Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

2017 Project Peer Review: U.S. Department of Energy Wind Energy Technologies Office: Volume I

This report details the results of the 2017 Peer Review for the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy Wind Energy Technologies Office (WETO). The purpose of the review was to evaluate projects funded by DOE from fiscal year 2014 through fiscal year 2016 for their contribution to the mission and goals of the office, assess progress against stated objectives, and appraise WETO’s overall management and performance. This volume (Volume I) includes Sections 1–5 of the report: the executive summary, synopses of the program and project-level evaluation results, and WETO’s response to the 2017 Peer Review findings. Volume II includes Sections 6 and 7—the complete program-level and project-level evaluation results—as well as the report appendices.

17 WIND ENERGY↗

Performance Assurance Planning: Continuous Design-Level Performance of Each Energy Conservation Measure in a Utility Energy Service Contract is Fundamental to Achieving Projected Results

An energy savings performance contract energy sales agreement (ESPC ESA) is a project structure, similar to a power purchase agreement, that uses the multiyear ESPC authority to implement renewable energy projects (referred to as ESA energy conservation measures [ECMs]) on federal buildings or land. The ESA ECM is initially privately owned for tax-incentive purposes, and the federal agency purchases the electricity it produces. An ESPC ESA is one of the most cost-effective methods for implementing on-site distributed energy projects at civilian federal agency sites.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final project report for DE-SC0010620: Scale-aware, improved hydrological and biogeochemical simulations of the Amazon under a changing climate

Shen was the PI for DOE project entitled Scale-Aware, Improved Hydrological and Biogeochemical Simulations of the Amazon Under a Changing Climate (contract DE-SC0010620; PI: Chaopeng Shen; co-PI, John Melack, William Riley, $976,000, 2013-2018). Under this project, the group has made substantial progress in (a) scientific advancement: (b) model and software engineering development; (c) aided parallel DoE project; (d) generating datasets; and (e) graduate and postdoc education that are useful global data fusion and model validation; and (f) participated and presented in several conferences. In summary, we have published 15 peer-reviewed papers (citations bolded below) and numerous conference presentations. One more paper is still under review. Our software progress has been shared with the wider community.

97 MATHEMATICS AND COMPUTING↗

Collaborative International Evaluated Library Organization (CIELO) Pilot Project

Current knowledge of the nuclear physics of fuels and materials provides an understanding and simulation of the operations of nuclear reactors and other systems, both under ordinary and exceptional circumstances. As part of a broad spectrum of collaborative activities underpinning research in basic nuclear sciences, the Nuclear Energy Agency (NEA) is supporting collaboration between experimentalists, theoreticians and modelling experts to advance the state of the art in nuclear data. This report offers an overview of collective results from 31 institutions in 15 NEA member countries, along with results from technical experts in the People’s Republic of China, in the context of the NEA Collaborative International Evaluated Library Organisation (CIELO) Pilot Project. It reviews recent developments resulting from new measurements and semi-empirical models, as well as the validation of the CIELO nuclear data evaluations against suites of systems representing a wide range of current and future nuclear facilities. The CIELO project has delivered new, evaluated data for the isotopes of uranium, plutonium, iron, oxygen and hydrogen, which have been adopted in all nuclear data libraries released since the CIELO project was completed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

WGRID-49 GMLC Project Report: Understanding the Role of Short-Term Energy Storage and Large Motor Loads for Active Power Controls by Wind Power

The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind

17 WIND ENERGY↗

Sandia-UT Academic Alliance Project Summary

This project seeks to leverage various hyperspectral tensor products for the purposes of target classification/detection/prediction. In addition to hyperspectral, these products may be images, time series, geometries, or other modalities. The scenarios in which the targets of interest must be identified are typically from remote sensing platforms such as satellites. As such, there are numerous real-world constraints that drive algorithmic formulation. Cost, complexity, and feasibility of the algorithm should all be considered. Targets of interest are exceedingly rare, and collecting many data samples is prohibitively expensive. Furthermore, model interpretability is paramount due to the application space. The goal of this project is to develop a constrained supervised tensor factorization framework for use on hyperspectral data products. Supervised tensor factorizations already exist in the literature, although they have not seen widespread adoption in the remote sensing domain. The novelty of this project will be the formulation and inclusion of constraints that take into account mission considerations and physics based limits to learn a factorization that is both physically interpretable and mission deployable. This will represent a new contribution to the field of remote sensing for performing supervised learning tasks with hyperspectral data.

97 MATHEMATICS AND COMPUTING↗

Recorded Information Management Records Move Project

Throughout the history of Sandia National Laboratories, both federal and corporate records have been stored in 12 structures in remote areas of the lab, none of which are compliant storage facilities under federal regulations. Upon inspection by the National Archives and Records Administration (NARA), findings were levied against Sandia along with recommendations on correcting the issues. The RM Department anticipated over 38,000 boxes of legacy records in Sandia’s current holdings. The current storage areas present an abundance of unknown issues and risks associated with the move project. Along with the large amount of records, and media types, this project faces issues with over 50 years of ever changing filing systems and human error pertaining to data entry, boxes being processed and destroyed. This document presents the final data and results pertaining to the Recorded Information Management Department corrective actions in a well laid out project plan that accommodated safety, security, environmental concerns and of course the records.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Samish Climate Resilience Planning Project

The Samish Indian Nation recognizes that climate change is indeed occurring and that even the most conservative climate projections threaten Samish members, culture, and natural resources. This report is a representation of the Samish Indian Nation’s commitment to providing a bright, sustainable future for the Seventh Generation and beyond by developing an institutional understanding of how climate change may impact the Tribe, determining what is most vulnerable to future changes, and creating strategies to mitigate these impacts and protect our resources. This report is the product of over a year of collaboration between Samish Indian Nation staff and Tribal community members, led by the Samish Climate Change Working Group (hereafter referred to as Working Group). This sharing of knowledge built a list of over 200 planning areas, including infrastructure, human health, and culturally important species, all of which were evaluated in this vulnerability assessment using up to date climate projections, recent reports, and internal expertise. This vulnerability assessment is the foundation for upcoming climate adaptation planning. It will provide staff with a knowledge base that can be used to develop effective climate adaptation strategies and foster a climate resilient community. This work will help ensure that Samish People can continue utilizing the bountiful natural resources of the Salish Sea that is such an important part of the Samish cultural identity. This document and associated web links within it represent the work and deliverables accomplished during the course of this project. It summarizes the last 2 years of effort by the Samish Tribe to understand, plan for and adapt to our changing climate and will provide planning guidance to the Tribe moving forward.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Modeling of the TN-32B Cask for the High Burnup Spent Fuel Data Project

This report describes thermal modeling done for the High Burnup Dry Storage Research Project that is being performed by the U.S. Department of Energy’s Spent Fuel and Waste Science and Technology (SFWST) research and development (R&D) program. The purpose of this project to investigate the performance of high-burnup spent nuclear fuel in dry storage. Part of this project is a demonstration test being performed with a storage module in the North Anna Nuclear Power Station’s Independent Spent Fuel Storage Installation (ISFSI). The storage module selected for this demonstration is an Orano TN-32B High Burnup cask (Fig. S-1) which has been loaded with fuel assemblies from the North Anna spent fuel pool. The main goals of this test are to provide confirmatory data for model validation and potential improvement, support license renewals and new licenses for ISFSIs, and support transportation licensing for high burnup spent nuclear fuel (EPRI 2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vegetation Assessment at Project 57 for 2019

During the late 1950s, the Atomic Energy Commission (AEC), now the U.S. Department of Energy (DOE), conducted a series of experiments in Emigrant Valley to determine if a nuclear device subjected to a large conventional explosives detonation would result in a nuclear yield. One of these tests, Project 57, disseminated plutonium across the ground surface. Plutonium isotopes dispersed across the land surface can adhere to soil particles, particularly fine soil materials. Plutonium can be redistributed beyond the Contamination Area (CA) boundary by both wind and water. A vegetation survey was initiated in 2016 to assess the vegetation cover of the Project 57 CA and was repeated in 2018 and 2019. The purpose of the survey was to inform managers and provide data about the site’s vegetation with a perspective toward aeolian (wind) transport of soil particles. Results from the 2019 survey are reported here, with comparison to previous surveys. Perennial cover has remained stable (16 percent) during the survey time period, from 2016 to 2019. Shrub cover measured for the 2019 survey was calculated at 14 percent, which is slightly less than reported in earlier surveys but still typical for Great Basin valley shrublands. Annual plant cover was dramatically higher in 2019 at 33 percent, comprised primarily of forbs. This is because of the even distribution of precipitation events from the prior winter compared with previous years. Annual plant cover was 17 percent in 2016 and less than 2 percent in 2018. The spike in annual production following a wet winter demonstrates the variability and resiliency of the desert shrubland environment, which can be difficult to predict over long time periods. Consequently, the percent of bare soil was considerably less than seen in prior years, down from 60 percent to 47 percent, primarily because of the high percentage of annuals. The burned area of the CA remained dominated by native annual plants. The entirety of the plant cover within the burned area as surveyed was comprised of annuals (44 percent), primarily bristly fiddleneck (Amsinckia tessellata), leaving 56 percent of the burned area as bare ground. No bromus tectorum (cheatgrass) was recorded in the 2019 survey in the burned area, but it was observed throughout the area in general. Lacking perennial shrub cover and despite the dramatic increase in annual cover in 2019, the burned area remains a potential and geographically large source for sediment transport. Therefore, the variability of annual plant cover and the potential for changes in the perennial plant cover because of fire or drought mortality continues to suggest sediment transport from the Project 57 study site could vary dramatically over time.

54 ENVIRONMENTAL SCIENCES↗

Scoping Sampling at the Site 300 Water Line Project: Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Liverniore National Laboratory’s (LLNL) Mechanical Utilities Division (MUD) is currently scoping a project with the Project Management Office (PMO) Experimental Test Site 300 (S300) to install/upgrade roughly six miles of water line along established roads within the complex. This Sampling and Analysis Plan (SAP) outlines the requirements to collect an initial round of soil samples from the proposed alignment of the water line to provide preliminary data and information that can be used during project design. The samples will be submitted to an offsite contract laboratory for analysis.

54 ENVIRONMENTAL SCIENCES↗

Placer County Biomass Utilization Pilot Project (Final Technical Report)

The County of Placer, California utilized the Congressionally Directed Project via the U.S. Department of Energy (DOE) award No. DE-FG36-08G088026 to facilitate a comprehensive project that integrated all facets of feasibility for the successful deployment of a woody biomass to energy project located within Placer County in the Lake Tahoe Region. A two-megawatt (MW) wood-to-energy biomass facility that would use a gasification technology was analyzed.

09 BIOMASS FUELS↗

ECP ST Project 2.3.1.06-STPM08-RAJA (Final Report)

Modern high-performance computing architectures are diverse, with hardware designs that feature multicore CPUs and CPUs plus accelerators, such as GPUs or FPGAs. Achieving good application performance often requires using a programming model and managing application data in ways that are best suited to a particular platform. For large codes that are used daily in production, and are under continual development, architecture-specific ports are untenable. Maintainability requires single-source code that is performance portable across a range of architectures and programming model back-ends. This report describes RAJA, Umpire, and CHAI, three software libraries that provide complementary capabilities to enable application portability for high performance computing (HPC) platforms. In particular, these libraries provide software abstractions that insulate application source code from hardware architecture and programming model-specific implementation details. These development of these libraries was motivated by the needs of multiphysics applications in the Weapons Simulation and Computing Program (WSC) at Lawrence Livermore National Laboratory (LLNL). Funding though the Exascale Computing Project (ECP) Software Technology (ST) project 2.3.1.06 RAJA has fostered outreach and collaboration with the ECP application and software technology development communities. In this report, we describe ECP adoption and integration of these tools to this point. The larger goal of the report is to describe to the ECP community what these projects offer, how they are used, and how to approach adoption and integration of them.

97 MATHEMATICS AND COMPUTING↗

Western sector in-situ chemical oxidation project: Supplemental results after injection activities

The purpose of the Western Sector ISCO project is to inject chemical oxidants (i.e., potassium permanganate and sodium persulfate) into the eight injections wells (i.e., WSI001B, WSI001C, WSI002B, WSI002C, WSI003B, WSI003C, WSI004B, and WSI004C) and evaluate the effectiveness of the chemical oxidants at degrading indiscriminate DNAPL that is present in the subsurface. Fifteen monitoring wells (i.e., WSM001BB, WSM001B, WSM001CC, WSM001C, WSM002BB, WSM002B, WSM002CC, WSM002C, WSM003BB, WSM003B, WSM003CC, WSM003C, MSB107B, MSB107CC, and MSB107C) are currently being used by SRS to monitor the effect of the oxidant injections on the VOC plume of the Western Sector of the M-Area HWMF. Figure 1 shows the project location in reference to the M-Area Settling Basin. This is the second of three planned interim reports to track the performance of the project. The purpose of this document is to report groundwater monitoring data collected during the baseline monitoring before oxidant injections occurred and the fifteen months after oxidant injections were completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Notification of Operational Scope Change for the FTWC Venting Project at Los Alamos National Laboratory (LANL)

This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pitka's Point/St. Mary's Wind Energy Construction Project. Final report

This is the final report for the St. Mary’s/Pitka’s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka’s Point about 4 miles from the diesel-fired prime power plant in St. Mary’s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator’s output augments the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Ford Thermoelectric HVAC Project (Final Report)

Current light-duty vehicles provide passenger thermal comfort primarily through the use of a centralized HVAC (Heating, Ventilation, and Air Conditioning) unit that distributes conditioned air to vent locations throughout the vehicle. A substantial portion of the air energy content is spent conditioning various elements of the vehicle's interior structures. This is not an overwhelming issue in today’s vehicles, but as pressure builds to improve powertrain efficiency, the energy available to provide occupant comfort will decrease. Thermoelectric devices were identified by the US Department of Energy as one method to potentially reduce HVAC-related energy consumption in vehicles. The objective of the Ford Thermoelectric HVAC Project was to identify a technical and business approach to accelerate research and development of light-duty automotive thermoelectric HVAC technology. A zonal HVAC system was developed to provide thermal comfort to each occupant, with the objective of reducing the overall power consumed by the HVAC system compared with a baseline system. The system was designed to provide a basis for a down-sized central HVAC unit, while providing equivalent comfort and equivalent heating/cooling time-to-comfort at startup, and reduce the energy consumed to provide these functions. Project success was evaluated using occupant comfort and energy consumption metrics, based on a novel thermal comfort-modeling approach, and empirical testing. The ability to produce and market the thermoelectric devices developed in this program was assessed by a business analysis that outlined key steps required for thermoelectric HVAC devices to come to market. Key hardware and controls attribute requirements were identified to determine how they contribute to the commercialization potential of the technology. Final testing and analysis showed that use of thermal comfort and zonal design criteria reduced the energy consumption of the climate control system in both heating and cooling tests, and were significantly better in low vehicle occupancy cases where zonal strategies could be employed. Thermoelectric devices were utilized in the vehicle design to support achieving the technical performance goals of the project. It was found that these devices need additional development in order to address commercial issues, due to their cost and performance limitations.

99 GENERAL AND MISCELLANEOUS↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗