Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

The Digital Space Shuttle, 3D Graphics, and Knowledge Management

The Digital Shuttle is a knowledge management project that seeks to define symbiotic relationships between 3D graphics and formal knowledge representations (ontologies). 3D graphics provides geometric and visual content, in 2D and 3D CAD forms, and the capability to display systems knowledge. Because the data is so heterogeneous, and the interrelated data structures are complex, 3D graphics combined with ontologies provides mechanisms for navigating the data and visualizing relationships.

Gomez, Julian E.↗

Dropping in on Mars

Here I was: 26 years old, I had never worked on a flight project before, and all eyes were on me. Every time I walked by the Pathfinder project office, Tony Spear, the project manager, would throw his arm around me and announce, 'Hey everybody, the whole mission is riding on this guy right here.' Our task was to design and build airbags for Pathfinder s landing on Mars - an approach that had never been used on any mission. Airbags may seem like a simple, low-tech product, but it was eye-opening to discover just how little we knew about them. We knew that the only way to find out what we needed to learn was to build prototypes and test them. We just didn t know how ignorant we were going to be. Airbags seemed like a crazy idea to a lot of people. Nobody ever said that, mind you, but there seemed to be a widespread feeling that the airbags weren t going to work. 'We ll let you guys go off and fool around until you fall flat on your faces.' That was the unspoken message I received day after day.

Rivellini, Tommaso P.↗

See Attachment

Since e-mail generates itself on a round-the-clock, daily basis, it's not unusual for me to receive an average of fifty e-mails a day, or more than 300 a week. That s a lot of e-mail. I have spoken with many of my fellow project managers about my relationship with e-mail. In my case, reading and responding to it is a temptation almost too hard to resist. When I receive an e-mail I tend to want to stop everything I m doing, and open and answer it. Indeed, in my life you could say e-mail is a force to be reckoned with. Interestingly, my fascination with mail began a long time ago. I trace it back to my days as a young boy when I started receiving my first letters from friends and family. Walking home from school, I was often filled with curiosity, wondering if I had received any mail that day. In college, I knew the exact time the mail was delivered, and I headed for my mailbox as close to that hour as I could. After that, I served in an Army Reserve Post Office Unit, where I came to realize how important a postal unit was to the military. There were many others like myself, far from home, who relied on the written word to stay connected to the people in their lives. Over the years I have changed in many ways, and so has the mail. But the same sense of connection, and the same urge to respond to someone who has written me, remains. The 24/7 nature of e-mail has compounded the situation. It is relentless in its pursuit of my time and attention-and, as such, e-mail has become something I have had to manage in a variety of situations

Cameron, W. Scott↗

Lessons from the Dark Side

Lessons to project managers Include the following in case of failure: a) make a timeline of events and include everything that is known; b) put down known facts and check every theory against them; c) don't beat the data until it confesses, i.e., know when to stop trying to force-fit a scenario; d) do not arrive at a conclusion too rapidly. Make sure any deviation form the norm is explained--remember the wrong conclusion is prologue to the next failure; and e) know when to stop.

Madden, Jerry↗

NASA's Virtual Product Laboratory Overview

The Virtual Product Laboratory (VPL) developed at Stennis Space Center is a tool that enables design and verification of remote sensing systems within a software (virtual) environment. The VPL can serve NASA's industry, government, and university partners by providing a means to conduct system trade studies, visual modeling, and data product simulations entirely in a virtual environment. The VPL can serve as a complete end-to-end simulation tool capable of producing system-level compatability assessments, performance characterizations, and simulated data products. In this paper, we present an overview of the VPL's current functions and planned capabilities. The VPL functional areas include Requirements, Design and Analysis, Simulation, Project Management, and Knowledge Base. A description of each function, along with the tools and techniques used to accomplish these functions, is provided.

Gasser, Gerald↗

NASA's Virtual Product Laboratory: An Overview

The Virtual Product Laboratory (VPL) developed by NASA's Commercial Remote Sensing Program at the John C. Stennis Space Center is a tool that enables simulation, design, and verification of remote sensing systems within a software (virtual) environment. The VPL can serve industry, government, and university communities by providing a means to conduct system trade studies, optimization, visual modeling, and data product simulations entirely in a virtual environment. The VPL can serve as a complete end-to-end simulation tool capable of producing system and subsystem performance characterizations, system optimization, and simulated data products or as a means of evaluating any one component of a remote sensing system. In this paper, we present an overview of the VPL capabilities. The VPL functional areas include Requirements, Design & Analysis, Simulation, Project Management, Knowledge Base, and Help. A description of each function along with the tools and techniques used to accomplish these functions will be provided. When possible, sample VPL displays and products will be used in the presentation.

Gasser, Jerry↗

A Metadata Element Set for Project Documentation

Abstract NASA Goddard Space Flight Center is a large engineering enterprise with many projects. We describe our efforts to develop standard metadata sets across project documentation which we term the "Goddard Core". We also address broader issues for project management metadata.

Hodge, Gail↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

Monell, Donald W.↗

Lunar settlements--a socio-economic outlook

The primary ingredient in a Lunar Settlement Program is the people. At the very high cost that will be required to transport, maintain and supply the people who will staff the Lunar operation, it is important to do everything possible to ensure their continued effectiveness in such an isolated, confined, and barren environment. This paper will attempt to identify the issues involved in providing for effective human performance in Lunar Settlements. The approach to be used will be contextual, and thus will not only examine the facets of the Lunar Settlement itself, but will also look at the organizational elements and the design and development processes used in project management from the point of view of long term success and cost effectiveness. The approach will also attempt to look at the Lunar Settlement "in time" as it is connected to events and experiences as they will evolve from the Space Station to Lunar Settlements. Finally, the approach will be contextual in the range of disciplines considered and their impact on planning, evolution, and activities in the entire process of Lunar Settlement. We will hope that Lunar settlers will be able to work and live as effective team members, and to make that possible, the designers, developers, builders, and managers must also function as a coherent team working together to bring about a common goal.

Space Flight/economics/organization & administrati↗

Quality Function Deployment for Large Systems

Quality Function Deployment (QFD) is typically applied to small subsystems. This paper describes efforts to extend QFD to large scale systems. It links QFD to the system engineering process, the concurrent engineering process, the robust design process, and the costing process. The effect is to generate a tightly linked project management process of high dimensionality which flushes out issues early to provide a high quality, low cost, and, hence, competitive product. A pre-QFD matrix linking customers to customer desires is described.

Dean, Edwin B.↗

NASA's Geospatial Interoperability Office(GIO)Program

NASA produces vast amounts of information about the Earth from satellites, supercomputer models, and other sources. These data are most useful when made easily accessible to NASA researchers and scientists, to NASA's partner Federal Agencies, and to society as a whole. A NASA goal is to apply its data for knowledge gain, decision support and understanding of Earth, and other planetary systems. The NASA Earth Science Enterprise (ESE) Geospatial Interoperability Office (GIO) Program leads the development, promotion and implementation of information technology standards that accelerate and expand the delivery of NASA's Earth system science research through integrated systems solutions. Our overarching goal is to make it easy for decision-makers, scientists and citizens to use NASA's science information. NASA's Federal partners currently participate with NASA and one another in the development and implementation of geospatial standards to ensure the most efficient and effective access to one another's data. Through the GIO, NASA participates with its Federal partners in implementing interoperability standards in support of E-Gov and the associated President's Management Agenda initiatives by collaborating on standards development. Through partnerships with government, private industry, education and communities the GIO works towards enhancing the ESE Applications Division in the area of National Applications and decision support systems. The GIO provides geospatial standards leadership within NASA, represents NASA on the Federal Geographic Data Committee (FGDC) Coordination Working Group and chairs the FGDC's Geospatial Applications and Interoperability Working Group (GAI) and supports development and implementation efforts such as Earth Science Gateway (ESG), Space Time Tool Kit and Web Map Services (WMS) Global Mosaic. The GIO supports NASA in the collection and dissemination of geospatial interoperability standards needs and progress throughout the agency including areas such as ESE Applications, the SEEDS Working Groups, the Facilities Engineering Division (Code JX) and NASA's Chief Information Offices (CIO). With these agency level requirements GIO leads, brokers and facilitates efforts to, develop, implement, influence and fully participate in standards development internationally, federally and locally. The GIO also represents NASA in the OpenGIS Consortium and ISO TC211. The OGC has made considerable progress in regards to relations with other open standards bodies; namely ISO, W3C and OASIS. ISO TC211 is the Geographic and Geomatics Information technical committee that works towards standardization in the field of digital geographic information. The GIO focuses on seamless access to data, applications of data, and enabling technologies furthering the interoperability of distributed data. Through teaming within the Applications Directorate and partnerships with government, private industry, education and communities, GIO works towards the data application goals of NASA, the ESE Applications Directorate, and our Federal partners by managing projects in four categories: Geospatial Standards and Leadership, Geospatial One Stop, Standards Development and Implementation, and National and NASA Activities.

Weir, Patricia↗

Putting Patience to the Test

A project manager recounts his decisions before and during the aftermath of the crash of a full-size flying model of Quetzalcoatlus northropi. The unstable pterodactyl crashed without harming anyone, although it caused a local power outage. The manager summarizes lessons learned about flight testing prototypes, including the effects of impatience.

Morgan, Ray↗

Comprehensive Modeling of the Apache with CAMRAD II

This paper presents a report of a multi year study of the U.S. Army LONGBOW APACHE (AH-64D) aircraft. The goals of this study were to provide the Apache Project Managers Office (PMO) with a broad spectrum of calibrated comprehensive and CFD models of the AH-64D aircraft. The goal of this paper is to present an overview of the comprehensive model which has been developed. The CAMRAD II computer code was chosen to complete this task. The paper first discusses issues that must be addressed when modeling the Apache using CAMRAD. The work required the acquisition of a data base for the aircraft and the development and application of a multidisciplinary computer model. Sample results from various parts of the model are presented. Conclusions with regard to the strengths and weaknesses of simulations based on this model are discussed.

Jones, Henry E.↗

Monolithic Microwave Integrated Circuit (MMIC) Phased Array Demonstrated With ACTS

Monolithic Microwave Integrated Circuit (MMIC) arrays developed by the NASA Lewis Research Center and the Air Force Rome Laboratory were demonstrated in aeronautical terminals and in mobile or fixed Earth terminals linked with NASA's Advanced Communications Technology Satellite (ACTS). Four K/Ka-band experimental arrays were demonstrated between May 1994 and May 1995. Each array had GaAs MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The 30-GHz transmit array used in uplinks to ACTS was developed by Lewis and Texas Instruments. The three 20-GHz receive arrays used in downlinks from ACTS were developed in cooperation with the Air Force Rome Laboratory, taking advantage of existing Air Force integrated-circuit, active-phased-array development contracts with the Boeing Company and Lockheed Martin Corporation. Four demonstrations, each related to an application of high interest to both commercial and Department of Defense organizations, were conducted. The location, type of link, and the data rate achieved for each of the applications is shown. In one demonstration-- an aeronautical terminal experiment called AERO-X--a duplex voice link between an aeronautical terminal on the Lewis Learjet and ACTS was achieved. Two others demonstrated duplex voice links (and in one case, interactive video links as well) between ACTS and an Army high-mobility, multipurpose wheeled vehicle (HMMWV, or "humvee"). In the fourth demonstration, the array was on a fixed mount and was electronically steered toward ACTS. Lewis served as project manager for all demonstrations and as overall system integrator. Lewis engineers developed the array system including a controller for open-loop tracking of ACTS during flight and HMMWV motion, as well as a laptop data display and recording system used in all demonstrations. The Jet Propulsion Laboratory supported the AERO-X program, providing elements of the ACTS Mobile Terminal. The successful performance of experimental, proof-of-concept MMIC K/Ka-band arrays developed with U.S. industry in field demonstrations with ACTS indicates that high density MMIC integration at 20 and 30 GHz is indeed feasible. The successful development and demonstration of the MMIC array systems was possible only because of significant intergovernmental and Government/industry cooperation and the high level of teamwork within Lewis. The results provide a strong incentive for continuing the focused development of MMIC-array technology for satellite communications applications, with emphasis on packaging and cost issues, and for continuing the planning and conducting of other appropriate demonstrations or experiments of phased-array technology with ACTS. Given the present pressures on reducing funding for research and development in Government and industry, the extent to which this can be continued in a cooperative manner will determine whether MMIC array technology will make the transition from the proof-of-concept level to the operational system level.

Source record↗

Aerospace Power Systems Design and Analysis (APSDA) Tool

The conceptual design of space and/or planetary electrical power systems has required considerable effort. Traditionally, in the early stages of the design cycle (conceptual design), the researchers have had to thoroughly study and analyze tradeoffs between system components, hardware architectures, and operating parameters (such as frequencies) to optimize system mass, efficiency, reliability, and cost. This process could take anywhere from several months to several years (as for the former Space Station Freedom), depending on the scale of the system. Although there are many sophisticated commercial software design tools for personal computers (PC's), none of them can support or provide total system design. To meet this need, researchers at the NASA Lewis Research Center cooperated with Professor George Kusic from the University of Pittsburgh to develop a new tool to help project managers and design engineers choose the best system parameters as quickly as possible in the early design stages (in days instead of months). It is called the Aerospace Power Systems Design and Analysis (APSDA) Tool. By using this tool, users can obtain desirable system design and operating parameters such as system weight, electrical distribution efficiency, bus power, and electrical load schedule. With APSDA, a large-scale specific power system was designed in a matter of days. It is an excellent tool to help designers make tradeoffs between system components, hardware architectures, and operation parameters in the early stages of the design cycle. user interface. It operates on any PC running the MS-DOS (Microsoft Corp.) operating system, version 5.0 or later. A color monitor (EGA or VGA) and two-button mouse are required. The APSDA tool was presented at the 30th Intersociety Energy Conversion Engineering Conference (IECEC) and is being beta tested at several NASA centers. Beta test packages are available for evaluation by contacting the author.

Truong, Long V.↗

NASA Handbook for Spacecraft Structural Dynamics Testing

Recent advances in the area of structural dynamics and vibrations, in both methodology and capability, have the potential to make spacecraft system testing more effective from technical, cost, schedule, and hardware safety points of view. However, application of these advanced test methods varies widely among the NASA Centers and their contractors. Identification and refinement of the best of these test methodologies and implementation approaches has been an objective of efforts by the Jet Propulsion Laboratory on behalf of the NASA Office of the Chief Engineer. But to develop the most appropriate overall test program for a flight project from the selection of advanced methodologies, as well as conventional test methods, spacecraft project managers and their technical staffs will need overall guidance and technical rationale. Thus, the Chief Engineer's Office has recently tasked JPL to prepare a NASA Handbook for Spacecraft Structural Dynamics Testing. An outline of the proposed handbook, with a synopsis of each section, has been developed and is presented herein. Comments on the proposed handbook are solicited from the spacecraft structural dynamics testing community.

Kern, Dennis L.↗

Space Electronic Test Engineering

The Space Power and Propulsion Test Engineering Branch at NASA Glenn Research center has the important duty of controlling electronic test engineering services. These services include test planning and early assessment of Space projects, management and/or technical support required to safely and effectively prepare the article and facility for testing, operation of test facilities, and validation/delivery of data to customer. The Space Electronic Test Engineering Branch is assigned electronic test engineering responsibility for the GRC Space Simulation, Microgravity, Cryogenic, and Combustion Test Facilities. While working with the Space Power and Propulsion Test Engineering Branch I am working on several different assignments. My primary assignment deals with an electrical hardware unit known as Sunny Boy. Sunny Boy is a DC load Bank that is designed for solar arrays in which it is used to convert DC power form the solar arrays into AC power at 60 hertz to pump back into the electricity grid. However, there are some researchers who decided that they would like to use the Sunny Boy unit in a space simulation as a DC load bank for a space shuttle or even the International Space Station hardware. In order to do so I must create a communication link between a computer and the Sunny Boy unit so that I can preset a few of the limits (such power, set & constant voltage levels) that Sunny Boy will need to operate using the applied DC load. Apart from this assignment I am also working on a hi-tech circuit that I need to have built at a researcher s request. This is a high voltage analog to digital circuit that will be used to record data from space ion propulsion rocket booster tests. The problem that makes building this circuit so difficult is that it contains high voltage we must find a way to lower the voltage signal before the data is transferred into the computer to be read. The solution to this problem was to transport the signal using infrared light which will lower the voltage signal down low enough so that it is harmless to a computer. Along with my involvement in the Space Power and Propulsion Test Engineering Branch, I am obligated to assist all other members of the branch in their work. This will help me to strengthen and extend my knowledge of Electrical Engineering.

Chambers, Rodney D.↗