Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Endpointtool: An Excel{sup R}-Based Workbook for Hanford Tank Waste Treatment Planning

The EndpointTool is a Microsoft Excel{sup R}-based workbook with a set of macros and worksheets for the evaluation of Hanford Site tank treatment scenarios. This tool enables the user to determine bottlenecks in processes and storage and address regulatory issues. It also provides an avenue to evaluate new technologies, as well as changes in existing technologies and their impact to the current baseline. The EndpointTool tracks 46 radionuclides, 52 species, and 10 properties for each event. Seventeen different processes are modeled, each with its own worksheet that describes that process, has its assumptions, qualifications, and calculations, and holds the historical results of each process event. This enables the user to not only look at the big picture, but to evaluate process parameters such as flowrates, sizing, etc. The user composes an event that is a combination of a sender tank, a process tank, and a receiver tank. Each event involves one of the processes and each process can have up to a total of 81 assumptions and 180 qualifications. The starting point for all tank inventories is the Hanford tank Best-Basis Inventory (BBI). Each tank comprises up to three phases: salt-cake, sludge, and supernatant. Each of these BBI phases has an insoluble solids fraction that was derived from the embedded solubility model. Each composed event must meet a set of qualifications that are dependent on the process, as well as whether the sender tank has any inventory, whether the receiver tank has sufficient space, etc. For example, supernatant events are limited to a maximum solids specified in its assumptions, usually 5 wt%. Above this solids contents, a slurry transfer must be used. Once a qualified event is added to the Event List, the inventories of involved tanks are updated in a status worksheet and the results of that event appear in the timeline and metrics charts. Although the EndpointTool is not a true dynamic model, it provides a useful desktop capability for quite complex process sequences. While only schedule and variances are presently performed, a cost module is in development. In summary: The EndpointTool is a powerful Excel-based planning resource. It is portable and test runs have shown that about 600 Events can effectively represent the processing of all of Hanford tank waste. Since each Event takes approximately 3 seconds to run on a 1.8 GHz CPU with 512 MB ram, a complete run only takes approximately 30 minutes. As a result, extensive scenario planning and process optimization is possible with this tool. Moreover, Event List 'scenarios' can be easily shared among users and scenario planning can then be distributed among a large number of users. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EMP Testing of NAE Magnetic Motor Starters

Sandia National Laboratories (SNL) performed a high-altitude nuclear electromagnetic pulse (HEMP) critical generation station component vulnerability test campaign with a focus on high-frequency, conducted early-time (E1) HEMP for the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER). This report provides vulnerability test results to investigate component response and/or damage thresholds to reasonable HEMP threat levels that will help to inform site vulnerability assessments, mitigation planning, and modeling calibrations. This work details testing of North American Electric (NAE) magnetic motor starters to determine the effects of conducted HEMP environments. Motor starters are the control elements that provide power to motors throughout a generating plant; a starter going offline would cause loss of power to critical pumps and compressors, which could lead to component damage or unplanned plant outages. Additionally, failed starters would be unable to support plant startup. Six industrial motor starters were tested: two 2 horsepower (HP) starters with breaker disconnects and typical protection equipment, two 20 HP starters with breaker disconnects, and two 20 HP starters with fused disconnects. Each starter was placed in a circuit with a generator and inductive motor matching the starter rating. The conducted EMP insult was injected on the power cables passing through the motor starter, with separate tests for the generator and motor sides of the starter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SU-C-213-03: Custom 3D Printed Boluses for Radiation Therapy

Purpose: To develop a clinical workflow and to commission the process of creating custom 3d printed boluses for radiation therapy. Methods: We designed a workflow to create custom boluses using a commercial 3D printer. Contours of several patients were deformably mapped to phantoms where the test bolus contours were designed. Treatment plans were created on the phantoms following our institutional planning guideline. The DICOM file of the bolus contours were then converted to stereoLithography (stl) file for the 3d printer. The boluses were printed on a commercial 3D printer using polylactic acid (PLA) material. Custom printing parameters were optimized in order to meet the requirement of bolus composition. The workflow was tested on multiple anatomical sites such as skull, nose and chest wall. The size of boluses varies from 6×9cm2 to 12×25cm2. To commission the process, basic CT and dose properties of the printing materials were measured in photon and electron beams and compared against water and soft superflab bolus. Phantoms were then scanned to confirm the placement of custom boluses. Finally dose distributions with rescanned CTs were compared with those computer-generated boluses. Results: The relative electron density(1.08±0.006) of the printed boluses resemble those of liquid tap water(1.04±0.004). The dosimetric properties resemble those of liquid tap water(1.04±0.004). The dosimetric properties were measured at dmax with an ion chamber in electron and photon open beams. Compared with solid water and soft bolus, the output difference was within 1% for the 3D printer material. The printed boluses fit well to the phantom surfaces on CT scans. The dose distribution and DVH based on the printed boluses match well with those based on TPS generated boluses. Conclusion: 3d printing provides a cost effective and convenient solution for patient-specific boluses in radiation therapy.

60 APPLIED LIFE SCIENCES↗

SU-F-J-121: Dosimetric Evaluation of Active Breathing Coordinator-Response Gating System Linked to Linear Accelerator in Volumetric Modulated Arc Therapy

Purpose: To reduce internal target volume (ITV), respiratory management is a must in imaging and treatment for lung, liver, and breast cancers. We investigated the dosimetric accuracy of VMAT treatment delivery with a Response™ gating system linked to linear accelerator. Methods: The Response™ gating module designed to directly control radiation beam by breath-holding with a ABC system (Elekta AB, Stockholm, Sweden) was tested for VMAT treatments. Seven VMAT plans including three conventional and four stereotactic body radiotherapy (SBRT) cases were evaluated. Each plan was composed of two or four arcs of 6MV radiation beam with prescribed dose ranged from 1.8 to 9 Gy per fraction. Each plan was delivered continuously without gating and delivered with multiple interruptions by the ResponseTM gating module with a 20 or 30 second breath-holding period. MapCheck2 and Gafchromic EBT3 films sandwiched in MapPHAN were used to measure the delivered dose with and without gating. Films were scanned on a flatbed color scanner, and red channel was extracted for film dosimetry. Gamma analysis was performed to analyze the dosimetrical accuracy of the radiation delivery with gating. Results: The measured doses with gating remarkably agree with the planned dose distributions in the results of gamma index passing rate (within 20% isodose; >98% for 3%/3mm and >92% for 2%/2mm in MapCheck2, and >91% for 3%/3mm criteria in EBT3 film except one case which was for large target and highly modulated). No significant difference (student t-test: p-value < 0.0005) was shown between the doses delivered with and without gating. There was no indication of radiation gap or overlapping during deliver interruption in film dosimetry. Conclusion: The Response™ gating system can be safely used during VMAT treatment. The accurate performance of the gating system linked to ABC can contribute to ITV reduction for SBRT using VMAT.

60 APPLIED LIFE SCIENCES↗

PEP Integrated Test D Run Report Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes" of the External Flowsheet Review Team (EFRT) issue response plan. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario (Test B and D) has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario (Test A) has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP and vessels UFP VSL-00001A and B in the WTP PTF). In Test D, 19M sodium hydroxide (NaOH, caustic) was added to the waste slurry in the UFP VSL T02 vessel after the solids were concentrated to ~20% undissolved solids. The NaOH was added to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by heating to 85°C using direct injection of steam to accelerate the leach process. The main difference of Test D compared to Test B is that the leach temperature is 85°C for 24 hrs as compared to 100°C for 12 hours. The other difference is the Test D simulant had Cr in the simulant from the start of processing and Test B had Cr added to adjust the simulant composition after aluminum leaching. Following the caustic leach, the UFP-VSL-T02A vessel contents are cooled using the vessel cooling jacket. The slurry was then concentrated to 17 wt% undissolved solids and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pretreatment Engineering Platform (PEP) Integrated Test B Run Report--Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NREL Develops Diagnostic Test Cases to Improve Building Energy Simulation Programs (Fact Sheet)

This technical highlight describes NREL research to develop a set of diagnostic test cases for building energy simulations in order to achieve more accurate energy use and savings predictions. The National Renewable Energy Laboratory (NREL) Residential and Commercial Buildings research groups developed a set of diagnostic test cases for building energy simulations. Eight test cases were developed to test surface conduction heat transfer algorithms of building envelopes in building energy simulation programs. These algorithms are used to predict energy flow through external opaque surfaces such as walls, ceilings, and floors. The test cases consist of analytical and vetted numerical heat transfer solutions that have been available for decades, which increases confidence in test results. NREL researchers adapted these solutions for comparisons with building energy simulation results. Testing the new cases with EnergyPlus identified issues with the conduction finite difference (CondFD) heat transfer algorithm in versions 5 and 6. NREL researchers resolved these issues for EnergyPlus version 7. The new test cases will help users and developers of EnergyPlus and other building energy tools to identify and fix problems associated with solid conduction heat transfer algorithms of building envelopes and their boundary conditions. In the long term, improvements to software algorithms will result in more accurate energy use and savings predictions. NREL researchers plan to document the set of test cases and make them available for future consideration by validation standards such as ASHRAE Standard 140: Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs. EnergyPlus users will also have access to the improved CondFD model in version 7 after its next scheduled release.

14 SOLAR ENERGY↗

Thermal and Deposition Modeling of the Canister Deposition Field Demonstration

This report provides initial thermal and deposition modeling results of the spent nuclear fuel (SNF) storage system planned for use in the Canister Deposition Field Demonstration (CDFD). The goal of the CDFD testing is to collect deposition measurements on the surface of the dry shielded canister (DSC) to aid in chloride-induced stress corrosion crack (CISCC) research. Ideally this testing will occur in a marine coastal environment but at the time of this report no official site has been selected. The CDFD will use the NUHOMS ® Advanced Horizontal Storage Module – High Seismic (AHSM-HS) with a 32PTH2 canister. The SNF assemblies will be replaced with electrical heaters. Canisters are currently being outfitted with these heaters and tested at Sandia National Laboratory (SNL). Thermal modeling was conducted to ensure the electrical heaters were representative of the temperature distribution found within a storage system with SNF. Deposition models were built to evaluate contaminant deposition on SNF canisters. The CDFD testing will help to validate these models, which will then be used to plan and inform on-site test programs and predictive models for the timing and occurrence of canister CISCC.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-F-T-305: Clinical Effects of Dosimetric Leaf Gap (DLG) Values Between Matched Varian Truebeam (TB) Linacs

Purpose: The dosimetric leaf gap (DLG) is an important parameter to be measured for dynamic beam delivery of modern linacs, like the Varian Truebeam (TB). The clinical effects of DLG-values on IMRT and/or VMAT commissioning of two “matched” TB linacs will be presented.Methods and Materials: The DLG values on two TB linacs were measured for all energy modalities (filtered and FFF-modes) as part of the dynamic delivery mode commissioning (IMRT and/or VMAT. After the standard beam data was modeled in eclipse treatment planning system (TPS) and validated, IMRT validation was performed based on TG1191 benchmark, IROC Head-Neck (H&N) phantom and sample of clinical cases, all measured on both linacs. Although there was a single-set of data entered in the TPS, a noticeable difference was observed for the DLG-values between the linacs. The TG119, IROC phantom and selected patient plans were furnished with DLG-values of TB1 for both linacs and the delivery was performed on both TB linacs for comparison. Results: The DLG values of TB1 was first used for both linacs to perform the testing comparisons. The QA comparison of TG119 plans revealed a great dependence of the results to the DLG-values used for the linac for all energy modalities studied, especially when moving from 3%/3mm to 2%/2mm γ-analysis. Conclusion: The DLG-values have a definite influence on the dynamic dose, delivery that increases with the plan complexity. We recommend that the measured DLG-values are assigned to each of the “matched” linacs, even if a single set of beam data describes multiple linacs. The user should perform a detail test of the dynamic delivery of each linac based on end-to-end benchmark suites like TG119 and IROC phantoms.1Ezzel G., et al., “IMRT commissioning: Multiple institution planning and dosimetry comparisons, a report from AAPM Task Group 119.” Med. Phys. 36:5359–5373 (2009). partly supported by CAMC Cancer Center and Alliance Oncology.

60 APPLIED LIFE SCIENCES↗

Validation of a new control system for Elekta accelerators facilitating continuously variable dose rate

Purpose: Elekta accelerators controlled by the current clinically used accelerator control system, Desktop 7.01 (D7), uses binned variable dose rate (BVDR) for volumetric modulated arc therapy (VMAT). The next version of the treatment control system (Integrity) supports continuously variable dose rate (CVDR) as well as BVDR. Using CVDR opposed to BVDR for VMAT has the potential of reducing the treatment time but may lead to lower dosimetric accuracy due to faster moving accelerator parts. Using D7 and a test version of Integrity, differences in ability to control the accelerator, treatment efficiency, and dosimetric accuracy between the two systems were investigated. Methods: Single parameter tests were designed to expose differences in the way the two systems control the movements of the accelerator. In these tests, either the jaws, multi leaf collimators (MLCs), or gantry moved at constant speed while the dose rate was changed in discrete steps. The positional errors of the moving component and dose rate were recorded using the control systems with a sampling frequency of 4 Hz. The clinical applicability of Integrity was tested using 15 clinically used VMAT plans (5 prostate, 5 H and N, and 5 lung) generated by the SmartArc algorithm in PINNACLE. The treatment time was measured from beam-on to beam-off and the accuracy of the dose delivery was assessed by comparing DELTA4 measurements and PINNACLE calculated doses using gamma evaluation. Results: The single parameter tests showed that Integrity had an improved feedback between gantry motion and dose rate at the slight expense of MLC control compared to D7. The single parameter test did not reveal any significant differences in the control of either jaws or backup jaws between the two systems. These differences in gantry and MLC control together with the use of CVDR gives a smoother Integrity VMAT delivery compared to D7 with less abrupt changes in accelerator motion. Gamma evaluation (2% of 2 Gy and 2 mm) of the calculated doses and DELTA4 measured doses corrected for systematic errors showed an average pass rate of more than 97.8% for both D7, Integrity BVDR, and Integrity CVDR deliveries. Direct comparisons between the measured doses using strict gamma criteria of 0.5% and 0.5 mm showed excellent agreement between D7 and Integrity delivered doses with average pass rates above 95.7%. Finally, the Integrity control system resulted in a significant 35% (55 {+-} 13 s) reduction in treatment time, on average. Conclusions: Single parameter tests showed that the two control systems differed in their feedback loops between MLC, gantry, and dose rate. These differences made the VMAT deliveries more smooth using the new Integrity treatment control system, compared to the current Desktop 7.01. Together with the use of CVDR, which results in less abrupt changes in dose rate, this further increases the smoothness of the delivery. The use of CVDR for VMAT with the Integrity desktop results in a significant reduction in treatment time compared to BVDR with an average reduction of 35%. This decrease in delivery time was achieved without compromising the dosimetric accuracy.

07 ISOTOPE AND RADIATION SOURCES↗

High-Temperature Latent Heat Storage System using Transportable Heat Pipes for Versatile Integration with Emerging Microreactors

With the growing interest in the development of micro nuclear reactors and their application to microgrid, high-temperature thermal energy storage (TES) has also been receiving great attention as a technology to reinforce the energy utilization and profitability of this class of reactors. Given the importance and research needs of the TES technology, a research project is underway at Idaho National Laboratory (INL) to develop high-temperature TES that can be easily interfaced with emerging micro nuclear reactors. Currently under development is the Heat pipe-Integrated Thermal Battery (HITB), a novel latent heat storage design that enables flexible and robust integration with any design of currently considered micro nuclear reactors. The development of detailed design based on the proposed TES concept, HITB, requires not only development and validation of modeling and simulation capabilities, but also research that spans thermal performance analysis, component- and system-scale design optimization, and experimental demonstrations including high-temperature feasibility testing. The current research efforts (and plans) are divided into the following four areas: (i) Thermal and structural modeling and analysis at both system- and component-scales for evaluating performance and conducting design optimization, (ii) Small-scale experimental demonstrations for the key components of the proposed HITB design, (iii) Modelica-based dynamic model development for developing a control strategy under dynamic operation within integrated energy systems configuration, (iv) Integrated experimental testing and demonstration. This paper introduces the overall research efforts that have been and are being conducted to develop and demonstrate the novel design of the high-temperature latent heat storage device, HITB. The key design features, ongoing research efforts including the development of modeling and simulation capabilities, small-scale demonstrations of the HITB’s key functionalities prior to scaled-up experimental demonstration, are discussed. Then, this paper concludes with a remark on the future research plans for this project.

25 ENERGY STORAGE↗

Closure Strategy for a Waste Disposal Facility with Multiple Waste Types and Regulatory Drivers at the Nevada Test Site

The U.S. Department of Energy, National Security Administration Nevada Site Office (NNSA/NSO) is planning to close the 92-Acre Area of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), which is about 65 miles northwest of Las Vegas, Nevada. Closure planning for this facility must take into account the regulatory requirements for a diversity of waste streams, disposal and storage configurations, disposal history, and site conditions. This paper provides a brief background of the Area 5 RWMS, identifies key closure issues, and presents the closure strategy. Disposals have been made in 25 shallow excavated pits and trenches and 13 Greater Confinement Disposal (GCD) boreholes at the 92-Acre Area since 1961. The pits and trenches have been used to dispose unclassified low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform waste, and to store classified low-level and low-level mixed materials. The GCD boreholes are intermediate-depth disposal units about 10 feet (ft) in diameter and 120 ft deep. Classified and unclassified high-specific activity LLW, transuranic (TRU), and mixed TRU are disposed in the GCD boreholes. TRU waste was also disposed inadvertently in trench T-04C. Except for three disposal units that are active, all pits and trenches are operationally covered with 8-ft thick alluvium. The 92-Acre Area also includes a Mixed Waste Disposal Unit (MWDU) operating under Resource Conservation and Recovery Act (RCRA) Interim Status, and an asbestiform waste unit operating under a state of Nevada Solid Waste Disposal Site Permit. A single final closure cover is envisioned over the 92-Acre Area. The cover is the evapotranspirative-type cover that has been successfully employed at the NTS. Closure, post-closure care, and monitoring must meet the requirements of the following regulations: U.S. Department of Energy Order 435.1, Title 40 Code of Federal Regulations (CFR) Part 191, Title 40 CFR Part 265, Nevada Administrative Code (NAC) 444.743, RCRA requirements as incorporated into NAC 444.8632, and the Federal Facility Agreement and Consent Order (FFACO). A grouping of waste disposal units according to waste type, location, and similarity in regulatory requirements identified six closure units: LLW Unit, Corrective Action Unit (CAU) 111 under FFACO, Asbestiform LLW Unit, Pit 3 MWDU, TRU GCD Borehole Unit, and TRU Trench Unit. The closure schedule of all units is tied to the closure schedule of the Pit 3 MWDU under RCRA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Salt Waste Processing Facility Streams on the Nitric-Glycolic Flowsheet in the Chemical Processing Cell

An evaluation of the previous Chemical Processing Cell (CPC) testing was performed to determine whether the planned concurrent operation, or “coupled” operations, of the Defense Waste Processing Facility (DWPF) with the Salt Waste Processing Facility (SWPF) has been adequately covered. Tests with the nitricglycolic acid flowsheet, which were both coupled and uncoupled with salt waste streams, included several tests that required extended boiling times. This report provides the evaluation of previous testing and the testing recommendation requested by Savannah River Remediation. The focus of the evaluation was impact on flammability in CPC vessels (i.e., hydrogen generation rate, SWPF solvent components, antifoam degradation products) and processing impacts (i.e., acid window, melter feed target, rheological properties, antifoam requirements, and chemical composition).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-J-211: Assessing the Consistency of the ViewRay 0.35 T MRI System

Purpose: ViewRay is a novel image-guided radiotherapy approach with an integrated 0.35 T MR unit and three Cobalt-60 heads. In order to continuously ensure the high resolution and high soft tissue contrast available in MR images, we quantified a multitude of relevant imaging parameters over a period of six months to establish its stability and imaging quality. In the assessment process, consideration is also given to the need to establish the number of tests required to have confidence in the performance of the system for radiation therapy planning applications. Methods: Daily, weekly, monthly and annual imaging tests were performed over a period of six months using standardized phantoms (a 24 cm diameter sphere and the ACR phantom) to quantify the performance of the system. In addition to the ACR and NEMA recommended tests, we also included element testing, spatial integrity, Eddy current and magnetic field inhomogeneity measurements. The ACR test is used for assessing the following parameters for T1 and T2: geometric accuracy, high contrast spatial resolution, slice thickness accuracy, slice position accuracy, percent signal ghosting, low contrast object detectability. It also includes percent image uniformity (PIU) for T1. The NEMA test is primarily designed to check SNR and PIU. Results: Over the period of six months, all the parameters were maintained within the recommendations provided in the ACR and NEMA standards. PIU and SNR were found to be sensitive to malfunctions in the components of the multileaf collimators. Details of the findings will be presented. Conclusion: The data suggests that ViewRay imaging system has functioned in a consistent and reliable manner. MR imaging from ViewRay 0.35T system complies with the ACR and NEMA recommended acceptance standards.

60 APPLIED LIFE SCIENCES↗

Reduction of Water Use in Wet FGD Systems

Cooperative Agreement DE-FC26-06NT42726 was established in January 2006, and is current through Amendment 2, April 2006. The current reporting period, April 1, 2008 through June 30, 2008, is the eighth progress-reporting period for the project. However, this report will be the final report (instead of a quarterly report) because this project is being terminated. Efforts to bring this project to a close over the past several months focused on internal project discussions, and subsequent communications with NETL, regarding the inherent difficulty with completing this project as originally scoped, and the option of performing an engineering study to accomplish some of the chief project objectives. However, NETL decided that the engineering study did indeed constitute a significant scope deviation from the original concepts, and that pursuit of this option was not recommended. These discussions are summarized in the Results and Discussion, and the Conclusion sections. The objective of this project by a team lead by URS Group was to demonstrate the use of regenerative heat exchange to reduce flue gas temperature and minimize evaporative water consumption in wet flue gas desulphurization (FGD) systems on coal-fired boilers. Furthermore, the project intended to demonstrate that regenerative heat exchange to cool flue gas upstream of the electrostatic precipitator (ESP) and reheat flue gas downstream of the FGD system would result in the following benefits to air pollution control (APC) systems on coal-fired power plants: (1) Improve ESP performance due to reduced gas volume and improved ash resistivity characteristics, (2) Control SO3 emissions through condensation on the fly ash, and (3) Avoid the need to install wet stacks or to provide flue gas reheat. Finally, operation at cooler flue gas temperatures offered the potential benefit of increasing mercury (Hg) removal across the ESP and FGD systems. This project planned to conduct pilot-scale tests of regenerative heat exchange to determine the reduction in FGD water consumption that can be achieved and assess the resulting impact on APC systems. An analysis of the improvement in the performance of the APC systems and the resulting reduction in capital and operating costs were going to be conducted. The tests were intended to determine the impact of operation of cooling flue gas temperatures on FGD water consumption, ESP particulate removal, SO{sub 3} removal, and Hg removal, and to assess the potential negative impact of excessive corrosion rates in the regenerative heat exchanger. Testing was going to be conducted on Columbian coal (with properties similar to low-sulfur Eastern bituminous coal) and SO{sub 3} will be spiked onto the flue gas to simulate operation with higher SO{sub 3} concentrations resulting from firing a higher sulfur coal, or operating with a selective catalytic reduction (SCR) unit. The project was also going to include associate planning, laboratory analytical support, reporting, and management activities. The URS project team finalized a conceptual alternative approach to demonstrate, via an engineering study, the use of regenerative heat exchange to reduce flue gas temperature and minimize evaporative water consumption. This idea was presented in summary format to NETL for consideration. NETL determined that this alternative approach deviated from the original project objectives, and that it would be in the best interest of all parties involved to cancel the project.

01 COAL, LIGNITE, AND PEAT↗

ADVANCED X-BAND TEST ACCELERATOR FOR HIGH BRIGHTNESS ELECTRON AND GAMMA RAY BEAMS

In support of Compton scattering gamma-ray source efforts at LLNL, a multi-bunch test stand is being developed to investigate accelerator optimization for future upgrades. This test stand will enable work to explore the science and technology paths required to boost the current 10 Hz monoenergetic gamma-ray (MEGa-Ray) technology to an effective repetition rate exceeding 1 kHz, potentially increasing the average gamma-ray brightness by two orders of magnitude. Multiple bunches must be of exceedingly high quality to produce narrow-bandwidth gamma-rays. Modeling efforts will be presented, along with plans for a multi-bunch test stand at LLNL. The test stand will consist of a 5.5 cell X-band rf photoinjector, single accelerator section, and beam diagnostics. The photoinjector will be a high gradient standing wave structure, featuring a dual feed racetrack coupler. The accelerator will increase the electron energy so that the emittance can be measured using quadrupole scanning techniques. Multi-bunch diagnostics will be developed so that the beam quality can be measured and compared with theory. Design will be presented with modeling simulations, and layout plans.

42 ENGINEERING↗

Advanced X-Band Test Accelerator for High Brightness Electron and Gamma Ray Beams

In support of Compton scattering gamma-ray source efforts at LLNL, a multi-bunch test stand is being developed to investigate accelerator optimization for future upgrades. This test stand will enable work to explore the science and technology paths required to boost the current 10 Hz monoenergetic gamma-ray (MEGa-Ray) technology to an effective repetition rate exceeding 1 kHz, potentially increasing the average gamma-ray brightness by two orders of magnitude. Multiple bunches must be of exceedingly high quality to produce narrow-bandwidth gamma-rays. Modeling efforts will be presented, along with plans for a multi-bunch test stand at LLNL. The test stand will consist of a 5.5 cell X-band rf photoinjector, single accelerator section, and beam diagnostics. The photoinjector will be a high gradient standing wave structure, featuring a dual feed racetrack coupler. The accelerator will increase the electron energy so that the emittance can be measured using quadrupole scanning techniques. Multi-bunch diagnostics will be developed so that the beam quality can be measured and compared with theory. Design will be presented with modeling simulations, and layout plans.

43 PARTICLE ACCELERATORS↗