases for CO 2 capture were evaluated. These included geothermally assisted MEA capture, CO2BOLs capture, and stand-alone hybrid power generation, compared with a baseline, no-geothermal case. Based on Case 10, and assuming 2.7 MMlb/h of geothermally sourced 150 ºC water, the parasitic power load associated with MEA capture could be offset by roughly seven percent, resulting in a small (~1 percent) overall loss to net power generation, but at levelized costs of electricity similar to the no-geothermal CCS case. For the CO 2 BOLs case, the availability of 150°C geothermal fluid could allow the facility to not only offset the net power decrease associated with CO 2 BOLs capture alone, but could increase nameplate capacity by two percent. The geothermally coupled CO 2 BOLs case also decreases LCOE by 0.75 ¢/kWh relative to the non-hybrid CO 2 BOLs case, with the improved performance over the MEA case driven by the lower regeneration temperature and associated duty for CO 2 BOLs relative to MEA.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MCM-41 support for ultrasmall γ-Fe 2 O 3 nanoparticles for H 2 S removal

In this paper, MCM-41 is proposed to build mesostructured Fe 2 O 3 -based sorbents as an alternative to other silica or alumina supports for mid-temperature H 2 S removal. MCM-41 was synthesized as micrometric (MCM41_M) and nanometric (MCM41_N) particles and impregnated through an efficient two-solvent (hexane–water) procedure to obtain the corresponding γ-Fe 2 O 3 @MCM-41 composites. The active phase is homogeneously dispersed within the 2 nm channels in the form of ultrasmall maghemite nanoparticles assuring a high active phase reactivity. The final micrometric (Fe_MCM41_M) and nanometric (Fe_MCM41_N) composites were tested as sorbents for hydrogen sulphide removal at 300 °C and the results were compared with a reference sorbent (commercial unsupported ZnO) and an analogous silica-based sorbent (Fe_SBA15). MCM-41 based sorbents, having the highest surface areas, showed superior performances that were retained after the first sulphidation cycle. Specifically, the micrometric sorbent (Fe_MCM41_M) showed a higher SRC value than the nanometric one (Fe_MCM41_N), due to the low stability of the nanosized particles over time caused by their high reactivity. Finally and furthermore, the low regeneration temperature (300–350 °C), besides the high removal capacity, renders MCM41-based systems an alternative class of regenerable sorbents for thermally efficient cleaning up processes in Integrated Gasification Combined Cycles (IGCC) systems.

36 MATERIALS SCIENCE↗

The CEOS Data Cube Portal: A User-Friendly, Open Source Software Solution for the Distribution, Exploration, Analysis, and Visualization of Analysis Ready Data

There is an urgent need to increase the capacity of developing countries to take part in the study and monitoring of their environments through remote sensing and space-based Earth observation technologies. The Open Data Cube (ODC) provides a mechanism for efficient storage and a powerful framework for processing and analyzing satellite data. While this is ideal for scientific research, the expansive feature space can also be daunting for end-users and decision-makers who simply require a solution which provides easy exploration, analysis, and visualization of Analysis Ready Data (ARD). Utilizing innovative web-design and a modular architecture, the Committee on Earth Observation Satellites (CEOS) has created a web-based user interface (UI) which harnesses the power of the ODC yet provides a simple and familiar user experience: the CEOS Data Cube (CDC). This paper presents an overview of the CDC architecture and the salient features of the UI. In order to provide adaptability, flexibility, scalability, and robustness, we leverage widely-adopted and well-supported technologies such as the Django web framework and the AWS Cloud platform. The fully-customizable source code of the UI is available at our public repository. Interested parties can download the source and build their own UIs. The UI empowers users by providing features that assist with streamlining data preparation, data processing, data visualization, and sub-setting ARD products in order to achieve a wide variety of Earth imaging objectives through an easy to use web interface.

User Interface↗

The involvement of SCK-CEN in decommissioning projects

SCK-CEN is the Belgian Nuclear Research Centre. Founded in the mid-fifties, it has accumulated experience and know-how in all fields of the nuclear power production: in the neutronics calculation, radiation protection, waste management, fuel performance and analysis, nuclear measurements, radiochemistry, reactor technology, etc. Since 1989, SCK-CEN has launched Decommissioning activities to deal with the Technical Liabilities created by 40 years of operation. The main projects started were: - the dismantling of the BR3 PWR reactor; - the dismantling of active laboratories and the decontamination of buildings for unrestricted reuse; - the management of the waste arising from the refurbishment activities of the BR2, especially the management of the high active beryllium matrix. In 1989, the BR3 reactor, a Pressurized Water Reactor, was selected by the European Commission as one of the four pilot dismantling projects in the framework of the EC five year RTD program on dismantling nuclear installations. Through this project, SCK-CEN has built up a broad know-how in dismantling and decommissioning operations. This know how concerns the decontamination for dose rate reduction and/or free release of materials, tele-operated techniques for cutting highly activated components of a reactor, concrete decontamination techniques, characterization techniques of radioactive waste or for free release of components and development of decommissioning management and record-keeping of material streams and of nuclear material accountancy. SCK-CEN is now actively involved in other decommissioning projects in Belgium and in expertise abroad. After giving an overview of the main achievements and the perspectives of the decommissioning of the BR3 reactor, the paper intends to present the involvement of SCK-CEN in the other decommissioning projects and to give an overview of our activities and capacities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗