Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report)

We sent our updated draft Site License Agreement back to SPI on June 4 th , with redlines. Gary Blanc of SPI said he would circulate it internally to appropriate parties and get back to us. He did not return an accepted or redlined version to us before the end of the month of July, nor did he send us any questions/comments or updates, despite them being requested. He is currently traveling around visiting SPI’s various forestry locations and mills, so is difficult to reach. In working towards the commercialization strategy, during the month of July, further research was completed on understanding and evaluating the availability and potential availability of fire clearing forestry residue in California. In July, a meeting with Stephen Kaffka and Rob Williams who are both authors of the report “An Assessment of Biomass Resource in California, 2013” was attended. These individuals provided us with guidance and information about how to identify the availability and potential availability of forestry/wood resource biomass in California. Also, in the month of July, a meeting with Cal-Fire was attended in order to understand what Cal-Fire plans to do in terms of reducing the risk of wildfires and how much potential fire clearing forestry residue biomass this will produce for California. Additionally, the potential of a novel pathway of producing H2 from pyrolysis oil, maximizing the products’ value, as well as maximizing the carbon emission reduction potential by incorporating carbon capture onsite, was investigated. We continued with the process of subcontracting with Iowa State University and Frontline BioEnergy. We have our Contract Administrators working with their counterparts at each partner to get the details in place. Draft contracts with statements of work were provided to each partner, and updated schedules and budgets, broken down by task in the statements of work, have been requested from each.

09 BIOMASS FUELS↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

Organizational Conflicts of Interest Disclosure Update Statement (FY2019)

The National Technology & Engineering Solutions of Sandia, LLC (NTESS) Prime Contract department manages an organizational conflicts of interest (OCI) program that is designed to provide NTESS employees an accessible means to assist in identifying potential OCI risk and providing development support services to avoid, neutralize, or mitigate the risk. The OCI program is responsible for maintaining a regulatory infrastructure, such as corporate OCI policy and training content, to comply with NTESS's obligations set forth in prime contract clauses H-4: ORGANIZATIONAL CONFLICT OF INTEREST (OCI) — SPECIAL PROVISION and Section I Department of Energy Acquisition Regulation 952.209-72, Organizational Conflicts of Interest, Alternate I, paragraph (c)(1), Disclosure After Award. Risk identification is a key OCI program priority. Providing employees with a straight-forward, accessible and navigable mechanism to identify potential OCI risk will assist the OCI program in meeting this priority.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Further Support of the Development of Advanced Multilayer Optics Coatings for X-Ray Imaging

SAO is working with LLNL to develop Wolter-I optics for x-ray imaging applications at energies of 15-50 keV and above at NNSA facilities. Our work includes R&D on advanced multilayer coatings as well as fabrication and testing of Wolter-I multilayer coated optics. It also includes delivery of custom 3.05-meter focal length Wolter optics with response at energies of interest to Sandia National Laboratories and LLNL. The mandrels for the custom optics are fabricated at MSFC. In previous contracts, SAO delivered several optics to LLNL with response at various energies. During this present contract period two tasks were carried out. Task1: the coating, replication and characterization of a custom optic with peak response at 22.8 keV, using the custom-designed SANZ mandrels. Task2: carrying out modifications to the coating chamber at SAO to accommodate new, longer, custom-designed mandrels (SANZlong) that will be fabricated at NASA MSFC in FY2020. The longer mandrels are necessary to mitigate end effects observed in the replication process for the small optics currently being fabricated.

36 MATERIALS SCIENCE↗

Northstar Accelerator Based Mo99 Production Facility Design Support (LANL FY20 Quarters 1 and 2 Facility Design Support Report)

Facility design support this quarter centered on transfer of the target insertion and design details to MBraun and Springs, the companies under contract via Northstar to do the hot cell, target insertion and the local target shielding. A significant number of changes have been introduced by these vendors which have been reviewed and critiqued. In addition, the company contracted to produce the Mo100 disks announced that the tolerance on the thickness of 0.5 mm would be ±25%. An alternative design of the target holder was proposed. Bulk shielding and local target shielding design work has continued also and will be reported.

43 PARTICLE ACCELERATORS↗

PV Production - Conceptual Location Analysis

The purpose of a Conceptual Location Analysis is to identify potential project/building sites in the planning phase of a project. The analysis includes review and comment on the potential sites by relevant disciplines. Site criteria encompasses DOE and NNSA requirements pertaining to real property and environmental stewardship and additionally addresses SNL site planning objectives such as sustainability and efficiency. This analysis is intended to be used as a tool to provide a comprehensive perspective on siting decisions, and is not intended to supersede previous siting decisions or agreements. This conceptual location analysis is for the siting of PV for power production. The goal of this Conceptual Location Analysis is to weigh different sites, and come to a consensus on preferred sites for potential solar arrays through an Energy Savings Performance Contract (ESPC) or a Utility Energy Service Contract (UESC).

14 SOLAR ENERGY↗

Implementing Environmental Requirements

The purpose of this document is to describe the processes for identifying, communicating, and implementing environmental requirements at the Los Alamos National Laboratory (LANL) for Triad National Security, LLC (Triad). References to LANL or the Laboratory refer to the Department of Energy, National Nuclear Security Administration (DOE/NNSA) managed portion of LANL. References to the Prime Contract refer to the contract between DOE/NNSA and Triad and does not apply to the portion of Technical Area 54 now managed and operated by DOE Environmental Management (EM-LA).

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for Sandia National Laboratories California (2019)

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2019 was prepared in accordance with DOE Order 231.1B, Environment, S afro and Health &potting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2019, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2017 Sandia National Laboratories California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology and Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2017 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2017, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2019

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 187 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Northstar Accelerator Based Mo99 Production Facility Design Support

Facility design support in FY20 centered on transfer of the target insertion and design details to MBraun and Springs, the companies under contract via Northstar to do the hot cell, target insertion and the local target shielding. A significant number of changes have been introduced by these vendors which have been reviewed and critiqued. In addition, the company contracted to produce the Mo100 disks announced that the tolerance on the thickness of 0.5 mm would be ±25%. An alternative design of the target holder was proposed. Bulk shielding and local target shielding design work has continued also and will be reported. Ongoing design and cooling issues continue to arise as the facility takes shape and moves toward completion. LANL is part of the team identifying, analyzing and designing solutions to these issues. Many of these are covered in this report.

43 PARTICLE ACCELERATORS↗

Los Alamos National Laboratory’s Contingent Labor Transformation with SAP Fieldglass [Slides]

LANL continues to expand our mission, increasing demand for a robust Contingent Labor program. Our remote location makes finding and attracting workers difficult. Our existing Contingent Labor program did not cover all workers or contracts. We had outsourced management services, including a Fieldglass instance that was 3rd party managed. The end of life of our current contract for Contingent Labor management propelled us to pursue a comprehensive change to our approach.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Vessel Fabrication Overview

LANL utilizes spherical vessels for numerous basic science, materials, and system performance experiments. These pressure vessels are designed and fabricated to meet the intent of ASME B&PV Section VIII, Division 3 and Code Case 2564. LANL has successfully contracted vessel construction in the past, utilizing HSLA-100 steel. As current vessel inventories approach design life, we are once again embarking upon a series of fabrication contracts to produce replacement components and vessel assemblies to support continued experiment cadence at LANL. LANL’s intent is to ramp up a continuous vessel supply chain for the DOE Complex.

42 ENGINEERING↗

Site Environmental Report for 2020, Sandia National Laboratories, California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2020 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2020, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CIO Cloud Strategy

The purpose of the Sandia CIO Cloud Strategy is to establish the strategic direction for the adoption of cloud services and technologies as the prevailing IT solution for Sandia National Laboratories. Sandia’s Chief Information Officer (CIO) will champion unified, site-wide adoption of cloud and will amplify business and mission impacts across the Labs. Sandia’s CIO Cloud Strategy aligns to the Federal Cloud Computing Strategy1 (Cloud Smart) and the Sandia Management and Operating Contract (Prime Contract).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning, Procuring, & Constructing on-site PV [Slides]

A developer will install a renewable energy system on DOE property. In exchange, DOE agrees to purchase the power generated by the system. These power purchase payments repay the developer over the contract term. The developer owns, operates, and maintains the system for the life of the contract.

14 SOLAR ENERGY↗