Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Sault Tribe Building Efficiency Audits of Tribally-Owned Governmental Buildings and Residential Tribal Housing

The Tribe is working to reduce energy consumption and expense in Tribally-owned governmental buildings and low income housing sites. In 2009, the Tribe applied to the U. S. Department of Energy for funding to conduct energy audits of Tribally-owned governmental buildings. Findings from the energy audits would define the extent and types of energy efficiency improvements needed, establish a basis for energy priorities, strategies and action plans, and provide a benchmark for measuring improvements from energy efficiency implementations. In 2010, the DOE awarded a grant in the amount of $95,238 to the Tribe to fund the energy audits of nine governmental buildings and to pay for travel expenses associated with attendance and participation at the DOE annual program reviews. In 2011, the Tribe applied for and was awarded a DOE grant in the amount of $75,509 to conduct energy audits of the remaining 30 Tribally-owned governmental buildings. Repeating mobilization steps performed during the first DOE energy audits grant, the Tribe initiated the second round of governmental building energy audits by completing energy auditor procurement. The selected energy auditor successfully passed DOE debarment and Sault Tribe background clearances. The energy audits contract was awarded to U. P. Engineers and Architects, Inc. of Sault Ste. Marie, Michigan. The Tribe continued mobilizing for the energy audits by providing the energy auditor with one year of electric, gas and water utility invoice copies per building, as well as supplemental building information, such as operating hours. The Tribe also contacted building occupants to coordinate scheduling for the on-site energy audit inspections and arranged for facilities management personnel to guide the energy auditor through the buildings and answer questions regarding building systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PLAN-TA9-2443(U), Rev. B Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure

This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived from APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

States of Cybersecurity: Electricity Distribution System Discussions

State and local entities that oversee the reliable, affordable provision of electricity are faced with growing and evolving threats from cybersecurity risks to our nation's electricity distribution system. All-hazards system resilience is a shared responsibility among electric utilities and their regulators or policy-setting boards of directors. Cybersecurity presents new challenges and should be a focus for states, local governments, and Native American tribes that are developing energy-assurance plans to protect critical infrastructure. This research sought to investigate the implementation of governance and policy at the distribution utility level that facilitates cybersecurity preparedness to inform the U.S. Department of Energy (DOE), Office of Energy Policy and Systems Analysis; states; local governments; and other stakeholders on the challenges, gaps, and opportunities that may exist for future analysis. The need is urgent to identify the challenges and inconsistencies in how cybersecurity practices are being applied across the United States to inform the development of best practices, mitigations, and future research and development investments in securing the electricity infrastructure. By examining the current practices and applications of cybersecurity preparedness, this report seeks to identify the challenges and persistent gaps between policy and execution and reflect the underlying motivations of distinct utility structures as they play out at the local level. This study aims to create an initial baseline of cybersecurity preparedness within the distribution electricity sector. The focus of this study is on distribution utilities not bound by the cybersecurity guidelines of the North American Electric Reliability Corporation (NERC) to examine the range of mechanisms taken by state regulators, city councils that own municipal utilities, and boards of directors of rural cooperatives.

14 SOLAR ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 414: Clean Slate III Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 1

This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 414, Clean Slate III Plutonium Dispersion (TTR). This document has been developed in accordance with the Federal Facility Agreement and Consent Order. CAU 414 is located on the Tonopah Test Range and includes one corrective action site, TA-23-03CS, Pu Contaminated Soil.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using AI for Management of Field Emission in SRF Linacs

Field emission control, mitigation, and reduction is critical for reliable operation of high gradient superconducting radio-frequency (SRF) accelerators. With the SRF cavities at high gradients, the field emission of electrons from cavity walls can occur and will impact the operational gradient, radiological environment via activated components, and reliability of CEBAF’s two linacs. A new effort has started to minimize field emission in the CEBAF linacs by re-distributing cavity gradients. To measure radiation levels, newly designed neutron and gamma radiation dose rate monitors have been installed in both linacs. Artificial intelligence (AI) techniques will be used to identify cavities with high levels of field emission based on control system data such as radiation levels, cryogenic readbacks, and vacuum loads. The gradients on the most offending cavities will be reduced and compensated for by increasing the gradients on least offensive cavities. Training data will be collected during this year’s operational program and initial implementation of AI models will be deployed. Preliminary results and future plans are presented.

Carpenter, Adam↗

Hanford Tank Farm Occupational Exposure and Risk Assessment Plan: Health Process Project (Rev.1)

The overall objective of the Hanford Tank Farm Occupational Exposure and Risk Assessment Plan (hereafter referred to as the “Assessment Plan”) is to provide the Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS), and the U.S. Department of Energy (DOE) with a plan for developing a transparent, peer-reviewed process for assessing potential health risks associated with worker exposures to chemical emissions from the Hanford tank farms. Revision 1 (2018) incorporates changes to the original draft plan prepared in 2016 to reflect updated strategies based on initial implementation of the recommended actions.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Research and Development on Advanced Electrochemical Energy Storage Devices Enabling a Spectrum of Electrified Vehicles

The USABC Advanced Battery development plan had the following three focus areas: 1. Existing technology validation, implementation, and cost reduction 2. Identification of the next viable technology with emphasis on the potential to meet USABC cost and energy density goals. 3. Support high-risk, high-reward battery technology R&D The primary aim of this project was focused on the barriers that most impede wider public adoption of electrification in vehicles-cost, energy density, low-temp performance, calendar life, and improvements in abuse tolerance. The specific objectives are as follows: Cost Reduction: drive to significantly reduce battery cost to be in-line with the $\$$100/kWh or less (by the end of calendar year 2020) DOE cost goals. Additionally, goals of $\$$75/KWh were set for 2023 aligned with fast charge and some offset of energy density. Energy Density Increase: focus on improving the cell-level specific energy and energy densities to >350 watt hours per kilogram (Wh/kg) and >750Wh/L. Low Temperature Performance Increase: strive toward developments that improve the discharge power and eliminate or dramatically reduce the life limiting lithium plating associated with regenerative braking at low temperatures, during the program. Calendar Life Increase: drive to achieve a 15-year calendar life. Abuse Tolerance Improvement: strive to develop improvements in Li-ion abuse tolerance and/or development of electrochemical energy storage technologies with inherently better response to abuse circumstances. Emerging Areas: initiate new programs that address emerging technologies that arise during the contract period.

25 ENERGY STORAGE↗

CosmoDC2: A Synthetic Sky Catalog for Dark Energy Science with LSST

This paper introduces cosmoDC2, a large synthetic galaxy catalog designed to support precision dark energy science with the Large Synoptic Survey Telescope (LSST). CosmoDC2 is the starting point for the second data challenge (DC2) carried out by the LSST Dark Energy Science Collaboration (LSST DESC). The catalog is based on a trillion-particle, (4.225 Gpc) 3 box cosmological N-body simulation, the Outer Rim run. It covers 440 deg 2 of sky area to a redshift of z = 3 and matches expected number densities from contemporary surveys to a magnitude depth of 28 in the r band. Each galaxy is characterized by a multitude of galaxy properties including stellar mass, morphology, spectral energy distributions, broadband filter magnitudes, host halo information, and weak lensing shear. The size and complexity of cosmoDC2 requires an efficient catalog generation methodology; our approach is based on a new hybrid technique that combines data-based empirical approaches with semianalytic galaxy modeling. A wide range of observation-based validation tests has been implemented to ensure that cosmoDC2 enables the science goals of the planned LSST DESC DC2 analyses. This paper also represents the official release of the cosmoDC2 data set, including an efficient reader that facilitates interaction with the data.

79 ASTRONOMY AND ASTROPHYSICS↗

Alignment and Aperture Scan at the Fermilab Booster

The Fermilab Booster is currently in the process of an intensity upgrade referred to as the Proton Improvement Plan (PIP). The goal of PIP is to have the Booster provide a proton beam flux of 2 x 10{sup 17} protons/hour. This is almost double the current operation of 1.1 x 10{sup 17} protons/hour. Beam losses in the machine due to the increased flux will create larger integrated doses on aperture limiting components that will need to be mitigated. The Booster accelerates beam from 400 MeV to 8 GeV at a rep rate of 15hz and then extracts beam to the Main Injector. Several percent of the beam is lost within 3 msec after injection in the early part of acceleration. The aperture at injection energy was recently measured using corrector scans. Along with magnet survey data and aperture scan data a plan to realign the magnets in the Booster was developed and implemented in May 2012. The beam studies, analysis of the scan and alignment data, and the result of the magnet moves are presented.

43 PARTICLE ACCELERATORS↗

Integration of Titan supercomputer at OLCF with ATLAS Production System

The PanDA (Production and Distributed Analysis) workload management system was developed to meet the scale and complexity of distributed computing for the ATLAS experiment. PanDA managed resources are distributed worldwide, on hundreds of computing sites, with thousands of physicists accessing hundreds of Petabytes of data and the rate of data processing already exceeds Exabyte per year. While PanDA currently uses more than 200,000 cores at well over 100 Grid sites, future LHC data taking runs will require more resources than Grid computing can possibly provide. Additional computing and storage resources are required. Therefore ATLAS is engaged in an ambitious program to expand the current computing model to include additional resources such as the opportunistic use of supercomputers. In this paper we will describe a project aimed at integration of ATLAS Production System with Titan supercomputer at Oak Ridge Leadership Computing Facility (OLCF). Current approach utilizes modified PanDA Pilot framework for job submission to Titan's batch queues and local data management, with lightweight MPI wrappers to run single node workloads in parallel on Titan's multi-core worker nodes. It provides for running of standard ATLAS production jobs on unused resources (backfill) on Titan. The system already allowed ATLAS to collect on Titan millions of core-hours per month, execute hundreds of thousands jobs, while simultaneously improving Titans utilization efficiency. We will discuss the details of the implementation, current experience with running the system, as well as future plans aimed at improvements in scalability and efficiency.

Megino, F. Barreiro↗

Integrity Assessment of Hanford 242-A Evaporator Facility E-A-1 Re-boiler Vessel via Fluorescein Liquid Tracer Test Methods - 17357

The 242-A Evaporator Facility is critical to the United States Department of Energy's (DOE) Hanford Site clean-up mission due to limited space within the existing Double-Shell Tanks (DSTs) used to store nuclear and chemical waste until future processing. The 242-A Evaporator Facility is currently the sole waste volume reduction process used at Hanford, and the E-A-1 Re-boiler is essential to the Evaporator process. Due to the potential for cross-contamination between the Re-boiler tubes through which waste passes and the tube sheets of uncontaminated steam, an assessment of the Re-boiler vessel's integrity is required for continuing operations of the facility. In order to meet these requirements, an independent integrity assessment was designed to use fluorescein liquid tracer (LT) to verify the leak-tightness of the Re-boiler vessel in accordance with Washington River Protection Solutions, LLC (WRPS) tightness test standards, as well as, the ASME Boiler and Pressure Vessel (B and PV) Code, Section III, Division 1, NB-6300. LT test methodologies were evaluated and determined to be appropriate for a vessel with restricted access, such as the E-A-1 Re-boiler, as it provided the needed sensitivity, reliability, and cost; as well as, exceeded the leak-tightness specifications required by both WRPS and ASME B and PV Code standards. The integrity test requires water laced with fluorescein be circulated through the waste processing loop of the 242-A Evaporator and samples of steam condensate be collected and analyzed for traces of fluorescein to determine leak-tightness. Liquid condensate sampling was conducted prior to and during testing and the samples were analyzed for fluorescein tracer to determine the amount of fluorescein that flowed out of the tubes of the Re-boiler into the steam side of the vessel. Given the established criteria for 'leak-tight,' test results determined that the Re-boiler passed the integrity assessment. After further scrutiny of the 2014 test and data results, it was determined that although the Re-boiler was 'leak-tight,' as established by the test criteria, there was concern of future leakage. The DOE and the DOE Office of River Protection (ORP) requested that WRPS repeat the integrity assessment in two and a half years to determine if the potential leak was growing, which could threaten continuing operations of the 242-A Evaporator. The 2017 test has been redesigned using lessons learned from the 2014 test and was modified to account for ergonomic and safety considerations, ease of repeatability, and accuracy of results. The liquid tracer methodology and test plan developed for the Re-boiler will continue to be implemented in 5 year increments to monitor current and future integrity. The method may also prove useful for other aging components across the Hanford Site, where appropriate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From Public Outreach: Effective Incorporation of the Stakeholder Voice - 18447

The licensing process for any facility associated with nuclear power or aspects of the nuclear fuel cycle can be expected to encounter intense stakeholder interest, and often significant challenges. Over the last decade, staff of the Center for Nuclear Waste Regulatory Analyses (CNWRA{sup R}) at Southwest Research Institute{sup R} (SwRI{sup R}) provided comprehensive support to the U.S. Nuclear Regulatory Commission (NRC) for public outreach efforts across a wide variety of nuclear activities. Many of these projects included public involvement and consultation activities for compliance with the National Environmental Policy Act (NEPA), including scoping, public meetings, responding to public comments on draft documents, and holding small meetings with affected local, state, and tribal governments. In addition, we have supported NRC public outreach related to nuclear facility licensing activities (including the proposed repository at Yucca Mountain), rulemaking, and regulatory guidance development. This experience has offered us a broad view of the challenges faced by industry, regulators, and stakeholders. In the process, we have observed some best practices that lead to effective stakeholder communication. Communication about complex technical issues is challenging, particularly for societally controversial topics, such as civilian use of nuclear power and management of radioactive waste. Most commonly, we have observed a lack of mutual trust and respect among industry, regulators, and stakeholders that creates an atmosphere ripe for suspicion and misunderstanding. Stakeholders have, in public comments, criticized the lack of appropriate venues to raise concerns in which they feel they can get meaningful responses from the nuclear industry and regulators. Conversely, industry faces difficulty in reaching compromise with stakeholders, who sometimes misinterpret or misrepresent factual information. Within this contentious environment, regulators are constrained by their statutory framework, even as they are challenged to be more responsive, transparent, and fair to both stakeholders and industry. In spite of these obstacles, there are examples where feedback from stakeholders was heard and utilized. Because of successful collection of appropriate feedback, regulators became more adept at understanding the full range of perspectives from both industry and stakeholders, and subsequently did a better job at effectively incorporating feedback and communicating their decisions and findings in a clear and understandable way. Ultimately, the success of these examples was based on a measure of mutual respect, which was reached through effective communication and implementation of some best practices. These best practices include (i) outreach planning that is abundantly mindful of the various stakeholder points of view, site history, regional characteristics, and probable future and related actions, combined with advance identification of key stakeholders; (ii) development and distribution of information that facilitates public participation; and (iii) use of avenues by which stakeholders can provide meaningful and effective comments. Illustrative examples include (i) how concerns raised by stakeholders were heard by an applicant and resulted in a revised project proposal; (ii) use of a variety of interaction formats that incorporated input across a broad spectrum of stakeholders; (iii) utilizing stakeholder feedback received during scoping; and (iv) how a facility underestimated the impact of 'outsider' stakeholder voices that were in contrast to the known local community. By moving past the viewpoint that public outreach is a 'necessary evil' and engaging only to check a procedural box, each participant can benefit from mutually satisfactory and improved outcomes. (author)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Assistance for Igiugig, Alaska

Igiugig, Alaska received technical assistance through the Energy Technology Innovation Partnership Project (ETIPP) to implement high-priority strategies detailed in their 2022 Community Energy Plan.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Safety Assessment for a Surface Repository in the Chernobyl Exclusion Zone - Methodology for Assessing Disposal under Intervention Conditions - 13476

The Radioactive Waste Disposal Facility (RWDF) Buryakovka was constructed in 1986 as part of the intervention measures after the accident at Chernobyl NPP (ChNPP). Today, RWDF Buryakovka is still being operated but its maximum capacity is nearly reached. Plans for enlargement of the facility exist since more than 10 years but have not been implemented yet. In the framework of an European Commission Project DBE Technology GmbH prepared a safety analysis report of the facility in its current state (SAR) and a preliminary safety analysis report (PSAR) based on the planned enlargement. Due to its history RWDF Buryakovka does not fully comply with today's best international practices and the latest Ukrainian regulations in this area. The most critical aspects are its inventory of long-lived radionuclides, and the non-existent multi-barrier waste confinement system. A significant part of the project was dedicated, therefore, to the development of a methodology for the safety assessment taking into consideration the facility's special situation and to reach an agreement with all stakeholders involved in the later review and approval procedure of the safety analysis reports. Main aspect of the agreed methodology was to analyze the safety, not strictly based on regulatory requirements but on the assessment of the actual situation of the facility including its location within the Exclusion Zone. For both safety analysis reports, SAR and PSAR, the assessment of the long-term safety led to results that were either within regulatory limits or within the limits allowing for a specific situational evaluation by the regulator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗