Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

High performance context switching for virtualized FPGA accelerators

A hardware context manager in a field-programmable gate array (FPGA) device includes configuration logic configured to program one or more programming regions in the FPGA device based on configuration data for implementing a target configuration of the one or more programming regions. Context management logic in the hardware context manager is coupled with the configuration logic and saves a first context corresponding to the target configuration by retrieving first state information from the set of one or more programming regions, where the first state information is generated based on the target configuration, and storing the retrieved first state information in a context memory. The context management logic restores the first context by transferring the first state information from the context memory to the one or more programming regions, and causing the configuration logic to program the one or more programming regions based on the configuration data.

42 ENGINEERING↗

Design Considerations of a Coordinative Demand Charge Mitigation Strategy

This paper presents a coordinative demand charge mitigation (DCM) strategy for reducing electricity consumption during system peak periods. Available DCM resources include batteries, diesel generators, controllable loads, and conservation voltage reduction. All resources are directly controlled by load serving entities. A mixed integer linear programming based energy management algorithm is developed to optimally coordinate of DCM resources considering the load payback effect. To better capture system peak periods, two different kinds of load forecast are used: the day-ahead load forecast and the peak-hour probability forecast. Five DCM strategies are compared for reconciling the discrepancy between the two forecasting results. The DCM strategies are tested using actual utility data. Simulation results show that the proposed algorithm can effectively mitigate the demand charge while preventing the system peak from being shifted to the payback hours. We also identify the diminishing return effect, which can help load serving entities optimize the size of their DCM resources.

Hu, Rongxing↗

Vehicle technologies heavy vehicle program : FY 2008 benefits analysis, methodology and results --- final report.

This report describes the approach to estimating the benefits and analysis results for the Heavy Vehicle Technologies activities of the Vehicle Technologies (VT) Program of EERE. The scope of the effort includes: (1) Characterizing baseline and advanced technology vehicles for Class 3-6 and Class 7 and 8 trucks, (2) Identifying technology goals associated with the DOE EERE programs, (3) Estimating the market potential of technologies that improve fuel efficiency and/or use alternative fuels, and (4) Determining the petroleum and greenhouse gas emissions reductions associated with the advanced technologies. In FY 08 the Heavy Vehicles program continued its involvement with various sources of energy loss as compared to focusing more narrowly on engine efficiency and alternative fuels. These changes are the result of a planning effort that first occurred during FY 04 and was updated in the past year. (Ref. 1) This narrative describes characteristics of the heavy truck market as they relate to the analysis, a description of the analysis methodology (including a discussion of the models used to estimate market potential and benefits), and a presentation of the benefits estimated as a result of the adoption of the advanced technologies. The market penetrations are used as part of the EERE-wide integrated analysis to provide final benefit estimates reported in the FY08 Budget Request. The energy savings models are utilized by the VT program for internal project management purposes.

02 PETROLEUM↗

Freedom car and vehicle technologies heavy vehicle program : FY 2007 benefits analysis, methodology and results -- final report.

This report describes the approach to estimating the benefits and analysis results for the Heavy Vehicle Technologies activities of the FreedomCar and Vehicle Technologies (FCVT) Program of EERE. The scope of the effort includes: (1) Characterizing baseline and advanced technology vehicles for Class 3-6 and Class 7 and 8 trucks, (2) Identifying technology goals associated with the DOE EERE programs, (3) Estimating the market potential of technologies that improve fuel efficiency and/or use alternative fuels, (4) Determining the petroleum and greenhouse gas emissions reductions associated with the advanced technologies. In FY 05 the Heavy Vehicles program activity expanded its technical involvement to more broadly address various sources of energy loss as compared to focusing more narrowly on engine efficiency and alternative fuels. This broadening of focus has continued in subsequent activities. These changes are the result of a planning effort that occurred during FY 04 and 05. (Ref. 1) This narrative describes characteristics of the heavy truck market as they relate to the analysis, a description of the analysis methodology (including a discussion of the models used to estimate market potential and benefits), and a presentation of the benefits estimated as a result of the adoption of the advanced technologies. The market penetrations are used as part of the EERE-wide integrated analysis to provide final benefit estimates reported in the FY07 Budget Request. The energy savings models are utilized by the FCVT program for internal project management purposes.

02 PETROLEUM↗

Advanced Assay Systems for Radionuclide Contamination in Soils

Through the support of the Department of Energy (DOE) Office of Environmental Management (EM) Technical Assistance Program, the Idaho National Laboratory (INL) has developed and deployed a suite of systems that rapidly scan, characterize, and analyze surface soil contamination. The INL systems integrate detector systems with data acquisition and synthesis software and with global positioning technology to provide a real-time, user-friendly field deployable turn-key system. INL real-time systems are designed to characterize surface soil contamination using methodologies set forth in the Multi-Agency Radiation Surveys and Site Investigation Manual (MARSSIM). MARSSIM provides guidance for planning, implementing, and evaluating environmental and facility radiological surveys conducted to demonstrate compliance with a dose or risk-based regulation and provides real-time information that is immediately available to field technicians and project management personnel. This paper discusses the history of the development of these systems and describes some of the more recent examples and their applications.

42 ENGINEERING↗

Estuary ecosystem restoration: implementing and institutionalizing adaptive management: Institutionalizing adaptive management

We successfully implemented and institutionalized an adaptive management (AM) process for the Columbia Estuary Ecosystem Restoration Program, which is a large-scale restoration program focused on improving ecosystem conditions in the 234-km lower Columbia River and estuary. For our purpose, “institutionalized” means the AM process and restoration program are embedded in the work flow of the implementing agencies and affected parties. While plans outlining frameworks, processes, or approaches to AM of ecosystem restoration programs are commonplace, establishment for the long term is not. This paper presents the basic AM framework and explains how AM was implemented and institutionalized. Starting with a common goal, we pursued included a well-understood governance and decision-making structure, routine coordination and communication activities, data and information sharing, commitment from partners and upper agency management to the AM process, and meaningful cooperation among program managers and partners. The overall approach and steps to implement and institutionalize AM for ecosystem restoration explained here are applicable to situations where it has been less than successful or, as in our case, the restoration program is just getting started.

adaptive management↗

Migratory Behavior and Survival of Juvenile Salmonids in the Lower Columbia River and Estuary in 2009

The study reported herein was funded as part of the Anadromous Fish Evaluation Program, which is managed by the U.S. Army Corps of Engineers (USACE). The Anadromous Fish Evaluation Program study code is EST P 02 01: A Study of Salmonid Survival and Behavior through the Columbia River Estuary Using Acoustic Tags. The study was conducted by the Pacific Northwest National Laboratory (PNNL) and National Oceanic and Atmospheric Administration (NOAA) Fisheries for the USACE Portland District. Estimated survival of acoustic-tagged juvenile Chinook salmon and steelhead through the lower Columbia River and estuary in 2009 was lowest in the final 50 km of the estuary. Probability of survival was relatively high (>0.90) for yearling and subyearling Chinook salmon from the Bonneville Dam forebay (rkm 236) to Three-tree Point (rkm 49.6). Survival of juvenile Chinook salmon declined sharply through the lower 50 km of the estuary. Acoustic-tagged steelhead smolts did not survive as well as juvenile Chinook salmon between Bonneville Dam and the mouth of the Columbia River. Steelhead survival began to decline farther upstream (at rkm 86) relative to that of the Chinook salmon stocks. Subyearling Chinook salmon survival decreased markedly as the season progressed. It remains to be determined whether later migrating subyearling Chinook salmon are suffering increasing mortality as the season progresses or whether some portion of the apparent loss is due to fish extending their freshwater residence. This study provided the first glimpse into what promises to be a very informative way to learn more about how juvenile salmonid passage experiences through the FCRPS may influence their subsequent survival after passing Bonneville Dam. New information regarding the influence of migration pathway through the lower 50 km of the Columbia River estuary on probability of survival of juvenile salmonids, combined with increased understanding regarding the foraging distances and time periods of avian predators should prove useful in developing or assessing management actions to reduce losses of juvenile salmonid smolts that attempt to pass through the estuary on their seaward migration.

54 ENVIRONMENTAL SCIENCES↗

Knowledge Management Analysis for Content Migration

This Content Migration Plan provides a framework and methodology for managing and executing the migration of content to the NEFC Program’s on-premises SharePoint 2016 instance, as well as guidelines regarding how to ensure that Knowledge Management Program content, both during and after the migration, is tagged properly. Analysis continues to develop a migration plan for a SharePoint Online instance in a Cloud environment.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Support of UJV Rez, a. s. for Shipments of Spent Nuclear Fuel Within the M3 Program - 19035

In 2005, UJV Rez, a. s. (UJV, the former Nuclear Research Institute Rez), Czech Republic joined the Russian Research Reactor Fuel Return (RRRFR) program under the US-Russian Global Threat Reduction Initiative (GTRI) (now Material Management and Minimization program, M{sup 3}). The primary goal of the program is to advance nuclear nonproliferation objectives encouraging eligible countries to convert their research reactors from highly enriched uranium (HEU) to low enriched uranium (LEU) fuel and eliminating stockpiles of HEU. UJV's daughter company, Research Centre Rez, operates the LVR-15 research reactor with output of 10 MWth, which has been in operation since 1957. After more than 50 years of operation of the reactor, a large amount of spent nuclear fuel (SNF) of Russian origin had been accumulated. The SKODA VPVR/M high capacity casks were used for SNF shipment from the LVR-15 research reactor back to the Russian Federation (RF). The cask has a capacity of 36 fuel assemblies, and 16 casks are available. This means that 576 FA can be transported in one shipment. Two SNF shipments of HEU and LEU SNF from UJV were realized in 2007 and 2013. After the shipments were completed, only LEU nuclear fuel remained on the territory of the Czech Republic. Proven to be an excellent and very sophisticated system for SNF transportation, the SKODA VPVR/M casks were further employed for SNF shipments from Bulgaria, Hungary, Poland, Ukraine, Belarus, Serbia, Vietnam, Uzbekistan and Georgia to Russia. Some shipments were carried out as air shipments with use of the TUK-145/C cask system developed in Russia that included the SKODA cask. In 2016, the new SKODA MNSR casks were developed on the base of the SKODA VPVR/M casks in the Czech Republic and currently are being employed in the shipments of HEU cores of Chinese Miniature Neutron Source Reactors (MNSR) to China. The TUK-145/C-MNSR cask system developed in Russia is used for air transportation. The shipment from Ghana was carried out in 2016; the shipment from Nigeria is under realization. Shipments from Syria, Iraq and Pakistan are planned. Sixteen shipments from eleven countries using a total of 109 SKODA casks have already been completed without any incident or accident and more than 3500 fuel assemblies or cores have been shipped to Russia and China. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Importance of Data Management in a Long-term Biological Monitoring Program

The long-term Biological Monitoring and Abatement Program (BMAP) has always needed to collect and retain high-quality data on which to base its assessments of ecological status of streams and their recovery after remediation. Its formal quality assurance, data processing, and data management components all contribute to this need. The Quality Assurance Program comprehensively addresses requirements from various institutions, funders, and regulators, and includes a data management component. Centralized data management began a few years into the program. An existing relational database was adapted and extended to handle biological data. Data modeling enabled the program's database to process, store, and retrieve its data. The data base's main data tables and several key reference tables are described. One of the most important related activities supporting long-term analyses was the establishing of standards for sampling site names, taxonomic identification, flagging, and other components. There are limitations. Some types of program data were not easily accommodated in the central systems, and many possible data-sharing and integration options are not easily accessible to investigators. The implemented relational database supports the transmittal of data to the Oak Ridge Environmental Information System (OREIS) as the permanent repository. From our experience we offer data management advice to other biologically oriented long-term environmental sampling and analysis programs.

54 ENVIRONMENTAL SCIENCES↗

Department of Energy Office of Legacy Management Progress on Defense-Related Uranium Mines Program - 18119

The Defense-Related Uranium Mines (DRUM) Program provides the structure and basis for the US Department of Energy Office of Legacy Management (LM) to manage the verification and validation (V and V) of defense-related uranium mines (mines) that provided ore to the Atomic Energy Commission from 1947 to 1970. V and V activities are conducted to fully understand the scope of potential problems posed by these mines by determining their location, reclamation or remediation status, and potential impacts to public safety, human health, and the environment. Land management agencies have limited resources and have generally not conducted comprehensive inventories of abandoned uranium mines, thus adding to the need to undertake this program. LM has entered into memoranda of understanding (MOUs) with the US Bureau of Land Management (BLM) and US Forest Service (USFS) to facilitate a better understanding of the scope of the problem posed by these mines. Currently, LM has executed MOUs with the BLM state offices in Colorado, New Mexico, Utah, and Wyoming and the USFS Rocky Mountain Region, which includes the national forests in Colorado, Wyoming, and South Dakota. This collaborative effort with partner agencies has led LM to develop a V and V Work Plan that describes the numerous activities and types of data to be collected at the mines. V and V activities verify actual mine location, collect coordinates of mining-related features, collect radiological data and soil samples, identify potential physical safety hazards, prioritize mines using a risk-based screening approach, and report the information to partner agencies. The partner agencies may use the reports to assess priorities and determine if any further action is warranted. The DRUM Program goals are to: - Improve data quality and content in the LM national inventory of abandoned uranium mines; - Conduct site-specific reconnaissance at mines for data verification and validation; - Exchange mine information with other federal agencies and state governments to help address mines presenting the greatest risks; - Develop reports for each mine that will contain a risk scoring assessment to help each agency develop priorities. The preliminary risk screening methodology was based on a joint effort between LM and BLM to develop factors that would be based on field observations, field data, and laboratory data using a multiple-lines-of-evidence approach. The multiple-lines-of-evidence assessment allows land managers the opportunity and flexibility to query specific criteria and make rankings based on specific priorities. The risk screening for each mine is based on evaluating the primary hazards of physical safety and risks to human health and several modifying factors that include accessibility and ecological/environmental risks. Gamma radiation scans are performed across the disturbed area of the mine, and soil samples are taken from waste rock piles and drainages, when applicable. This paper presents the results of performing inventory, environmental sampling, and risk ranking along with other accomplishments and lessons learned during the initial year of V and V activities and reporting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Joint FAM/Line Management Assessment Report on LLNL Machine Guarding Safety Program

The LLNL Safety Program for Machine Guarding is implemented to comply with requirements in the ES&H Manual Document 11.2, "Hazards-General and Miscellaneous," Section 13 Machine Guarding (Rev 18, issued Dec. 15, 2015). The primary goal of this LLNL Safety Program is to ensure that LLNL operations involving machine guarding are managed so that workers, equipment and government property are adequately protected. This means that all such operations are planned and approved using the Integrated Safety Management System to provide the most cost effective and safest means available to support the LLNL mission.

99 GENERAL AND MISCELLANEOUS↗

Sandia National Laboratories, California Pollution Prevention Program annual Report

The Pollution Prevention (P2) Program is one of six programs under the Environmental Management Department at Sandia National Laboratories, California (SNL/CA). The P2 Program promotes the elimination or reduction of all types of wastes generated at SNL/CA. The Program works closely with the site’s organizations to establish routine and project specific recycling programs. The Program provides guidance for resource and energy conservation and assists in identifying recycled-content products for use throughout the site. The P2 Program also implements the Universal Waste program to ensure proper handling and disposal of low-hazard waste specifically consumer electronics, batteries, cathode ray tubes (CRTs), and fluorescent tubes. The P2 Program is responsible for the collection, analysis, and reporting of waste generation, recycling and Environmentally Preferable Purchases (EPP) data. The P2 Program is part of the SNL/CA Environmental Management System (EMS) and maintains responsibility for implementing the DOE Pollution Prevention performance based goals. The Program is an indirectly funded program, supported through the Integrated Enabling Service.

Dicker, Deanna M.↗

Conceptual Soundness, Metric Development, Benchmarking, and Targeting for PATH Subprogram Evaluation

The objective of this study is to evaluate the conceptual soundness of the U.S. Department of Housing and Urban Development (HUD) Partnership for Advancing Technology in Housing (PATH) program's revised goals and establish and apply a framework to identify and recommend metrics that are the most useful for measuring PATH's progress. This report provides an evaluative review of PATH's revised goals, outlines a structured method for identifying and selecting metrics, proposes metrics and benchmarks for a sampling of individual PATH programs, and discusses other metrics that potentially could be developed that may add value to the evaluation process. The framework and individual program metrics can be used for ongoing management improvement efforts and to inform broader program-level metrics for government reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Network modeling for reverse flows of end-of-life vehicles

Highlights: • We developed a network model for reverse flows of end-of-life vehicles. • The model considers all recovery operations for end-of-life vehicles. • A scenario-based model is used for uncertainty to improve real case applications. • The model is adequate to real case applications for end-of-life vehicles recovery. • Considerable insights are gained from the model by sensitivity analyses. - Abstract: Product recovery operations are of critical importance for the automotive industry in complying with environmental regulations concerning end-of-life products management. Manufacturers must take responsibility for their products over the entire life cycle. In this context, there is a need for network design methods for effectively managing recovery operations and waste. The purpose of this study is to develop a mathematical programming model for managing reverse flows in end-of-life vehicles’ recovery network. A reverse flow is the collection of used products from consumers and the transportation of these products for the purpose of recycling, reuse or disposal. The proposed model includes all operations in a product recovery and waste management network for used vehicles and reuse for vehicle parts such as collection, disassembly, refurbishing, processing (shredding), recycling, disposal and reuse of vehicle parts. The scope of the network model is to determine the numbers and locations of facilities in the network and the material flows between these facilities. The results show the performance of the model and its applicability for use in the planning of recovery operations in the automotive industry. The main objective of recovery and waste management is to maximize revenue and minimize pollution in end-of-life product operations. This study shows that with an accurate model, these activities may provide economic benefits and incentives in addition to protecting the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗