Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Comparision of the different probability distributions for earthquake hazard assessment in the North Anatolian Fault Zone

In this study we examined and compared the three different probabilistic distribution methods for determining the best suitable model in probabilistic assessment of earthquake hazards. We analyzed a reliable homogeneous earthquake catalogue between a time period 1900-2015 for magnitude M ≥ 6.0 and estimated the probabilistic seismic hazard in the North Anatolian Fault zone (39°-41° N 30°-40° E) using three distribution methods namely Weibull distribution, Frechet distribution and three-parameter Weibull distribution. The distribution parameters suitability was evaluated Kolmogorov-Smirnov (K-S) goodness-of-fit test. We also compared the estimated cumulative probability and the conditional probabilities of occurrence of earthquakes for different elapsed time using these three distribution methods. We used Easyfit and Matlab software to calculate these distribution parameters and plotted the conditional probability curves. We concluded that the Weibull distribution method was the most suitable than other distribution methods in this region.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SU-F-J-34: Automatic Target-Based Patient Positioning Framework for Image-Guided Radiotherapy in Prostate Cancer Treatment

Purpose: Current image-guided radiotherapy (IGRT) procedure is bonebased patient positioning, followed by subjective manual correction using cone beam computed tomography (CBCT). This procedure might cause the misalignment of the patient positioning. Automatic target-based patient positioning systems achieve the better reproducibility of patient setup. Our aim of this study was to develop an automatic target-based patient positioning framework for IGRT with CBCT images in prostate cancer treatment. Methods: Seventy-three CBCT images of 10 patients and 24 planning CT images with digital imaging and communications in medicine for radiotherapy (DICOM-RT) structures were used for this study. Our proposed framework started from the generation of probabilistic atlases of bone and prostate from 24 planning CT images and prostate contours, which were made in the treatment planning. Next, the gray-scale histograms of CBCT values within CTV regions in the planning CT images were obtained as the occurrence probability of the CBCT values. Then, CBCT images were registered to the atlases using a rigid registration with mutual information. Finally, prostate regions were estimated by applying the Bayesian inference to CBCT images with the probabilistic atlases and CBCT value occurrence probability. The proposed framework was evaluated by calculating the Euclidean distance of errors between two centroids of prostate regions determined by our method and ground truths of manual delineations by a radiation oncologist and a medical physicist on CBCT images for 10 patients. Results: The average Euclidean distance between the centroids of extracted prostate regions determined by our proposed method and ground truths was 4.4 mm. The average errors for each direction were 1.8 mm in anteroposterior direction, 0.6 mm in lateral direction and 2.1 mm in craniocaudal direction. Conclusion: Our proposed framework based on probabilistic atlases and Bayesian inference might be feasible to automatically determine prostate regions on CBCT images.

60 APPLIED LIFE SCIENCES↗

Developing and Implementing the Data Mining Algorithms in RAVEN

The RAVEN code is becoming a comprehensive tool to perform probabilistic risk assessment, uncertainty quantification, and verification and validation. The RAVEN code is being developed to support many programs and to provide a set of methodologies and algorithms for advanced analysis. Scientific computer codes can generate enormous amounts of data. To post-process and analyze such data might, in some cases, take longer than the initial software runtime. Data mining algorithms/methods help in recognizing and understanding patterns in the data, and thus discover knowledge in databases. The methodologies used in the dynamic probabilistic risk assessment or in uncertainty and error quantification analysis couple system/physics codes with simulation controller codes, such as RAVEN. RAVEN introduces both deterministic and stochastic elements into the simulation while the system/physics code model the dynamics deterministically. A typical analysis is performed by sampling values of a set of parameter values. A major challenge in using dynamic probabilistic risk assessment or uncertainty and error quantification analysis for a complex system is to analyze the large number of scenarios generated. Data mining techniques are typically used to better organize and understand data, i.e. recognizing patterns in the data. This report focuses on development and implementation of Application Programming Interfaces (APIs) for different data mining algorithms, and the application of these algorithms to different databases.

97 MATHEMATICS AND COMPUTING↗

Solar PV, Wind Generation, and Load Forecasting Dataset for ERCOT 2018: Performance-Based Energy Resource Feedback, Optimization, and Risk Management (P.E.R.F.O.R.M.)

This report describes the Advanced Research Projects Agency-Energy Performance-Based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) Electric Reliability Council of Texas (ERCOT) dataset consisting of load, solar, and wind deterministic and probabilistic forecasts at three timescales. This dataset consists of 1 year of time-coincident load, wind, and solar actuals and probabilistic forecasts for a region similar to ERCOT. All the data are stored in Hierarchical Data Format 5 (HDF5) files and have been uploaded to an Amazon Web Services repository. The ERCOT data set has 2 years (2017, 2018) of actuals and 1 year (2018) of probabilistic forecasts. These data are provided at various spatial (i.e., site-level, zone-level, and system-level) and temporal scales (i.e., day-ahead, intraday, and intra-hour). Specifically, data are provided for 125 existing wind sites, 22 existing solar sites, 139 proposed wind sites, and 204 proposed solar sites.

14 SOLAR ENERGY↗

Evaluating Faulty State Occurrence in Wildfire UAS Missions Using Markov Chains

As autonomous technology advances, unmanned aircraft systems are increasingly integrated into emergency response missions, such as wildfire response. These systems must be be safe with less risk than non-autonomous counter parts, yet quantifying the risk associated with present-day and future systems conventionally relies solely on expert opinion and little data. Instead, combining narrative mishap reports with probabilistic analysis can provide a method for evolutionary and timely risk analysis. In this paper, we present a framework for a data-driven probabilistic risk assessment style analysis, where hazard events and rates originate from documented UAS mishaps. The framework is applied to a UAS mapping mission in wildfire response, including a fault tree analysis, event tree analysis, and probabilistic analysis using Markov Chains. The analysis provides an enumeration of hazards in the system, hazard events that can lead to faults, the probability of a mission experiencing any fault, the probability of experiencing a specific fault, and the expected time spent until faulty states occur in present-day operations.

risk analysis↗

Evaluating Faulty State Occurrence in Wildfire UAS Missions Using Markov Chains

As autonomous technology advances, unmanned aircraft systems are increasingly integrated into emergency response missions, such as wildfire response. These systems must be be safe with less risk than non-autonomous counter parts, yet quantifying the risk associated with present-day and future systems conventionally relies solely on expert opinion and little data. Instead, combining narrative mishap reports with probabilistic analysis can provide a method for evolutionary and timely risk analysis. In this paper, we present a framework for a data-driven probabilistic risk assessment style analysis, where hazard events and rates originate from documented UAS mishaps. The framework is applied to a UAS mapping mission in wildfire response, including a fault tree analysis, event tree analysis, and probabilistic analysis using Markov Chains. The analysis provides an enumeration of hazards in the system, hazard events that can lead to faults, the probability of a mission experiencing any fault, the probability of experiencing a specific fault, and the expected time spent until faulty states occur in present-day operations.

risk analysis↗

Proof-of-Concept for a Long-Term Health Metric to Quantify End of Mission Health Status in Astronauts

NASA has long used Probabilistic Risk Assessment (PRA) when high-stakes decisions need to be made about complex systems. For spaceflight medical risk, the Human Research Program’s Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is a significant step towards robustly quantifying the risk to crew health during exploration missions. However, there remains a significant gap in the ability to comprehensively characterize and assess risk across the disparate functionalities and capabilities which comprise the entire Crew Health and Performance (CHP) system. To fill this gap, the Crew Health and Performance – Probabilistic Risk Assessment (CHP-PRA) project aims to perform risk characterization for the CHP system by assessing performance risk in addition to medical risk. This effort also includes quantifying Long-Term Health (LTH) risk in addition to in-mission risk outcomes within the CHP-PRA results. LTH risk encompasses the timeframe from immediately post-flight, through the rest of an astronaut’s career, through retirement, and until death. A proof-of-concept LTH risk metric is based on medical condition end-state, as defined by the Evidence Library, capturing the spaceflight specific medical impacts persisting into post-flight[1]. Condition outcomes in the Evidence Library progress through three Clinical Phases (CP): the diagnostic phase (CP1), the treatment/convalescent phase (CP2), and the end-state phase (CP3) which represents the detrimental effects of the condition after the crew member has recovered to the maximal extent. Each CP has an associated Task Impairment (TI), defined as the degree of crew incapacity due to experiencing the condition, and is quantified with a 0-1 range. Conditions with an associated CP3 (e.g. Sepsis, Traumatic Hypovolemic Shock, Sudden Cardiac Arrest, etc.) typically have serious consequences that can cause an astronaut to be fully or partially debilitated throughout the remainder of the mission. Consequently, the Cumulative CP3 TI End-of-Mission Health Status Metric is developed by CHP-PRA to quantify the cumulative effects of all conditions which progressed to the CP3 state throughout the entirety of the mission. Hence, this End-of-Mission Health Status Metric attempts to serve as an indicator of an astronaut’s health state at the time of landing. The severity of the lingering effects of in-mission medical events are dependent on mission activities and the level of available in-mission medical care. This allows the associated cumulative TI metric to be used in comparison with the crew’s end of mission health status for different levels of in-mission resources. This presentation provides the strategy for using CP3 as an LTH metric component, as well as a proof-of-concept demonstration of LTH risk characterization using this component.

long term health↗

ROBUSTNESS OF DECISION INSIGHTS UNDER ALTERNATIVE ALEATORY/EPISTEMIC UNCERTAINTY CLASSIFICATIONS

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A key technical challenge is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, would be founded on probabilistic characterizations of SSC performance. Evaluation of probabilistic safety margins will in general entail the uncertainty characterization both of the prospective challenge to the performance of an SSC ("load") and of its "capacity" to withstand that challenge. The RISMC framework contrasts sharply with the traditional probabilistic risk assessment (PRA) structure in that the underlying models are not inherently aleatory. Rather, they are largely deterministic physical/engineering models with ambiguities about the appropriate uncertainty classification of many model parameters. The current analysis demonstrates that if the distinction between epistemic and aleatory uncertainties is to be preserved in a RISMC-like modeling environment, then it is unlikely that analysis insights supporting decision-making will in general be robust under recategorization of input uncertainties. If it is believed there is a true conceptual distinction between epistemic and aleatory uncertainty (as opposed to the distinction being primarily a legacy of the PRA paradigm) then a consistent and defensible basis must be established by which to categorize input uncertainties.

probabilistic risk assessment↗

Sensitivity Study for Forecasting Variables of WRF-Solar Using a Tangent Linear Approach

Integrating solar generation in recent years has highlighted the need for improved accuracy in predicting solar power. Confidence in solar power forecasting can be achieved by designing an ensemble that provides reliable probabilistic information for solar radiation with reduced uncertainty and error. Ideally, ensemble members are created through the optimized perturbation of the initial conditions in numerical weather prediction (NWP) models. Tangent linear models are capable of efficiently investigating the sensitivity of solar radiation to model input parameters because they do not require individual perturbation of each variable. This sensitivity study using tangent linear models provide us the capability to identify the right variables to perturb in an ensemble prediction system. In this study, we developed tangent linear models for WRF-Solar modules that directly impact the computation of solar radiation and the simulation of cloud formation and dissipation including the Fast All-sky Model for Solar Applications (FARMS), the Noah land surface model (LSM), the Thompson microphysics, the Mello-Yamada-Nakanishi-Niino (MYNN) boundary layer parameterization, and the Deng scheme for a shallow-convection parameterization. A sensitivity analysis was conducted under various scenarios based on satellite observations and model simulations from the National Solar Radiation Data Base (NSRDB) and WRF-Solar, respectively. Critical forecasting variables that are highly sensitive to the forecasting of global horizontal irradiance (GHI), direct normal irradiance (DNI), cloud mixing ratio, cloud tendency, cloud fraction, and sensible and latent heat fluxes were determined using the relevant WRF-Solar module. This study will be used as a guidance on future research leading to high-quality probabilistic solar forecasting. In this presentation, we discuss the validation of tangent linear approach for WRF-Solar modules and illustrate how the sensitivity results are valuable in the improvement of probabilistic solar prediction.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges to Evaluating Ecological Risks in Performance Assessments - 18424

Performance assessments (PAs), whether probabilistic or deterministic, have largely focused on evaluating human health effects of radionuclides. In the past, it was asserted that protecting human health would automatically protect the environment. This blanket assertion has been questioned, so tools and methodologies to directly estimate non-human biota dose have been developed and made available since the early 2000's. For example, the Biota Dose Assessment Committee (BDAC) guidance led to the development of the RESRAD-BIOTA (RESRAD stands for Residual Radioactive materials) software to implement this guidance. The BDAC was a US Department of Energy (DOE) led working group with members from academia and consultancies in addition to DOE technical staff. Parallel efforts have been in place in Europe with the development of the ERICA tool (Environmental Risk from Ionising Contaminants: Assessment and Management). More recently, interpretation of the requirements of US Department of Energy (DOE) Order O458.1 have led some waste management facilities to include ecological risks in addition to human health effects in their PAs. We have recently developed methodologies to assess ecological risks within probabilistic PAs (PPAs) for two Federal facilities. One of the challenges in applying the non-human biota assessment models to PPAs is that ecological risk assessments following US Environmental Protection Agency (EPA) or DOE guidance start with protective screening assessments before moving into more site-specific ecological risk assessments. Conservative assumptions bias the screening assessments and greatly overestimate the risks posed by contaminants. However, although the screens are biased they can be useful in ruling out model spatial domain areas or types of biota from requiring further assessment. In some cases, the results of the screen could entirely rule out ecological risks from further assessment. For a more refined and unbiased estimate of dose to non-human biota, one would typically conduct site-specific studies to better define exposure through the food web or adverse effects based on eco-toxicity studies of environmental, and generally weathered, contaminant mixtures. However, for PPAs that consider future site conditions after the loss of institutional control, such site-specific studies are not possible. Rather, site-specific future ecological risk models use probabilistic inputs that result in a distribution of population doses or exposures and calculate the distribution of possible adverse effects to ecological populations. This approach considers both radionuclide and chemical inventory. For both Federal facilities, the model spatial domains include riparian and aquatic environments located downstream of the waste management site. These riparian and aquatic environments represent linear exposure elements for some wildlife populations and require special consideration of exposures to individuals and to populations along such spatial domains. At a minimum, wildlife foraging should be focused along the axis of such water bodies. Another challenge is how to incorporate ecologically relevant spatial scales into models that have contaminant transport as the primary focus. Riparian and aquatic environments also have threatened and endangered (T and E) species, which necessitate greater levels of protection given their rarity. A final challenge for conducting ecological risk assessments is how to evaluate T and E species in the future. This might be addressed by evaluating potential for impacts on individuals of feeding guilds with species that are currently threatened or endangered. We also have to consider how ecological populations might change as a result of climate change. It is a more difficult problem to predict what species might become rare in the future, and how to best assess future populations of threatened or endangered species. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion of Aluminum in the Chemical Environment after a Loss of Coolant Accident (LOCA)

Probabilistic assessment of Generic Safety Issue (GSI)- 191 generated further studies to improve the characterization of post-Loss of Coolant Accident (LOCA) aluminum release from corrosion sources, since the current industry approach of assessing aluminum release is only valid for deterministic assessments of GSI-191. The nuclear industry has long accepted that solution pH, solution temperature, sump chemical constituents and the phenomena of silicate or phosphate 'inhibition' affects the quantity of aluminum released and the quality of results obtained from models used to predict aluminum release. While improvements in the characterization of aluminum release has been made, the impacts of solution velocity, concurrent corrosion of other metals [6], and trace amount of chemical constituents such as chloride and sulfate ions on aluminum release in post-LOCA conditions have not been assessed. Those factors are well known to influence aluminum corrosion, and will be investigated in this work. The effect of flow on aluminum corrosion rate is characterized using different hydrodynamic system, which has not been investigated in GSI-191 related studies. The corrosion rate depends on the mass-transfer rate which is a function of flow velocity and flow pattern. The inhibition effect of silicon on aluminum corrosion is characterized, and the representative silicon concentration in post-LOCA condition has the potential to significantly inhibit the aluminum corrosion rate. The experiments that investigated silicon effects on aluminum corrosion also showed that calcium leached from Cal-sil can slow corrosion and that the silicon inhibition effect on aluminum corrosion became less pronounced at higher temperature and lower pH. Trace chloride and fluoride ions slightly increased aluminum corrosion rate, and the presence of sulfite ions could mitigate this harmful effect. The corrosion of zinc significantly retarded the aluminum corrosion rate, while presence of copper and carbon steel has little effect on aluminum corrosion in both galvanic and non-galvanic corrosion cases. This work is not complete and is currently evaluating high temperature (>95 C) test with all parameters mentioned and evaluation of the effects on variable boron concentrations at set conditions; Therefore an improved aluminum release model for probabilistic aluminum release model is not proposed. However, this work shows the important impact on aluminum corrosion of parameters not characterized by other studies. To obtain representative aluminum release results for use in GSI-191 probabilistic analysis, the model should be built on data obtained from experiments that account for all parameters that may impact aluminum corrosion and release. (authors)

36 MATERIALS SCIENCE↗

Radiological Performance Modeling: Platform Comparison

Zapadnoe Uranium Mill Tailings Site, Pridneprovsky Chemical Plant Ukraine: Two exposure scenarios were utilized to develop performance assessment models in GoldSim and NORMALYSA. The first scenario is an onsite worker exposed to radioactivity through external ground irradiation as well as radon and radioactive dust inhalation. The second being an offsite Resident 300 years after institutional control exposed through the ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from Konoplyanka River, and agricultural activities in contaminated garden. NORMALYSA utilizes a modular interface to connect extensive pre-created modules to develop contaminant transport and risk assessment models for safety assessments and performance assessments at NORM and legacy sites. Developed by Facilia AB, the program was tested with the creation of the Zapadnoe model under the International Atomic Energy Agency MODARIA Il Working Group 1 (WG1). Default values are provided for input parameters where site specific data and distributions lack. Probabilistic simulations and inputs are limited to parameters with assigned Gaussian probability functions. Similar results for transient worker inhalation dose were found in comparison with the Zapadnoe GoldSim model. However, the NORMALYSA model has results larger by an order of magnitude for external radiation in the transient worker and for aquatic food ingestion, inhalation, and garden food ingestion to the resident. Performance Assessment Modeling: Radiological performance models promote good management and support in remediation and environmental decision making by optimizing radioactive waste disposal site performance. a performance assessment model of the Zapadnoe uranium mill tailings site and a model for calculating authorized limits at Los Alamos National Laboratory are created to demonstrate and highlight the respective capabilities of three modeling platforms: GoldSim, NORMALYSA, and RESRAD-Onsite. GoldSim is a general-purpose modeling platform with the ability to simulate site-specific FT radionuclide transport and risk assessment using a graphical interface to create and link elements that act as indivisible building blocks of the model. The Zapadnoe performance assessment model created in GoldSim is composed of input parameters collected from site specific parameters from WG1 as well as standard assumptions seen in the Generic PA Model from Neptune and Company. The multivariate Zapadnoe simulation contains both deterministic and probabilistic simulation capabilities with the ability to quantitatively represent the uncertainty and associated risks of the site via the Monte Carlo simulation method. Model parameters, documentation, and assumptions are built directly into the model creating a transparent, reproducible, and more purposeful site specific model. To demonstrate this, an ingestion of water pathway was included in addition to the exposure pathways included in the NORMALYSA model. GoldSim offers a wide variety of probability distributions to choose from as well as many tools to visualize the uncertainty of the models and explore which pathways and radionuclides dominate dose. In contrast to the NORMALYSA model, the GoldSim model uses dynamic simulation to calculate tritium concentrations. Authorized limits support the evaluation of radiological health effects from radionuclides present in bulk contaminated soil in order to assist in the process of clearing land for release under different uses. Calculations of authorized limits in RESRAD-Onsite and GoldSim models support the evaluation for 15 radionuclides using a residential exposure scenario, indoor and outdoor inhalation of dust and vapor phase radionuclides (tritium), incidental soil ingestion, and ingestion grown fruits and Vegetables. RESRAD-Onsite, developed by Argonne National Laboratory is a dedicated computer code for calculating radiation doses and cancer risks to an individual located on top of radioactively contaminated soils. It can also be used to provide guidelines for deriving radionuclide soil levels corresponding to a specific dose criterion. The menu driven user interface facilitates selection of radionuclides and soil concentrations, as well as defines parameter values related to materials, environmental factors, and exposure pathways. The program contains radionuclide-specific data such as dose conversion factors and risk coefficients, as well as soil-water partition coefficients and transfer factors for biotic media. The GoldSim model successfully emulates the RESRAD-Onsite code using identical radiological decay and ingrowth factors, radiation dose conversion factors, and other input parameters. DE EEDE ETS Each model supports dynamic modeling of radionuclide ingrowth and decay over time, and integrate this capability with the transport of radionuclides in the environment via processes such as advection and/or diffusion in fluids, or within porous solid media, The applicability of each program is heavily dependent on project context. In the context of developing Authorized Limits, RESRAD-Onsite may be a more desirable option as it was developed for this particular application. For simple disposal or legacy sites or sites that do not need site-specific model structure, NORMALYSA may be a desirable modeling platform, GoldSim can be used to model any problem for which RESRAD or NORMALYSA is applicable, but its strength lies in its flexibility, analytical, and probabilistic capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Incorporating the Impacts of Climate Change on Hydrology in a Performance Assessment Model - 20403

The evidence of climate change is increasingly well-documented and impacts should be incorporated in performance assessment studies. The current climate literature provides both observational evidence and climate model projections of climate trends and/or climate change in the late 20. and early 21. centuries for North America and the northeast United States. Probabilistic modeling is a core requirement for quantifying uncertainty and evaluating its impacts. Not evaluating future climate states in a performance assessment because of the existence of uncertainty is contradictory to good modeling practices - the most uncertain issues and parameters require the most attention in effective probabilistic modeling. Excluding climate change limits development of modeling information that could aid in effective decision making. In this work we develop methods to use the output from hydrologic models and analysis of historical aerial imagery to quantify and implement the impacts of climate change on hydrologic processes at a nuclear waste site in West Valley, New York. Specifically, we used the HELP (Hydraulic Performance of Landfill Performance) model to characterize key hydrologic processes under both current and future climate conditions to assess the impacts of changing climate on hydrology. A suite of previous climatic models were reviewed and synthesized to produce a cohesive representation of the current state of knowledge of the impact of climate change on important model inputs such as precipitation. Output from the HELP simulations was coupled to the GoldSim model that was used to develop the Probabilistic Performance Assessment (PPA) approach through the application of a novel 'nearest neighbor' technique. First, several thousand realizations were generated from the HELP model using a Latin Hypercube experimental design to ensure adequate coverage of the parameter space of explanatory variables used to drive HELP. For example, porosity is a physical parameter that is used as an input to both HELP and the GoldSim PA model. We then ran sensitivity analysis (SA) algorithms on the output of HELP for each of the responses of interest. For each predictor, each time we build an SA model we get a different value for the sensitivity index (SI). From the collection of all the SA models, the average was computed among all of the SIs to represent the predictor within the context of the nearest neighbor approach. That is, we conduct SA on each HELP outcome for each scenario. This gives us parameter sensitivity indices for the outcomes. We average the parameter sensitivity indices across the outcomes to get the average SI for a scenario. For each realization that is generated from the Goldsim PA model, Goldsim generates random values for physical/empirical parameters that HELP uses as well. For each vector of physical/empirical parameters that Goldsim generates, the vector from the 5,000 HELP runs that is most 'similar' to the Goldsim vector is computed using the nearest neighbor approach. In this context 'similar' means minimization of the SA-weighted sum of the absolute differences among the 5,000 values computed for this statistic, where each value corresponds to a different HELP realization. In order to account for the impacts of climate change, this process was repeated using the spatially downscaled future climate projections. For each of the key parameters of interest, it was assumed that a linear change depicted the relationship between the values for the present day and those for 2100. In this way, the climatically-driven changes in key parameters used to inform the GoldSim model are quantified and incorporated into the PA model output for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational performance risk assessment in support of a supervisory control system - 251

A supervisory control system is being developed for multiunit advanced small modular reactors to minimize human interventions during normal and abnormal operations. In the supervisory control system, control action decisions are made based on a probabilistic risk assessment that employs event trees and fault trees. Although traditional probabilistic risk assessment tools are implemented, their scope is extended to normal operations, and the application is reversed to assess the success of non-safety related systems and to enable continued operation of the plant. This extended probabilistic risk assessment approach is called operational performance risk assessment (OPRA). OPRA helps to identify available paths, combine control actions for maintaining plant conditions within operational limits, and to quantify the likelihood of success of these operational trajectories to optimize the selection of alternative actions without activating reactor protection system. In this paper, a case study of OPRA in a supervisory control system is demonstrated for the Advanced Liquid Metal Reactor (ALMR) Power Reactor Inherently Safe Module (PRISM) design, specifically the power conversion system. The scenario investigated involved a condition in which the feedwater control valve that was observed to be drifting to the closed position. Alternative plant configurations that would allow the plant to continue to operate at full or reduced power were identified using OPRA. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate the magnitude of safety margins. Successful recovery paths for the selected scenario were identified and quantified using the supervisory control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Rich-Text based PSA Model Transformation and Verification in RiskA

Nuclear Energy is one of the most possible alternative to fossil energy in large-scale. Nuclear safety is the lifeline of nuclear energy development, and has been an important part of national security, especially after the accident of Fukushima. On the basis of computer codes, reliability engineering and Probabilistic Risk Assessment (PSA) is effective methods to improve the safety of nuclear power plants. After many years of development, the methodologies, applications and relevant soft programs have been quite sufficient in the area of nuclear safety. However, it is still difficult for the current PSA technologies and software to meet the needs of dealing with the problems of quantitatively public risk assessment in the digital society. Especially, there are so many software that adopted different modeling and analyzing methods, which brings difficulties to the comparison, evaluation or verification for different software and models. By using its own academic advantages, the advanced nuclear energy research team, i.e., FDS Team has invested a few hundreds person-years of independent research and development of a reliability and probabilistic safety assessment software system RiskA. The system consists of three main functions: device reliability optimization management, probabilistic safety assessment and instantaneous risk monitoring, and the comprehensive public risk assessment in digital society. RiskA establishes an integrated risk evaluation system for the device reliability, nuclear power plant (NPP) risk monitoring and public risk assessment. Currently, RiskA has successfully been applied in more than 600 organizations and institutes from a variety of fields in 39 countries, involving nuclear, aerospace, defense and so on. For example, RiskA has been used in the safety analysis of International Thermonuclear Experimental Reactor (ITER), FDS series fusion reactor, and the Strategic Priority Research Program of Chinese Academy of Sciences 'the Future Advanced Nuclear Fission Energy - Accelerator Driven Sub-critical (ADS) transmutation system'. Also, RiskA has been used in public risk communication and risk assessment. Among them, Third Qinshan nuclear power plant Risk Monitor (TQRM), which is the China's first domestic nuclear safety analysis software used in the actual online operation, has been highly apprised by renowned experts in the field. Meanwhile, it has been identified as the first domestic nuclear power plant risk monitoring system with completely independent intellectual property rights, and has reached the international advanced level. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bayesian-information-gap decision theory with an application to CO 2 sequestration

Decisions related to subsurface engineering problems such as groundwater management, fossil fuel production, and geologic carbon sequestration are frequently challenging because of an overabundance of uncertainties (related to conceptualizations, parameters, observations, etc.). Because of the importance of these problems to agriculture, energy, and the climate (respectively), good decisions that are scientifically defensible must be made despite the uncertainties. We describe a general approach to making decisions for challenging problems such as these in the presence of severe uncertainties that combines probabilistic and non-probabilistic methods. The approach uses Bayesian sampling to assess parametric uncertainty and Information-Gap Decision Theory (IGDT) to address model inadequacy. The combined approach also resolves an issue that frequently arises when applying Bayesian methods to real-world engineering problems related to the enumeration of possible outcomes. In the case of zero non-probabilistic uncertainty, the method reduces to a Bayesian method. Lastly, to illustrate the approach, we apply it to a site-selection decision for geologic CO 2 sequestration.

58 GEOSCIENCES↗

A Framework for Quantitative Assessment of Impacts Related to Energy and Mineral Resource Development

Natural resource planning at all scales demands methods for assessing the impacts of resource development and use, and in particular it requires standardized methods that yield robust and unbiased results. Building from existing probabilistic methods for assessing the volumes of energy and mineral resources, we provide an algorithm for consistent, reproducible, quantitative assessment of resource development impacts. The approach combines probabilistic input data with Monte Carlo statistical methods to determine probabilistic outputs that convey the uncertainties inherent in the data. For example, one can utilize our algorithm to combine data from a natural gas resource assessment with maps of sage grouse leks and pinon-juniper woodlands in the same area to estimate possible future habitat impacts due to possible future gas development. As another example: one could combine geochemical data and maps of lynx habitat with data from a mineral deposit assessment in the same area to determine possible future mining impacts on water resources and lynx habitat. The approach can be applied to a broad range of positive and negative resource development impacts, such as water quantity or quality, economic benefits, or air quality, limited only by the availability of necessary input data and quantified relationships among geologic resources, development alternatives, and impacts. In conclusion, the framework enables quantitative evaluation of the trade-offs inherent in resource management decision-making, including cumulative impacts, to address societal concerns and policy aspects of resource development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An extended polynomial chaos expansion for PDF characterization and variation with aleatory and epistemic uncertainties

This paper presents an extended polynomial chaos formalism for epistemic uncertainties and a new framework for evaluating sensitivities and variations of output probability density functions (PDF) to uncertainty in probabilistic models of input variables. An ”extended” polynomial chaos expansion (PCE) approach is developed that accounts for both aleatory and epistemic uncertainties, modeled as random variables, thus allowing a unified treatment of both types of uncertainty. We explore in particular epistemic uncertainty associated with the choice of prior probabilistic models for input parameters. A PCE-based Kernel Density (KDE) construction provides a composite map from the PCE coefficients and germ to the PDF of quantities of interest (QoI). Here, the sensitivities of these PDF with respect to the input parameters are then evaluated. Input parameters of the probabilistic models are considered. By sampling over the epistemic random variable, a family of PDFs is generated and the failure probability is itself estimated as a random variable with its own PCE. Integrating epistemic uncertainties within the PCE framework results in a computationally efficient paradigm for propagation and sensitivity evaluation. Two typical illustrative examples are used to demonstrate the proposed approach.

Aleatory uncertainty↗