Refining the Approach to Process Flowsheet Development and Maturation at Hanford - 20049

Rigorous process flowsheet management strategies form the basis of an enduring approach to refining the River Protection Project Integrated Process Flowsheet. Incorporation of lessons learned, recognizing upstream and downstream impacts and understanding barriers to implementation of process flowsheets from the outset of the decision-making process will help future revisions to the River Protection Project Integrated Process Flowsheet be more robust, technically defensible, cost effective, and time efficient, ultimately leading to an improved environmental stewardship of the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Postoperative Stereotactic Body Radiation Therapy (SBRT) for Spine Metastases: A Critical Review to Guide Practice

Postoperative stereotactic body radiation therapy (SBRT) for metastatic spinal tumors is increasingly being performed in clinical practice. Whereas the fundamentals of SBRT practice for intact spinal metastases are established, there are as yet no comprehensive practice guidelines for the postoperative indications. In particular, there are unique considerations for patient selection and treatment planning specific to postoperative spine SBRT that are critical for safe and effective management. The purpose of this critical review is to discuss the rationale for treatment, describe those factors affecting surgical decision making, introduce modern surgical trends, and summarize treatment outcomes for both conventional postoperative external beam radiation therapy and postoperative spine SBRT. Lastly, an in-depth practical discussion with respect to treatment planning and delivery considerations is provided to help guide optimal practice.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Microbial hydrocarbons: back to the future

The defining challenge of energy research in the 21st century is the development and deployment of technologies for large-scale reconfiguration of global energy infrastructure. Modern society is built upon a concentrated yet finite reservoir of diverse hydrocarbons formed through the photosynthetic transformation of several hundred million years of solar energy. In human history, the fossil energy era will be short lived and never repeated. Although the timing of peak oil is extensively debated, it is an eventuality. It is, therefore, imperative that projections for both when it will occur and the degree to which supply will fall short of demand be taken into serious consideration, especially in the sectors of energy technology development, political and economic decision making, and societal energy usage. The requirement for renewable energy systems is no longer a point for discussion, and swift advances on many fronts are vital to counteract current and impending crises in both energy and the environment.

14 SOLAR ENERGY↗

Disposition of Hanford Tank Waste sludge from tank 241-AY-102 and the 241-Aa/241-AX farm tanks - 15298

WRPS must retrieve the waste from double-shell tank 241-AY-102 and the single-shell tanks in the 241A and -AX Tank Farms, while finishing the ongoing retrieval of tanks in the 241-C Tank Farm. Given the limited availability of double-shell tank space, the challenge is to identify an optimum combination of double-shell tanks that can safely and efficiently serve as receiver tanks for the combined inventory of sludge wastes from these source tanks. A multiple-criteria, weighted-sum decision-making process, in conjunction with sensitivity analysis and a Pareto evaluation, was used to determine the optimum set of receiver tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Genomic Prostate Cancer Classifier Predicts Biochemical Failure and Metastases in Patients After Postoperative Radiation Therapy

Purpose: To test the hypothesis that a genomic classifier (GC) would predict biochemical failure (BF) and distant metastasis (DM) in men receiving radiation therapy (RT) after radical prostatectomy (RP). Methods and Materials: Among patients who underwent post-RP RT, 139 were identified for pT3 or positive margin, who did not receive neoadjuvant hormones and had paraffin-embedded specimens. Ribonucleic acid was extracted from the highest Gleason grade focus and applied to a high-density-oligonucleotide microarray. Receiver operating characteristic, calibration, cumulative incidence, and Cox regression analyses were performed to assess GC performance for predicting BF and DM after post-RP RT in comparison with clinical nomograms. Results: The area under the receiver operating characteristic curve of the Stephenson model was 0.70 for both BF and DM, with addition of GC significantly improving area under the receiver operating characteristic curve to 0.78 and 0.80, respectively. Stratified by GC risk groups, 8-year cumulative incidence was 21%, 48%, and 81% for BF (P<.0001) and for DM was 0, 12%, and 17% (P=.032) for low, intermediate, and high GC, respectively. In multivariable analysis, patients with high GC had a hazard ratio of 8.1 and 14.3 for BF and DM. In patients with intermediate or high GC, those irradiated with undetectable prostate-specific antigen (PSA ≤0.2 ng/mL) had median BF survival of >8 years, compared with <4 years for patients with detectable PSA (>0.2 ng/mL) before initiation of RT. At 8 years, the DM cumulative incidence for patients with high GC and RT with undetectable PSA was 3%, compared with 23% with detectable PSA (P=.03). No outcome differences were observed for low GC between the treatment groups. Conclusion: The GC predicted BF and metastasis after post-RP irradiation. Patients with lower GC risk may benefit from delayed RT, as opposed to those with higher GC; however, this needs prospective validation. Genomic-based models may be useful for improved decision-making for treatment of high-risk prostate cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Romania: Brand-New Engineering Solutions

The HEU spent nuclear fuel transport from Romania was a pilot project in the framework of the Russian Research Reactor Fuel Return Program (RRRFR), being the first fully certified spent nuclear fuel shipment by air. The successful implementation of the Romanian shipment also brought various new technology in the program, further used by other participating countries. Until 2009, the RRRFR program repatriated to the Russian Federation HEU spent nuclear fuel of Russian origin from many countries, like Uzbekistan, Czech Republic, Latvia, Hungary, Kazakhstan and Bulgaria. The means of transport used were various; from specialized TK-5 train for the carriage of Russian TUK-19 transport casks, to platform trains for 20 ft freight ISO containers carrying Czech Skoda VPVR/M casks; from river barge on the Danube, to vessel on the Mediterranean Sea and Atlantic Ocean. Initially, in 2005, the transport plan of the HEU spent nuclear fuel from the National Institute for R&D in Nuclear Physics and Nuclear Engineering 'Horia Hulubei' in Magurele, Romania considered a similar scheme, using the specialized TK-5 train transiting Ukraine to the destination point in the Russian Federation, or, as an alternative, using the means and route of the spent nuclear fuel periodically shipped from the Bulgarian nuclear power plant Kosloduy (by barge on the Danube, and by train through Ukraine to the Russian Federation). Due to impossibility to reach an agreement in due time with the transit country, in February 2007 the US, Russian and Romanian project partners decided to adopt the air shipment of the spent nuclear fuel as prime option, eliminating the need for agreements with any transit countries. By this time the spent nuclear fuel inspections were completed, proving the compliance of the burn-up parameters with the international requirements for air shipments of radioactive materials. The short air route avoiding overflying of any other countries except the country of origin and the country of destination also contributed to the decision making in this issue. The efficient project management and cooperation between the three countries (Russia, Romania and USA) made possible, after two and a half years of preparation work, for the first fully certified spent nuclear fuel air shipment to take place on 29th of June 2009, from Romanian airport 'Henri Coanda' to the Russian airport 'Koltsovo' near Yekaterinburg. One day before that, after a record period of 3 weeks of preparation, another HEU cargo was shipped by air from Romanian Institute for Nuclear Research in Pitesti to Russia, containing fresh pellets and therefore making Romania the third HEU-free country in the RRRFR program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Roadmapping – A Systematic Approach to Overcoming NGNP Challenges

Changing requirements, programmatic challenges, and technical risk hinder even the best projects. The Next Generation Nuclear Plant (NGNP) is a complex project with technical and programmatic uncertainty. This paper presents the path forward, methods, and tools used to understand the requirements, manage the uncertainty, and mitigate the risk for the NGNP project. The key tool, technology development roadmaps, is described in detail as a means to facilitate NGNP risk-informed decision making, technology down selection, and technology qualification and maturation. Technology roadmaps for each NGNP System, Structure, or Component (SSC) were developed to set the vision for and drive the needed actions to down select technologies and designs; to assure technology readiness is demonstrated through testing, modeling, piloting, and prototyping; and to develop the test plans required to provide demonstrable evidence of the technology maturation required for codification and qualification. In the NGNP application, technology roadmaps provide the framework and structure required to systematically perform decision analysis, reduce risk, and mature technologies in a cost effective and timely manner. The steps followed include Structure Identification, Technology Readiness Assessment, Technology Selection, Technology Maturation, and Test Plan Development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reverse logistics network for municipal solid waste management: The inclusion of waste pickers as a Brazilian legal requirement

Highlights: • We propose a reverse logistics network for MSW involving waste pickers. • A generic facility location mathematical model was validated in a Brazilian city. • The results enable to predict the capacity for screening and storage centres (SSC). • We minimise the costs for transporting MSW with screening and storage centres. • The use of SSC can be a potential source of revenue and a better use of MSW. - Abstract: This study proposes a reverse logistics network involved in the management of municipal solid waste (MSW) to solve the challenge of economically managing these wastes considering the recent legal requirements of the Brazilian Waste Management Policy. The feasibility of the allocation of MSW material recovery facilities (MRF) as intermediate points between the generators of these wastes and the options for reuse and disposal was evaluated, as well as the participation of associations and cooperatives of waste pickers. This network was mathematically modelled and validated through a scenario analysis of the municipality of São Mateus, which makes the location model more complete and applicable in practice. The mathematical model allows the determination of the number of facilities required for the reverse logistics network, their location, capacities, and product flows between these facilities. The fixed costs of installation and operation of the proposed MRF were balanced with the reduction of transport costs, allowing the inclusion of waste pickers to the reverse logistics network. The main contribution of this study lies in the proposition of a reverse logistics network for MSW simultaneously involving legal, environmental, economic and social criteria, which is a very complex goal. This study can guide practices in other countries that have realities similar to those in Brazil of accelerated urbanisation without adequate planning for solid waste management, added to the strong presence of waste pickers that, through the characteristic of social vulnerability, must be included in the system. In addition to the theoretical contribution to the reverse logistics network problem, this study aids in decision-making for public managers who have limited technical and administrative capacities for the management of solid wastes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring pluralism – Different stakeholder views of the expected and realised value of strategic environmental assessment (SEA)

This paper explores the concept of pluralism by evaluating different stakeholder views on the expected and realised value of strategic environmental assessment (SEA). The research followed a single embedded case study approach (of a national-level SEA for renewable energy planning in South Africa) and engaged with four different stakeholder groups, namely government, industry, conservation groups, and interested and affected parties (IAPs). A total of 21 different value expectations (VEs) across all four stakeholder groups were identified. However, stakeholder groups contrast significantly in terms of VEs, with government concerned more with process and mandate; industry with cost, efficiency and certainty; conservation groups with data and technical aspects; and the IAPs with local scale issues. In terms of realisation of VEs the results suggest that SEA does provide opportunities for learning; focussing project level EIA and providing spatial guidance on the location of projects. However, SEA was less successful in realising integration of decision making and alignment of policy within government. Recognition and better understanding of the pluralistic nature of expected and realised VEs could potentially improve the legitimacy of SEA processes and methodologies if they are designed and implemented to accommodate pluralism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Applying Risk Science and Stakeholder Engagement to Overcome Environmental Barriers to Marine and Hydrokinetic Energy Projects

The production of electricity from the moving waters of the ocean has the potential to be a viable addition to the portfolio of renewable energy sources worldwide. The marine and hydrokinetic (MHK) industry faces many hurdles, including technology development, challenges of offshore deployments, and financing; however, the barrier most commonly identified by industry, regulators, and stakeholders is the uncertainty surrounding potential environmental effects of devices placed in the water and the permitting processes associated with real or potential impacts. Regulatory processes are not well positioned to judge the severity of harm due to turbines or wave generators. Risks from MHK devices to endangered or protected animals in coastal waters and rivers, as well as the habitats that support them, are poorly understood. This uncertainty raises concerns about catastrophic interactions between spinning turbine blades or slack mooring lines and marine mammals, birds and fish. In order to accelerate the deployment of tidal and wave devices, there is a need to sort through the extensive list of potential interactions that may cause harm to marine organisms and ecosystems, to set priorities for regulatory triggers, and to direct future research. Identifying the risk of MHK technology components on specific marine organisms and ecosystem components can separate perceived from real risk-relevant interactions. Scientists from Pacific Northwest National Laboratory (PNNL) are developing an Environmental Risk Evaluation System (ERES) to assess environmental effects associated with MHK technologies and projects through a systematic analytical process, with specific input from key stakeholder groups. The array of stakeholders interested in the development of MHK is broad, segmenting into those whose involvement is essential for the success of the MHK project, those that are influential, and those that are interested. PNNL and their partners have engaged these groups, gaining valuable information, gathering pertinent feedback on the efficacy of the process, and providing a level of ownership for the risk evaluation process that will encourage adoption of the outcome to inform future MHK siting and permitting decisions. The ERES development process provides the scientific structure to support risk characterization, comparison of tradeoffs, and risk-informed decision-making by project and technology developers, regulatory agencies, and other interested stakeholders. The PNNL team will determine the range and severity of environmental effects of MHK development, leading to the development of mitigation strategies where residual risk remains.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS AND THE FEDERAL GOVERNMENT

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical processing canyons.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

U.S. DOE's environmental management site-specific advisory board: 20 years of effective community involvement - 15377

This paper provides an overview of the U.S. DOE's Environmental Management Site-Specific Advisory Board from its roots in the early 1990's at the Keystone Center to its current activities. The Environmental Management Site-Specific Advisory Board has a unique mandate to provide input regarding the cleanup of nuclear legacy sites in the United States. Chartered under the Federal Advisory Committee Act, the Environmental Management Site-Specific Advisory Board comprises eight local boards. The Office of Environmental Management has made public participation a fundamental component of its cleanup mission and has found that the Environmental Management Site-Specific Advisory Board has contributed greatly to bringing community input regarding values and priorities to the cleanup decision-making processes. Public participation that involves ongoing community engagement has inherent challenges; the Environmental Management Site-Specific Advisory Board operates with additional challenges that reflect the political and technical nature of U.S. DOE's work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming the barriers to implementation of decommissioning and environmental remediation projects, the CIDER project - 15160

Much remains to be done in terms of addressing the legacies from the early development of nuclear energy, including the dismantling of redundant research and fuel cycle facilities, research reactors, and power plants, and the remediation of sites affected by past uranium mining and processing operations. Long-term solutions still need to be found for management of the resulting waste, including development of disposal facilities that meet public acceptance and safety requirements. Some countries are moving forward with dealing with these legacies, and accordingly have built up appropriate technical resources and expertise, but many national programmes still face very significant challenges. Many are the factors that constrain progress in addressing past legacies. It is recognized the importance of early implementation of decommissioning and environmental remediation (D and ER) programmes in order to safeguard people and the environment from the undesirable effects of ionizing radiation and other hazards associated with these sites. There is also an urgent need to better understand the global status of these activities and to establish mechanisms to analyze and report the barriers impeding the implementation of D and ER programmes, with the aim of outlining actions that may improve the current situation. The IAEA has thus launched the CIDER Project (Constraints to Implementing Decommissioning and Environmental Remediation) with the broad aim of contributing to improve current levels of performance on D and ER programmes through promoting greater cooperation amongst its Member States and relevant international organizations. This paper provides early results from the first phase of the project. During this phase, a survey on the global situation of D and ER was undertaken in order to better understand why these programmes proceed faster in some countries than in others; to identify major constraining factors that affect the implementation of D and ER programmes and how these impediments might be overcome. The paper aims to address policy-level issues, regulatory aspects, technological aspects, and stakeholder involvement in the decision-making process. In the next phase of the project it is intended that specific actions and/or innovative approaches will be proposed at international, regional, or national levels with the goal of facilitating progress in programme implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New High-Throughput Measurement Systems for Radioactive Wastes Segregation and Free Release - 16166

The European Metrology Research Program (EMRP) is a coordinated research-and-development program that pursues the closer integration of national research programs. The EMRP Metrology for Decommissioning Nuclear Facilities 'MetroDecom' Joint Research Project ENV54 (JRP ENV54), a 36-month project started in September 2014, delivers research products addressing all aspects of the decommissioning process. This includes the characterization of waste materials present on the decommissioning site, pre-selection prior to free release or repository acceptance measurement, free-release measurement, the measurement of waste packages thermal power prior to the repository storage, and the monitoring of stored wastes and repositories in the very long term. This paper describes the track record of two JRP ENV54 working packages, which address the measurement facilities for pre-selection of waste materials prior to measurement for repository acceptance or possible free release (segregation measurement system); and free release (free release measurement system), based on a single standardized concept characterized by unique, patented lead-free shielding. The key objective is to improve the throughput, accuracy, reliability, modularity and mobility of segregation and free-release measurement. This will result in more reliable decision-making with regard to the safe release and disposal of radioactive wastes into the environment and, resulting in positive economic outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review on landfill leachate treatment by electrochemical oxidation: Drawbacks, challenges and future scope

Highlights: • Comparison is made between conventional and bioreactor landfill leachate. • Organics and ammonium nitrogen removal mechanism have been described. • Various influencing factors of EO process have been discussed. • Application of EO combined with biological/physicochemical process is reviewed. • Incorporation of LCA in LL treatment technology selection is proposed. - Abstract: Various studies on landfill leachate treatment by electrochemical oxidation have indicated that this process can effectively reduce two major pollutants present in landfill leachate; organic matter and ammonium nitrogen. In addition, the process is able to enhance the biodegradability index (BOD/COD) of landfill leachate, which make mature or stabilized landfill leachate suitable for biological treatment. The elevated concentration of ammonium nitrogen especially observed in bioreactor landfill leachate can also be reduced by electrochemical oxidation. The pollutant removal efficiency of the system depends upon the mechanism of oxidation (direct or indirect oxidation) which depends upon the property of anode material. Applied current density, pH, type and concentration of electrolyte, inter-electrode gap, mass transfer mode, total anode area to volume of effluent to be treated ratio, temperature, flow rate or flow velocity, reactor geometry, cathode material and lamp power during photoelectrochemical oxidation may also influence the system performance. In this review paper, past and present scenarios of landfill leachate treatment efficiencies and costs of various lab scale, pilot scale electrochemical oxidation studies as a standalone system or integrated with biological and physicochemical processes have been reviewed with the conclusion that electrochemical oxidation can be employed as a complementary treatment system with biological process for conventional landfill leachate treatment as well as a standalone system for ammonium nitrogen removal from bioreactor landfill leachate. Furthermore, present drawbacks of electrochemical oxidation process as a landfill leachate treatment system and relevance of incorporating life cycle assessment into the decision-making process besides process efficiency and cost, have been discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Judging the J pouch: a pictorial review

Restorative total proctocolectomy with ileal pouch-anal anastomosis is the surgery of choice for patients with medically refractory ulcerative colitis, ulcerative colitis with high-grade dysplasia or multi-focal low-grade dysplasia, and for patients with familial adenomatous polyposis. The natural history of the surgery is favorable, and patients generally experience improved quality of life and acceptable long-term functional outcome. However, some patients experience significant long-term morbidity from early and/or late pouch-related complications. When complications arise, radiologists must understand the advantages and disadvantages of the various imaging modalities that can be used to assess the pouch. Radiologist familiarity with the surgical technique, pouch anatomy, and imaging appearance of the various potential early and late complications will help facilitate appropriate clinical and surgical decision-making. This review provides an anatomic-based imaging review of the pouch and pouch-related complications, including numerous illustrative fluoroscopic and cross-sectional imaging examples.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Ranking and Selection of Populations on the Base of Sample Means

A number of directions is indicated in which for statistical problems of decision making related to ordering the parameters of distributions, it is expedient to lean on comparison of sample means. It is assumed that the corresponding parametric family has no nontrivial sufficient statistics. The key role is played by establishing conditions under which the reliability of inferences increases monotonically with increasing the sampling size. Examples of applications are given.

97 MATHEMATICS AND COMPUTING↗

Dynamic control of photosynthetic photon flux for lettuce production in CELSS

A new dynamic control of photosynthetic photon flux (PPF) was tested using lettuce canopies growing in the Minitron II plant-growth/canopy gas-exchange system. Canopy photosynthetic rates (Pn) were measured in real time and fedback for further environment control. Pn can be manipulated by changing PPF, which is a good environmental parameter for dynamic control of crop production in a Controlled Ecological Life-Support Systems CELSS. Decision making that combines empirical mathematical models with rule sets developed from recent experimental data was tested. With comparable yield indices and potential for energy savings, dynamic control strategies will contribute greatly to the sustainability of space-deployed CELSS.

NASA Discipline Life Support Systems↗