Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “systems testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Integration of Dynamic Simulation for Infrastructure and Full Hardware Testing Capability into SCEPTRE

Sandia National Laboratories has an existing capability for hybrid control systems testing called SCEPTRE. This article proposes an architecture to add dynamic simulation capability for the underlying physical process (e.g. the power grid). Dynamic simulation for SCEPTRE will enable very accurate simulation, and allow the full integration of analog control systems hardware.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Temperature Controlled Redox Crystallization Studies

The crystallization of silicates containing redox sensitive ions (e.g., Fe, Ti, Ce) must be performed under controlled and known redox conditions in order to obtain the maximum scientific benefit from experimental study. Furthermore, many compositions crystallize dense phases which settle during ground-based experiments. This settling influences the texture and chemical evolution of the crystallizing system. The purpose of this investigation is to develop a test system in which controlled redox experiments can be performed in the microgravity environment. The system will use solid ceramic oxygen electrolyte cells for control, measurements, and production of the required redox conditions. A preliminary design for a prototype is developed, the electrolyte and furnace tested, and a tentative protocol for experiment developed. The control parameter is to be established and a laboratory prototype built.

Williams, R. J.↗

Recent Development Activities and Future Mission Applications of NASA's Evolutionary Xenon Thruster (NEXT)

NASAs Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to enhance the performance and lower the costs of future NASA space science missions. This is being accomplished by producing Engineering Model (EM) and Prototype Model (PM) components, validating these via qualification-level and integrated system testing, and preparing the transition of NEXT technologies to flight system development. This presentation is a follow-up to the NEXT project overviews presented in 2009-2010. It reviews the status of the NEXT project, presents the current system performance characteristics, and describes planned activities in continuing the transition of NEXT technology to a first flight. In 2013 a voluntary decision was made to terminate the long duration test of the NEXT thruster, given the thruster design has exceeded all expectations by accumulating over 50,000 hours of operation to demonstrate around 900 kg of xenon throughput. Besides its promise for upcoming NASA science missions, NEXT has excellent potential for future commercial and international spacecraft applications.

Electric propulsion↗

Green Propellant Infusion Mission (GPIM) Thruster Valve Testing

The Green Propellant Infusion Mission (GPIM) is a project in the NASA Technology Demonstration Missions (TDM) that will perform a spaceflight demonstration of an AF-M315E propulsion system. The mission is led by Ball Aerospace & Technologies Corporation, with participation across industry and government. The spacecraft is based on the Ball BCP-100 bus, with an Aerojet propulsion system. NASA GSFC provides system testing and analysis of the flow within the AF-M315E propulsion system. A facility was developed at the NASA GSFC propulsion test site to safely use and test the AF-M315E propellant. Testing was performed on multiple 1 N and 22 N non-flight thruster valves provided by Aerojet. A mock-up of the flight system was driven at multiple pressures and temperatures to approximate different flight conditions. Testing was conducted to observe how AF-M315E behaves in fight-like conditions due to the propellant's mass properties heavy dependence on changes in temperature. The testing consisted of driving the different thruster valves at a set on-time and off-time for all and varying the driving pressure from 125 psig to 410 psig. Individual pulses were measured and analyzed for each valve to compare the various rise times and fall times of each thruster valve. The rise times and fall times were then analyzed for thruster valves by measuring the differential pressure from directly upstream and downstream of the valve. The rise times and fall times were also analyzed by measuring the amperage trace of the thruster valve measured with an oscilloscope. The pressure and amperage rise and fall times were compared collectively and individually for the various thruster valves. These results were compared to the fall time data provided by Aerojet.

Hynous, Andrew T.↗

Evaluation of Cable Harness Post-Installation Testing

The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

King, M. S.↗

V/STOLAND avionics system flight-test data on a UH-1H helicopter

The flight-acceptance test results obtained during the acceptance tests of the V/STOLAND (versatile simplex digital avionics system) digital avionics system on a Bell UH-1H helicopter in 1977 at Ames Research Center are presented. The system provides navigation, guidance, control, and display functions for NASA terminal area VTOL research programs and for the Army handling qualities research programs at Ames Research Center. The acceptance test verified system performance and contractual acceptability. The V/STOLAND hardware navigation, guidance, and control laws resident in the digital computers are described. Typical flight-test data are shown and discussed as documentation of the system performance at acceptance from the contractor.

Baker, F. A.↗

A Modular Nuclear Vehicle System with Multi-Mission Capability for Mars Stopover Missions

In depth studies conducted over the past two years have established a modular nuclear stage concept which offers multi-mission capability with a maximum of hardware commonality, i.e., a concept which minimizes total hardware development effort and investment in facilities while providing a logical development evolution from ground test systems to flight test and from initial to more ambitious space applications. Recent results oriented toward the definition and application of such a vehicle concept for the manned Mars landing mission are presented. The basic modular concept employing NERVA nuclear rocket engines is reviewed and the mission peculiar factors affecting the module sizes and number of modules required are discussed. Specific results presented are restricted primarily to the 1982 Mars landing mission via the opposition class mission mode since this is the earliest anticipated date for such a mission. The realistic effects of orbital launch windows are considered and brief discussions of orbital assembly and packaging options with a modular approach are given. Typical ground launch and orbital assembly operations are defined assuming an uprated Saturn V class launch vehicle and the connecting mode of orbital assembly, in which all modules are orbited fully loaded with propellant. The effect of a significant increase in nuclear engine specific impulse is discussed.

Harris, Ronald J.↗

Proposed system safety design and test requirements for the microlaser ordnance system

Safety for pyrotechnic ignition systems is becoming a major concern for the military. In the past twenty years, stray electromagnetic fields have steadily increased during peacetime training missions and have dramatically increased during battlefield missions. Almost all of the ordnance systems in use today depend on an electrical bridgewire for ignition. Unfortunately, the bridgewire is the cause of the majority of failure modes. The common failure modes include the following: broken bridgewires; transient RF power, which induces bridgewire heating; and cold temperatures, which contracts the explosive mix away from the bridgewire. Finding solutions for these failure modes is driving the costs of pyrotechnic systems up. For example, analyses are performed to verify that the system in the environment will not see more energy than 20 dB below the 'No-fire' level. Range surveys are performed to determine the operational, storage, and transportation RF environments. Cryogenic tests are performed to verify the bridgewire to mix interface. System requirements call for 'last minute installation,' 'continuity checks after installation,' and rotating safety devices to 'interrupt the explosive train.' As an alternative, MDESC has developed a new approach based upon our enabling laser diode technology. We believe that Microlaser initiated ordnance offers a unique solution to the bridgewire safety concerns. For this presentation, we will address, from a system safety viewpoint, the safety design and the test requirements for a Microlaser ordnance system. We will also review how this system could be compliant to MIL-STD-1576 and DOD-83578A and the additional necessary requirements.

Stoltz, Barb A.↗

Spacecraft surgical scrub system

Ease of handling and control in zero gravity and minimizing the quantity of water required were prime considerations. The program tasks include the selection of biocidal agent from among the variety used for surgical scrub, formulation of a dispensing system, test, and delivery of flight dispensers. The choice of an iodophore was based on effectiveness on single applications, general familiarity among surgeons, and previous qualification for space use. The delivery system was a choice between the squeeze foamer system and impregnated polyurethane foam pads. The impregnated foam pad was recommended because it is a simpler system since the squeeze foamer requires some applicator to effectively clean the skin surfaces, whereas the form pad is the applicator and agent combined. Testing demonstrated that both systems are effective for use as surgical scrubs.

Abbate, M.↗

Manipulator system performance measurement

Free-flying teleoperator technology for satellite servicing is reported. The rationale for a series of manipulator system tests is presented. Data are reported on movement time in a fine positioning task using two different manipulator systems. The movement time data showed reliable effects of movement direction and index of difficulty. These data were considered to be baseline performance measures for the manipulator system used and modifications to the control and visual systems were suggested for future testing.

Kirkpatrick, M., III↗

Software Requirements Analysis as Fault Predictor

Waiting until the integration and system test phase to discover errors leads to more costly rework than resolving those same errors earlier in the lifecycle. Costs increase even more significantly once a software system has become operational. WE can assess the quality of system requirements, but do little to correlate this information either to system assurance activities or long-term reliability projections - both of which remain unclear and anecdotal. Extending earlier work on requirements accomplished by the ARM tool, measuring requirements quality information against code complexity and test data for the same system may be used to predict specific software modules containing high impact or deeply embedded faults now escaping in operational systems. Such knowledge would lead to more effective and efficient test programs. It may enable insight into whether a program should be maintained or started over.

Wallace, Dolores↗

Check Calibration of the NASA Glenn 10- by 10-Foot Supersonic Wind Tunnel (2014 Test Entry)

A check calibration of the 10- by 10-Foot Supersonic Wind Tunnel (SWT) was conducted in May/June 2014 using an array of five supersonic wedge probes to verify the 1999 Calibration. This check calibration was necessary following a control systems upgrade and an integrated systems test (IST). This check calibration was required to verify the tunnel flow quality was unchanged by the control systems upgrade prior to the next test customer beginning their test entry. The previous check calibration of the tunnel occurred in 2007, prior to the Mars Science Laboratory test program. Secondary objectives of this test entry included the validation of the new Cobra data acquisition system (DAS) against the current Escort DAS and the creation of statistical process control (SPC) charts through the collection of series of repeated test points at certain predetermined tunnel parameters. The SPC charts secondary objective was not completed due to schedule constraints. It is hoped that this effort will be readdressed and completed in the near future.

pressure measurement↗

Heat pipe radiators for space

Analysis of the data heat pipe radiator systems tested in both vacuum and ambient environments was continued. The systems included (1) a feasibility VCHP header heat-pipe panel, (2) the same panel reworked to eliminate the VCHP feature and referred to as the feasibility fluid header panel, and (3) an optimized flight-weight fluid header panel termed the 'prototype.' A description of freeze-thaw thermal vacuum tests conducted on the feasibility VCHP was included. In addition, the results of ambient tests made on the feasibility fluid header are presented, including a comparison with analytical results. A thermal model of a fluid header heat pipe radiator was constructed and a computer program written. The program was used to make a comparison of the VCHP and fluid-header concepts for both single and multiple panel applications. The computer program was also employed for a parametric study, including optimum feeder heat pipe spacing, of the prototype fluid header.

Sellers, J. P.↗

End of FY2014 Report - Filter Measurement System for Nuclear Material Storage Canisters (Including Altitude Correction for Filter Pressure Drop)

Two LANL FTS (Filter Test System ) devices for nuclear material storage canisters are fully operational. One is located in PF-4 ( i.e. the TA-55 FTS) while the other is located at the Radiation Protection Division’s Aerosol Engineering Facility ( i.e. the TA-3 FTS). The systems are functionally equivalent , with the TA-3 FTS being the test-bed for new additions and for resolving any issues found in the TA-55 FTS. There is currently one unresolved issue regarding the TA-55 FTS device. The canister lid clamp does not give a leak tight seal when testing the 1 QT (quart) or 2 QT SAVY lids. An adapter plate is being developed that will ensure a correct test configuration when the 1 or 2 QT SAVY lid s are being tested .

aerosol↗

757 Fly-By-Wire Demonstrator Flight Test

The Boeing Company modified a production 757-200 to emulate the 777 fly-by-wire control laws in order to evaluate the operation and performance of the 777 FBW flight control laws in flight. Following installation and checkout of the FBW system, testing began in March, 1992. Flight testing is currently planned to continue through August, 1992. The conventional 757 longitudinal flight control system is retained but controlled by only the captain’s column. The fly-by-wire system is evaluated by the pilot in the first officer’s seat and the safety pilot function is conducted from the captain’s seat. The flight test FBW longitudinal system is a 2-channel flight control system. The first officer’s column drives the current 757 left and right flight control computers (autopilots) which are modified to act as FBW computers. These FBW computers, which emulate the 777-200 FBW control laws, drive their respective autopilot actuators to control the airplane pitch axis. Directional FBW control laws arc emulated in the existing 757 yaw dampers, with corresponding modifications to the normal 757 directional control system. This paper presents a summary of the airplane FBW modifications and the flight test program to evaluate/validate the 777 FBW flight control laws.

Flight Testing↗

Exploration Platform in the Earth-Moon Libration System Based on ISS

International Space Station (ISS) industry partners have been working for the past two years on concepts using ISS development methods and residual assets to support a broad range of exploration missions. These concepts have matured along with planning details for NASA's Space Launch System (SLS) and Multi-Purpose Crew Vehicle (MPCV) to allow serious consideration for a platform located in the Earth-Moon Libration (EML) system. This platform would provide a flexible basis for future exploration missions and would significantly reduce costs because it will enable re-use of expensive spacecraft and reduce the total number of launches needed to accomplish these missions. ISS provides a robust set of methods which can be used to test systems and capabilities needed for missions to the Moon, Mars, asteroids and other potential destinations. We will show how ISS can be used to reduce risk and improve operational flexibility for missions beyond low earth orbit through the development of a new Exploration Platform based in the EML system. The benefits of using the EML system as a gateway will be presented along with additional details of a lunar exploration mission concept. International cooperation is a critical enabler and ISS has already demonstrated successful management of a large multi-national technical endeavor. We will show how technology developed for ISS can be evolved and adapted to the new exploration challenge. New technology, such as electric propulsion and advanced life support systems can be tested and proven at ISS as part of an incremental development program. Finally, we will describe how the EML Platform could be built and deployed and how International access for crew and cargo could be provided.

Raftery, Michael↗

Spaceport Command and Control System User Interface Testing

The Spaceport Command and Control System will be the National Aeronautics and Space Administration's newest system for launching commercial and government owned spacecraft. It's a large system with many parts all in need of testing. To improve upon testing already done by NASA engineers, the Engineering Directorate, Electrical Division (NE-E) of Kennedy Space Center has hired a group of interns each of the last few semesters to develop novel ways of improving the testing process.

SCCS↗