Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

US HL-LHC Accelerator Upgrade Project (MQXFA Final Design Report)

The MQXFA Quadrupole magnets will be installed in High Luminosity LHC to form the Q1 and Q3 inner triplet optical elements in front of the interaction points 1 (ATLAS) and 5 (CMS). A pair of MQXFA units is assembled in a stainless steel helium vessel, including the end domes, to make the Q1 Cold Mass or the Q3 Cold Mass. The US HL LHC Accelerator Upgrade Project* is responsible for the design, manufacturing and test of the Q1/Q3 Cold Masses and the complete MQXFA magnets. CERN provides the cryostat components and is responsible for integration and installation in HL LHC. The MQXFA quadrupoles have 150 mm aperture, 4.2 m magnetic length, nominal gradient of 132.2 T/m, and coil peak field of 11.3 T. They use Nb_3Sn conductor and a support structure made of segmented aluminum shells pre-loaded by using bladders and keys. This report presents the final design of the MQXFA quadrupole magnets.

43 PARTICLE ACCELERATORS↗

US HL-LHC Accelerator Upgrade Project, Acceptance Criteria Part A: MQXFA Magnet

This document specifies the functional requirements for the MQXFA magnet readapted for the American contribution. If all the requirements specified in this document are met, then the U.S. HL-LHC AUP MQXFA deliverables will be accepted by CERN for the HL-LHC project. Another separate document will be issued by the American contribution for the MQXFA cold mass functional requirements. Please note that the definition of threshold as it is being used by the American contribution is not the same as objective, according to the HL-LHC quality policy.

42 ENGINEERING↗

MQXFA Series Magnet Production Specification: US HL-LHC Accelerator Upgrade Project

The purpose of this document is to define the specifications for the structure fabrication and assembly of MQXFA series magnets to be used by the US High-Luminosity LHC Accelerator Upgrade Project (AUP). Magnets fabricated according to these specifications are expected to allow MQXFA magnets to meet the MQXFA Functional Requirements Specification. These specifications for the fabrication of MQXFA series magnets are based on the R&D performed by the US LHC Accelerator Research Program (LARP) and the development performed by AUP, in collaboration with CERN, through fabrication and test of pre-series coils and magnets.

43 PARTICLE ACCELERATORS↗

Electron Cloud Simulations for the Electron-Ion Collider in Brookhaven National Laboratory

For high-intensity circular accelerators and storage rings, if the secondary electron emission yield (SEY) of the vacuum chamber surfaces is high, an EC (Electron Cloud) could build up with the passage of the circulating beam. The presence of EC can strongly affect the beam quality, such as transverse instabilities, transverse emittance growth, and beam loss. Furthermore, the heat load from EC can exceed the available cryogenic capability. For the RHIC superconducting (SC) arc magnets, to be used for the hadron storage ring of the Electron-Ion Collider (EIC), the dynamic heat load budget is 0.5 W/m to the 4.5 K stainless steel beam pipe. This can limit the maximum beam bunches or intensity of the EIC, hence diminishing the luminosity provided by the EIC. The EC has affected the beam instability and significantly contributed to cryogenic heat load in the Large Hadron Collider (LHC). Positron storage rings for which ECs have been a critical factor in the design and performance include KEKB in Japan and EC buildup remains one of the concerns for future high-intensity accelerators design. EC considerations have driven the SuperKEKB collider design and the positron damping ring for the proposed International Linear Collider (ILC). The LHC luminosity upgrade is contingent on reducing the bunch spacing to 25 ns; at this bunch spacing, severe EC buildup has been observed. The success of the upgrade is likely contingent on limiting EC buildup. To study the EC heat load, we did some EC simulations with PyECLOUD code for the dipole, quadrupole, sextupole magnets, and the warm (drift) section of the EIC hadron storage ring. PyECLOUD is an EC simulation code developed by CERN. The code has been validated and used to study EC in the LHC, SPS, and PS. To eliminate EC buildup, the sources of electrons must be minimized. First, we will reduce the production of electrons due to residual gas ionization by specifying the maximum gas density, which requires a vacuum chamber with low electron-stimulated desorption (ESD) yields and a sufficient (preferably distributed) pumping speed. Second, we should reduce the secondary electrons with a lower secondary electron yield (SEY) material.

43 PARTICLE ACCELERATORS↗

LDRD 2022 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a report of its completed Laboratory Directed Research and Development Program (LDRD) projects to the Department of Energy (DOE) Office of Scientific and Technical Information in accordance with DOE Order 413.2C Chg1 (MinChg) dated August 2, 2018. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2022, in fulfillment of that requirement. In FY 2022, the BNL LDRD Program funded 70 projects, 30 of which were new starts, at a total cost of $17.2M. The investments that BNL makes in its LDRD program support the Laboratory’s strategic goals. BNL has identified seven scientific initiatives that define the Laboratory’s scientific future and that will enable it to realize its overall vision. This requires simultaneous excellence in all aspects of BNL’s work – from science and operations, to external partnerships with the local, state, and national communities, and beyond. This is enabled by safe, efficient, and secure operations; by an unwavering commitment to a diverse, equitable, and inclusive environment, including workforce development, both with staff and reaching out to the community; and by a strong focus on renewed infrastructure. The seven scientific initiatives are: 1) Nuclear Physics: uncover the structure of visible matter by constructing and operating the Electron-Ion Collider at BNL to maintain international leadership in nuclear physics for decades; 2) Clean Energy and Climate: support a net-zero U.S. economy through fundamental research in basic energy and climate sciences to revolutionize grid-scale storage, renewable integration, and the study of atmospheric processes with a new facility to improve climate predictability; 3) Quantum Information Science and Technology: discover new quantum materials to enhance quantum computers and develop an entanglement sharing quantum network as a prototype for the first quantum internet; 4) Discovery Science Driven by the Human-AI Facility Integration: revolutionize the operation of experiments across the sciences at user facilities and in core programs; 5) High Energy Physics: understand the origin of space and time with the ATLAS high luminosity upgrade at CERN and the future Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment; 6) Isotope Production: accelerate and expand isotope production to ensure the security of the Nation’s supply; 7) Accelerator Science and Technology: harness the cross-cutting accelerator science expertise at BNL to develop new facilities, improve and expand its user facilities, and promote the use of accelerators in industry. The funded projects support BNL’s seven scientific initiatives and priority programs as well as new areas of research and competencies at the Laboratory that are consistent with the Laboratory’s vision and mission. In total, these LDRD investments supported 43 postdoctoral researchers in whole or in part and resulted in 138 publications and 7 awards. This Program Activities Report represents the future of BNL science; it is an impressive body of exploratory work that investigates many scientific and technical directions in support of the DOE and BNL missions.

99 GENERAL AND MISCELLANEOUS↗

Feebly-Interacting Particles: FIPs 2022 Workshop Report

Particle physics today faces the challenge of explaining the mystery of dark matter, the origin of matter over anti-matter in the Universe, the origin of the neutrino masses, the apparent fine-tuning of the electro-weak scale, and many other aspects of fundamental physics. Perhaps the most striking frontier to emerge in the search for answers involves new physics at mass scales comparable to familiar matter, below the GeV-scale, or even radically below, down to sub-eV scales, and with very feeble interaction strength. New theoretical ideas to address dark matter and other fundamental questions predict such feebly interacting particles (FIPs) at these scales, and indeed, existing data provide numerous hints for such possibility. A vibrant experimental program to discover such physics is under way, guided by a systematic theoretical approach firmly grounded on the underlying principles of the Standard Model. This document represents the report of the FIPs 2022 workshop, held at CERN between the 17 and 21 October 2022 and aims to give an overview of these efforts, their motivations, and the decadal goals that animate the community involved in the search for FIPs.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The ERL Facility PERLE at Orsay

The realisation of the LHeC and the FCC-eh at CERN require the development of the energy recovering technique in multipass mode and for large currents O(10) mA in the SRF cavities. For this purpose, a technology development facility, PERLE, is under design to be built at IJCLab Orsay, which has the key LHeC ERL parameters, in terms of configuration, source, current, frequency and technical solutions, cryomodule, stacked magnets. In this talk we review the design and comment on the status of PERLE.

Bogacz, Alex↗

SAMPA Based Streaming Readout Data Acquisition Prototype

We have assembled a small-scale streaming data acquisition system based on the SAMPA front-end ASIC. The 32-channel SAMPA chip was designed for the high-luminosity upgrade of the ALICE Time Projection Chamber (TPC) detector at the CERN Large Hadron Collider. The goals of the prototype system are to determine if the SAMPA chip is appropriate for use in detector systems at Jefferson Lab, and to gain experience with the hardware and software required to deploy streaming data acquisition systems in nuclear physics experiments. The 800 channel system is composed of components used in the ALICE TPC data acquisition upgrade. Five front-end cards (FEC) support five SAMPA chips each. SAMPA data streams on an FEC are concentrated into two high-speed (4.48 Gb/s) serial data streams by a pair Gigabit Transceiver ASICs (GBTx). These ten streams (44.8 Gb/s) are transmitted from the FECs over fibers to a PCIe based readout unit. The FPGA engine on the readout unit compresses data for transmission to a server via 100 Gb ethernet. Components on the FECs are radiation tolerant. High data rates can be handled. The system is by design scalable and thus provides a functional prototype for high-rate streaming readout at Jefferson Lab and the future Electron Ion Collider. We have made fundamental measurements (noise, linearity, time resolution) on the SAMPA ASIC. We have also coupled the readout system to a small Gas Electron Multiplier (GEM) detector and have studied its response to cosmic rays. A beam test of the system is planned.

ABBOTT, David↗

Towards Combined QCD Global Analysis of Polarized and Unpolarized PDFs and Fragmentation Functions

We present a new global QCD analysis of spin-dependent PDFs (SPDF) and fragmentation functions (FF) performed by the JAM (Jefferson Lab Angular Momentum) Collaboration, based on all available data on inclusive spin structure functions from CERN, SLAC, DESY and JLab, and all semi-inclusive hadron production data from electron-positron annihilation experiments, including the most resent measurements from Belle and BaBar. Preliminary results on combined SPDFs and FFs using polarized semi-inclusive data from COMPASS and HERMES will be presented.

Sato, N.↗

Forward Pixel Detector for the Phase 2 Upgrade of CMS And Module Testing at UIC

High-Luminosity Large Hadron Collider (HL-LHC) upgrade aims to increase performance. In order to efficiently handle the larger particle flux and increased radiation, an upgrade is planned for the inner Tracker of the Compact Muon Solenoid (CMS) detector, which is located at the innermost part of the CMS. To efficiently reconstruct and track particles, the existing pixel tracker will be upgraded with novel sensors, readout chips, and front-end electronics designed to handle increased data rates. These improvements will allow the detector to track particles more precisely. In the United States, we are working on assembling new sensor modules to be inserted into disks, referred to as TFPX, for installation in the CMS detector for the HL-LHC era. We are currently testing the prototype of TFPX modules to ensure the upgrade is carried out in the best way possible. The University of Ilinois Chicago has been tasked with testing the final versions of the TFPX sensor modules before they are sent to CERN to be installed into the CMS detector. This work is supported by NSF.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Strain measurements of Nb₃Sn coils with optical fibers

The HL-LHC at CERN will be using new superconducting quadrupole magnets (MQXFA) made of Nb₃Sn that are in the process of being tested before installation in the LHC tunnel. MQXFA07 and MQXFA08 magnets failed because of high stress developed at the coil wedge/end spacer interface, where the Nb₃Sn coil, the stainless-steel end parts, and copper wedges exhibit different strain responses. Interrogating a cut piece of coil QXFP06 with optical fibers, we expect to get a better understanding of the stress response of the coil wedge/end spacer interface.

Nisa, Kuvvetn↗

Hadron Production Measurements at NA61/SHINE

In current day measurements of neutrino oscillation parameters with accelerator-based neutrino experiments, neutrino flux uncertainties are frequently a leading systematic uncertainty. Precise measurements of primary and secondary hadron production processes for neutrino beams, performed by the NA61/SHINE experiment at CERN's Super Proton Synchrotron, can significantly constrain these uncertainties; the T2K experiment has incorporated previous NA61/SHINE measurements for a substantial flux uncertainty reduction. For these measurements, NA61/SHINE analyzes the interactions of charged hadrons with materials relevant to long-baseline experiments, measuring the differential cross sections of produced particles. This poster will review the NA61/SHINE experiment, including recent, ongoing, and future measurements with thin and replica targets, such as proton-carbon interactions at 31 GeV/c and 120 GeV/c for the T2K and DUNE experiments, respectively.

Allison, Kyle↗

3D Display of Events on a Stack of CCDs and OSCURA MCMs Copper Box Redesign

A 3D event display algorithm was successfully implemented using CERN root to visualize muons, electrons, and photons within the CCD's from the OSCURA testing setup. The copper box from this setup was also redesigned to accommodate up to 21 MCMs, enabling a multi-layer sensor tracker orientation. This setup and algorithm aims to explore and search for millicharged particles (mCPs) in accelerators, leading to improved particle tracking precision and reduced background events.

Meza Quintero, Oscar↗

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. This facility will be located at Fermilab and will have a capability similar to EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15T in HFVMTF will be produced by a magnet pro-vided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. As a primary use it will be superconducting cable test facility, in high magnetic fields and wide range of temperatures. Complementary, this facility will be used to test high-field super-conducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of Top Plates Assembly and Sample Insert Anticryostat, which will be a main interface component between cable test mode and magnet test mode at this facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Effect of CLIQ on training of HL-LHC quadrupole magnets

The high-luminosity LHC upgrade requires stronger than LHC low-beta magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb3Sn magnets to be used in any large particle accelerator. At development stages, many Nb3Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based devices can affect Nb3Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. The present paper investigates effects on training induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation because of the capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exists so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Calibration of the ProtoDUNE Horizontal-Drift position reconstruction using a laser system

Forthcoming in the next decade of neutrino physics advancements is the construction of the Deep Underground Neutrino Experiment (DUNE), a long baseline neutrino oscillation experiment which has the potential to answer fundamental questions such as why there is more matter than antimatter in the universe, and ultimately why we exist at all. A prototype of this experiment, ProtoDUNE, sits in a charged particle test beam at the European Organization for Nuclear Research (CERN) and uses Liquid Argon time projection chambers to image interactions of these particles. ProtoDUNE Single-Phase (ProtoDUNESP) had positively charged hadrons as well as positrons in its initial 2018 beam data run. Because ProtoDUNE is a surface-based time projection chamber, it experiences a constant influx of cosmic rays. These cosmic rays ionize the liquid argon within the detector, resulting in an accumulation of slow moving positive ions towards the cathode. This local charge distribution results in electric field non uniformities, which can have a significant effect on the accuracy of the event reconstruction. This paper outlines a monte carlo simulation study which adapts methodology from the MicroBooNE experiment, another neutrino oscillation experiment, to derive electric field correction maps which can correct for distortions of the electric field within the detector. These correction maps accurately estimate the electric field throughout the detector volume and correct for uncertainties in reconstructed event data enabling for physics discoveries.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗