At least 1,639 records · Page 91

Development Of A Compact Photo-injector With RF-focusing Lens For Short Pulse Electron Source Application

For development of compact ultrafast electron source system, we are currently designing a short-pulse RF-gun with RF focusing structure by means of a series of comprehensive modeling analysis processes. EM design of a 2.5 cell resonant cavity with input coupler, acceleration dynamics of photo-emitted electron bunch, EM design of RF-lens with input coupler, and phasespace analysis of focused electron bunch are systematically examined with multi-physics simulators. All the features of the 2.856 GHz cavity geometry were precisely engineered for acceleration energies ranging from 100 keV to 500 keV (safety limited) to be powered by our 5 MW S-band klystron. The klystron (Thales TH2163) and modulator system (ScandiNova K1 turnkey system) were successfully installed and tested. Performance tests of the klystron system show peak output power > 5 MW, as per operation specifications. At the quasi-relativistic energies, the electron source is capable of generating 100fC -- 1 pC electron bunch with pulse duration close to 30 fs -- 1 ps and transverse size of a few hundred microns. PIC simulations have shown that the electron bunch undergoes fast RF acceleration, rapidly reaching the desired energies, which can be controlled by tuning RF injection phase and input driving power. It has been shown that it is possible to also focus/compress the bunch longitudinally using a RF-lens, which would allow us to control the temporal resolution of the system as well. While our primary analysis has been performed on a 2.5 cell design, we are also looking into half-cell (single cavity) design that is expected to provide the same range of beam energy with a simple configuration.

Grabenhofer, Alexander↗

SULI Research Report Paper

The Intelligence and Space Research Group 4 (ISR-4) at the Los Alamos National Laboratory focuses on signal processing and developing space electronics for various national security missions. The Space and Atmospheric Burst Reporting System (SABRS) is a sensing payload designed for nuclear detonation detection. As the sensors from previous payloads become obsolete, the requirement for a novel payload design increases. SABRS Prime is the successor to the previous SABRS payloads and is scheduled for delivery in 2028. As part of the SABRS Prompt Gamma Instrument Interface Board, high frequency signals from silicon photomultiplier tubes need to be split and subsequently transmitted to the Analog to Digital Converter. Prior to developing the Space Grade Instrument Interface Board, evaluation modules with Commercial off-the-shelf (COTS) components are evaluated and tested under rigorous conditions. Verification of power levels and gain specifications are some of the important steps taken during the evaluation stage. Working on the Signal Splitting Board has enabled me to work with various schematic software applications and learn more about the processes behind designing space grade electronic components. In addition, I conducted research on efficiency improvements for space-based power systems. Changes in design approaches were found to be the most significant sources of improvement. Being able to interact with researchers and peers across various scientific disciplines has given me a better insight into my future pursuits. Working in a R&D environment has cemented my decision to work on space applications for Quantum Sensing and pursue a PhD in Electrical Engineering. The SULI internship program at the Los Alamos National Laboratory has helped me develop the skillset of a researcher, understand the rigorous processes behind developing space grade hardware, and improve my critical thinking abilities to support the development of reliable instrumentation for deep space missions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Carbon Capture on Air Liquide United States Gulf Coast Steam Methane Reformer using the Cryocap TM Flue Gases Process

The objective of this DOE-funded project is to execute and complete a Front-End Engineering and Design (FEED) study for a commercial-scale carbon capture project for Air Liquide’s Steam Methane Reformer (SMR) located at La Porte, near Houston, Texas. The Host Site is one of Air Liquide’s largest SMR assets, and supplies hydrogen to the Air Liquide Gulf Coast Hydrogen System, which serves refiners and petrochemical manufacturers through an existing H2 pipeline spanning roughly 200 miles from Port Arthur, TX to Bay City, TX. The Host Site produces up to 116.5 million standard cubic feet per day (MMSCFD) of gaseous hydrogen and emits approximately 950 ktpy CO 2 at the nameplate capacity. The evolving importance of decarbonized H2 for both existing customers and new markets, as well as the availability and intent of prominent third-party partners to transport and sequester captured CO 2 in locally abundant geological sites for 45Q credits, make the AL US Gulf Coast SMR an ideal site for the proposed FEED study. The envisioned carbon capture system is based on Air Liquide’s proprietary Cryocap™ Flue Gas (FG) process. The integration of the Cryocap™ FG technology to the existing SMR would enable the capture of 900 ktpy of CO 2 , with a net carbon capture rate of >95% and with minimum impact on the levelized cost of hydrogen produced at 99.97% purity.

03 NATURAL GAS↗

Enabling Production of Low Carbon Emissions Steel through CO 2 Capture from Blast Furnace Gases at Cleveland Cliffs’ 5 mtpa Steel Plant at Burns Harbor, Indiana

Dastur International Inc. has prepared a DOE-funded Pre-front-end engineering design (Pre-FEED) study to capture up to 2.8 mtpa of CO 2 from the available Blast Furnace (BF) gases at the Burns Harbor steel plant operated by Cleveland Cliffs in Burns Harbor, Indiana. The project consists of an amine solvent based pre-combustion carbon capture system, along with a unique BF gas conditioning process which significantly optimizes the project design and architecture in terms of higher volumes (2.8 mtpa vis-à-vis 1.6 mtpa without conditioning) & concentration (32 vol% in conditioned gas vs. 22% in raw BF gas) of CO 2 , which can be captured using a single train, resulting in reduced size and capital cost of the CO 2 capture island, and improved overall economics on a $\$$/tCO 2 captured basis.

42 ENGINEERING↗

Genome editing in plants using the compact editor CasΦ

Clustered regularly interspaced short palindromic repeats and CRISPR-associated proteins (CRISPR-Cas) systems have been developed as important tools for plant genome engineering. Here, we demonstrate that the hypercompact CasΦ nuclease is able to generate stably inherited gene edits in Arabidopsis, and that CasΦ guide RNAs can be expressed with either the Pol-III U6 promoter or a Pol-II promoter together with ribozyme mediated RNA processing. Using the Arabidopsis fwa epiallele, we show that CasΦ displays higher editing efficiency when the target locus is not DNA methylated, suggesting that CasΦ is sensitive to chromatin environment. Importantly, two CasΦ protein variants, vCasΦ and nCasΦ, both showed much higher editing efficiency relative to the wild-type CasΦ enzyme. Consistently, vCasΦ and nCasΦ yielded offspring plants with inherited edits at much higher rates compared to WTCasΦ. Extensive genomic analysis of gene edited plants showed no off-target editing, suggesting that CasΦ is highly specific. The hypercompact size, T-rich minimal protospacer adjacent motif (PAM), and wide range of working temperatures make CasΦ an excellent supplement to existing plant genome editing systems.

59 BASIC BIOLOGICAL SCIENCES↗

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

Formal verification and validation of run-to-completion style state charts using Event-B

State chart notations with ‘run to completion’ semantics are popular with engineers for designing controllers that react to environment events with a sequence of state transitions but lack formal refinement and rigorous verification methods. State chart models are typically used to design complex control systems that respond to environmental triggers with a sequential process. The model is usually constructed at a concrete level and verified and validated using animation techniques relying on human judgement. Event-B, on the other hand, is based on refinement from an initial abstraction and is designed to make formal verification by automatic theorem provers feasible. Abstraction and formal verification provide greater assurance that critical (e.g. safety or security) properties are not violated by the control system. In this paper, we introduce a notion of refinement into a ‘run to completion’ state chart modelling notation and leverage Event-B’s tool support for theorem proving. We describe the difficulties in translating ‘run to completion’ semantics into Event-B refinements and suggest a solution. We illustrate our approach and show how models can be validated at different refinement levels using our scenario checker animation tools. We show how critical invariant properties can be verified by proof despite the reactive nature of the system and how behavioural aspects of the system can be verified by testing the expected reactions using a temporal logic, model checking approach. To verify liveness, we outline a proof that the run to completion is deadlock-free and converges to complete the run.

97 MATHEMATICS AND COMPUTING↗

An approach to developing an integrated pyroprocessing simulator

Pyroprocessing has been studied for a decade as one of the promising fuel recycling options in Korea. We have built a pyroprocessing integrated inactive demonstration facility (PRIDE) to assess the feasibility of integrated pyroprocessing technology and scale-up issues of the processing equipment. Even though such facility cannot be replaced with a real integrated facility using spent nuclear fuel (SF), many insights can be obtained in terms of the world's largest integrated pyroprocessing operation. In order to complement or overcome such limited test-based research, a pyroprocessing Modelling and simulation study began in 2011. The Korea Atomic Energy Research Institute (KAERI) suggested a Modelling architecture for the development of a multi-purpose pyroprocessing simulator consisting of three-tiered models: unit process, operation, and plant-level-model. The unit process model can be addressed using governing equations or empirical equations as a continuous system (CS). In contrast, the operation model describes the operational behaviors as a discrete event system (DES). The plant-level model is an integrated model of the unit process and an operation model with various analysis modules. An interface with different systems, the incorporation of different codes, a process-centered database design, and a dynamic material flow are discussed as necessary components for building a framework of the plant-level model. As a sample model that contains methods decoding the above engineering issues was thoroughly reviewed, the architecture for building the plant-level-model was verified. By analyzing a process and operation-combined model, we showed that the suggested approach is effective for comprehensively understanding an integrated dynamic material flow. This paper addressed the current status of the pyroprocessing Modelling and simulation activity at KAERI, and also predicted its path forward.

42 ENGINEERING↗

Cost Estimation of a Permanent Magnet Synchronous Machine for Use in Adjustable Speed-Pumped Storage Hydropower

Electric machine design has become an easier process with the availability of computers in recent decades. However, the interest in electric machine design among students has declined. University-level design courses must compete with courses perceived as more desirable by the potential job market. Hence, the power system engineers with this expertise are very few and are nearing retirement. Contrarily, renewable energy has been picking up in the past few decades. The indeterminacy and variation of renewable energy sources require a balancing mechanism to maintain the constant voltage and frequency of the grid. Adjustable-Speed Pumped-Storage Hydropower plants are considered the contender for future energy storage, providing large capacity and fast-acting response. Large-scale hydropower applications depend on the natural characteristics of each project site, making less expensive, off-the-shelf generators unfeasible. This work gives a shortcut to estimate the cost of constructing a permanent magnet generator for low-volume manufacturing.

13 HYDRO ENERGY↗

Microbial and Chemical Enhancement of In-Situ Carbon Mineralization in Geological Formation

Predictions of global energy usage suggest a continued increase in carbon emissions and rising concentrations of CO 2 in the atmosphere unless major changes are made to the way energy is produced and used. Various carbon capture and storage (CCS) technologies are currently being developed, but unfortunately little is known regarding the fundamental characteristics of CO 2 -mineral reactions to allow a viable in-situ carbon mineralization that would provide the most permanent and safe storage of geologically-injected CO 2 . The ultimate goal of this research project was to develop a microbial and chemical enhancement scheme for in-situ carbon mineralization in geologic formations in order to achieve long-term stability of injected CO 2 . Thermodynamic and kinetic studies of CO 2 -mineral-brine systems were systematically performed to develop the in-situ mineral carbonation process that utilizes organic acids produced by a microbial reactor. The major participants in the project are three faculty members and their graduate and undergraduate students at the School of Engineering and Applied Science and at the Lamont-Doherty Earth Observatory at Columbia University: Alissa Park in Earth and Environmental Engineering & Chemical Engineering (PI), Juerg Matter in Earth and Environmental Science (Co-PI), and Kartik Chandran in Earth and Environmental Engineering (Co-PI). Two graduate students, Huangjing Zhao and Edris Taher, were trained as a part of this project as well as a number of graduate students and undergraduate students who participated part-time. Edris Taher received his MS degree in 2012 and Huangjing Zhao will defend his PhD on Jan. 15th, 2014. The interdisciplinary training provided by this project was valuable to those students who are entering into the workforce in the United States. Furthermore, the findings from this study were and will be published in referred journals to disseminate the results. The list of the papers is given at the end of the report for reference.

54 ENVIRONMENTAL SCIENCES↗

Human Factors Considerations for Hydrogen Rail Refueling and Maintenance

The Federal Railroad Administration (FRA) contracted Sandia National Laboratories to review the risks introduced specifically through human interactions within hydrogen rail refueling and maintenance activities and present recommendations for future system development and implementation. Due to the lack of domestic hydrogen-powered trains at the time of review, observational data was collected on analogous existing systems to consider various ways hydrogen might be implemented within future designs. The team developed 50 human factors design guidelines through analysis of human risk factors. Because hydrogen rail systems are still in the early design stage, the resulting human factors guidelines represent general best practices and do not include specific design features. The research team recommends design and regulatory agencies include a Human Factors Engineer in the design and review process to ensure the guidelines are appropriately implemented and verified.

08 HYDROGEN↗

Advanced Simulation Capability for Environmental Management (ASCEM): Early Site Demonstration

The U.S. Department of Energy Office of Environmental Management, Technology Innovation and Development (EM-32), is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high performance computing tool will facilitate integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. As part of the initial development process, a series of demonstrations were defined to test ASCEM components and provide feedback to developers, engage end users in applications, and lead to an outcome that would benefit the sites. The demonstration was implemented for a sub-region of the Savannah River Site General Separations Area that includes the F-Area Seepage Basins. The physical domain included the unsaturated and saturated zones in the vicinity of the seepage basins and Fourmile Branch, using an unstructured mesh fit to the hydrostratigraphy and topography of the site. The calculations modeled variably saturated flow and the resulting flow field was used in simulations of the advection of non-reactive species and the reactive-transport of uranium. As part of the demonstrations, a new set of data management, visualization, and uncertainty quantification tools were developed to analyze simulation results and existing site data. These new tools can be used to provide summary statistics, including information on which simulation parameters were most important in the prediction of uncertainty and to visualize the relationships between model input and output.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visual Data Analysis as an Integral Part of Environmental Management

The U.S. Department of Energy's (DOE) Office of Environmental Management (DOE/EM) currently supports an effort to understand and predict the fate of nuclear contaminants and their transport in natural and engineered systems. Geologists, hydrologists, physicists and computer scientists are working together to create models of existing nuclear waste sites, to simulate their behavior and to extrapolate it into the future. We use visualization as an integral part in each step of this process. In the first step, visualization is used to verify model setup and to estimate critical parameters. High-performance computing simulations of contaminant transport produces massive amounts of data, which is then analyzed using visualization software specifically designed for parallel processing of large amounts of structured and unstructured data. Finally, simulation results are validated by comparing simulation results to measured current and historical field data. We describe in this article how visual analysis is used as an integral part of the decision-making process in the planning of ongoing and future treatment options for the contaminated nuclear waste sites. Lessons learned from visually analyzing our large-scale simulation runs will also have an impact on deciding on treatment measures for other contaminated sites.

54 ENVIRONMENTAL SCIENCES↗

Control Selection for the Neutralization Tank in the Aqueous Recovery System at the Savannah River Plutonium Processing Facility

The Aqueous Recovery System (ARS) at the Savannah River Plutonium Processing Facility (SRPPF) recovers and purifies plutonium (Pu) using aqueous chemistry techniques. The neutralization tanks in the ARS collect waste streams with various impurities and greatly reduced concentrations of Pu than are produced during aqueous processing. Criticality safety is primarily achieved in the ARS by using geometrically favorable process vessels. However, due to the geometry of neutralization tanks, each tank is administratively limited to no more than 450 g Pu, thus representing the transition from geometry to mass control. To ensure that this mass limit is not exceeded, an administrative control requires taking two samples of any solution to be sent to a neutralization tank. Normal operations are expected to result in less than 50 g Pu in a neutralization tank filled to its capacity of 250 L. Process upsets may cause an inadvertent transfer of up to 1000 g Pu to a neutralization tank, producing a system that is potentially not subcritical for all possible configurations of the tank. To ensure that a neutralization tank remains safety subcritical, passive engineered controls (e.g. changing tank geometry or adding fixed poisons), active engineered controls (e.g. interlocks), and administrative controls (e.g. soluble poisons and valve isolation) were considered and their viability evaluated. Ultimately, the team chose an administrative, dual-valve isolation strategy. This paper will thoroughly discuss the various control strategy options and why many of the options were not feasible for maintaining criticality safety.

Dressman, Phillip M. [Savannah River Nuclear Solut↗

Control Selection for the Neutralization Tank in the Aqueous Recovery System at the Savannah River Plutonium Processing Facility

The Aqueous Recovery System (ARS) at the Savannah River Plutonium Processing Facility (SRPPF) recovers and purifies plutonium (Pu) using aqueous chemistry techniques. The neutralization tanks in the ARS collect the waste streams, containing various impurities and greatly reduced concentrations of Pu, that are produced during aqueous processing. Criticality safety is primarily achieved in the ARS by using geometrically favorable process vessels. However, due to the geometry of neutralization tanks, each tank is administratively limited to no more than 450 g Pu, thus representing the transition from geometry to mass control. To ensure that this mass limit is not exceeded, an administrative control requires taking two samples of any solution to be sent to a neutralization tank. Normal operations are expected to result in less than 50 g Pu in a neutralization tank filled to its capacity of 250 L. Process upsets may cause an inadvertent transfer of up to 1000 g Pu to a neutralization tank, producing a system that is potentially not subcritical for all possible configurations of the tank. To ensure that a neutralization tank remains safety subcritical, passive engineered controls (e.g.changing tank geometry or adding fixed poisons), active engineered controls (e.g. interlocks), and administrative controls (e.g. soluble poisons and valve isolation) were considered and their viability evaluated. Ultimately, the team chose an administrative, dual-valve isolation strategy. This paper will thoroughly discuss the various control strategy options and why many of the options were not feasible for maintaining criticality safety.

Dressman, Phillip M. [Savannah River Nuclear Solut↗

A sociotechnical framework for understanding infrastructure breakdown and repair

This paper looks at how and why infrastructure is repaired. With a new era of infrastructure spending underway, policymakers need to understand and anticipate the particular technical and political challenges posed by infrastructure repair. In particular, as infrastructure problems are increasingly in the public eye with current economic stimulus efforts, the question has increasingly been asked: why has it been so difficult for the United Statesto devote sustained resources to maintaining and upgrading its national infrastructure? This paper provides a sociotechnical framework for understanding the challenges of infrastructure repair, and demonstrates this framework using a case study of seismic retrofit of freeway bridges in California. The design of infrastructure is quite different from other types of design work even when new infrastructure is being designed. Infrastructure projects are almost always situated within, and must work with, existing infrastructure networks. As a result, compared to design of more discrete technological artifacts, the design of infrastructure systems requires a great deal of attention to interfaces as well as adaptation of design to the constraints imposed by existing systems. Also, because of their scale, infrastructural technologies engage with social life at a level where explicit political agendas may playa central role in the design process. The design and building of infrastructure is therefore often an enormously complex feat of sociotechnical engineering, in which technical and political agendas are negotiated together until an outcome is reached that allows the project to move forward. These sociotechnical settlements often result in a complex balancing of powerful interests around infrastructural artifacts; at the same time, less powerful interests have historically often been excluded or marginalized from such settlements.

99 GENERAL AND MISCELLANEOUS↗

A Multi-Sensor Approach for Measuring Bird and Bat Collisions with Offshore Wind Turbines (Final Technical Report)

Collision of birds and bats with wind turbines is a conservation concern for both land-based and offshore wind projects. The fatality rates of birds and bats at land-based turbines are well documented. The measurement strategies on land focus on finding carcasses following collision, estimating the number of carcasses missed through searcher efficiency, carcass persistence trials and carcass fall distributions, and modeling statistically robust fatality rates. Few technologies have been developed to monitor offshore bird and bat collisions, and many that have been developed focused on detecting collisions with large birds. The few studies that have attempted to document collisions at offshore turbines do not account for smaller bodied animals or for collisions that might be missed, which prevents the calculation of statistically robust fatality rates. The overall goal of this report, A Multi-Sensor Approach for Measuring Bird and Bat Collisions with Offshore Wind Turbines (Project), was to develop an effective multi-sensor system for quantifying bird and bat collision rates, specifically for offshore wind facilities. The Project goal and resulting automated collision detection system was achieved through two major technological advancements: 1) refining The Netherlands Organisation for Applied Scientific Research’s (TNO’s) existing WT-Bird® vibration sensing system, that had successfully detected large bird collisions during daytime, to allow for improved detection of smaller birds and bats during both daytime and nighttime hours and 2) improving image processing systems and developing and integrating machine learning algorithms to automatically detect and classify small and large bird and bat collisions with offshore turbines. This final technical report (FTR) summarizes Methods , Results , Conclusions , and Lessons Learned during each of the five Tasks identified for this research and development effort. This FTR includes summaries of the following: Task 1. Initial Engineering Tests to Improve WT-Bird® Task 2. Installation of WT‐Bird® on a Utility-scale Turbine at the National Wind Technology Center – National Renewable Energy Laboratory Task 3. Field Tests and Refinement of the Object Detection System Task 4. Validation of WT-Bird® on a Land-based Turbine Task 5. Preparation for the Implementation of WT-Bird® on an Offshore Turbine. This research and development effort documented successful improvement of the WT Bird® collision detection system to detect small birds and bats, and WT-Bird® is the first collision detection system to validate results compared to land-based post-construction monitoring. The collision trials provide estimates of missed targets that can be used to estimate fatality rates, a significant improvement relative to other offshore collision monitoring systems. Advances were made in developing an edge-processing solution to reduce data storage requirements, which is important if the system is deployed for long periods of time at offshore turbines. The improved WT-Bird® system also provides an important option for wind operators on land or offshore who need to document specific details about when collisions occur, particularly efforts to further research on bat impact minimization, or when standard fatality searches are impractical (e.g. offshore) or inadequate (e.g. challenging locations on land).

17 WIND ENERGY↗