Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Arvia Organics Destruction: An Innovative Treatment Approach for Dioxins, Furans and Other Problematic (Orphan) Organic Wastes - 16262

The safe and efficient disposal of radionuclide-contaminated organic wastes is a key component in the lifecycle of a nuclear power plant. Technologies are available for the processing of some of these wastes although there are a number of waste streams for which the disposition path is not clear or does not exist at all. For example, waste streams such as dioxin, furan and PCB-laden oils and aqueous organic matrices pose an issue for the US Dept. of Energy complex. These wastes present a challenge as they cannot be readily treated using existing treatment technologies because of legislative and material constraints such as gaseous phase radioactivity discharge limits, waste elemental content, by-product generation and waste resistance to thermal decomposition. Alternate methods of organics destruction can circumvent some of these issues by using different mechanisms of organics oxidation. One such innovative method, known as the Arvia organics destruction process, combines adsorption with electrochemical combustion and offers such an alternative. This technology, based on a patented material, Nyex{sup TM} that is able to act as both an adsorbent and as an electrode, allows the electrochemical combustion of adsorbed organics to occur on the material's surface. The result is the destruction of organics whilst the bulk of inorganic and radionuclide components remain in the aqueous phase. These components can subsequently be treated using existing waste processing technologies. This paper outlines recent work conducted on demonstrating the Arvia process against the destruction of dioxin, furan and PCB-laden wastes that demonstrates that the technology successfully removes these target species to below discharge standards in the aqueous phase. Based on these successful trials a test unit has been designed to demonstrate the process on actual radioactive wastes at the DOE Oak Ridge facility. During commissioning at Arvia's facility the unit achieved a destruction rate of over 1.5 ml of 100% organic waste per hour. The unit is currently at a partner laboratory facility based at Oak Ridge National Laboratories and has recently completed a further suite of simulant trials which are reported here. The above work showcases the development, testing and initial application of an innovative technology, first presented to the industry at the Waste Management 2012, as another option for the treatment of challenging wastes with expensive, complex or no current disposal routes. Over the years the technology has gone through a number of proving stages culminating in the testing on real orphan wastes based at the Oak Ridge Facility. The Arvia Organics Destruction Cell technology adds to the portfolio of available treatment technologies and will help facilitate the decommissioning and waste disposal responsibilities of the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Explore Moon to Mars

OSCAR Overview: What? Orbital Syngas Commodity Augmentation Reactor. Why? Current methods of space waste management are comprehensively unsustainable • Convert trash and human waste into useful gases, enabling long duration human exploration of deep space. Confirm the operability of a space waste conversion reactor in microgravity How? Incineration and steam reforming. Reactor heats (600 °C) the trash under pressure (40 psia) to incinerate it. Suborbital flight sequence trash conversion: 60-70%. Long duration trash conversion: up to 90%.

Morgan A Benson↗

2nd Quarter Transportation Report FY2015: Radioactive Waste Shipments to and from the Nevada National Security Site

This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 2nd quarter of Fiscal Year (FY) 2015 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chapter 10, Industry, in: Climate Change 2014: Mitigation of Climate Change. Contribution of Working Group III to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change

This chapter provides an update to developments on mitigation in the industry sector since the IPCC (Intergovernmental Panel on Climate Change) Fourth Assessment Report (AR4) (IPCC, 2007), but has much wider coverage. Industrial activities create all the physical products (e.g., cars, agricultural equipment, fertilizers, textiles, etc.) whose use delivers the final services that satisfy current human needs. Compared to the industry chapter in AR4, this chapter analyzes industrial activities over the whole supply chain, from extraction of primary materials (e.g.,ores) or recycling (of waste materials), through product manufacturing, to the demand for the products and their services. It includes a discussion of trends in activity and emissions, options for mitigation (technology, practices, and behavioural aspects), estimates of the mitigation potentials of some of these options and related costs, co-benefits, risks and barriers to their deployment, as well as industry - specific policy instruments. Findings of integrated models (long -term mitigation pathways) are also presented and discussed from the sector perspective. In addition, at the end of the chapter, the hierarchy in waste management and mitigation opportunities are synthesized,covering key waste -related issues that appear across all chapters in the Working Group III contribution to the Fifth Assessment Report.

Fischedick, Manfred↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2nd Quarter FY18 Transportation Report

This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. This report summarizes the 2nd quarter of fiscal year (FY) 2018 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW), which includes classified LLW and MLLW, classified non-radioactive (CNR) and classified non-radioactive hazardous (CNRH) shipments. There were no shipments sent for offsite treatment from a NNSS facility and returned to the NNSS this quarter of FY2018.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System - 17541

The Pile Fuel Cladding Silo (PFCS) at the Sellafield decommissioning, reprocessing and nuclear waste management facility in the UK was constructed in the late 1940-s and used for the storage of Intermediate Level Waste (ILW) arising from the Windscale Piles, Calderhall and Chapelcross Reactors until the 1960's. The PFCS is 21 metres high and comprises 6 identical tall compartments with the waste added to the silo via a charge-hole at the top of each compartment; each compartment is split by a central dividing wall that runs from the base of the silo to a few metres below the underside of the silo roof. A deflector plate assembly (DPA) supported on two horizontal beams is located between the top of the dividing wall and the roof and allowed the waste to spread as it fell into the silo and prevent excessive mounding. Sellafield Ltd is currently engaged in an overall programme of works to remove the waste for storage within modern ILW containers. Prior to the commencement of these works the Deflector Plate Assemblies (DPA) and beam structures within the silos are required to be removed to allow access for the waste retrievals equipment through the side of the silo at the point where the DPAs are situated. James Fisher Nuclear (JFN) and Sellafield Ltd have developed a system using suspended water jet cutting equipment combined with custom long reach tooling, installed through penetrations made in the side of the silo, to enable the remote size reduction of the DPA and beams within each compartment. The use of a low pressure suspended water jet cutting system has enabled a single water/abrasive hose to be routed down a tool deployment pole and allowed long hose lengths up to 80 m from pump to nozzle enabling siting of equipment on a congested and difficult access site. The use of lightweight, yet high strength, carbon fibre poles within the tools has enabled the deployment of tool end effectors at distances of up to 6.5 m from the compartment walls using a relatively small 60 mm diameter pole. This maximised articulation of the pole within the 300 mm wall penetrations to reach all areas of the DPA. Capability of the operators to install the tooling and size reduce DPA and beam assemblies have been demonstrated through the training on a Full Scale Test Rig (FSTR). The FSTR was integral to the development of the equipment and techniques and to providing assurance to the client that the project was technically achievable given the tight building restraints and safety issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical Modelling of Radionuclide Migration in the Context of a Near-Surface LILW Disposal Facility - 18618

The reference solution for the management of low and intermediate level short-lived waste (LILW) in France consists in their emplacement in concrete vaults built at the near-surface. The corresponding disposal facility under operation by the French waste management organization (Andra), is located in North-eastern France and planned to be closed in 2060. The safety case developed by Andra has to show the evidence that, amongst other aspects, the radionuclide transfer through the confinement barriers will occur in such a way that the human and environmental exposure will be as low as reasonably achievable (ALARA) and in accordance with the dose constraints. For this purpose, modelling is used to integrate uncertainties about the characteristics of concrete components, waste and water table and their evolution in time and space. At last, modelling is finally used to investigate the radiological impact of specific scenarios in which the failure of safety barriers occurs. In the frame of its technical review of the safety assessment, the French Institute for Radiological Protection and Nuclear Safety (IRSN) also performs such kind of numerical modelling of radionuclide fate from the waste to the hydrogeological outlets, in order to check whether the assessment performed by Andra takes into account sufficiently conservative assumptions. The present work aims to evaluate the role of components of the vaults on radionuclide transport during the post-closure period over a few thousand years. For this purpose, IRSN carries out numerical calculations with MELODIE software, which simulates water flow and transport of species, in order to simulate radionuclide migration from waste packages emplaced in a concrete vault to the surrounding groundwater. The developed transport model focuses on 3-H radionuclide and integrates Andra's main assumptions (release model from the waste packages, chemical and hydraulic properties of the vault components, shrinkage and cracks in concrete components). An adaptive mesh method, based on an a posteriori error estimator, was used to model the cracks and the consideration of a strong heterogeneity in the hydraulic and transport parameters values in the different components of the model. This method shows an improvement of results of about 40 times, whereas the mesh size was increased by only 2%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Disused Sealed Sources in Austria - 12147

The use of sealed radiation sources is regulated by the Austrian Radiation Protection Act and the General Radiation Protection Ordinance. The Austrian radiation protection legislation requires minimisation of radioactive waste. The preferred radioactive waste management option concerning sealed sources, both spent and disused, is the return to the manufacturer. If this is not possible a reuse by a third party is encouraged. According to this requirement, disused sealed sources shall, as far as possible, be stored on the site of the licence holder until a new owner is found. If this is not possible, disused sealed sources shall be transported to Nuclear Engineering Seibersdorf, which is a recognised storage facility for radioactive waste in Austria, for temporary storage pending reuse. Sources, which cannot be reused, are declared as radioactive waste. Since Austria is a Member State of the European Union, the Council Directive 122/2003/Euratom on High Activity Sealed Sources and Orphan Sources is applied. This directive defines high activity sealed sources on the basis of their total activity. The possession of such sources is subject to certain obligations. Therefore it is in the interest of the owner to return disused sources as soon as possible to the manufacturer or to deliver them to Nuclear Engineering Seibersdorf. In case of the loss and finding of an 'orphan' source the competent authority secures, recovers and stores the source at the cost of the owner of the source with recourse. In line with the directive the licensee of a High Activity Sealed Source has to notify the main data concerning this source to the Central Source Register which is maintained by the Federal Minister of Agriculture, Forestry, Environment and Water Management for all radioactive sources. This register was put into operation in 2006. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Tribo-charging properties of waste plastic granules in process of tribo-electrostatic separation

Highlights: • The cyclone charging was more effective and stable than vibrating charging. • The small particle size was better changed than large ones and was more suitable recycled by TES. • The drying pretreatment is good for improving the short-term charging effect. - Abstract: Plastic products can be found everywhere in people’s daily life. With the consistent growth of plastic consumption, more and more plastic waste is generated. Considering the stable chemical and physics characteristics of plastic, regular waste management methods are not suitable for recycling economic strategy of each government, which has become a serious environmental problem. Recycling plastic waste is considered to be the best way to treat it, because it cannot only deduce the waste but also save the energy to produce new virgin plastic. Tribo-electrostatic separation is strongly recommended for plastic separation as it can preserve the original properties of plastic and has little additional pollution. In this study, plastic granules are generated by crushing plastic waste in waste electric and electronic equipment. The tribo-charging properties of plastic waste were studied by vibrating tribo-charging and cyclone tribo-charging. The triboelectric series obtained by vibrating was: (−)-PE–PS–PC–PVC–ABS–PP-(+), while the triboelectric series obtained by cyclone was (−)-PE–PS–PC–PVC–ABS–PP-(+). Further, the cyclone charging was more effective and stable than vibrating charging. The impact factors experiments showed that small particle size was better changed than large ones and were more suitable recycled by tribo-electrostatic separation. High relative humidity was identified as impede charging effect. The results of this study will help defining the operating parameters of subsequent separator.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of a Loess-Cement Cushion as an Integral Component of an SL-LILW Repository - 16077

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for short-lived low and intermediate level radioactive waste, the National Disposal Facility (NDF), adjacent to the Kozloduy Nuclear Power Plant (KNPP). The NDF will be constructed as a reinforced concrete vault-type repository system, where prefabricated cubic waste packages (2 m on a side) will be emplaced in large reinforced concrete disposal cells. Waste emplacement operations will be conducted in three phases over a total of 60 years of operations. After the last waste packages have been disposed, an engineered multilayer cover will be installed over the site to further isolate the waste from the accessible environment. The Radiana Site where the NDF will be constructed is a sloping area located between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. The unsaturated zone at the location selected for waste disposal ranges from 13 m to 16 m in thickness. After construction, the unsaturated zone will consist of a 5 m thick, engineered loess-cement cushion installed over naturally occurring Pliocene clays and sandy clayey sediments of the Brusarci Formation with a thickness above the top of groundwater ranging from 8 m to 11 m. The loess-cement cushion is a key component of the 'engineered fill' barrier as identified in the Intermediate Safety Assessment Report (ISAR) for the NDF. This barrier consists of engineered fill both below the disposal cells, i.e., the loess-cement cushion, and above the disposal cells, i.e. the final multilayer cover to be installed at closure of the facility. The loess-cement cushion component of this barrier will act to provide a geo-technically stable foundation for the disposal system. In addition, the barrier will raise the base of the disposal cells and increases the unsaturated zone thickness above the top of the groundwater table, as well as to serve as a chemical barrier that will act to sorb radionuclides thereby retarding their migration to the underlying groundwater. In addition to its assigned barrier functions the loess cement cushion also houses key embedded components required as part of the overall NDF safety concept, including systems necessary for operational and post-closure performance monitoring as well as the support foundation structures required for the mobile roofs, which are designed to handle and protect the waste during emplacement operations. The post-closure monitoring period, i.e., the period of institutional control, is given by as 300 years. While similar although less massive cushions have been previously constructed as foundations for various structures at the KNPP, the loess-cement cushion planned for construction at the NDF including the embedded structures will represent a first of its kind construction in terms of both its physical dimensioning as well as its requirements for long-term performance. This paper describes the design of the cushion, its functions and its construction as planned for the NDF as an integral component of the site safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repository Performance Confirmation - 12119

Repository performance confirmation links the technical bases of repository science and societal acceptance. Among the countless aspects of monitoring, performance confirmation holds a special place, involving distinct activities combining technical and social significance in radioactive waste management. Discussion is divided into four themes: 1. A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives, 2. A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain, 3. A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant, and 4. An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. Experience from two repository programs in the United States sheds light on how performance confirmation has been executed. Lessons learned can help the next generation of performance confirmation. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Minerals on the Removal of Uranium (VI) in the Presence of Humic Acid and Colloidal Silica - 19406

Uranium is one of the key contaminants of concern in groundwater as a result of past nuclear processing activities at the Department of Energy (DOE) facilities such as the Savannah River Site (SRS) in Aiken, South Carolina. SRS was one of the major nuclear processing facilities during the Cold War where plutonium was produced. Beginning with the implementation of the environmental cleanup program in 1981, SRS has become a hazardous waste management facility responsible for the storage and remediation of contaminated soil and groundwater from radionuclides. Approximately 1.8 billion gallons of acidic waste containing radionuclides and dissolved heavy metals was disposed in the F/H Area seepage basins. This led to the unintentional creation of highly contaminated groundwater plumes, consisting of radionuclides with an acidic pH between 3 and 5.5. The acidity of the plumes contributed to the mobility of several constituents of concern (COC) such as tritium ({sup 3}H), uranium-238 ({sup 238}U), iodine-129 ({sup 129}I), and strontium-90 ({sup 90}Sr) for the F-Area plume and {sup 3}H, {sup 90}Sr and mercury for the H-Area plume. This investigation will focus on uranium in the oxidation state +6 (U(VI)), which is a key contaminant of concern in the groundwater plume of the FArea. Initially, the pump-treat-reinject system was implemented from 1997 to 2003 to remove contaminants from polluted groundwater. Downgrade groundwater within the system would be pumped to the water treatment facility and re-injected upgrade within the aquifer. The effectiveness and sustainability of this process diminished over time. Therefore, it was discontinued and replaced with a funnel-and-gate process in 2004. This new process injects sodium hydroxide directly into the gates of the F-Area groundwater to effectively raise pH levels. By raising the pH of the groundwater, a treatment zone is created by reversing the acidic nature of the contaminated sediments and producing a negative net charge on the surface of sediment particles. As a result, the adsorption of cationic contaminants is expected to be enhanced. So far, this process has resulted in a decrease of {sup 90}Sr and {sup 238}U concentrations, though the concentration of iodine has been unaffected by this treatment. The solution used for the injections contains a high carbonate alkalinity in order to overcome the surface acidic conditions and natural partitions in the groundwater system. To maintain the neutral pH in the treatment zone, systematic injections are required. The continuous use of high concentrations of a carbonate solution to raise pH could re-mobilize uranium previously adsorbed within the treatment zone, though this has not been observed in the monitoring data. Humic substances (HS) are major components of soil organic matter. HS are polyfunctional organic macromolecules formed by the chemo-microbiological decomposition of biomass or dead organic matter. These substances are usually divided into three main fractions: humin (insoluble at all pH values), humic acid (soluble at pH greater than 3.5), and fulvic acid (soluble at all pH values). Humic acid carries a large number of functional groups such as aromatic rings, carboxyl groups, phenols, aliphatic chains, etc. Humic acid is an important ion exchange and metal complexing ligand with a high complexation capacity. The ability of humic acid to chemically bind to metals influences in their migration behavior and fate in natural systems. Various studies have suggested that the retention of U(VI) via sorption in the presence of humic acid is a complex process. For instance, humic acid can form an organic coating at the surface of minerals, which can enhance the sequestration of metals. Ivanov et al. (2012) studied the sorption of U(VI) sorption onto bentonite in the presence and absence of humic acid. The study found that uranium sorption in the presence of humic acid was enhanced at low pH (below 3.8) while at moderate pH (3.8 and 6.5) uranium sorption was reduced compared to the absence of humic acid. At high pH (7 and 9), uranium sorption was reduced for both the presence and absence of humic acid. Also, Krepelova et al. (2007) not only found that U(VI) sorption onto kaolinite was influenced by pH, U(VI) concentration, the presence of inorganic carbon species, and humic acid but also that U(VI) preferred to be adsorbed onto kaolinite as a uranyl-humate complex. This investigation analyzed the mechanisms of the synergetic interactions of humic acid and colloidal silica on the removal of uranium in the presence of pure minerals such as quartz, kaolinite and goethite which are characteristic of the F/H area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNL Technologies for Heavy Water Detritiation - 19437

Canadian Nuclear Laboratories (CNL) is responsible for a large amount of heavy water owned by the Government of Canada. A significant portion of this heavy water has been downgraded and is chemically and/or radiologically contaminated (besides tritium). Storage, monitoring and disposal of this water incurs significant costs. Upgrading following chemical purification (including removal of radionuclides other than tritium) of this water is feasible with commercial processes. However, removal of the tritium to the level that would allow the heavy water to be available for non-nuclear applications requires very specialized processes. CNL has developed and demonstrated the Combined Electrolysis and Catalytic Exchange (CECE) detritiation technology to reduce the tritium to the level at which the heavy water can be classified as non-radioactive. The CECE process consists of a Liquid Phase Catalytic Exchange (LPCE) bed, where the transfer of hydrogen isotopes between water and gaseous hydrogen occurs, and an electrolysis cell (E-cell) that produces hydrogen and separates the isotopes of hydrogen, adding to the enrichment achieved in the LPCE catalyst bed. The application of the CECE technology to the tritium-contaminated heavy water would restore its full market value. As part of a project supported by CNL Decommissioning and Waste Management, a business case is being developed to build and operate a facility that will purify and detritiate heavy water to render it commercially attractive. The main goal of the current study is to evaluate the net benefits of detritiation and product sale versus the cost of permanent storage or disposal. Such a facility would not only eliminate the need to store the heavy water as a radioactive waste material and provide revenue, but would also serve as a demonstration of CNL's technology for similar applications elsewhere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualitative Decision and Risk Assessment Approaches for Managing Nuclear Materials - 19061

Qualitative approaches to performing decision analyses and risk assessments have recently been developed at ORNL with the goal of providing simple tools to help manage complex projects that have a variety of drivers, constraints, or both. Many of the DoE's nuclear materials management projects involve making 'keep-or-dispose' decisions for nuclear materials and then developing projects to manage or dispose of the materials. ORNL uses decision analysis tools to identify and rank options for accomplishing nuclear materials management projects, and risk assessment tools to evaluate the preferred option(s) to identify risks and prioritize mitigation actions to reduce risks during implementation. This paper focuses on application of the decision analysis and risk-based planning tool(s) to guide management of projects during the planning and start-up phases when only preliminary project information is likely to be available. Such an analysis seeks to reduce risks, lower costs, and improve chances of project success. Examples showing the use of the tools in nuclear waste management scenarios are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring the Long-Term Safety Performance of a Repository for Used Nuclear Fuel - 12294

The nuclear waste management programs of several nations include plans for the design, construction and operation of deep geological repositories. Some of these programs have initiated the licensing process for their repository designs. Monitoring strategies and systems are at different levels of development in each program and there is common ground with respect to the ultimate goal of the monitoring function. In this context, the primary functions of a monitoring system are considered to be the verification of safety performance and making available information that may be required for implementation of future decisions such as the timing of repository decommissioning and closure or the possible retrieval of waste containers. This study examines some of the relevant issues and outlines a conceptual monitoring system for further study and development during implementation of Adaptive Phased Management, the method selected by the Government of Canada for long-term management of used nuclear fuel. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 3QCY15 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the third quarter of calendar year 2015 (3QCY15). After a 28 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP).1 The 3QCY15 saltstone sample results meet South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents (UHC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗