Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Payload”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Manipulation strategies for massive space payloads

Motion planning and control for the joints of flexible manipulators are discussed. Specific topics covered include control of a flexible braced manipulator, control of a small working robot on a large flexible manipulator to suppress vibrations, control strategies for ensuring cooperation among disparate manipulators, and motion planning for robots in free-fall.

Book, Wayne J.↗

Pegsat - First Pegasus payload

Pegsat was designed, built, and tested in slightly more than 6 months to meet the planned launch date for the first launch of the Pegasus vehicle. The primary objective of this multifunction spacecraft was to obtain environmental data from the Pegasus vehicle for use in designing future satellite busses. Taking full advantage of the opportunity, Pegsat also deployed a small Navy experimental satellite, and conducted scientific experiments over northern Canada in support of the upcoming CRRES mission.

Pincus, Robert↗

Space Shuttle payload trunnion interface verification test and correlation with fixed based responses

An interface verification test (IFVT) in the free-free condition was conducted to verify that the constrained modes of a mass simulator had the same frequencies as the Hubble Space Telescope, for which it was designed. Landing tests were performed in which the mass simulator was mounted on its trunnions inside a container onboard an aircraft. Its acceleration response was adequately measured, and the anticipated constrained natural frequencies based on the IFVT were confirmed. The first test updated the model to predict the fixed based modes, and the second verified the test's capacity to characterize the structure. The IFVT is shown to generate information which permits accurate modeling of the constrained structure, without requiring the traditional fixed-based modal test.

Blair, Mark A.↗

ATDRS payload technology R & D

Four technology development tasks were chosen to reduce (or at least better understand) the technology risks associated with proposed approaches to Advanced Tracking and Data Relay Satellite (ATDRS). The four tasks relate to a Tri-Band Antenna feed system, a Digital Beamforming System for the S Band Multiple-Access System (SMA), an SMA Phased Array Antenna, and a Configuration Thermal/Mechanical Analysis task. The objective, approach, and status of each are discussed.

Anzic, G.↗

Evolving the SP-100 reactor in order to boost large payloads to GEO and to low lunar orbit via nuclear-electric propulsion

In striving to reduce exploration cost and exploration risks, a crucial aspect of the plans is program continuity, i.e., the continuing application of a given technology over a long period so that experience will accumulate from extended testing here on earth and from a diversity of applications in space. An integrated view needs to be formed of the missions SEI will carry out, near term as well as far, and of the ways in which these missions can mutually support one another. Near term programs should be so constituted as to provide for the long term missions both the enabling technologies and the accumulation of experience they need. In achieving this, missions in earth orbit should both evolve and show the technologies crucial to long term missions on the lunar surfaces, and the program for the lunar labs should evolve and show the enabling technologies for exploration of the surface of Mars and for flights of human beings to Mars and return. In the near term, the program for the Space Station should be directed and funded to develop and demonstrate the solar Brayton power plant that will be most useful as the power generator for the SP-100 nuclear reactor.

English, Robert E.↗

Coping With Vibrations In A Multiple-Payload Platform

Paper discusses methods of coping with vibrations in large platform supporting multiple scientific instruments. Solution requires coordination of three engineering approaches: suppressing vibrations, isolating vibrations, and compensating for vibrations. Has considerable value as introductory text on aiming instruments and minimizing effects of vibrations in large structures.

Sirlin, Samuel W.↗

Centaur in-tank explosion flow fields within STS and Titan 4 payload spaces

Explosions are examined which result from the mixing of liquid hydrogen and liquid oxygen (LH2-LO2) such that the reactants are confined by the missile (CBM) body. Explosion which were confined by the ground surface (CBGS) were also studied, with results reported elsewhere. Initial attempts to predict the reported PYRO experimental results were unsuccessful. A new reaction energy addition hypothesis was then developed and tested. The results obtained provide reasonable agreement with the experiments both in the near and far field. Calculations were performed to predict the environment which would occur at the Galileo Radioisotope Thermoelectric Generator (RTG) location given a Centaur G' upper stage and an STS launch vehicle. It was concluded that the principle threat to the RTG in this environment would be the impact of a slug of LH2. No analyses were conducted to assess the response of the Galileo RTG to such an environment. It was shown that the flow field resulting from the failure of the Centaur G' tankage was benign. It was concluded that while the cryogen particle velocity was very high, the flow field density was extremely low. As a result, the dynamic pressure was a trivial eight psia.

Eck, M.↗

Information Flow Analysis of Level 4 Payload Processing Operations

The Level 4 Mission Sequence Test (MST) was studied to develop strategies and recommendations to facilitate information flow. Recommendations developed as a result of this study include revised format of the Test and Assembly Procedure (TAP) document and a conceptualized software based system to assist in the management of information flow during the MST.

Danz, Mary E.↗

Space transportation system and associated payloads: Glossary, acronyms, and abbreviations

A collection of some of the acronyms and abbreviations now in everyday use in the shuttle world is presented. It is a combination of lists that were prepared at Marshall Space Flight Center and Kennedy and Johnson Space Centers, places where intensive shuttle activities are being carried out. This list is intended as a guide or reference and should not be considered to have the status and sanction of a dictionary.

Source record↗

Payload system tradeoffs for mobile communications satellites

System level trade-offs carried out during Mobile Satellite (M-SAT) design activities are described. These trade-offs relate to the use of low level beam forming, flexible power and spectrum distribution, and selection of the number of beams to cover the service area. It is shown that antenna performance can be improved by sharing horns between beams using a low level beam forming network (BFN). Additionally, greatly increased power utilization is possible using a hybrid matrix concept to share power between beams.

Moody, H. J.↗

Payload and General Support Computer (PGSC) Detailed Test Objective (DTO) number 795 postflight report: STS-41

Since 1983, the Space Transportation System (STS) had routinely flown the GRiD 1139 (80286) laptop computer as a portable onboard computing resource. In the spring of 1988, the GRiD 1530, an 80386 based machine, was chosen to replace the GRiD 1139. Human factors ground evaluations and detailed test objectives (DTO) examined the usability of the available display types under different lighting conditions and various angle deviations. All proved unsuitable due to either flight qualification of usability problems. In 1990, an Electroluminescent (EL) display for the GRiD 1530 became flight qualified and another DTO was undertaken to examine this display on-orbit. Under conditions of indirect sunlight and low ambient light, the readability of the text and graphics was only limited by the observer's distance from the display. Although a problem of direct sunlight viewing still existed, there were no problems with large angular deviations nor dark adaptation. No further evaluations were deemed necessary. The GRiD 1530 with the EL display was accepted by the STS program as the new standard for the PGSC.

Adolf, Jurine A.↗