Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “accelerated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Machine Learning-Based Technique for Automated Sensor Characterization

The development of novel instrumentation requires an iterative cycle with three stages: design, prototyping, and testing. Recent advancements in simulation and nanofabrication techniques have significantly accelerated the design and prototyping phases. Nonetheless, detector characterization continues to be a major bottleneck in device development. During the testing phase, a significant time investment is required to characterize the device in different operating conditions and find optimal operating parameters. The total effort spent on characterization and parameter optimization can occupy a year or more of an expert s time. In this work, we present a novel technique for automated sensor calibration that aims to accelerate the testing stage of the development cycle. This technique leverages closed-loop Bayesian optimization (BO), using real-time measurements to guide parameter selection and identify optimal operating states. We demonstrate the method with a novel low-noise CCD, showing that the machine learning-driven tool can efficiently characterize and optimize operation of the sensor in a couple of days without supervision of a device expert.

Zepeda, Cuevas [Chicago U., KICP]↗

Automating Sensor Characterization with Bayesian Optimization

The development of novel instrumentation requires an iterative cycle with three stages: design, prototyping, and testing. Recent advancements in simulation and nanofabrication techniques have significantly accelerated the design and prototyping phases. Nonetheless, detector characterization continues to be a major bottleneck in device development. During the testing phase, a significant time investment is required to characterize the device in different operating conditions and find optimal operating parameters. The total effort spent on characterization and parameter optimization can occupy a year or more of an expert's time. In this work, we present a novel technique for automated sensor calibration that aims to accelerate the testing stage of the development cycle. This technique leverages closed-loop Bayesian optimization (BO), using real-time measurements to guide parameter selection and identify optimal operating states. We demonstrate the method with a novel low-noise CCD, showing that the machine learning-driven tool can efficiently characterize and optimize operation of the sensor in a couple of days without supervision of a device expert.

Cuevas-Zepeda, Julian [Chicago U., KICP; Chicago U↗

Electron acceleration by Z-mode and whistler-mode waves

We carried out a series of particle simulations to study electron acceleration by Z-mode and whistler-mode waves generated by an electron ring distribution. The electron ring distribution leads to excitations of X-mode waves mainly in the perpendicular direction, Z-mode waves in the perpendicular and parallel directions, and whistler-mode waves mainly in the parallel direction. The parallel Z- and whistler-mode waves can lead to an effective acceleration of ring electrons. The electron acceleration is mainly determined by the wave amplitude and phase velocity, which in turn is affected by the ratio of electron plasma to cyclotron frequencies. For the initial kinetic energy ranging from 100 to 500 keV, the peak energy of the accelerated electrons is found to reach 2–8 times the initial kinetic energy. We further study the acceleration process by test-particle calculations in which electrons interact with one, two, or four waves. The electron trajectories in the one-wave case are simple diffusion curves. In the multi-wave cases, electrons are accelerated simultaneously by counter-propagating waves and can have a higher final energy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Whitepaper submitted to Snowmass21: Advanced accelerator linear collider demonstration facility at intermediate energy

It is widely accepted that the next lepton collider beyond a Higgs factory would require center-of-mass energy of the order of up to 15 TeV. Since, given reasonable space and cost restrictions, conventional accelerator technology reaches its limits near this energy, high-gradient advanced acceleration concepts are attractive. Advanced and novel accelerators (ANAs) are leading candidates due to their ability to produce acceleration gradients on the order of 1--100~GV/m, leading to compact acceleration structures. Over the last 10-15 years significant progress has been achieved in accelerating electron beams by ANAs. For example, the demonstration of several-GeV electron beams from laser-powered capillary discharge waveguides, as well as the proof-of-principle coupling of two accelerating structures powered by different laser pulses, has increased interest in ANAs as a viable technology to be considered for a compact, TeV-class, lepton linear collider. However, intermediate facilities are required to test the technology and demonstrate key subsystems. A 20-100 GeV center-of-mass energy ANA-based lepton collider can be a possible candidate for an intermediate facility. Apart from being a test beam facility for accelerator and detector studies, this collider will provide opportunities to study muon and proton beam acceleration, investigate charged particle interactions with extreme electromagnetic fields (relevant for beam delivery system designs and to study the physics at the interaction point), as well as precision Quantum Chromodynamics and Beyond the Standard Model physics measurements. Possible applications of this collider include the studies of $\gamma\gamma$ and $e$-ion collider designs.

43 PARTICLE ACCELERATORS↗

Status of J-PARC Main Ring

The J-PARC (Japan Proton Accelerator Research Complex) facility is under construction as a joint project of KEK and JAEA. In this paper, we present a construction status of slow cycling main ring synchrotron (MR) of J-PARC. Performance test and installation of accelerator components are now in progress. Beam commissioning is scheduled to start in May 2008.

43 PARTICLE ACCELERATORS↗

Varying alpha and cosmic acceleration in Brans-Dicke-BSBM theory: stability analysis and observational tests

By integration of generalized BSBM and Brans-Dicke cosmological models, in this article, we investigate the theoretical framework of fine structure constant variation and current cosmic acceleration. We first develop a mathematical formalism to analyse the stability of the model. By employing observational data to constrain the model parameters, phase space is performed and the attractor solutions of the model are detected. We then examine the model against observational data such as observational Hubble parameter dataset and quasar absorption spectra. The results confirm current universe acceleration and also predicts fine structure constant variation. Furthermore, extrapolation of the best fitted model in high redshift (z > 15) illustrates a significantly larger variation of fine structure constant in earlier epoch of the universe.

79 ASTRONOMY AND ASTROPHYSICS↗

Microsecond-latency feedback at a particle accelerator by online reinforcement learning on hardware

The commissioning and operation of future large-scale scientific experiments will challenge current tuning and control methods. Reinforcement learning (RL) algorithms are a promising solution due to their ability to dynamically adapt to changing environments and consider delayed consequences. In many real-world applications, RL policies must produce actions in real time, often within microseconds to milliseconds, imposing significant constraints on system latency and computational overhead that conventional machine learning libraries are not designed to handle. To control phenomena in real time at these timescales, RL needs to be deployed on-the-edge, namely on dedicated hardware located near the system it controls, without relying on a host CPU or cloud-based inference. In this work we present the design and deployment of an experience accumulator system in a particle accelerator. In this system, deep-RL algorithms run using hardware acceleration and act within a few microseconds, enabling the use of RL for control of phenomena like beam instabilities. The training uses the collected data offline to reduce the number of operations carried out on the acceleration hardware. The proposed architecture was tested in real experimental conditions at the Karlsruhe research accelerator, a synchrotron light source, where the system was used to control artificially induced horizontal betatron oscillations in real-time, with a control loop period of just 2.7 μs. The results showed a performance comparable to the commercial feedback system available at the accelerator, demonstrating the viability and potential of this approach. Due to the self-learning and reconfiguration capability of this implementation, a seamless application to other control problems is possible. Applications range from particle accelerators to large-scale research and industrial facilities.

FPGA↗

Beam Dynamics Studies and the Design, Fabrication and Testing of Superconducting Radiofrequency Cavity for High Intensity Proton Accelerator

The application horizon of particle accelerators has been widening significantly in recent decades. Where large accelerators have traditionally been the tools of the trade for high-energy nuclear and particle physics, applications in the last decade have grown to include large-scale accelerators like synchrotron light sources and spallation neutron sources. Applications like generation of rare isotopes, transmutation of nuclear reactor waste, sub-critical nuclear power, generation of neutrino beams etc. are next area of investigation for accelerator scientific community all over the world. Such applications require high beam power in the range of few mega-watts (MW). One such high intensity proton beam facility is proposed at Fermilab, Batavia, US, named as Project-X. Project-X facility is based on H - linear accelerator (linac), which will operate in continuous wave (CW) mode and accelerate H - ion beam with average current of 1 mA from kinetic energy of 2.5 MeV to 3 GeV to deliver 3MW beam power. One of the most challenging tasks of the Project-X facility is to have a robust design of the CW linac which can provide high quality beam to several experiments simultaneously. Hence a careful design of linac is important to achieve this objective.

43 PARTICLE ACCELERATORS↗

DETERMINATION OF CORROSION INHIBITOR CRITERIA FOR TYPE III IIIA TANKS DURING SALT DISSOLUTION OPERATIONS

Preparation of high level waste for vitrification involves in part the dissolution of salt cake from the carbon steel storage tanks. The salt crystals composing this cake are high in nitrate concentration with the interstitial liquid being high in hydroxide and nitrite concentration. During the salt dissolution process, a stage is reached in which the inhibitors, hydroxide and nitrite, are insufficient to prevent nitrate stress corrosion cracking (SCC) and fall outside the requirements of the corrosion control program. Additional inhibitors, which are necessary to meet the requirements, may be counterproductive to the efficiency of the process and waste minimization. Corrosion testing was initiated to better characterize the necessary inhibitor concentration for high nitrate waste during salt dissolution processing. A four-phase test program is being conducted: (1) electrochemical characterization, (2) accelerated or polarized U-bend testing, (3) long-term (non-polarized) U-bend testing and (4) vapor space U-bend tests. Electrochemical testing, which included cyclic potentiodynamic polarization (CPP), linear polarization resistance (LPR) and open-circuit potential (OCP) measurements, was performed to identify stress corrosion cracking susceptibility, to characterize pitting resistance and to determine the general corrosion rate. Polarized U-bend tests were utilized to assess the effect of minimum inhibitor concentrations and heat treatment on SCC and to determine test parameters for future long-term U-bend testing. Results from CPP, LPR and OCP tests demonstrated that carbon steel formed a protective oxide film and the potential became electropositive during exposure to the waste at all inhibitor concentrations. The tenacity of this film improved as the inhibitor concentration level was increased and the temperature was decreased. This passive film increased the resistance to localized corrosion significantly. Therefore if any of these inhibitor levels are selected for storage of dissolved salt solutions, no changes to the service life estimates that were based on general corrosion are necessary. The breakdown potential for SCC as well as the other electrochemical parameters were independent of nitrate concentration (4.5-8.5 M). The breakdown potential, however, was strongly affected by temperature (i.e., 25 and 50 C) and inhibitor concentration. These results indicate that for this nitrate concentration range a critical inhibitor level is necessary for minimizing the occurrence of SCC. The polarized U-bend tests were in good agreement with the electrochemical tests. The U-bend testing clearly demonstrated that the heat treating of the samples clearly improved the SCC resistance of A537 carbon steel even at the low inhibitor concentration (0.01 M hydroxide and 0.01 M nitrite). This concentration was insufficient to prevent cracking for any tested nitrate concentration (4.5-8.5 M). At a 7 M nitrate concentration, SCC was prevented for inhibitor concentrations as low as 0.3 M hydroxide and 0.1 M nitrite. The current inhibitor requirements for a waste containing 7 M nitrate are 0.6 M hydroxide and 1.1 M hydroxide and nitrite. Thus, a considerable reduction in the amount of inhibitor necessary may be attained. It will also be recommended that the temperature of the dissolved salt solution be maintained below 50 C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated Weathering of Waste Glass at 90°C with the Pressurized Unsaturated Flow (PUF) Apparatus: Implications for Predicting Glass Corrosion with a Reactive Transport Model

The interest in the long-term durability of waste glass stems from the need to predict radionuclide release rates from the corroding glass over geologic time-scales. Several long-term test methods have been developed to accelerate the glass-water reaction [drip test, vapor hydration test, product consistency test-B, and pressurized unsaturated flow (PUF)]. Currently, the PUF test is the only method that can mimic the unsaturated hydraulic properties expected in a subsurface disposal facility and simultaneously monitor the glass-water reaction. PUF tests are being conducted to accelerate the weathering of glass and validate the model parameters being used to predict long-term glass behavior. One dimensional reactive chemical transport simulations of glass dissolution and secondary phase formation during a 1.5-year long PUF experiment was conducted with the subsurface transport over reactive multi-phases (STORM) code. Results show that parameterization of the computer model by combining direct laboratory measurements and thermodynamic data provides an integrated approach to predicting glass behavior over geologic-time scales.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diagnostics of the ITER neutral beam test facility

The ITER heating neutral beam (HNB) injector, based on negative ions accelerated at 1 MV, will be tested and optimized in the SPIDER source and MITICA full injector prototypes, using a set of diagnostics not available on the ITER HNB. The RF source, where the H{sup -}/D{sup -} production is enhanced by cesium evaporation, will be monitored with thermocouples, electrostatic probes, optical emission spectroscopy, cavity ring down, and laser absorption spectroscopy. The beam is analyzed by cooling water calorimetry, a short pulse instrumented calorimeter, beam emission spectroscopy, visible tomography, and neutron imaging. Design of the diagnostic systems is presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗