Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Essentials for Team Based Rehearsals and the Differences Between Earth Orbiting and Deep Space Missions

The mission readiness environment is where spacecraft and ground systems converge to form the entire as built flight system for the final phase of operationally-themed testing. For most space missions, this phase starts between nine to twelve months prior to the planned launch. In the mission readiness environment, the goal is to perform sufficient testing to exercise the flight teams and systems through all mission phases in order to demonstrate that all elements are ready to support. As part of the maturation process, a mission rehearsal program is introduced to focus on team processes within the final flight system, in a more realistic operational environment. The overall goal for a mission rehearsal program is to: 1) ensure all flight system elements are able to meet mission objectives as a cohesive team; 2) reduce the risk in space based operations due to deficiencies in people, processes, procedures, or systems; and 3) instill confidence in the teams that will execute these first time flight activities. A good rehearsal program ensures critical events are exercised, discovers team or flight system nuances whose impact were previously unknown, and provides a real-time environment in which to interact with the various teams and systems. For flight team members, the rehearsal program provides experience and training in the event of planned (or unplanned) flight contingencies. To preserve the essence for team based rehearsals, this paper will explore the important elements necessary for a successful rehearsal program, document differences driven by Earth Orbiting (Aqua, Aura, Suomi-National Polar-orbiting Partnership (NPP)) and Deep Space missions (New Horizons, Mars Atmosphere and Volatile EvolutioN (MAVEN)) and discuss common challenges to both mission types. In addition, large scale program considerations and enhancements or additional steps for developing a rehearsal program will also be considered. For NASA missions, the mission rehearsal phase is a key milestone for predicting and ensuring on-orbit success.

Gomez-Rosa, Carlos↗

STS-47 Space Shuttle mission report

The STS-47 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the fiftieth Space Shuttle Program flight and the second flight of the Orbiter Vehicle Endeavour (OV-105). In addition to the Endeavour vehicle, the flight vehicle consisted of the following: an ET which was designated ET-45 (LWT-38); three SSME's which were serial numbers 2026, 2022, and 2029 and were located in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-053. The lightweight/redesigned RSRM that was installed in the left SRB was designated 360L026A, and the RSRM that was installed in the right SRB was 360W026B. The primary objective of the STS-47 flight was to successfully perform the planned operations of the Spacelab-J (SL-J) payload (containing 43 experiments--of which 34 were provided by the Japanese National Space Development Agency (NASDA)). The secondary objectives of this flight were to perform the operations of the Israeli Space Agency Investigation About Hornets (ISAIAH) payload, the Solid Surface Combustion Experiment (SSCE), the Shuttle Amateur Radio Experiment-2 (SAREX-2), and the Get-Away Special (GAS) payloads. The Ultraviolet Plume Instrument (UVPI) was flown as a payload of opportunity.

Fricke, Robert W., Jr.↗

Attitude Design for the LADEE Mission

The Lunar Atmosphere and Dust Environment Explorer (LADEE) satellite successfully completed its 148-day science investigation in a low-altitude, near-equatorial lunar orbit on April 18, 2014. The LADEE spacecraft was built, managed and operated by NASA's Ames Research Center (ARC). The Mission Operations Center (MOC) was located at Ames and was responsible for activity planning, command sequencing, trajectory and attitude design, orbit determination, and spacecraft operations. The Science Operations Center (SOC) was located at Goddard Space Flight Center and was responsible for science planning, data archiving and distribution. This paper details attitude design and operations support for the LADEE mission. LADEE's attitude design was shaped by a wide range of instrument pointing requirements that necessitated regular excursions from the baseline one revolution per orbit "Ram" attitude. Such attitude excursions were constrained by a number of flight rules levied to protect instruments from the Sun, avoid geometries that would result in simultaneous occlusion of LADEE's two star tracker heads, and maintain the spacecraft within its thermal and power operating limits. To satisfy LADEE's many attitude requirements and constraints, a set of rules and conventions was adopted to manage the complexity of this design challenge and facilitate the automation of ground software that generated pointing commands spanning multiple days of operations at a time. The resulting LADEE Flight Dynamics System (FDS) that was developed used Visual Basic scripts that generated instructions to AGI's Satellite Tool Kit (STK) in order to derive quaternion commands at regular intervals that satisfied LADEE's pointing requirements. These scripts relied heavily on the powerful "align and constrain" capability of STK's attitude module to construct LADEE's attitude profiles and the slews to get there. A description of the scripts and the attitude modeling they embodied is provided. One particular challenge analysts faced was in the design of LADEE maneuver attitudes. A flight rule requiring pre-maneuver verification of in-flight maneuver conditions by ground operators prior to burn execution resulted in the need to accommodate long periods in the maneuver attitude. This in turn complicated efforts to satisfy star tracker interference and communication constraints in lunar orbit. In response to this challenge, a graphical method was developed and used to survey candidate rotation angles about the thrust vector. This survey method is described and an example of its use on a particular LADEE maneuver is discussed. Finally, the software and methodology used to satisfy LADEE's attitude requirements are also discussed in the context of LADEE's overall activity planning effort. In particular, the way in which strategic schedules of instrument and engineering activities were translated into actual attitude profiles at the tactical level, then converted into precise quaternion commands to achieve those pointing goals is explained. In order to reduce the risk of time-consuming re-planning efforts, this process included the generation of long-term projections of constraint violation predictions for individual attitude profiles that could be used to establish keep-out time-frames for particular attitude profiles. The challenges experienced and overall efficacy of both the overall LADEE ground system and the attitude components of the Flight Dynamics System in meeting LADEE's varied pointing requirements are discussed.

LADEE↗

The Multi-Spectral Solar Telescope Array - Initial results and future plans

We review the scientific objectives, configuration, and initial flight results of the Multi-Spectral Solar Telescope Array (MSSTA). The MSSTA is a comprehensive solar rocket-borne observatory which utilizes multilayer coated optics to achieve high resolution thermally resolved images of the sun at FUV, EUV and soft X-ray wavelengths. The MSSTA was successfully flown on May 13, 1991, obtaining high resolution images of chromospheric and coronal structures, including loops, filaments, polar plumes, and coronal holes. We also discuss plans to expand the capabilities of the MSSTA for future flights.

Walker, Arthur B. C., Jr.↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

Deep Learning-Based Negotiation Strategy Selection for Cooperative Conflict Resolution in Urban Air Mobility

This paper presents a collaborative conflict resolution technique using deep neural network-based intelligent search of the solution space. This approach offers a rapid convergence to a mutually acceptable solution for real-time conflict resolution, suitable for urban air mobility operations. Furthermore, the presented technique allows operational flexibility to the urban air mobility agents where these agents can collaboratively devise the solution via integrative negotiation, based on their local utility functions, as long as such a solution does not violate the global safety thresholds. The presented machine-to-machine negotiation method is built on our prior work on holistic assessment of the airspace and potential conflict detection implemented at-the-edge, onboard the unmanned aircraft systems. This paper extends the prior work to augment decision-making at-the-edge, thereby, promising a true distributed control architecture for urban air mobility. In this approach, each agent (a) builds a potential in-flight conflict map, (b) identifies the conflicting agents, (c) dynamically prepares a list of alternatives based on its current utility functions, (d) negotiates with the conflicting agents to pick one of these alternatives, and (e) implements the negotiated alternative to mutually resolve the conflict. Note that such an approach does not require a contingency plan to be made pre-flight, as the conflict resolution strategies are decided and negotiated in real time based on the present state of the agent. The contingency plan, if available, can serve as an input to the real-time conflict resolution strategy formulation, and also can be used as a fallback plan in case the negotiation fails and the impacted agents need to switch to a rule-based/supervisory resolution mode from the discussed distributed resolution mode. The presented collaborative negotiation-based conflict resolution technique incorporates a time-dependent reward function to catalyze collaborative resolution by incentivizing the agents with local and global rewards beneficial to their business operations.

Advanced Air Mobility↗

Flight safety programs and enhancements for sounding rockets at Wallops Flight Facility

Sounding rocket programs are becoming larger and more complex, thus range safety personnel are required to be central to vehicle and mission design and operations planning. In response to this, the Wallops Flight Facility (VA), is upgrading range facilities, tracking systems, mobile systems and real-time safety systems. These enhancements will improve safety and reliability while augmenting mission success. Flight safety requirements and responsibilities are summarized, and the range safety's future upgrades for wind weighting, real-time analysis and displays, and the mobile safety systems for rocket programs, are considered.

Balach, Dean↗

Status of the National Space Transportation System

The National Space Transportation System is a national resources serving the government, Department of Defense and commercial needs of the USA and others. Four orbital flight tests were completed July 4, 1982, and the first Operational Flight (STS-5) which placed two commercial communications into orbit was conducted November 11, 1982. February 1983 marked the first flight of the newest orbiter, Challenger. Planned firsts in 1983 include: use of higher performance main engines and solid rocket boosters, around-the-clock crew operations, a night landing, extra-vehicular activity, a dedicated DOD mission, and the first flight of a woman crew member. By the end of 1983, five commercial payloads and two tracking and data relay satellites should be deployed and thirty-seven crew members should have made flights aboard the space shuttle.

Abrahamson, J. A.↗

Evaluation of Perspective and Coplanar Cockpit Displays of Traffic Information to Support Hazard Awareness in Free Flight

We examined the cockpit display representation of traffic, to support the pilot in tactical planning and conflict avoidance. Such displays may support the "free flight" concept, but can also support greater situation awareness in a non-free flight environment. Two perspective views and a coplanar display were contrasted in scenarios in which pilots needed to navigate around conflicting traffic, either in the absence (low workload) or presence (high workload) of a second intruder aircraft. All three formats were configured with predictive aiding vectors that explicitly represented the predicted point of closest pass, and predicted penetration of an alert zone around ownship. Ten pilots were assigned to each of the display conditions, and each flew a series of 60 conflict maneuvers that varied in their workload and the complexity of the conflict geometry. Results indicated a tendency to choose vertical over lateral maneuvers, a tendency which was amplified with the coplanar display. Vertical maneuvers by the intruder produced an added source of workload. Importantly, the coplanar display supported performance in all measures that was equal to or greater than either of the perspective displays (i.e., fewer predicted and actual conflicts, less extreme maneuvers). Previous studies that have indicated perspective superiority have only contrasted these with UNIplanar displays rather than the coplanar display used here.

Merwin, David H.↗

Streamlining Collaborative Planning in Spacecraft Mission Architectures

During the past two decades, the planning and scheduling community has substantially increased the capability and efficiency of individual planning and scheduling systems. Relatively recently, research work to streamline collaboration between planning systems is gaining attention. Spacecraft missions stand to benefit substantially from this work as they require the coordination of multiple planning organizations and planning systems. Up to the present time this coordination has demanded a great deal of human intervention and/or extensive custom software development efforts. This problem will become acute with increased requirements for cross-mission plan coordination and multi -spacecraft mission planning. The Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center is taking innovative steps to define collaborative planning architectures, and to identify coordinated planning tools for Cross-Mission Campaigns. Prototypes are being developed to validate these architectures and assess the usefulness of the coordination tools by the planning community. This presentation will focus on one such planning coordination too], named Visual Observation Layout Tool (VOLT), which is currently being developed to streamline the coordination between astronomical missions

Misra, Dhariti↗

System architecture for asynchronous multi-processor robotic control system

The architecture for the Modular Telerobot Task Execution System (MOTES) as implemented in the Supervisory Telerobotics (STELER) Laboratory is described. MOTES is the software component of the remote site of a local-remote telerobotic system which is being developed for NASA for space applications, in particular Space Station Freedom applications. The system is being developed to provide control and supervised autonomous control to support both space based operation and ground-remote control with time delay. The local-remote architecture places task planning responsibilities at the local site and task execution responsibilities at the remote site. This separation allows the remote site to be designed to optimize task execution capability within a limited computational environment such as is expected in flight systems. The local site task planning system could be placed on the ground where few computational limitations are expected. MOTES is written in the Ada programming language for a multiprocessor environment.

Steele, Robert D.↗

On Fast Post-Processing of Global Positioning System Simulator Truth Data and Receiver Measurements and Solutions Data

Post-processing of data, related to a GPS receiver test in a GPS simulator and test facility, is an important step towards qualifying a receiver for space flight. Although the GPS simulator provides all the parameters needed to analyze a simulation, as well as excellent analysis tools on the simulator workstation, post-processing is not a GPS simulator or receiver function alone, and it must be planned as a separate pre-flight test program requirement. A GPS simulator is a critical resource, and it is desirable to move off the pertinent test data from the simulator as soon as a test is completed. The receiver and simulator databases are used to extract the test data files for postprocessing. These files are then usually moved from the simulator and receiver systems to a personal computer (PC) platform, where post-processing is done typically using PC-based commercial software languages and tools. Because of commercial software systems generality their functions are notoriously slow and more than often are the bottleneck even for short duration simulator-based tests. There is a need to do post-processing faster and within an hour after test completion, including all required operations on the simulator and receiver to prepare and move off the post-processing files. This is especially significant in order to use the previous test feedback for the next simulation setup or to run near back-to-back simulation scenarios. Solving the post-processing timing problem is critical for a pre-flight test program success. Towards this goal an approach was developed that allows to speed-up post-processing by an order of a magnitude. It is based on improving the post-processing bottleneck function algorithm using a priory information that is specific to a GPS simulation application and using only the necessary volume of truth data. The presented postprocessing scheme was used in support of a few successful space flight missions carrying GPS receivers.

Kizhner, Semion↗

Space Shuttle Program: Automatic rendezvous, proximity operations, and capture (category 3)

The NASA Johnson Space Center is actively pursuing the development and demonstration of capabilities for automatic rendezvous, proximity operations, and capture (AR&C) using the Space Shuttle as the active vehicle. This activity combines the technologies, expertise, tools, and facilities of the JSC Tracking and Communications Division (EE), Navigation, Control and Aeronautics Division (EG), Automation and Robotics Division (ER), and Structures and Mechanics Division (ES) of the Engineering Directorate and the Flight Design and Dynamics Division (DM) of the Mission Operations Directorate. Potential benefits of AR&C include more efficient and repeatable rendezvous, proximity operations, and capture operations; reduced impacts on the target vehicles (e.g., Orbiter RCS plume loads); reduced flight crew work loads; reduced ground support requirements; and reduced operational constraints. This paper documents the current JSC capabilities/tools/facilities for AR&C and describes a proposed plan for a progression of ground demonstrations and flight tests and demonstrations of AR&C capabilities. This plan involves the maturing of existing technologies in tracking and communications; guidance, navigation and control; mechanisms; manipulators; and systems management and integrating them into several evolutionary demonstration stages.

Jackson, William L.↗

Space Station attached payloads

The Space Station Freedom is being designed and developed with user requirements being used to shape the configuration. Plans include accommodation provisions for a wide variety of attached payloads including the Earth sciences research activities which are the focus of this conference. The station program is even beginning some preliminary payload manifesting which involves planning for accommodation of payload during the station's assembly flights. Potential payload organizations should be aware of the station's plans for payload accommodations so as to guide their own payload activities for future space station use.

Clark, Lenwood G.↗

Lessons Learned in Space Life Support System Testing

The earlier problems can be found and corrected, the easier and cheaper it is to fix them. Doing less testing saves cost and time but doing too little testing increases the risk of operational failures causing large costs and delays. Integrated test is necessary to determine if the subsystems work together and the overall architecture performs as intended. This report reviews the testing lessons learned from the NASA Systems Engineering Handbook, a National Research Council report, and five reviews of International Space Station (ISS) lessons learned. The five reviews all mention two important points. First, that testing should be performed on the final integrated system, one as close as possible to the intended flight system. Second, “test as you fly,” while operating as planned in an environment as close as possible to the expected flight environment. Other lessons are the need for extensive preflight ground testing, the need to establish and defend an adequate budget, the problems using protoflight hardware on ISS, and the benefit of having ISS as a zero gravity test bed. The major ISS life support systems, carbon dioxide, water recycling, and oxygen recovery, were protoflight systems with little testing before launch to ISS. The failure rates these systems have been much greater than predicted and this has caused dissatisfaction with the protoflight approach. The more costly traditional approach is building qualification and test units in addition to flight units. The test units are used to test, analyze, and fix failure modes. Other work shows that there is an optimum cost-effective intuitive appeal of a human ecosystem in space.

Life support↗

Lessons Learned in Space Life Support System Testing

The earlier problems can be found and corrected, the easier and cheaper it is to fix them. Doing less testing saves cost and time but doing too little testing increases the risk of operational failures causing large costs and delays. Integrated test is necessary to determine if the subsystems work together and the overall architecture performs as intended. This report reviews the testing lessons learned from the NASA Systems Engineering Handbook, a National Research Council report, and five reviews of International Space Station (ISS) lessons learned. The five reviews all mention two important points. First, that testing should be performed on the final integrated system, one as close as possible to the intended flight system. Second, “test as you fly,” while operating as planned in an environment as close as possible to the expected flight environment. Other lessons are the need for extensive preflight ground testing, the need to establish and defend an adequate budget, the problems using protoflight hardware on ISS, and the benefit of having ISS as a zero gravity test bed. The major ISS life support systems, carbon dioxide removal, water recycling, and oxygen recovery, were protoflight systems with little testing before launch to ISS. The failure rates of these systems have been much greater than predicted and this has caused dissatisfaction with the protoflight approach. The more costly traditional approach builds qualification and test units in addition to flight units. The test units are used to find, analyze, and fix failure modes. Other work shows that there is an optimum cost-effective amount of testing when redundant systems must have a specified reliability and confidence.

Harry W. Jones↗

User's manual for a fuel-conservative descent planning algorithm implemented on a small programmable calculator

A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. An explanation and examples of how the algorithm is used, as well as a detailed flow chart and listing of the algorithm are contained.

Vicroy, D. D.↗

Mission safety evaluation report for STS-48, postflight edition

Space Shuttle Discovery was launched into a 57 deg inclination orbit from the Kennedy Space Center (KSC) Launch Complex 39A at 7:11 p.m. EDT on 12 Sep. 1991. STS-48 was the second mission since return-to-flight to have KSC as the planned end-of-mission landing site, and the first mission to have a planned night landing at KSC. However, due to weather conditions at KSC, Discovery flew one extra orbit and landed at Edwards AFB, Calif. at 3:38 a.m. EDT on 18 Sep. 1991. Operation of all systems was generally satisfactory during the 5 day mission. On flight day 3, the Upper Atmospheric Research Satellite (UARS) was deployed from Discovery's payload bay 350 statute miles above Earth. This orbiting observatory will study mankind's effects on the planet's atmosphere and its shielding ozone layer. STS-48 safety risk factors are addressed that represent a change from previous flights, factors from previous flights that had an impact on this flight, and factors that are unique to this flight.

Clatterbuck, Guy E.↗