Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

An Information Building on Radioactivity and Nuclear Energy for the French CEA Cadarache Research Center - 13492

The CEA Cadarache research center is one of the 10 research centers of the French Alternative Energies and Atomic Energy Commission (CEA). Distributed throughout various research platforms, it focuses on nuclear fission, nuclear fusion, new energy technologies (hydrogen, solar, biomass) and fundamental research in the field of vegetal biology. It is the most important technological research and development centers for energy in Europe. Considering the sensitive nature of nuclear activities, the questions surrounding the issue of radioactive waste, the nuclear energy and the social, economic and environmental concerns for present and future generations, the French Government asked nuclear actors to open communication and to give all the information asked by the Local Information Commission (CLI) and the public [1]. In this context, the CEA Cadarache has decided to better show and explain its expertise and experience in the area of nuclear energy and nuclear power plant design, and to make it available to stakeholders and to the public. CEA Cadarache receives each year more than 9000 visitors. To complete technical visits of the research facilities and laboratories, a scientific cultural center has been built in 2011 to inform the public on CEA Cadarache research activities and to facilitate the acceptance of nuclear energy in a way suited to the level of knowledge of the visitors. A modern interactive exhibition of 150 m{sup 2} allows visitors to find out more about energy, CEA Cadarache research programs, radioactive waste management and radiological impact on the research center activities. It also offers an auditorium for group discussions and for school groups to discover science through enjoyment. This communication center has received several thousand visitors since its opening on October 2011; the initial results of this experience are now available. It's possible to explain the design of this exhibition, to give some statistics on the number of the visitors, their characteristics and their perception after their center visits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The EU Approach for Responsible and Safe Management of Spent Fuel and Radioactive Waste - 12118

In July 2011 legislation on responsible and safe management of spent fuel and radioactive waste was adopted in the European Union (EU). It aims at ensuring a high level of safety, avoiding undue burdens on future generations and enhancing transparency. EU Member States are responsible for the management of their spent fuel and/or radioactive waste. Each Member State remains free to define its fuel cycle policy. The spent fuel can be regarded either as a valuable resource that may be reprocessed or as radioactive waste that is destined for direct disposal. Whatever option is chosen, the disposal of high level waste, separated at reprocessing, or of spent fuel regarded as waste should be considered. The storage of radioactive waste, including long-term storage, is an interim solution, but not an alternative to disposal. To this end, each Member State has to establish, maintain and implement national policy, framework and programme for management of spent fuel and/or radioactive waste in the long term. Member States will invite international peer reviews to ensure that high safety standards are achieved. The EU approach is anchored in internationally endorsed principles and requirements of the IAEA safety standards and the Joint Convention and in this context makes them legally binding and enforceable in the EU. The EU approach of regulating the management of spent fuel and radioactive waste is anchored in the competence of the national regulatory authorities and in the internationally endorsed principles and requirements of the IAEA Safety Standards and the Joint Convention. Member States have to report to the Commission on the implementation of Directive 2011/70/Euratom for the first time by 23 August 2015, and every 3 years thereafter, taking advantage of the review and reporting under the Joint Convention. On the basis of the Member States' reports, the Commission will submit to the European Parliament and the Council a report on progress made and an inventory of radioactive waste and spent fuel present in the EU territory and the future prospects. Directive 2011/70/Euratom is a logical next step after the Council Directive 2009/71/Euratom on the nuclear safety of nuclear installations. The EU is the first major regional actor providing a binding legal framework on nuclear safety and on responsible and safe management of spent fuel and radioactive waste, and thus is a real model to progress spent fuel and waste management in a safe and responsible manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remotely-Controlled Shear for Dismantling Highly Radioactive Tools In Rokkasho Vitrification Facility - 12204

A high-level liquid waste vitrification facility in the Japanese Rokkasho Reprocessing Plant (RRP) is right in the middle of hot commissioning tests toward starting operation in fall of 2012. In these tests, various tools were applied to address issues occurring in the vitrification cell. Because of these tools' unplanned placement in the cell it has been necessary to dismantle and dispose of them promptly. One of the tools requiring removal is a rod used in the glass melter to improve glass pouring. It is composed of a long rod made of Inconel 601 or 625 and has been highly contaminated. In order to dismantle these tools and to remotely put them in a designated waste basket, a custom electric shear machine was developed. It was installed in a dismantling area of the vitrification cell by remote cranes and manipulators and has been successfully operated. It can be remotely dismantled and placed in a waste basket for interim storage. This is a very good example of a successful deployment of a specialty remote tool in a hot cell environment. This paper also highlights how commissioning and operations are done in the Japanese Rokkasho Reprocessing Plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Level Radioactive Waste Management in the United States: What Have We Wrought? The Richard S. Hodes, M.D. Honor Lecture Award - 12222

In 1979, radioactive waste disposal was an important national issue. State governors were closing the gates on the existing low-level radioactive waste disposal sites and the ultimate disposition of spent fuel was undecided. A few years later, the United States Congress thought they had solved both problems by passing the Low-Level Radioactive Waste Policy Act of 1981, which established a network of regional compacts for low-level radioactive waste disposal, and by passing the Nuclear Waste Policy Act of 1982 to set out how a final resting place for high-level waste would be determined. Upon passage of the acts, State, Regional and Federal officials went to work. Here we are some 30 years later with little to show for our combined effort. The envisioned national repository for high-level radioactive waste has not materialized. Efforts to develop the Yucca Mountain high-level radioactive waste disposal facility were abandoned after spending $13 billion on the failed project. Recently, the Blue Ribbon Commission on America's Nuclear Future issued its draft report that correctly concludes the existing policy toward high-level nuclear waste is 'all but completely broken down'. A couple of new low-level waste disposal facilities have opened since 1981, but neither were the result of efforts under the act. What the Act has done is interject a system of interstate compacts with a byzantine interstate import and export system to complicate the handling of low-level radioactive waste, with attendant costs. As this paper is being written in the fourth-quarter of 2011, after 30 years of political and bureaucratic turmoil, a new comprehensive low-level waste disposal facility at Andrews Texas is approaching its initial operating date. The Yucca Mountain project might be completed or it might not. The US Nuclear Regulatory Commission is commencing a review of their 1981 volume reduction policy statement. The Department of Energy after 26 years has yet to figure out how to implement its obligations under the 1985 amendments to the Low-Level Radioactive Waste Policy Act. But, the last three decades have not been a total loss. A great deal has been learned about radioactive waste disposal since 1979 and the efforts of the public and private sector have shaped and focused the work to be done in the future. So, this lecturer asks the question: 'What have we wrought?' to which he provides his perspective and his recommendations for radioactive waste management policy for the next 30 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's regulatory and demonstration testing of MAGNOX fuel flasks in the United Kingdom (the CEGB 'Operation Smash Hit' tests), and the 1980's regulatory drop and fire tests conducted on the TRUPACT II containers used for transuranic waste shipments to the Waste Isolation Pilot Plant in New Mexico. The primary focus of the paper is a detailed evaluation of the cask testing programs proposed by the NRC in its decision implementing staff recommendations based on the Package Performance Study, and by the State of Nevada recommendations based on previous work by Audin, Resnikoff, Dilger, Halstead, and Greiner. The NRC approach is based on demonstration impact testing (locomotive strike) of a large rail cask, either the TAD cask proposed by DOE for spent fuel shipments to Yucca Mountain, or a similar currently licensed dual-purpose cask. The NRC program might also be expanded to include fire testing of a legal-weight truck cask. The Nevada approach calls for a minimum of two tests: regulatory testing (impact, fire, puncture, immersion) of a rail cask, and extra-regulatory fire testing of a legal-weight truck cask, based on the cask performance modeling work by Greiner. The paper concludes with a discussion of key procedural elements - test costs and funding sources, development of testing protocols, selection of testing facilities, and test peer review - and various methods of communicating the test results to a broad range of stakeholder audiences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Getting Beyond Yucca Mountain - 12305

The U.S. Department of Energy has terminated the Yucca Mountain repository project. The U.S. Nuclear Regulatory Commission has indefinitely suspended the Yucca Mountain licensing proceeding. The presidentially-appointed Blue Ribbon Commission (BRC) on America's Nuclear Future is preparing a report, due in January 2012, to the Secretary of Energy on recommendations for a new national nuclear waste management and disposal program. The BRC Draft Report published in July 2011 provides a compelling critique of the past three decades failed efforts in the United States to site storage and disposal facilities for spent nuclear fuel (SNF) and high-level radioactive waste (HLW). However, the BRC Draft Report fails to provide detailed guidance on how to implement an alternative, successful approach to facility site selection. The comments submitted to the BRC by the State of Nevada Agency for Nuclear Projects provide useful details on how the US national nuclear waste program can get beyond the failed Yucca Mountain repository project. A detailed siting process, consisting of legislative elements, procedural elements, and 'rules' for volunteer sites, could meet the objectives of the BRC and the Western Governors Association (WGA), while promoting and protecting the interests of potential host states. The recent termination of the proposed Yucca Mountain repository provides both an opportunity and a need to re-examine the United States' nuclear waste management program. The BRC Draft Report published in July 2011 provides a compelling critique of the past three decades failed efforts in the United States to site storage and disposal facilities for SNF and HLW. It is anticipated that the BRC Final report in January 2012 will recommend a new general course of action, but there will likely continue to be a need for detailed guidance on how to implement an alternative, successful approach to facility site selection. Getting the nation's nuclear waste program back on track requires, among other things, new principles for siting-principles based on partnership between the federal implementing agency and prospective host states. These principles apply to the task of developing an integrated waste management strategy, to interactions between the federal government and prospective host states for consolidated storage and disposal facilities, and to the logistically and politically complicated task of transportation system design. Lessons from the past 25 years, in combination with fundamental parameters of the nuclear waste management task in the US, suggest new principles for partnership outlined in this paper. These principles will work better if well-grounded and firm guidelines are set out beforehand and if the challenge of maintaining competence, transparency and integrity in the new organization is treated as a problem to be addressed rather than a result to be expected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Geologic Nuclear Waste Disposal - No New Taxes - 12469

To some, the perceived inability of the United States to dispose of high-level nuclear waste justifies a moratorium on expansion of nuclear power in this country. Instead, it is more an example of how science yields to social pressure, even on a subject as technical as nuclear waste. Most of the problems, however, stem from confusion on the part of the public and their elected officials, not from a lack of scientific knowledge. We know where to put nuclear waste, how to put it there, how much it will cost, and how well it will work. And it's all about the geology. The President's Blue Ribbon Commission on America's Nuclear Future has drafted a number of recommendations addressing nuclear energy and waste issues (BRC 2011) and three recommendations, in particular, have set the stage for a new strategy to dispose of high-level nuclear waste and to manage spent nuclear fuel in the United States: 1) interim storage for spent nuclear fuel, 2) resumption of the site selection process for a second repository, and 3) a quasi-government entity to execute the program and take control of the Nuclear Waste Fund in order to do so. The first two recommendations allow removal and storage of spent fuel from reactor sites to be used in the future, and allows permanent disposal of actual waste, while the third controls cost and administration. The Nuclear Waste Policy Act of 1982 (NPWA 1982) provides the second repository different waste criteria, retrievability, and schedule, so massive salt returns as the candidate formation of choice. The cost (in 2007 dollars) of disposing of 83,000 metric tons of heavy metal (MTHM) high-level waste (HLW) is about $ 83 billion (b) in volcanic tuff, $ 29 b in massive salt, and $ 77 b in crystalline rock. Only in salt is the annual revenue stream from the Nuclear Waste Fund more than sufficient to accomplish this program without additional taxes or rate hikes. The cost is determined primarily by the suitability of the geologic formation, i.e., how well it performs on its own for millions of years with little engineering assistance from humans. It is critical that the states most affected by this issue (WA, SC, ID, TN, NM and perhaps others) develop an independent multi-state agreement in order for a successful program to move forward. Federal approval would follow. Unknown to most, the United States has a successful operating deep permanent geologic nuclear repository for high and low activity waste, called the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Its success results from several factors, including an optimal geologic and physio-graphic setting, a strong scientific basis, early regional community support, frequent interactions among stakeholders at all stages of the process, long-term commitment from the upper management of the U.S. Department of Energy (DOE) over several administrations, strong New Mexico State involvement and oversight, and constant environmental monitoring from before nuclear waste was first emplaced in the WIPP underground (in 1999) to the present. WIPP is located in the massive bedded salts of the Salado Formation, whose geological, physical, chemical, redox, thermal, and creep-closure properties make it an ideal formation for long-term disposal, long-term in this case being greater than 200 million years. These properties also mean minimal engineering requirements as the rock does most of the work of isolating the waste. WIPP has been operating for twelve years, and as of this writing, has disposed of over 80,000 m{sup 3} of nuclear weapons waste, called transuranic or TRU waste (>100 nCurie/g but <23 Curie/1000 cm{sup 3}) including some high activity waste from reprocessing of spent fuel from old weapons reactors. All nuclear waste of any type from any source can be disposed in this formation better, safer and cheaper than in any other geologic formation. At the same time, it is critical that we complete the Yucca Mountain license application review so as not to undermine the credibility of the Nuclear Regulatory Commission and the scientific community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Research Reactor IEA-R1 - A Study of the Preparing for Decommissioning

The Institute of Energy and Nuclear Research (IPEN), Sao Paulo, according to the assignments given by the National Commission of Nuclear Energy (CNEN), enabled the development of this study, especially operational reports about refurbishing carried out on 2013, involving the production of radioisotopes and research in the areas of Radiochemistry and Nuclear Physics. These reports are made in accordance with established standard procedures to meet the requirements of CNEN (National Nuclear Energy Commission, the regulator the nuclear area activities in Brazil) and IAEA (International Atomic Energy Agency). This study presents an assessment of the procedures and methods of treatments for decontamination of the refrigeration primary circuit and changes parts, equipment and tubes of the of the IEA-R1 nuclear research reactor, pool type, power between 3,5 and 4,5 MW. In order to have a sequence in the work, the well-known contaminant radioisotopes were evaluated firstly, using Geiger- Muller equipment. In the second phase, the decontamination was done manually together with the ultrasound cleaning and washing equipment. From the several water solutions of citric acid assessment, the concentration with better confidence was obtained; in order to achieve the best results for decontamination. This study intends to define the best process for decontamination with low taxes of waste and without expensive costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EPRI Research Results: The EPRI Implementation Guide for the NRC BTP on Concentration Averaging and Encapsulation - 17488

The Nuclear Regulatory Commission published Revision 1 of the Branch Technical Position (BTP) on 'Concentration Averaging and Encapsulation' (BTP 2015.) PRI developed an Implementation Guide for applying BTP 2015 to nuclear power plant specific waste streams. This Implementation Guide has been vetted and supported by an EPRI organized working group consisting of industry participants (including utilities subject matter experts, disposal sites, NRC and Agreement State representatives and industry experts) will ensure compliant and consistent application during waste generation, packaging, processing and disposal activities. The Implementation Guide provides for a comparison to previous BTP guidance and provides clarification and common understanding of the key concepts contained within the revised BTP. These include averaging constraints, hot spots, waste streams, waste types, discrete items, blending, solidification, encapsulation and alternative approaches. EPRI published the Implementation Guidance for the Nuclear Regulatory Commission Branch Technical Position on 'Concentration Averaging and Encapsulation, Revision 1' (EPRI Report 3002008189) in the September 2016 and it was made available to the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Problems Related to Temperature-Induced Processes in Long-Term Repositories for Nuclear Waste - 17514

Concepts for the final disposal of high level radioactive waste in deep geological formations must consider the heat pulse produced from radioactive decay during operations and in the post-closure phase as an important factor for the integrity of barrier systems. Several safety cases in different countries limit the maximum temperature at the boundary between the technical barrier/canister surface to the host rock/buffer material to 100 C. Increases in maximum temperature have very diverse effects with respect to the type, intensity and range of the heat pulse. These depend, among other factors, on i) the amount of heat emitted, ii) the type of host rock including site-specific characteristics, iii) the safety and repository concept and further site-specific boundary conditions. The German Commission on the Disposal of High-level Radioactive Waste (Commission) recommended, for precautionary reasons, that the temperature limit at the outer surface of waste containers should not exceed 100 C. Higher temperatures could only be considered if the maximum physically possible temperatures in the respective host rock have been reliably set as a result of research findings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated sampling and data flow for Hanford vitrification - 15337

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear facility being designed, built, and commissioned for the U.S. Department of Energy (DOE) by Bechtel National, Inc. and its subcontractor URS Corporation. The WTP facilities are under construction to complete the design and construction, as well as planning to support the startup, commissioning, and operation for vitrifying the radioactive waste stored in aging underground tanks at the Hanford Site. The work progress includes development of waste feed acceptance and qualification program, including methodologies for processing feed batches. Qualification data from staged feed samples will support the verification that waste acceptance criteria (WAC) and processability requirements are met. This verification is required to ensure safe operation of WTP processes for vitrifying the waste, while establishing specific campaign and batch sheets to comply with glass form acceptance requirements. Sampling and data integration are critical for process control and monitoring of the feed through unit operations. Data collection begins with process knowledge of staged feed for determining the required WAC analyses and testing for unit operations. The waste feed qualification data form the baseline information for WTP operation. The qualification data will be tracked and compared with sample analyses at different steps in vitrification operation. All aspects of data life cycle will be managed by the WTP Plant Engineering organization. The data management approach is established in this manner to allow maintaining campaign traceability through glass production records, while safely processing the corresponding feed campaigns and complying with permitting requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The cementitious barriers partnership experimental programs and software advancing DOE's waste disposal/tank closure efforts - 15436

The U.S. Department of Energy Environmental Management (DOE-EM) Office of Tank Waste Management sponsored Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. DOE needs in this area include the following to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex: - Long-term performance predictions and - Flow sheet development and flow sheet enhancements - Conceptual designs for new disposal facilities The DOE-EM Cementitious Barriers Partnership is producing software and experimental programs resulting in new methods and data needed for end-users involved with environmental cleanup and waste disposal. Both the modeling tools and the experimental data have already benefited the DOE sites in the areas of performance assessments by increasing confidence backed up with modeling support, leaching methods, and transport properties developed for actual DOE materials. In 2014, the CBP Partnership released the CBP Software Toolbox - 'Version 2.0' which provides concrete degradation models for: 1) sulfate attack, 2) carbonation, 3) chloride initiated rebar corrosion, and includes constituent leaching. These models are applicable and can be used by both DOE and the Nuclear Regulatory Commission (NRC) for service life and long-term performance evaluations and predictions of nuclear and radioactive waste containment structures across the DOE complex (Figure 1) including Future SRS salt-stone and HLW tank performance assessments and special analyses - Hanford site HLW tank closure projects and other projects in which cementitious barriers are required - The Advanced Simulation Capability for Environmental Management (ASCEM) project which requires source terms from cementitious containment structures as input to their flow simulations - Regulatory reviews of DOE performance assessments - Nuclear Regulatory Commission reviews of commercial nuclear power plant (NPP) structures which are part of the overall US Energy Security program to extend the service life of NPPs In addition, the CBP experimental programs have had a significant impact on the DOE complex by providing specific data unique to DOE sodium salt wastes at Hanford and SRS which are not readily available in the literature. Two recent experimental programs on cementitious phase characterization and on technetium (Tc) mobility have provided significant conclusions as summarized below: Recent mineralogy characterization discussed in this paper illustrates that sodium salt waste form matrices are somewhat similar to but not the same as those found in blended cement matrices which to date have been used in long-term thermodynamic modeling and contaminant sequestration as a first approximation. Utilizing the CBP generated data in long-term performance predictions provides for a more defensible technical basis in performance evaluations. - In addition, recent experimental studies related to technetium mobility indicate that conventional leaching protocols may not be conservative for direct disposal of Tc- containing waste forms in vadose zone environments. These results have the potential to influence the current Hanford supplemental waste treatment flow sheet and disposal conceptual design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Texas authorizes disposal of large quantities of depleted uranium at wcs - 15626

The U.S. Nuclear Regulatory Commission (NRC) has been actively engaged in a rulemaking process that would revise Title 10 of the Code of Federal Regulations (CFR), Part 61, Licensing Requirements for Land Disposal of Radioactive Waste, to govern the disposal of large quantities of Depleted Uranium (DU) and Blended Waste (referred to as Unique Waste Streams). While the NRC plans to propose a Site Specific Analysis (SSA) rulemaking in early 2015, they have already issued guidance to Agreement States which identified general disposal criteria that could be used should a licensee propose to dispose of Unique Waste Streams before their rulemaking was completed. On August 5, 2013, Waste Control Specialists LLC (WCS) submitted a major license amendment application for review and approval to the Texas Commission on Environmental Quality (TCEQ). This major license amendment request proposed, among other things, authorization to dispose of large quantities of DU at its Federal Facility Waste Disposal Facility (FWF). Pursuant to Title 30 of the Texas Administrative Code (TAC), Rule 336.709, Technical and Environmental Analyses, disposal of waste must be sufficient to meet the radiological dose criteria for a minimum period of performance of 1,000 years after closure or the period where peak dose occurs, whichever is longer. These regulations are more stringent than those of any other state that hosts a facility authorized to dispose of Low-Level Radioactive Waste (LLW) in the U.S. On August 28, 2014, the TCEQ approved the major amendment request authorizing disposal of large quantities of DU. During the licensing review process, significant technical issues were successfully resolved ensuring that large quantities of DU could be safely isolated from the biosphere for long time periods after site closure. Many important lessons were learned during the licensing proceedings that have potential significant impacts to the licensed community. Namely that a modern, well designed disposal facility that is properly sited geologically and in an arid environment is ideal for ensuring that long-lived alpha emitting radionuclides are sufficiently isolated to protect public health for long into the future. The DOE is currently finalizing plans to complete a Supplemental Environmental Analysis (EA) to support shipments of DU for disposal at WCS' FWF as required under the National Environmental Policy Act of 1970. The DOE may begin shipments of DU for disposal to WCS FWF that was licensed and constructed to support disposal of waste that is the responsibility of the federal government as stipulated in the Low-Level Radioactive Waste Policy Amendments Act of 1985. This paper will present the regulatory history of events that initiated the NRC's rulemaking for Unique Waste Streams and the technical analysis that were conducted in support of WCS' major amendment that has been approved by the TCEQ. A description of the geological characteristics and engineering designs used to support the Performance Assessment will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Immediate Dismantling of a Large Fleet of LWR NPPs: Consequences for Spent Fuel and Waste Management - 16027

The experience feedback shows that the complete dismantling of one Light Water Reactor (LWR) unit is an activity now globally well under control (reactor pressure vessel and its internals removal and cutting included). However some specific industrial difficulties may arise in view of the dismantling of numerous LWR units simultaneously. Indeed more than 300 LWR units are currently operated worldwide, which have been commissioned these last 50 years. So in some countries, many units may be permanently shut down over a period of few years in the next decades. Such a situation addresses the issue of the overall management of large quantities of spent nuclear fuel (SNF) and decommissioning waste for the concerned units. For example, in France, the legislative and regulatory framework for the nuclear facilities favors their dismantling 'as soon as possible' after their permanent shutdown which implies as well to limit the duration of the transition period from operation to decommissioning. Furthermore 58 LWR units have been commissioned between 1977 and 1999 in France - on average more than 2 units per year. In this context, the operator (Electricite de France - EDF) plans to remove quickly the SNF then to perform dismantling actions immediately after the permanent shutdown of the LWR units. One issue is to remove the SNF from all the relevant units, even if this removal is simultaneous in many units (permanently shut down or still under operation). Similar issue has to be taken into account regarding the management of the radioactive waste (RW) produced by the dismantling and clean-up actions, notably the RW that cannot be disposed of in a near surface repository. One method followed by the French technical support organization (Institut de Radioprotection et de Surete Nucleaire - IRSN) to analyze these issues is the use of estimates of flows of SNF and RW. These estimates are based notably on a phasing-scenario and a planning template defined for the decommissioning of the units of one nuclear power plant (NPP) and coupled to an overall schedule for phase out all the units of the fleet. The estimates relative to the next decades can be compared to the current experience feedback of flows of SNF and RW for units under operation, in order to identify risks when facing decommissioning. The risks highlighted are driven by key parameters (as duration of the main dismantling actions) of the estimates which can be adapted to minimize their impact. On this basis, it is possible to identify the key-factors to dismantle each unit of NPPs and phase out the fleet regarding SNF and RW management. It is noteworthy that this work needs to be done in any case upstream the studies and the implementation of dismantling actions. Finally it can be underlined that another issue is the human resources (staff, skills and knowledge) necessary to perform all the decommissioning actions, but this aspect is not addressed in the present paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Selection in Germany - Status of the Evaluation of the Site Selection Law - 16122

Since 2011 Germany is pursuing a phase out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high active heat producing waste from scratch. The consequence of this law is a delay of at least two decades to start operation of a final disposal site and additional costs of at least EUR 2.7 billion. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission includes representatives from the parliament, academia, civil society organizations, industry, the environmental organizations and trade unions and should forward its recommendations after a delay in starting the evaluation process now in summer 2016. The present law will then be reviewed. The site selection then might start after the next federal election in 2017 at the earliest probably based on a new site selection law. A new repository site should be determined till 2031 and for this site the more detailed site investigation will take place followed by a detailed safety analysis, before the erection of the repository can start. Based on the present procedural steps it seems to be rather unlikely to determine a repository site till 2031. As shown in the publication, there will be a delay of at least 20 years compared to the schedule given in the site selection law until a repository site can be determined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗