Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Evaluation of a high performance, fixed-ratio, traction drive

A test program was initiated to evaluate the key operational and performance factors associated with the Nasvytis multiroller concept. Two sets of Nasvytis drives, each of slightly geometry, were parametrically tested on a back to back test stand. Initial results from these tests are reported. One of these units was later retrofitted to the power turbine of an automotive gas turbine engine and dynamometer tested.

Loewenthal, S. H.↗

Qualification testing of solar photovoltaic powered refrigerator freezers for medical use in remote geographic locations

One of the primary obstacles to the application of vaccination in developing countries is the lack of refrigerated storage. Vaccines exposed to elevated temperatures suffer a permanent loss of potency. Photovoltaic (PV) powered refrigerator/freezer (R/F) units could surmount the problem of refrigeration in remote areas where no reliable commercial power supply is available. The performance measurements of two different models of PV powered R/F units for medical use are presented. Qualification testing consisted of four major procedures: no-load pull down, ice making, steady-state (maintenance), and holdover. Both R/F units met the major World Health Organization (WHO) requirements. However, the testing performed does not provide complete characterization of the two units; such information could be derived only from further extensive test procedures.

Kaszeta, W. J.↗

Building fault detection and diagnostics: Achieved savings, and methods to evaluate algorithm performance

Fault detection and diagnosis (FDD) represents one of the most active areas of research and commercial product development in the buildings industry. This paper addresses two questions concerning FDD implementation and advancement 1) What are today's users of FDD saving and spending on the technology? 2) What methods and datasets can be used to evaluate and benchmark FDD algorithm performance? Relevant to the first question, 26 organizations that use FDD across a total 550 buildings and 97 M sf achieved median savings of 8%. Twenty-seven FDD users reported that the median base cost for FDD software, annual recurring software cost, and annual labor cost were $8, $2.7 and $8 per monitoring point, with a median implementation size of approximately 1300 points. To address the second question, this paper describes a systematic methodology for evaluating the performance of FDD algorithms, curates an initial test dataset of air handling unit (AHU) system faults, and completes a trial to demonstrate the evaluation process on three sample FDD algorithms. The work provided a first step toward a standard evaluation of different FDD technologies. Finally, it showed the test methodology is indeed scalable and repeatable, provided an understanding of the types of insights that can be gained from algorithm performance testing, and highlighted the priorities for further expanding the test dataset.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Coal direct chemical looping process: 250 kW pilot-scale testing for power generation and carbon capture

Chemical looping combustion (CLC) is an energy conversion technology that can produce concentrated CO 2 stream without the need for a gas separation step, and thus, has the potential to drastically reduce the energy consumption and cost associated with CO 2 capture in power generation. The coal-direct chemical looping (CDCL) process is a CLC technology that uses a moving bed reducer configuration that can directly consume coal as a feedstock without requiring an upstream gasification step. An integrated 250 kW th CDCL pilot unit using iron-based oxygen carriers was constructed and demonstrated for over 1000 h of testing. The principles for the CDCL pilot unit design and operation are summarized in this article. During the 288-hour continuous operation testing, the CDCL pilot unit achieved >96% coal conversion with a CO 2 purity of >97%. Low carbon carryover into the combustor, i.e. <2%, was also confirmed during the test, which shows the capability of the moving bed reactor to retain and convert coal using the oxygen available on the iron-based oxygen carrier. The results from the pilot unit testing confirms the CDCL concept as a promising coal combustion technology for heat and power generation with CO 2 capture.

10 SYNTHETIC FUELS↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Hall, Scott J.↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Advanced Electric Propulsion System (AEPS)↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Hall, Scott J.↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report

Thruster valve assemblies (T/VA's) were subjected to the development test program for the combined JPL Low-Cost Standardized Spacecraft Equipment (LCSSE) and Mariner Jupiter/Saturn '77 spacecraft (MJS) programs. The development test program was designed to achieve the following program goals: (1) demonstrate T/VA design compliance with JPL Specifications, (2) to conduct a complete performance Cf map of the T/VA over the full operating range of environment, (3) demonstrate T/VA life capability and characteristics of life margin for steady-state limit cycle and momentum wheel desaturation duty cycles, (4) verification of structural design capability, and (5) generate a computerized performance model capable of predicting T/VA operation over pressures ranging from 420 to 70 psia, propellant temperatures ranging from 140 F to 40 F, pulse widths of 0.008 to steady-state operation with unlimited duty cycle capability, and finally predict the transient performance associated with reactor heatup during any given duty cycle, start temperature, feed pressure, and propellant temperature conditions.

Clark, E. C.↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report, addendum

Capillary tube plugging phenomena on the 0.2-lbf thruster/valve assembly was examined. Vibration tests were conducted in the nozzle up attitude. Failure to fire caused by blockage of the capillary tube by catalyst fines was observed after vibration. Water flushing and previbration hot firing were used to remove the fines.

Wilson, W. W.↗

Low-Cost Sulfur Thermal Storage for Solar Industrial Process Heat Applications

Industrial process heat (IPH) is one of the largest energy demands in U.S., representing about 10% of all domestic energy consumption. Fuel costs to generate this industrial process heat are generally a top three cost for industry, a major component in American manufacturing competitiveness. Roughly 60% of US IPH demand (about 6,500 TBtu annually) falls in the medium-temperature range of 100–250 °C. While concentrated solar thermal (CST) technologies can provide a cost-effective source of heat in this temperature range, solar intermittency limits their adoption in industries that operate 24/7. Element 16 Technologies, Inc. developed a low-cost sulfur thermal energy storage (TES) technology to bridge this gap by capturing excess solar heat during the day and dispatching it reliably during non-solar hours. The core innovation is the use of sulfur, an abundant, industrial waste byproduct that costs ten times less than molten salt used in commercial TES systems. The overall goal of the project was to advance the design and development of molten sulfur TES to a manufacturing-relevant prototype stage for solar industrial process heat applications, while establishing and validating a realistic pathway to commercial success. Key tasks included corrosion and mechanical durability testing to identify cost-effective materials, design investigations using physics-based simulation tools, techno-economic evaluations of system lifetime costs, and pilot-scale testing for performance verification. Corrosion testing of steel alloys under cyclic molten sulfur conditions showed that austenitic stainless steels in the 300 series performed particularly well, with no structural degradation of welds or joints. Thermal cyclic testing of pilot sulfur TES units up to 1.5 MWh quantified charge/discharge rates, heat losses, round-trip efficiency and validated the system's capability to operate effectively under intermittent charging conditions. A techno-economic model, informed by sulfur TES performance model validated using pilot test data, showed that hybrid solar+sulfur TES+NG boiler systems are economically competitive with incumbent natural gas boilers for multiple locations in the southwest US. In summary, this project established molten sulfur TES as a technically viable pathway to improve economic competitiveness of American manufacturing by lowering the cost of solar industrial process heat.

14 SOLAR ENERGY↗

Virtual Build: Low-Tech Simulations Can Be High on IPPD Content

After two years of design, component testing, and parts fabrication, the project team was within months of starting assembly on the first major elements of a new product assembly. Schedules were extremely tight and there was no room for error in the first unit build-up for test. The first draft of the assembly drawing was nearing completion and needed to be approved by key members of the Integrated Product Team (IPT) before release. Only then could the manufacturing planning be finalized and released for assembly to begin. What could we do to improve the quality of our first build effort? How could we minimize all the changes inherent in the first-time build of a complex mechanical system? Why not a dress rehearsal of the build process with all the participating players, hardware, and build documentation? A "virtual build simulation". In an organization employing integrated product teams there is no substitute for clear communication between the various cross-functional members. Despite team collocation, integrated solid modeling, and frequent coordination meetings. elements of the product-process design can still slip through the cracks and show up on the assembly floor. The virtual build exercise was designed to provide one intensive hands-on experience for all members of the design and assembly team in time to make corrections without schedule impact.

Hilscher, Rick↗

High resolution infrared radiation sounder for the Nimbus F spacecraft

The activities on the HIRS program are described for the period of July through September, 1973. Completion of design activity and early fabrication effort on the protoflight unit were the major efforts. Operation of the engineering model in spacecraft integration tests was completed during July and August, after which the unit was returned for added test and evaluation.

Koenig, E. W.↗

An Engineered Minimal-Set Stimulus for Periodic Information Leakage Fault Detection on a RISC-V Microprocessor

Recent evaluations of counter-based periodic testing strategies for fault detection in Microprocessor (μP) have shown that only a small set of counters is needed to provide complete coverage of severe faults. Severe faults are defined as faults that leak sensitive information, e.g., an encryption key on the output of a serial port. Alternatively, fault detection can be accomplished by executing instructions that periodically test the control and functional units of the μP. In this paper, we propose a fault detection method that utilizes an ’engineered’ executable program combined with a small set of strategically placed counters in pursuit of a hardware Periodic Built-In-Self-Test (PBIST). We analyze two distinct methods for generating such a binary; the first uses an Automatic Test Generation Pattern (ATPG)-based methodology, and the second uses a process whereby existing counter-based node-monitoring infrastructure is utilized. We show that complete fault coverage of all leakage faults is possible using relatively small binaries with low latency to fault detection and by utilizing only a few strategically placed counters in the μP.

42 ENGINEERING↗

A measured energy use, solar production, and building air leakage dataset for a zero energy commercial building

This paper provides an open dataset of measured energy use, solar energy production, and building air leakage data from a 328 m 2 (3,531 ft 2 ) all-electric, zero energy commercial building in Virginia, USA. Over two years of energy use data were collected at 1-hour intervals using circuit-level energy monitors. Over six years of solar energy production data were measured at 1-hour resolution by 56 microinverters (presented as daily and monthly data in this dataset). The building air leakage data was measured post-construction per ASTM-E779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization and the United States Army Corps (USACE) Building Enclosure Testing procedure; both pressurization and depressurization results are provided. The architectural and engineering (AE) documents are provided to aid researchers and practitioners in reliable modeling of building performance. The paper describes the data collection methods, cleaning, and convergence with weather data. This dataset can be employed to predict, benchmark, and calibrate operational outcomes in zero energy commercial buildings.

14 SOLAR ENERGY↗

Overview of Non-nuclear Testing of the Safe, Affordable 30-kW Fission Engine, Including End-to-End Demonstrator Testing

Successful development of space fission systems will require an extensive program of affordable and realistic testing. In addition to tests related to design/development of the fission system, realistic testing of the actual flight unit must also be performed. At the power levels under consideration (3-300 kW electric power), almost all technical issues are thermal or stress related and will not be strongly affected by the radiation environment. These issues can be resolved more thoroughly, less expensively, and in a more timely fashing with nonnuclear testing, provided it is prototypic of the system in question. This approach was used for the safe, affordable fission engine test article development program and accomplished viz cooperative efforts with Department of Energy labs, industry, universiites, and other NASA centers. This Technical Memorandum covers the analysis, testing, and data reduction of a 30-kW simulated reactor as well as an end-to-end demonstrator, including a power conversion system and an electric propulsion engine, the first of its kind in the United States.

VanDyke, M. K.↗

High Voltage Hall Accelerator Propulsion System Development for NASA Science Missions

NASA Science Mission Directorates In-Space Propulsion Technology Program is sponsoring the development of a 3.8 kW-class engineering development unit Hall thruster for implementation in NASA science and exploration missions. NASA Glenn Research Center and Aerojet are developing a high fidelity high voltage Hall accelerator (HiVHAc) thruster that can achieve specific impulse magnitudes greater than 2,700 seconds and xenon throughput capability in excess of 300 kilograms. Performance, plume mappings, thermal characterization, and vibration tests of the HiVHAc engineering development unit thruster have been performed. In addition, the HiVHAc project is also pursuing the development of a power processing unit (PPU) and xenon feed system (XFS) for integration with the HiVHAc engineering development unit thruster. Colorado Power Electronics and NASA Glenn Research Center have tested a brassboard PPU for more than 1,500 hours in a vacuum environment, and a new brassboard and engineering model PPU units are under development. VACCO Industries developed a xenon flow control module which has undergone qualification testing and will be integrated with the HiVHAc thruster extended duration tests. Finally, recent mission studies have shown that the HiVHAc propulsion system has sufficient performance for four Discovery- and two New Frontiers-class NASA design reference missions.

Kamhawi, Hani↗

DARHT Axis 1 Performance Results with and without a Blumlein Charge Unit

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility provides flash radiography capabilities using two electron Linear Induction Accelerators (LIA’s). Axis 1 of DARHT produces a 20- MeV, 2-kA, 80-ns-FWHM electron beam. As DARHT Axis 1 enters its twentieth year of operation, the probability of Blumlein Charge Unit (BCU) failure has increased and the risk of a failure on the day of an explosive experiment has become more likely. Replacement time for a BCU is four to six hours. This report examines the radiographic and beam transport effect of operating the accelerator with a missing or reduced charge voltage BCU. The results are compared with normal, full machine operation. A prescription for alternate operation with missing or reduced charge voltage on BCU22 is given.

47 OTHER INSTRUMENTATION↗

Micro-Environmental Control System (Final Report)

This project developed an innovative micro-environmental control system (µX) that enables office buildings to reduce energy used for heating and cooling by 15% or more. The µX is a compact, quiet, and ergonomic device that is designed to be installed under an office workstation; it is designed to maintain occupant comfort when room thermostat setpoints are incremented by 4°F or more (warmer in the summer and cooler in the winter) to save energy. When ambient room temperatures are outside of the usual comfort range, the µX maintains occupant comfort by delivering personalized cooling or heating locally to each office worker. The µX provides personalized cooling using a micro vapor compression system that includes a new high-performance micro-scroll compressor and a novel thermal storage unit. The vapor compression system operates at night to freeze a phase-change material (PCM). During the workday, the cooling stored in the PCM is released as a cool breeze of air to make occupants more comfortable. The micro-scroll compressor was developed specifically for this application; it is smaller than any of its type, minimizing the amount of power needed. In heating mode, the µX maintains occupant comfort using a foot heating mat with an infrared reflective box. The µX R&D project was conducted by Syracuse University in collaboration with United Technologies Research Center, Air Innovations, Bush Technical, and Cornell University. Over the course of the initial three-year project, the team developed and evaluated four versions of the unit, advancing the concept to Technology Readiness Level 6. The capabilities of individual proof-of-concept prototypes were verified in tests that were conducted with: 1) units in psychrometric chambers, 2) an instrumented manikin in a laboratory, and 3) human subjects in laboratories that simulate office environments. The tests verified that the µX prototypes met or exceeded all performance targets required to enable office buildings to reduce energy used for heating and cooling by 15% or more by maintaining occupant comfort when thermostat setpoints are incremented by 4°F or more.

25 ENERGY STORAGE↗