Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Stand for studying technological processes under conditions simulating space

A test stand for conducting processing experiments under conditions simulating space is described. The most important units of the stand are discussed. Tests of the stand and research studies using the stand demonstrated that it is a reliable and universal research facility which makes it possible to study processes such as metal melting, welding, and deposition.

Paton, B. Y.↗

Multi-mode optical sensor (B) evaluation test report

An evaluation test series was performed on the unit to develop realistic specifications for a similar device for use on the orbiter vehicle. Tests included sensitivity, target dynamic range, tracking angular rate, external magnetic field effects, and photocathode uniformity. Several demonstrations of operation under automatic control were also prepared, using a desk calculator for numerical control and for subsequent reduction of data derived from the test.

Smith, R. A.↗

Stability of Pharmaceuticals in Space

Stability testing is a tool used to access shelf life and effects of storage conditions for pharmaceutical formulations. Early research from the International Space Station (ISS) revealed that some medications may have degraded while in space. This potential loss of medication efficacy would be very dangerous to Crew health. The aim of this research project, Stability of Pharmacotherapeutic Compounds, is to study how the stability of pharmaceutical compounds is affected by environmental conditions in space. Four identical pharmaceutical payload kits containing medications in different dosage forms (liquid for injection, tablet, capsule, ointment and suppository) were transported to the ISS aboard a Space Shuttle. One of the four kits was stored on that Shuttle and the other three were stored on the ISS for return to Earth at various time intervals aboard a pre-designated Shuttle flight. The Pharmacotherapeutics laboratory used stability test as defined by the United States Pharmacopeia (USP), to access the degree of degradation to the Payload kit medications that may have occurred during space flight. Once these medications returned, the results of stability test performed on them were compared to those from the matching ground controls stored on Earth. Analyses of the results obtained from physical and chemical stability assessments on these payload medications will provide researchers additional tools to promote safe and efficacious medications for space exploration.

Nguyen, Y-Uyen↗

Field Testing of Compartmentalization Methods for Multifamily Construction

The 2012 IECC has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure for both single-family and multifamily construction in Climate Zones 3-8. Other programs (LEED, ASHRAE 189, ASHRAE 62.2) have similar or tighter compartmentalization requirements, driving the need for easier and more effective methods of compartmentalization in multifamily buildings. Builders and practitioners have found that fire-resistance rated wall assemblies are a major source of difficulty in air sealing/compartmentalization, particularly in townhouse construction. This problem is exacerbated when garages are “tucked in” to the units and living space is located over the garages. In this project, Building Science Corporation examined the taping of exterior sheathing details to improve air sealing results in townhouse and multifamily construction, when coupled with a better understanding of air leakage pathways. Current approaches are cumbersome, expensive, time consuming, and ineffective; these details were proposed as a more effective and efficient method. The effectiveness of these air sealing methods was tested with blower door testing, including “nulled” or “guarded” testing (adjacent units run at equal test pressure to null out inter-unit air leakage, or “pressure neutralization”). Pressure diagnostics were used to evaluate unit-to-unit connections and series leakage pathways (i.e., air leakage from exterior, into the fire-resistance rated wall assembly, and to the interior).

42 ENGINEERING↗

Wind-tunnel tests on a 3-dimensional fixed-geometry scramjet inlet at M = 2.30 to 4.60

Wind-tunnel tests were conducted on a baseline scramjet inlet model having fixed geometry and swept leading edges at M = 2.30, 2.96, 3.95, and 4.60 in the Langley unitary plan wind tunnel. The unit Reynolds number of the tests was held constant at 6.56 million per meter (2 million per foot). The objectives of the tests were to establish inlet performance and starting characteristics in the lower Mach number range of operation (less than M = 5). Surface pressures obtained on the inlet components are presented, along with the results of the internal flow surveys made at the throat and capture stations of the inlet. Contour plots of the inlet-flow-field parameters such as Mach numbers, pressure recovery, flow capture, local static and total pressure ratios at the survey stations are shown for the test Mach numbers.

Mueller, J. N.↗

Numerical Simulations in Support of a Long-Term Test of Gas Production From Hydrate Accumulations on the Alaska North Slope: Water Production and Associated Design and Management Issues

Here, we investigated numerical simulation strategies for a long-term test of depressurization-induced gas production from the B1 Sand of Unit B at the Hydrate-01 Stratigraphic Test Well. The main objective of this study was to estimate fluid production rates (with emphasis on water production) under a variety of conditions and production scenarios and contribute new insights to the design and management of the field test. In the first part of the study, we investigated the system response to a three-step depressurization process using two limiting sets of flow properties─the expected maximum and minimum intrinsic and effective permeabilities─for the very heterogeneous reservoir. In the second part, we investigated the effect of the production interval length and placement within the formation relative to the boundaries of the hydrate-bearing unit. The best performing well configuration was used in the third part of the study, which used the most representative subsurface flow properties to investigate the effect of the depressurization strategy on the production performance. The best overall performance (largest gas production with modest water production and a strong response at the observation wells) was obtained with a 10 m-long well situated 3 m below the top of the formation and a three-step depressurization scheme at 15-day intervals to a terminal bottomhole pressure of 2.8 MPa. The overall production performance was enhanced by a faster rate of depressurization. Estimated water production rates in all cases were limited and easily manageable. None of the tested well configurations or depressurization strategies significantly reduced water production without also severely reducing gas production. In all the investigated cases, 95% of the long-term fraction of produced water was replenished by inflows from the boundaries and could not be reduced. These substantial water inflows are an unavoidable feature of HU-B and cannot be easily mitigated by a hydraulic control.

02 PETROLEUM↗

RG217 V2-V2 Coaxial Cable Acceptance Test

The ECSE Solid State Pulsed Power unit is a high current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the testing procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This test procedure verifies the cable is undamaged and assembled correctly, the correct cable connectors are installed properly onto the cable, and that the entire assembly meets conductivity and holdoff voltage requirements. This procedure will verify that the RG217 Coaxial Cable Assembly meets all assembly and functional requirements. In particular, this procedure verifies the Cable Shield and Center Conductor meet conductivity requirements by testing their resistances. Additionally, this procedure ensures the RG217 Coaxial Cable Assembly meets holdoff voltage requirements by applying high voltage and verifying the RG217 Coaxial Cable Assembly does not experience any breakdowns or arcing.

42 ENGINEERING↗

Design, fabrication and testing of an optical temperature sensor

The laboratory breadboard optical temperature sensor based on the temperature dependent absorptive characteristics of a rare earth (europium) doped optical fiber. The principles of operation, materials characterization, fiber and optical component design, design and fabrication of an electrooptic interface unit, signal processing, and initial test results are discussed. Initial tests indicated that, after a brief warmup period, the output of the sensor was stable to approximately 1 C at room temperature or approximately + or - 0.3 percent of point (K). This exceeds the goal of 1 percent of point. Recommendations are presented for further performance improvement.

Morey, W. W.↗

Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

Mason, Lee↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope B1 Feed in Support of the LAW Pilot Melter, VSL-02R62N0-5, Rev. 0 (May 2003)

The principal objective of the DM100 tests was to demonstrate the robustness of the vitrification process with respect to feed and glass compositional changes resulting from variations in the simulant-to-additive ratio. The DM100-WV unit was selected for these tests; this melter was used for all of the Part B 1 tests on LAW Envelopes A, B, and C sulfate incorporation that were used to support the subsequent tests on the Pilot Melter as well as for the more recent LAW Sub-Envelope Al, A2, A3 and Cl tests. The same melter was selected for the present tests in order to maintain comparisons between the data sets. In addition, the somewhat smaller glass volume for the same melt surface area as compared to the DM100-BL melter means that more glass turnovers are achieved for a given test duration. The DM100 tests used nominal feed and feed with a 15% surplus in waste simulant. Previous Pilot Melter tests on Envelope A with 10% variations (but with sulfate removal) showed significant impacts on glass production rates that were ultimately corrected by adjustments in the sugar additions. Consequently, robustness with respect to throughput as well as sulfate tolerance are important motivations for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mapping soils, crops, and rangelands by machine analysis of multitemporal ERTS-1 data

ERTS-1 data, obtained during the period 25 August 1972 to 5 September 1973 over a range of test sites in the Central United States, have been used for identifying and mapping differences in soil patterns, species and conditions of cultivated crops, and conditions of rangelands. Multispectral scanner data from multiple ERTS passes over certain test sites have provided the opportunity to study temporal changes in the scene. Multispectral classifications delineating soils boundaries in different test sites compared well with existing soil association maps prepared by conventional means. Spectral analysis of ERTS data was used to identify, maps, and make areal measurements of wheat in western Kansas. Multispectral analysis of ERTS-1 data provided patterns in rangelands which can be related to soils differences, range management practices, and the extent of infestation of grasslands by mesquite (prosopis fuliflora) and juniper (juniperus spp.).

Baumgardner, M. F.↗

A real-time simulator of a turbofan engine

A real-time digital simulator of a Pratt and Whitney F100 engine has been developed for real-time code verification and for actuator diagnosis during full-scale engine testing. This self-contained unit can operate in an open-loop stand-alone mode or as part of closed-loop control system. It can also be used for control system design and development. Tests conducted in conjunction with the NASA Advanced Detection, Isolation, and Accommodation program show that the simulator is a valuable tool for real-time code verification and as a real-time actuator simulator for actuator fault diagnosis. Although currently a small perturbation model, advances in microprocessor hardware should allow the simulator to evolve into a real-time, full-envelope, full engine simulation.

Litt, Jonathan S.↗

Test and evaluation of load converter topologies used in the Space Station Freedom Power Management and distribution DC test bed

Power components hardware in support of the Space Station Freedom dc Electrical Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switchmode converter, and a switching full-bridge forward converter. The topology, operation principles, and tests results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

Lebron, Ramon C.↗

Test and evaluation of load converter topologies used in the Space Station Freedom power management and distribution dc test bed

Power components hardware in support of the Space Station freedom dc Electric Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switch-mode converter, and a switching full-bridge forward converter. The topology, operation principles, and test results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

Lebron, Ramon C.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Benavides, Gabriel F.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Benavides, Gabriel F.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Advanced Electric Propulsion System (AEPS)↗

The Arctic data buoy. A system for environmental monitoring in the Arctic

An automated data buoy system for environmental monitoring in the Arctic was developed. The buoy is designed to operate for a minimum of 1 year providing position and environmental data through polar-orbiting satellite telecommunications. It can be deployed by a two or three man crew using a small aircraft. It is capable of operating in both free-floating and frozen-in situations. An experimental unit successfully completed a 5-month test at Fletcher's Ice Island (T-3) during the winter of 1971-72 and six units were deployed in the Arctic during the spring of 1972. Results to data have demonstrated the utility of the basic design, the effectiveness of the satellite communications, and the feasibility of deploying and operating a large array of such buoy systems in the Arctic Ocean.

Haugen, D. P.↗