Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Roadmap”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Status of Laser/Lidar Working Group Requirements

This viewgraph presentation reviews the status of the development of the requirements by the Laser/Lidar working group. Included in the presentation is another viewgraph report on the NASA Earth Science Technology Office (ESTO) Laser/Lidar working group, by the chairperson of the working group. Some of the uses of Laser and Lidar in earth sciences are reviewed and a roadmap for the future use of the technology is included.

Kavaya, Michael J.↗

Science Opportunities Enabled by NASA's Constellation System: Interim Report

In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies on two criteria: whether the concepts offered the potential for a significant scientific advance, and whether or not the concepts would benefit from the Constellation System. The committee determined that all of the concepts offered the possibility of a significant scientific advance, but it cautions that such an evaluation ultimately must be made by the decadal survey process, and it emphasizes that this interim report s evaluation should not be considered to be an endorsement of the scientific merit of these proposals, which must of course be evaluated relative to other proposals. The committee determined that seven of these concepts would benefit from the Constellation System, whereas four would not, but it stresses that this conclusion does not reflect an evaluation of the scientific merit of the projects, but rather an assessment of whether or not new capabilities provided by the Constellation System could significantly affect them. Some of the mission concepts, such as the Advanced Compton Telescope, already offer a significant scientific advance and fit easily within the mass and volume constraints of existing launch vehicles. Other mission concepts, such as the Palmer Quest proposal to drill through the Mars polar cap, are not constrained by the launch vehicle, but rather by other technology limitations. The committee evaluated the mission concepts as presented to it, aware nevertheless that proposing a far larger and more ambitious mission with the same science goals might be possible given the capabilities of the Ares V launch vehicle. (Such proposals can be submitted in response to the committee s request for information to be evaluated in its final report.) See Table S.1 for a summary of the Vision Missions, including their cost estimates, technical maturity, and reasons that they might benefit from the Constellation System. The committee developed several findings and recommendations.

Source record↗

Human Factors and ISS Medical Systems: Highlights of Procedures and Equipment Findings

As part of the Space Human Factors Engineering Critical Questions Roadmap, a three year Technology Development Project (TDP) was funded by NASA Headquarters to examine emergency medical procedures on ISS. The overall aim of the emergency medical procedures project was to determine the human factors issues in the procedures, training, communications and equipment, and to recommend solutions that will improve the survival rate of crewmembers in the event of a medical emergency. Currently, each ISS crew remains on orbit for six month intervals. As there is not standing requirement for a physician crewmember, during such time, the maintenance of crew health is dependant on individual crewmembers. Further, in the event of an emergency, crew will need to provide prolonged maintenance care, as well as emergency treatment, to an injured crewmember while awaiting transport to Earth. In addition to the isolation of the crew, medical procedures must be carried out within the further limitations imposed by the physical environment of the space station. For example, in order to administer care on ISS without the benefit of gravity, the Crew Medical Officers (CMOs) must restrain the equipment required to perform the task, restrain the injured crewmember, and finally, restrain themselves. Both the physical environment and the physical space available further limit the technology that can be used onboard. Equipment must be compact, yet able to withstand high levels of radiation and function without gravity. The focus here is to highlight the human factors impacts from our three year project involving the procedures and equipment areas that have been investigated and provided valuable to ISS and provide groundwork for human factors requirements for medical applications for exploration missions.

Byrne, V. E.↗

The Stellar Imager (SI) Vision Mission and the Benefits of an Ares V Launch

The Stellar Imager (SI) is a UV/Optical, Space-Based Interferometer designed to enable 0.1 milli-arcsecond (mas) spectral imaging of stellar surfaces and, via asteroseismology, stellar interiors and of the Universe in general. The ultra-sharp images of the Stellar Imager will revolutionize our view of many dynamic astrophysical processes by transforming point sources into extended sources, and snapshots into evolving views. SI's science focuses on the role of magnetism in the Universe, particularly on magnetic activity on the surfaces of stars like the Sun. SI's prime goal is to enable long-term forecasting of solar activity and the space weather that it drives. SI will also revolutionize our understanding of the formation of planetary systems, of the habitability and climatology of distant planets, and of many magneto-hydrodynamically controlled processes in the Universe. SI is a "Flagship and Landmark Discovery Mission" in the 2005 Heliophysics Roadmap and a potential implementation of the UVOI in the 2006 Science Program for NASA's Astronomy and Physics Division. In this paper we briefly discuss the science goals, technology needs, and baseline design of the SI Mission, and then describe the benefits to the mission that a launch on an Ares V, with its larger payload shroud, would produce. Additional information on SI can be found at: http://hires.gsfc.nasa.gov/si/.

Carpenter, Kenneth F.↗

Quo Vadis Payload Safety?

As we complete the preparations for the fourth Hubble Space Telescope (HST) servicing mission, we note an anniversary approaching: it was 30 years ago in July that the first HST payload safety review panel meeting was held. This, in turn, was just over a year after the very first payload safety review, a Phase 0 review for the Tracking and Data Relay Satellite and its Inertial Upper Stage, held in June of 1977. In adapting a process that had been used in the review and certification of earlier Skylab payloads, National Aeronautics and Space Administration (NASA) engineers sought to preserve the lessons learned in the development of technical payload safety requirements, while creating a new process that would serve the very different needs of the new space shuttle program. Their success in this undertaking is substantiated by the fact that this process and these requirements have proven to be remarkably robust, flexible, and adaptable. Furthermore, the payload safety process has, to date, served us well in the critical mission of safeguarding our astronauts, cosmonauts, and spaceflight participants. Both the technical requirements and their interpretation, as well as the associated process requirements have grown, evolved, been streamlined, and have been adapted to fit multiple programs, including the International Space Station (ISS) program, the Shuttle/Mir program, and most recently the United States Constellation program. From its earliest days, it was anticipated that the payload safety process would be international in scope, and so it has been. European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA), German Space Agency (DLR), Canadian Space Agency (CSA), Russian Space Agency (RSA), and many additional countries have flown payloads on both the space shuttle and on the ISS. Our close cooperation and long-term working relationships have culminated in the franchising of the payload safety review process itself to our partners in ESA, which in turn will serve as a roadmap for extending the franchise to other Partners.

Fodroci, Michael P.↗

A One Chip Hardened Solution for High Speed SpaceWire System Implementations. Session: Components

An Application Specific Integrated Circuit (ASIC) that implements the SpaceWire protocol has been developed in a radiation hardened 0.25 micron CMOS technology. This effort began in March 2003 as a joint development between the NASA Goddard Space Flight Center (GSFC) and BAE Systems. The BAE Systems SpaceWire ASIC is comprised entirely of reusable core elements, many of which are already flight-proven. It incorporates a router with 4 SpaceWire ports and two local ports, dual PC1 bus interfaces, a microcontroller, 32KB of internal memory, and a memory controller for additional external memory use. The SpaceWire cores are also reused in other ASICs under development. The SpaceWire ASIC is planned for use on the Geostationary Operational Environmental Satellites (GOES)-R, the Lunar Reconnaissance Orbiter (LRO) and other missions. Engineering and flight parts have been delivered to programs and users. This paper reviews the SpaceWire protocol and those elements of it that have been built into the current and next SpaceWire reusable cores and features within the core that go beyond the current standard and can be enabled or disabled by the user. The adaptation of SpaceWire to BAE Systems' On Chip Bus (OCB) for compatibility with the other reusable cores will be reviewed and highlighted. Optional configurations within user systems and test boards will be shown. The physical implementation of the design will be described and test results from the hardware will be discussed. Application of this ASIC and other ASICs containing the SpaceWire cores and embedded microcontroller to Plug and Play and reconfigurable implementations will be described. Finally, the BAE Systems roadmap for SpaceWire developments will be updated, including some products already in design as well as longer term plans.

Marshall, Joseph R.↗

Stellar Imager - Observing the Universe in High Definition

Stellar Imager (SI) is a space-based, UV Optical Interferometer (UVOI) with over 200x the resolution of HST. It will enable 0.1 milli-arcsec spectral imaging of stellar surfaces and the Universe in general and open an enormous new 'discovery space' for Astrophysics with its combination of high angular resolution, dynamic imaging, and spectral energy resolution. SI's goal is to study the role of magnetism in the Universe and revolutionize our understanding of: 1) Solar/Stellar Magnetic Activity and their impact on Space Weather, Planetary Climates. and Life, 2) Magnetic and Accretion Processes and their roles in the Origin and Evolution of Structure and in the Transport of Matter throughout the Universe, 3) the close-in structure of Active Galactic Nuclei and their winds, and 4) Exo-Solar Planet Transits and Disks. The SI mission is targeted for the mid 2020's - thus significant technology development in the upcoming decade is critical to enabling it and future spacebased sparse aperture telescope and distributed spacecraft missions. The key technology needs include: 1) precision formation flying of many spacecraft, 2) precision metrology over km-scales, 3) closed-loop control of many-element, sparse optical arrays, 4) staged-control systems with very high dynamic ranges (nm to km-scale). It is critical that the importance of timely development of these capabilities is called out in the upcoming Astrophysics and Heliophysics Decadal Surveys, to enable the flight of such missions in the following decade. S1 is a 'Landmark/Discovery Mission' in 2005 Heliophysics Roadmap and a candidate UVOI in the 2006 Astrophysics Strategic Plan. It is a NASA Vision Mission ('NASA Space Science Vision Missions' (2008), ed. M. Allen) and has also been recommended for further study in the 2008 NRC interim report on missions potentially enabled enhanced by an Ares V' launch, although a incrementally-deployed version could be launched using smaller rockets.

Carpenter, Kenneth↗

"Built-In" Action/Issues Tracking and Post-Ops Analysis Tool for Realtime Console Operations

Marshall Space Flight Center's (MSFC) Payload Operations Integration Center (POIC) for the International Space Station (ISS) uses a number of formal databases to manage and track flight plan changes, onboard and ground equipment anomalies, and other events. However, individual console positions encounter many action items and/or occurrences that don't fit neatly into the databases, and while console logs are comprehensive, manual or automated searches do not always yield consistent results. The Payload Communications Manager (PAYCOM) team, whose members speak directly with the ISS onboard crew with respect to NASA payload operations, has found a creative way to reformat a mandatory Daily Report to organize action items, standing reminders, significant events, and other comments. While the report keeps others appraised of PAYCOMs activities and issues of the moment, the format makes it easy to capture very brief summaries of the items in a "Roll Off Matrix", including start and stop dates, resolution, and possible applicability to future ops. The matrix provides accountability for all action items, gives direct insight into the issues surrounding various payloads and methods of dealing with them, yields indirect information on PAYCOM priorities and processes, and provides a roadmap that makes it easier to get back to extensive details if needed. This paper describes how the ISS PAYCOM Daily Report and Roll Off Matrix are organized, used, and inter-related to each other and the PAYCOM operations log. While the application is for a manned vehicle, the concepts could apply in a wide spectrum of operational settings.

Scott, David W.↗

Ares I Crew Launch Vehicle Upper Stage Avionics and Software Overview

This viewgraph presentation gives an overall description of the avionics and software functions of the Ares I Upper Stage Crew Launch Vehicle. The contents include: 1) IUA Team - Development Approach Roadmap; 2) Ares I US Avionics and Software Development Approach; 3) NDT Responsibilities; 4) Ares I Upper Stage Avionics Locations; 5) Ares I Overall Avionics & Software Functions; 6) Block Diagram Version of Avionics Architecture; 7) Instrument Unit Avionics Preliminary Design; and 8) Upper Stage Avionics External Interfaces.

Nola, Charles L.↗

Sub-orbital Programs and their Influence upon Space Missions

Sub-orbital programs can push science to new limits by deploying the very latest in instrument concepts and technologies. Many space missions have sprung from sub-orbital programs, scientifically, technologically, and personally. I will illustrate the sub-orbital potential with examples from cosmology, interferometry, high-energy astrophysics, and others foreseen in NASA roadmaps.

Mather, John C.↗

Ares I Crew Launch Vehicle Upper Stage Element Overview

This viewgraph presentation gives an overview of NASA's Ares I Crew Launch Vehicle Upper Stage Element. The topics include: 1) What is NASA s Mission?; 2) NASA s Exploration Roadmap What is our time line?; 3) Building on a Foundation of Proven Technologies Launch Vehicle Comparisons; 4) Ares I Upper Stage; 5) Upper Stage Primary Products; 6) Ares I Upper Stage Development Approach; 7) What progress have we made?; 8) Upper Stage Subsystem Highlights; 9) Structural Testing; 10) Common Bulkhead Processing; 11) Stage Installation at Stennis Space Center; 12) Boeing Producibility Team; 13) Upper Stage Low Cost Strategy; 14) Ares I and V Production at Michoud Assembly Facility (MAF); 15) Merged Manufacturing Flow; and 16) Manufacturing and Assembly Weld Tools.

McArthur, J. Craig↗

A Process for Technology Prioritization in a Competitive Environment

This slide presentation reviews NASA's process for prioritizing technology requirements where there is a competitive environment. The In-Space Propulsion Technology (ISPT) project is used to exemplify the process. The ISPT project focuses on the mid level Technology Readiness Level (TRL) for development. These are TRL's 4 through 6, (i.e. Technology Development and Technology Demonstration. The objective of the planning activity is to identify the current most likely date each technology is needed and create ISPT technology development schedules based on these dates. There is a minimum of 4 years between flight and pacing mission. The ISPT Project needed to identify the "pacing mission" for each technology in order to provide funding for each area. Graphic representations show the development of the process. A matrix shows which missions are currently receiving pull from the both the Solar System Exploration and the Sun-Solar System Connection Roadmaps. The timeframes of the pacing missions technologies are shown for various types of propulsion. A pacing mission that was in the near future serves to increase the priority for funding. Adaptations were made when budget reductions precluded the total implementation of the plan.

Stephens, Karen↗

Optics Requirements For The Generation-X X-Ray Telescope

US, European, and Japanese space agencies each now operate successful X-ray missions -- NASA s Chandra, ESA s XMM-Newton, and JAXA s Suzaku observatories. Recently these agencies began a collaboration to develop the next major X-ray astrophysics facility -- the International X-ray Observatory (IXO) -- for launch around 2020. IXO will provide an order-of-magnitude increase in effective area, while maintaining good (but not sub-arcsecond) angular resolution. X-ray astronomy beyond IXO will require optics with even larger aperture areas and much better angular resolution. We are currently conducting a NASA strategic mission concept study to identify technology issues and to formulate a technology roadmap for a mission -- Generation-X (Gen-X) -- to provide these capabilities. Achieving large X-ray collecting areas in a space observatory requires extremely lightweight mirrors.

O'Dell, S. .↗

Ares First Stage "Systemology" - Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success

Ares is an integral part of NASA s Constellation architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Ares replaces the Space Shuttle in the post 2010 time frame. Ares I is an in-line, two-stage rocket topped by the Orion Crew Exploration Vehicle, its service module, and a launch abort system. The Ares I first stage is a single, five-segment reusable solid rocket booster derived from the Space Shuttle Program's reusable solid rocket motor. The Ares second or upper stage is propelled by a J-2X main engine fueled with liquid oxygen and liquid hydrogen. This paper describes the advanced systems engineering and planning tools being utilized for the design, test, and qualification of the Ares I first stage element. Included are descriptions of the current first stage design, the milestone schedule requirements, and the marriage of systems engineering, detailed planning efforts, and roadmapping employed to achieve these goals.

Seiler, James↗

Solar Sails

The Solar Sail Propulsion investment area has been one of the three highest priorities within the In-Space Propulsion Technology (ISPT) Project. In the fall of 2003, the NASA Headquarters' Science Mission Directorate provided funding and direction to mature the technology as far as possible through ground research and development from TRL 3 to 6 in three years. A group of experts from government, industry, and academia convened in Huntsville, Alabama to define technology gaps between what was needed for science missions to the inner solar system and the current state of the art in ultra1ightweight materials and gossamer structure design. This activity set the roadmap for development. The centerpiece of the development would be the ground demonstration of scalable solar sail systems including masts, sails, deployment mechanisms, and attitude control hardware and software. In addition, new materials would be subjected to anticipated space environments to quantify effects and assure mission life. Also, because solar sails are huge structures, and it is not feasible to validate the technology by ground test at full scale, a multi-discipline effort was established to develop highly reliable analytical models to serve as mission assurance evidence in future flight program decision-making. Two separate contractor teams were chosen to develop the SSP System Ground Demonstrator (SGD). After a three month conceptual mission/system design phase, the teams developed a ten meter diameter pathfinder set of hardware and subjected it to thermal vacuum tests to compare analytically predicted structural behavior with measured characteristics. This process developed manufacturing and handling techniques and refined the basic design. In 2005, both contractor teams delivered 20 meter, four quadrant sail systems to the largest thermal vacuum chamber in the world in Plum Brook, Ohio, and repeated the tests. Also demonstrated was the deployment and articulation of attitude control mechanisms. In conjunction with these tests, the stowed sails were subjected to launch vibration and ascent vent tests. Other investments studied radiation effects on the solar sail materials, investigated spacecraft charging issues, developed shape measuring techniques and instruments, produced advanced trajectory modeling capabilities, and identified and resolved gossamer structure dynamics issues. Technology validation flight and application to a He1iophysics science mission is on the horizon.

Young, Roy↗

Overview of Key Saturn Probe Mission Trades

Ongoing studies, performed at NASA/JPL over the past two years in support of NASA's SSE Roadmap activities, proved the feasibility of a NF class Saturn probe mission. I. This proposed mission could also provide a good opportunity for international collaboration with the proposed Cosmic Vision KRONOS mission: a) With ESA contributed probes (descent modules) on a NASA lead mission; b) Early 2017 launch could be a good programmatic option for ESA-CV/NASA-NF. II. A number of mission architectures could be suitable for this mission: a) Probe Relay based architecture with short flight time (approx. 6.3-7 years); b) DTE probe telecom based architecture with long flight time (-11 years), and low probe data rate, but with the probes decoupled from the carrier, allowing for polar trajectories I orbiter. This option may need technology development for telecom; c) Orbiter would likely impact mission cost over flyby, but would provide significantly higher science return. The Saturn probes mission is expected to be identified in NASA's New Frontiers AO. Thus, further studies are recommended to refine the most suitable architecture. International collaboration is started through the KRONOS proposal work; further collaborated studies will follow once KRONOS is selected in October under ESA's Cosmic Vision Program.

probes↗