Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Study of the interrelation between the electrotechnical parameters of the plasma focus discharge circuit and the plasma compression dynamics on the PF-3 and PF-1000 facilities

The main stages of the plasma current sheath (PCS) dynamics on two plasma focus (PF) facilities with different geometries of the electrode system, PF-3 (Filippov type) and PF-1000 (Mather type), were studied by analyzing the results of the current and voltage measurements. Some dynamic characteristics, such as the PCS velocity in the acceleration phase in the Mather-type facility (PF-1000), the moment at which the PCS reaches the anode end, and the plasma velocity in the radial stage of plasma compression in the PF-3 Filippov-type facility, were determined from the time dependence of the inductance of the discharge circuit with a dynamic plasma load. The energy characteristics of the discharge circuit of the compressing PCS were studied for different working gases (deuterium, argon, and neon) at initial pressures of 1.5–3 Torr in discharges with energies of 0.3–0.6 MJ. In experiments with deuterium, correlation between the neutron yield and the electromagnetic energy deposited directly in the compressed PCS was investigated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Distribution of leakage currents in the cylindrical and conical sections of the magnetically insulated transmission line of the Angara-5-1 facility in experiments with wire arrays

Current leakages in the magnetically insulated transmission lines (MITL) impose restrictions on the transmission of electromagnetic pulses to the load in high-power electrophysical facilities. The multimodule Angara-5-1 facility with an output electric power of up to 6 TW is considered. In this work, the experimental and calculated profiles of leakage currents in two sections of the line are compared when the eight-module facility is loaded by a wire array. The azimuthal distribution of the current in the cylindrical section of the MITL is also considered.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A comparison of metrics to evaluate the effects of hydro-facility passage stressors on fish

Hydropower is the most common form of renewable energy, and countries worldwide are considering expanding hydropower to new areas. One of the challenges of hydropower deployment is mitigation of the environmental impacts including water quality, habitat alterations, and ecosystem connectivity. For fish species that inhabit river systems with hydropower facilities, passage through the facility to access spawning and rearing habitats can be particularly challenging. Fish moving downstream through a hydro-facility can be exposed to a number of stressors (e.g., rapid decompression, shear forces, blade strike and collision, and turbulence), which can all affect fish survival in direct and indirect ways. Many studies have investigated the effects of hydro-turbine passage on fish; however, the comparability among studies is limited by variation in the metrics and biological endpoints used. Future studies investigating the effects of hydro-turbine passage should focus on using metrics and endpoints that are easily comparable. This review summarizes four categories of metrics that are used in fisheries research and have application to hydro-turbine passage (i.e., mortality, injury, molecular metrics, behavior) and evaluates them based on several criteria (i.e., resources needed, invasiveness, comparability among stressors and species, and diagnostic properties). Additionally, these comparisons are put into context of study setting (i.e., laboratory vs. field). Overall, injury and molecular metrics are ideal for studies in which there is a need to understand the mechanisms of effect, whereas behavior and mortality metrics provide information on the whole body response of the fish. The study setting strongly influences the comparability among studies. In laboratory-based studies, stressors can be controlled by both type and magnitude, allowing for easy comparisons among studies. In contrast, field studies expose fish to realistic passage environments but the comparability is limited. Based on these results, future studies, whether lab or field-based, should focus on metrics that relate to mortality for ease of comparison.

fish↗

Considerations on the design of a rare isotope beam facility based on superconducting heavy ion linacs

To establish an accelerator facility based on superconducting linear accelerator (linac) for nuclear and applied sciences in Korea, the rare isotope science project started in December 2011 under the auspices of the Institute for Basic Science (IBS). The layout of the facility has been mostly frozen since 2013 and civil construction began in 2016. On the other hand, an alternative linac design option was recently investigated in collaboration with the linac development group of Argonne National Lab in search of a further optimized configuration. A new linac lattice was developed and evaluated against realistic machine errors using TRACK. The beam optics simulations and error analysis then proved the soundness of this alternative design. In addition, beam optics of the injector was studied for simultaneous acceleration of both stable and rare isotope beams with the use of an electron beam ion source (EBIS). Additionally considered are alternative options of high-power cyclotrons as ISOL driver in order to enhance the capability of rare isotope beam production and fully exploit the superconducting linac facility built at high cost.

07 ISOTOPE AND RADIATION SOURCES↗

Facility Detection and Popularity Assessment from Text Classification of Social Media and Crowdsourced Data

Advances in technology have continually progressed our understanding of where people are, how they use the environment around them, and why they are at their current location. Having a better knowledge of when various locations become popular through space and time could have large impacts on research fields like urban dynamics and energy consumption. In this paper, we discuss the ability to identify and locate various facility types (e.g. restaurant, airport, stadiums) using social media, and assess methods in determining when these facilities become popular over time. We use natural language processing tools and machine learning classifiers to interpret geotagged Twitter text and determine if a user is seemingly at a location of interest when the tweet was sent. On average our classifiers are approximately 85% accurate varying across multiple facility types, with a peak precision of 98%. By using these methods to classify unstructured text, geotagged social media data can be an extremely useful tool to better understanding the composition of places and how and when people use them.

crowd-sourced data↗

Bulk Handling Facility Modeling and Simulation for Safeguards Analysis

The Separation and Safeguards Performance Model (SSPM) uses MATLAB/Simulink to provide a tool for safeguards analysis of bulk handling nuclear processing facilities. Models of aqueous and electrochemical reprocessing, enrichment, fuel fabrication, and molten salt reactor facilities have been developed to date. These models are used for designing the overall safeguards system, examining new safeguards approaches, virtually testing new measurement instrumentation, and analyzing diversion scenarios. The key metrics generated by the models include overall measurement uncertainty and detection probability for various material diversion or facility misuse scenarios. Safeguards modeling allows for rapid and cost-effective analysis for Safeguards by Design. The models are currently being used to explore alternative safeguards approaches, including more reliance on process monitoring data to reduce the need for destructive analysis that adds considerable burden to international safeguards. Machine learning techniques are being applied, but these techniques need large amounts of data for training and testing the algorithms. The SSPM can provide that training data. This paper will describe the SSPM and its use for applying both traditional nuclear material accountancy and newer machine learning options.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

DISTRI: Distributed Multi-Facility HPC Simulator (DISTRI) v2.1

DISTRI is an advanced network simulator designed for multi-facility computational infrastructures with agentic behavior. It simulates HPC facilities where computational resources act as autonomous agents, making intelligent decisions about job scheduling, load balancing, and resource allocation. The simulator focuses on developing and testing decentralized algorithms that promote resilience and efficiency in multi-facility environments. Key Features: - Agentic Resource Behavior: Processors and DTNs act as autonomous agents with decision-making capabilities - Pheromone-Based Load Balancing: Decentralized load balancing inspired by ant colony optimization - Dual Topology Support: Mesh (normal operations) and Dumbell (network testing) topologies - Comprehensive TCP Simulation: Realistic TCP implementations with multiple congestion control algorithms - Failure Resilience Testing: Processor failure simulation with automatic job reassignment - Extensive Visualization: Detailed performance analysis and metrics collection - Research-Ready: Designed for algorithm development and benchmarking

Bez, Jean Luca [Lawrence Berkeley National Laborat↗

External Events Analysis for Experimental Fusion Facilities a

External events are those off-normal events that threaten facilities either from outside or inside the building. These events, such as floods, fires, and earthquakes, are among the leading risk contributors for fission power plants, and the nature of fusion facilities indicates that they may also lead fusion risk. This paper gives overviews of analysis methods, references good analysis guidance documents, and gives design tips for mitigating the effects of floods and fires, seismic events, and aircraft impacts. Implications for future fusion facility siting are also discussed. Sites similar to fission plant sites are recommended.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Benefits of a Software Bill of Materials Program at Nuclear Facilities

Software supply chain attacks are becoming increasingly more prevalent in both information communications technology and operational technology environments. Often, a supplier or other entity discloses vulnerability information about software components and subcomponents used in a digital asset, but an asset owner is unable to quickly ascertain if the vulnerable component is installed in their facility. The generation and use of a software bill of materials (SBOM) for installed digital assets can enable an asset owner to quickly identify if and where a component is used, allowing them to evaluate the risk and determine necessary risk treatments. The integration of an SBOM program into a nuclear facility not only improves vulnerability management and risk management processes, it also benefits asset and configuration management, cybersecurity, and supply chain programs. This paper reviews the U.S. Department of Energy Office of Nuclear Energy Cybersecurity Crosscutting Technology Development program’s work on integrating an SBOM program into a nuclear facility. It also provides a discussion on the benefits of such a program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Biological shield design and analysis of KIPT accelerator-driven subcritical facility.

Argonne National Laboratory of the United States and Kharkov Institute of Physics and Technology of Ukraine have been collaborating on the conceptual design development of an electron accelerator-driven subcritical facility. The facility will be utilized for performing basic and applied nuclear research, producing medical isotopes, and training young nuclear specialists. This paper presents the design and analyses of the biological shield performed for the top section of the facility. The neutron source driving the subcritical assembly is generated from the interaction of a 100-kW electron beam with a natural uranium target. The electron energy is in the range of 100 to 200 MeV, and it has a uniform spatial distribution. The shield design and the associated analyses are presented including different parametric studies. In the analyses, a significant effort was dedicated to the accurate prediction of the radiation dose outside the shield boundary as a function of the shield thickness without geometrical approximations or material homogenization. The MCNPX Monte Carlo code was utilized for the transport calculation of electrons, photons, and neutrons. Weight window variance-reduction techniques were introduced, and the dose equivalent outside the shield can be calculated with reasonably good statistics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Production and Injection data for NV Binary facilities

Excel files are provided with well production and injection data for binary facilities in Nevada. The files contain the data that reported montly to the Nevada Bureau of Mines and Geology (NBMG) by the facility operators. this data has been complied into Excel spreadsheets for each of the facilities given on the NBMG web site.

15 GEOTHERMAL ENERGY↗

Anomaly Detection in Accelerator Facilities Using Machine Learning

Synchrotron light sources are user facilities and usually run about 5000 hours per year to support many beamlines operations in parallel. Reliability is a key parameter to evaluate machine performance. Even many facilities have achieved >95% beam reliability, there are still many hours of unscheduled downtime and every hour lost is a waste of operation costs along with a big impact on individual scheduled user experiments. Preventive maintenance on subsystems and quick recovery from machine trips are the basic strategies to achieve high reliability, which heavily depends on experts’ dedication. Recently, SLAC, APS, and NSLS-II collaborated to develop machine-learning-based approaches aiming to solve both situations, hardware failure prediction and machine failure diagnosis to find the root sources. In this paper, we report our facility operation status, development progress, and plans.

Accelerator Physics↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗

FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

LLNL Fire Protection Engineering Standard 5.8 Facility Survey Program (Rev.5)

This standard describes the LLNL Fire Protection Facility Survey Program. The purpose of this standard is to describe the type of facility surveys required to fulfill the requirements of DOE Order 420.1B, Facility Safety. Nothing in this standard is intended to prevent the development of a FHA using alternative approaches. Alternate approaches, including formatting, will be by exception only, and approved by the Fire Marshal/Fire Protection Engineering Subject Matter Expert in advance of their use.

99 GENERAL AND MISCELLANEOUS↗

Cultural Resources Monitoring for the Rattlesnake Mountain Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, 600 Area, Hanford Site, Washington – HCRC# 2008-600-004

Since 1989, cleaning up the Hanford Site has been the primary mission of the U.S. Department of Energy Richland Operations Office (DOE-RL). One cleanup goal is footprint reduction on the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE). Footprint reduction includes a variety of activities such as the remediation of waste sites, demolition of abandoned buildings and infrastructure, and removal of equipment and miscellaneous debris items. Footprint reduction on the Rattlesnake Mountain ridgeline also included the construction of the Combined Community Communications Facility (CCCF), which combines all communication towers on Rattlesnake Mountain into a single facility. The proposed footprint reduction activities on ALE were covered in several previously completed cultural resources reviews. Two project areas are especially sensitive to cultural resources----the Rattlesnake Mountain ridgeline, a traditional cultural property (TCP), and Rattlesnake Spring, where several National Register-eligible sites are located. The first cultural resource review for this project found that footprint reduction activities would have an adverse effect on Laliik, the Rattlesnake Mountain TCP, by compromising its spiritual qualities and its visual and natural setting. Through consultation among representatives of DOE, the State Historic Preservation Office, and local tribal groups, a number of mitigation strategies were developed to resolve the adverse effects. These strategies focused on minimizing impacts during the construction and operation of the new CCCF and during demolition and cleanup activities. These stipulations were cemented in a Memorandum of Agreement (MOA), signed by the project stakeholders on July 30, 2009. The MOA required intermittent monitoring by qualified archaeologists during construction of the new communications facility and during demolition and removal of debris and infrastructure. Archaeologists with Pacific Northwest National Laboratory performed archaeological monitoring intermittently from August 12, 2009, through May 5, 2011. This report documents all archaeological monitoring conducted for the ALE footprint reduction project in accordance with stipulations outlined in the MOA.

54 ENVIRONMENTAL SCIENCES↗

The Vapor Plume at Material Disposal Are C in Relation to Pajarito Corridor Facilities

A vapor plume made up of volatile organic compounds is present beneath Material Disposal Area C (MDA C) at Los Alamos National Laboratory (LANL). The location and concentrations within the vapor plume are discussed in relation to existing and planned facilities and construction activities along Pajarito Road (the 'Pajarito Corridor') and in terms of worker health and safety. This document provides information that indicates that the vapor plume does not pose a threat to the health of LANL workers nor will it pose a threat to workers during construction of proposed facilities along Pajarito Road. The Los Alamos National Laboratory (LANL or the Laboratory) monitors emissions, effluents, and environmental media to meet environmental compliance requirements, determine actions to protect the environment, and monitor the long-term health of the local environment. LANL also studies and characterizes 'legacy' waste from past Laboratory operations to make informed decisions regarding eventual corrective actions and the disposition of that waste. Starting in 1969, these activities have been annually reported in the LANL Environmental Report (formerly Environmental Surveillance Report), and are detailed in publicly accessible technical reports meeting environmental compliance requirements. Included among the legacy sites being investigated are several formerly used material disposal areas (MDAs) set aside by the Laboratory for the general on-site disposal of waste from mission-related activities. One such area is MDA C located in Technical Area 50 (TA-50), which was used for waste disposal between 1948 and 1974. The location of TA-50 is depicted in Figure 1. The present paper uses a series of maps and cross sections to address the public concerns raised about the vapor plume at MDA C. As illustrated here, extensive sampling and data interpretation indicate that the vapor plume at MDA C does not pose a threat to the health of LANL workers nor will it pose a threat to workers during construction of the proposed facilities and utility trenches. The public cannot be directly exposed to the vapor plume beneath MDA C because Pajarito Road is closed to the public.

COMPLIANCE↗