Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

The Next Step in Deployment of Computer Based Procedures For Field Workers: Insights And Results From Field Evaluations at Nuclear Power Plants

The paper-based procedures currently used for nearly all activities in the commercial nuclear power industry have a long history of ensuring safe operation of the plants. However, there is potential to greatly increase efficiency and safety by improving how the human operator interacts with the procedures. One way to achieve these improvements is through the use of computer-based procedures (CBPs). A CBP system offers a vast variety of improvements, such as context driven job aids, integrated human performance tools (e.g., placekeeping, correct component verification, etc.), and dynamic step presentation. The latter means that the CBP system could only display relevant steps based on operating mode, plant status, and the task at hand. A dynamic presentation of the procedure (also known as context-sensitive procedures) will guide the operator down the path of relevant steps based on the current conditions. This feature will reduce the operator’s workload and inherently reduce the risk of incorrectly marking a step as not applicable and the risk of incorrectly performing a step that should be marked as not applicable. The research team at the Idaho National Laboratory has developed a prototype CBP system for field workers, which has been evaluated from a human factors and usability perspective in four laboratory studies. Based on the results from each study revisions were made to the CBP system. However, a crucial step to get the end users' (e.g., auxiliary operators, maintenance technicians, etc.) acceptance is to put the system in their hands and let them use it as a part of their everyday work activities. In the spring 2014 the first field evaluation of the INL CBP system was conducted at a nuclear power plant. Auxiliary operators conduct a functional test of one out of three backup air compressors each week. During the field evaluation activity, one auxiliary operator conducted the test with the paper-based procedure while a second auxiliary operator followed along with the computer-based procedure. After each conducted functional test the operators were asked a series of questions designed to provide feedback on the feasibility to use a CBP system in the plant and the general user experience of the CBP system. This paper will describe the field evaluation and its results in detail. For example, the result shows that the context driven job aids and the incorporated human performance tools are much liked by the auxiliary operators. The paper will describe and present initial findings from a second field evaluation conducted at second nuclear utility. For this field evaluation a preventive maintenance work order for the HVAC system was used. In addition, there will be a description of the method and objective of two field evaluations planned to be conducted late 2014 or early 2015.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lifetime predictions for dimmable two-channel drivers for color tuning luminaires

Two-channel tunable white lighting (TWL) systems represent the next wave of solid-state lighting (SSL) systems and promise flexibility in light environment while maintaining the high reliability and luminous efficacy expected with SSL devices. TWL systems utilize LED assemblies consisting of two different LED spectra (i.e., often a warm white assembly and a cool white assembly) that are integrated into modules. While these systems provide the ability to adjust the lighting spectrum to match the physiology needs of the task at hand, they also are a potentially more complex lighting system from a performance and reliability perspective. We report an initial study on the reliability performance of such lighting systems including an examination of the lumen maintenance and chromaticity stability of warm white and cool white LED assemblies and the multi-channel driver that provides power to the assemblies. Accelerated stress tests including operational bake tests conducted at 75°C and 95°C were used to age the LED modules, while more aggressive temperature and humidity tests were used for the drivers in this study. Small differences in the performance between the two LED assemblies were found and can be attributed to the different phosphor chemistries. The lumen maintenances of both LED assemblies were excellent. The warm white LED assemblies were found to shift slightly in the green color direction over time while the cool white LED assemblies shifted slightly in the yellow color direction. The net result of these chromaticity shifts is a small, barely perceptible reduction in the tuning range after 6,000 hours of exposure to an accelerating elevated temperature of 75°C.

Chromaticity↗

Integration of Data Analytics with Plant System Health Program

This report summarizes the R&D activities of the Plant Health Management (PHM) project during fiscal year 2020 (FY20). This project focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate system sources of risk. This project development lives in cooperation with the Risk Informed Asset Management (RIAM) project. The RIAM project, in fact, uses the reliability models and data generated by the PHM project to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture). This year’s activities for the PHM project focused mainly on the development of two classes of models. The first one includes a series of component reliability models which include aging, testing and maintenance. The second class includes a series of system reliability models which focus on the secondary side of exiting U.S. reactors. These models are based on fault tree logic structures such that they can be used by existing plant PRA software. We also started to focus on the management of health data and we tackled this issue in two directions. The first one focuses on the integration of monitor data with simulation models to assess component health. This approach is moving from a classical data based to a model+data based approach with the goal of improving higher component health information. The second direction focuses on linking equipment reliability data (e.g., maintenance/failure reports, component monitoring data) directly to system reliability models using a safety margin based language rather than a probability based language. The main advantage of a safety margin based language is that it can provide to system engineers more tangible information on system/component health and how it propagates to the system level.

97 MATHEMATICS AND COMPUTING↗

A general stochastic approach to unavailability analysis of standby safety systems

The paper presents a general analytical framework to analyze unavailability caused by latent failures in standby safety systems used in nuclear plants. The proposed approach is general in a sense that it encompasses a variety of inspection and maintenance policies and relaxes restrictive assumptions regarding the distributions of time to failure (or aging) and duration of repair. A key result of the paper is a general integral equation for point unavailability, which can be tailored to any specific maintenance policy. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints

The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)

97 MATHEMATICS AND COMPUTING↗

Ultrasonic imaging in liquid sodium

The fourth generation of nuclear reactor can use liquid sodium as the core coolant. When the reactor is operating, sodium temperatures can reach up to 600 deg. C. During maintenance periods, when the reactor is shut down, the coolant temperature is reduced to 200 deg. C. Because molten sodium is optically opaque, ultrasonic imaging techniques are developed for maintenance activities. Under-sodium imaging aims at i) checking the health of immersed structures. It should also allow ii) to assess component degradation or damage as cracks and shape defects as well as iii) the detection of lost objects. The under-sodium imaging system has to sustain high temperature (up to 300 deg. C) and hostility of the sodium environment. Furthermore, specific constraints such as transducers characteristics or the limited sensor mobility in the reactor vessel have to be considered. This work focuses on developing a methodology for detecting damages such as crack defects with ultrasound devices. Surface-breaking cracks or deep cracks are sought in the weld area, as welds are more subject to defects. Traditional methods enabled us to detect emerging cracks of submillimeter size with sodium-compatible high-temperature transducer. The presented approach relies on making use of prior knowledge about the environment through the implementation of differential imaging and time-reversal techniques. Indeed, this approach allows to detect a change by comparison with a reference measurement and by focusing back to any change in the environment. It is a means of analysis and understanding of the physical phenomena making it possible to design more effective inspection strategies. Difference between the measured signals reveals the acoustic field scattered by a perturbation (a crack for instance), which may occur between periodical measurements. The imaging method relies on the adequate combination of two computed ultrasonic fields, one forward and one adjoint. The adjoint field, which carries the information about the defects, is analogous to a time-reversal operation. One of the interests of the presented method is that the time-reversal operation is not done experimentally but numerically. Numerical simulations have been carried out to validate the practical relevance of this approach. The preliminary numerical results show a nice agreement between the guessed and the actual positions of the defect. After water-tests, in sodium-tests must be done in order to validate the water/sodium transposition. For this purpose, an under-sodium device is under development, which can move the transducers with four degrees of freedom in a 1.5 m{sup 3} sodium pot. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Future of Robotics/Remote Handling Solutions for the Nuclear Industry - 17347

The nuclear industry is seeing a resurgence of development and utilization of advanced integrated systems; fused sensor arrays; autonomous, remote and hybrid operations; and augmented reality display and control system interfaces. A new age of 'robotics' and remote handling technologies. For many years the use of robotics in nuclear applications has been done sparingly due to technical limitations, perceived and real reliability issues, perceived and real risk concerns, and cost. Although robotics have been used successfully on a variety of projects globally, the underuse of this technology, particularly within the nuclear industry both public and private, is overwhelming. As the number of complex, high hazard projects in the nuclear industry increases, the use of robotics for maintenance, inspection, repair, decommissioning, and remediation activities will become increasingly vital in the future. The risks associated with direct human exposure are high and thus eliminating the risk, or managing it to acceptable levels by using robotics/remote handling as well as other technologies is critical to success as more extreme environment operations and tasks are undertaken. Recent and ongoing advances in technology now allows us to safely and effectively remove the direct / in-situ human element from these type of activities. All the while delivering the same or better outcomes when considering the alternatives when limited or no direct / in-situ human intervention would be allowed. The biggest obstacles the nuclear industry faces center on the cost, reliability, maintainability, effectiveness and appropriate uses of robotics/remote handling solutions in a nuclear (radiation and/or contamination) environment. In order to mitigate these concerns, a sound approach to the use of robotics needs to be addressed. This approach must include: 1. A better understanding of what technology is available and how it can be utilized across multiple sectors, e.g. Commercial Off-the-Shelf (COTS) technology modified / adapted for the nuclear sector; 2. How to implement technology in an integrated pragmatic approach that is cost effective by combining technological know-how / subject matter expertise (SME) with the equivalent subject matter expertise in regulatory, operational and maintenance requirements and limitations, such that a more complete set of functional and operational requirements can be jointly developed in the process. 3. The integration of requirements (project, site, regulatory, etc.), risk management (human factors) and technology, i.e. a marriage between political, programmatic, and technological factors. As the development of robotic/remote handling technology progresses and the successful implementation on projects is demonstrated, the better off the industry will be. This paper provides an overview of the fundamental issues facing the nuclear industry with regard to effective and successful technology selection, maturation, deployment, and integrated risk management, and offers suggestions on how we may overcome these persistent issues now and in the future. Robotic systems and solution experts that are focused on the integration of proven technologies - and that are an integrated part of the project team from its onset - are a necessity for successful planning during nuclear operations. The approach to nuclear operations should always be, 'what is the simplest, most effective way we can approach a particular project need?'. Understanding and implementing the right technologies is where the true value will be recognized. The integration of systems, which includes more than just robotics, is key when developing schemes for these types of complex operations. Often times during planning, the remote handling needs of the job are set aside to be evaluated at a later time due to risk concerns and lack of knowledge. The issue is, experts in the area of robotics or remote handling are rarely involved in the upfront planning. As a result, unnecessary constraints, risks, and obstacles are imposed on project teams to deliver. If done intelligently, this should be introduced at the forefront of planning. Using this type of sound approach leads to effective task organization for the end user. By developing an overall philosophy that leverages proven technologies with implementation expertise; i.e. solutions versus products, is a recipe for success. This is the area that is under-appreciated in the industry and one that needs to be recognized on a much broader scale. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aging Infrastructure: Application of System Health Monitoring at the Defense Waste Processing Facility - 16069

The disposition of high level waste (HLW) into borosilicate glass canistered waste forms began at SRS in 1996. Since that time, the Defense Waste Processing Facility (DWPF) has produced nearly four thousand HLW canisters. The DWPF is now approaching 20 years of radioactive service and 25 years of operation since the commencement of nonradioactive testing in 1990. Many facility systems are challenged by equipment or component obsolescence, which places a premium on proper work planning, engineering, and maintenance resource allocation to ensure facility reliability. To this end, Savannah River Remediation (SRR) implements programs and procedures for performance monitoring of structures, systems, and components (SSCs) within all of its processing facilities. As these programs have matured, they have helped to identify vulnerabilities within facility systems and provided a framework for ranking system assets to ensure correct priority is established and maintained. This paper provides an overview of how SRR structures and implements system performance monitoring with specific focus on the recent replacement of the DWPF Safety Grade Purge Flowmeters. This case study will discuss: 1) How the performance monitoring process identified an availability risk due to the minimal vendor support for the in-use flow transmitters, 2) The design changes developed as part of the project to transition to a different measurement technology, which includes operational lessons learned from the original installation, 3) The execution of the replacement effort, which was complicated by the fact that the purge system is a Vital Safety System (VSS) and not easily taken out of service for extended maintenance, and 4) The need to consider future maintainability, particularly given that continued acceleration in technical innovation will likely increase the frequency of equipment obsolescence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D of the Callisto PWR Loop as part of the Refurbishment of the BR2 Research Reactor - 16168

Research reactor BR2 is undergoing a thorough maintenance and modernisation operation until mid-2016. In order to be able to use the reactor safely and efficiently in the coming period of 10 years, a preventive replacement of the beryllium matrix was required as a major step in the refurbishment. At the same time, a number of preventive maintenance and modernisation activities have been defined, including the dismantling of the CALLISTO (Capability for Light Water Irradiation in Steady State and Transient Operation) PWR experimental facility for in-pile studies installed into BR2 for more than 20 years. The CALLISTO end of life decommissioning strategy aims for waste, cost and dose uptake minimisation and includes: - the unloading and removal of the in-pile sections; - a closed-loop full system decontamination for dose reduction; - the complete dismantling of the loop; - the further sorting and segmentation in a dedicated workshop; - a hard chemical batch-wise decontamination for unconditional clearance. The operation is planned in the period of mid-2015 until mid-2016. The paper will describe in detail these subsequent steps, with a focus on decontamination and dismantling. Lessons learned and potential benefits towards the D and D of commercial PWR will be highlighted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Community Based Concepts Become Reality - 16538

The Port Hope Area Initiative (PHAI) involves the cleanup of historic low-level radioactive waste (LLRW) resulting from radium and uranium processing by the former Crown Corporation, Eldorado Nuclear Limited, and its predecessor companies, during the period between 1932 and 1988. The PHAI, which is based on a legal agreement between the Government of Canada and the adjacent municipalities of Port Hope and Clarington in Ontario, Canada, comprises two separate community-initiated projects for the long-term management of the historic LLRW located in each of these municipalities. The Port Hope Project involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from various sites within the urban area of Port Hope, the construction and operation of an engineered aboveground mound where the waste will be safely contained, and the long-term maintenance and monitoring of the new waste management facility. The waste is currently located in 13 large-scale sites and an estimated 375 small-scale sites within the community. In contrast, the Port Granby Project involves the relocation of approximately 450,000 cubic metres of historic LLRW from the existing waste site on the north shore of Lake Ontario in rural Clarington, to a new engineered aboveground mound to be built 700 metres north of the shoreline. The work also involves the restoration of the existing site and long-term maintenance and monitoring the new facility. The PHAI entered Phase 2 (construction) of a three-phase program in early 2012, when $1.28 billion (Canadian) in federal funding was announced by the Minister of Natural Resources Canada. The funding, together with regulatory approval from the Canadian Nuclear Safety Commission (CNSC), which granted 10-year waste management licences to both projects, have permitted the PHAI to move forward with construction and remediation. Waste water treatment plants based on best-available technologies have been constructed for each project to remove a wide range of contaminants from groundwater, surface water and leachate collected during construction and operation of the aboveground mounds. Each treatment process has been designed to ensure the quality of treated water being discharged into Lake Ontario meets or exceeds stringent regulatory requirements, resulting in the enhanced protection of the Great Lakes Basin ecosystem. In 2015, the contract to build the Port Granby long-term waste management facility and remediate the existing waste site was awarded, and the long-awaited facility development will soon begin. The use of a dedicated internal waste transportation route along, which the LLRW will be trucked from the existing site to the new facility, is a key component of the design to minimize the impact on the local, rural community. In Port Hope, the removal of contaminated soil within the site for the new long-term management facility commenced in the fall of 2015. Over the next several years, multiple contracts will be awarded for construction and operation of the new waste management facility and remediation of the large and small-scale sites. In short, the Port Hope and Port Granby community-based concepts have matured into tangible projects with appropriate regulatory approvals and federal funding in place. Ongoing communications with the two communities have resulted in a well-informed public that understands the work to be done and is eager to see their projects take shape and become reality. As Canada's largest environmental remediation and restoration undertaking, the PHAI has never been closer to fulfilling its vision - working with the local communities to fulfil Canada's commitment for the cleanup of historic waste in Port Hope and Port Granby to leave an honourable legacy for future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Quality Management for Transport Packages Not Requiring Authority Design Approval - 18194

The majority of transports of radioactive materials are carried out in packages which don't need a package design approval of a competent authority. Low active radioactive materials are transported in such kind of packages e.g. in the medical and pharmaceutical industry and in the nuclear industry as well. In Germany the decision to phase out nuclear energy leads to a strong demand for packages to transport low and middle active radioactive waste due to the dismantling and decommissioning of nuclear power plants. According to IAEA regulations the 'non-competent authority approved package types' are the excepted packages and the industrial packages of Type IP-1, IP-2 and IP-3 and of Type A. For the packages of Type IP-2, IP-3 and Type A an assessment by the German competent authority is required for the quality management for the design, manufacture, testing, documentation, use, maintenance and inspection. In general a compliance audit of the manufacturer of the packaging is required during this assessment procedure. Their regulatory level in the IAEA regulations is not comparable with the regulatory density for packages requiring competent authority design approval. The countries apply different approaches within the assessment of the quality assurance measures in the management system as well as in the quality assurance program of a special package design. To use the package or packaging in a safe manner and in compliance with the regulations a management system for each phase of the life of the package or packaging is necessary. In order to help manufactures, which measurements and documents are needed for the assessment procedure, BAM developed a guideline. The guideline BAM-GGR 016 [5] describes the needed quality management for the design, manufacture, testing, documentation, use, maintenance and inspection of a packaging and the package. The poster to be presented will explain the different requirements of the quality assurance measures and give examples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facilities Asset Mobile Environment (FAME): From Old School to World Class - 18224

Newport News Shipbuilding (NNS) is on a mission to achieve and sustain world-class performance and maintenance excellence for Facilities Support. Our Computerized Maintenance Management System (CMMS) installation was 17 years old, and legacy data structures were inadequate to support collection of accurate reliability data. The Facilities Asset Mobile Environment (FAME) project includes three major segments - Mobile Hardware, Information, and Process Upgrades supported by the CMMS. By implementing the FAME project, NNS is making significant strides in improving Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR). (authors)

97 MATHEMATICS AND COMPUTING↗

Precision Control of a Slender High Payload 22 DoF Nuclear Robot System: TARM Re-ascending - 18346

The DEMO Remote Maintenance System (RMS) functional requirements represent a truly extreme environment. In the current design of the in-vessel RMS, blanket segment maintenance represents one of the most challenging tasks overall. As part of the JET (Joint European Torus) project, an ambitious 22 DoF transporter was created, the TARM (Telescopic Articulated Remote MAST). The TARM has been identified as a suitable test bed for the early development and verification of the control system and structural simulators. This paper outlines the development of the TARM into a multi-purpose test-rig for Precision Control of a Slender High Payload large DoF Nuclear Robot System. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrading the JET Remote Handling System - 18356

The Joint European Torus (JET) has employed advanced remote-maintenance techniques for over three decades to avoid exposing humans to a potentially hazardous environment and to develop techniques for future power-generating fusion reactors where environments will be too hazardous for any manned maintenance. As a unique application of robotics, virtual reality and operations management systems, JET's remote handling unit, now a part of RACE, has driven the state-of-the-art with each upgrade programme in its history. This conference paper presents the current capabilities of the JET remote handling system, and the future capabilities being delivered by its latest upgrade programme, which makes use of cutting edge advances. RACE (Remote Applications in Challenging Environments) aims to shape the technologies being developed for JET in such a way that they will have wider applications, such as in nuclear decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Historic Perspective of NPDES Individual Permit for Storm Water Discharges from Solid Waste Management Units at Los Alamos National Laboratory - 18667

The Los Alamos National Laboratory (LANL) and the associated communities of Los Alamos and White Rock are located in Los Alamos County in north-central New Mexico approximately 60 mi north-northeast of Albuquerque and 25 mi northwest of Santa Fe. The 36-mi{sup 2} facility is situated on the Pajarito Plateau, which consists of a series of fingerlike mesas separated by deep east-to-west oriented canyons cut by predominately ephemeral and intermittent streams. The mesa tops range in elevation from approximately 7800 ft. on the flanks of the Jemez Mountains to about 6200 ft. at their eastern termination above the Rio Grande Canyon. The land surrounding the Laboratory is largely undeveloped. Public access to much of the facility is limited for safety and security reasons. Large tracts of surrounding land are held by the U.S. Forest Service (Santa Fe National Forest), the Bureau of Land Management (Bandelier National Monument), the General Services Administration and San Ildefonso Pueblo. Storm water discharges from Solid Waste Management Units (SWMUs) have been regulated at the LANL since the early 1990's and have evolved into an Individual Stormwater Permit (IP) that may be one of the most complex in the nation. Historically, storm water discharges from SWMUs at LANL were regulated under a nationwide general permit using a watershed based approach requiring a Storm Water Pollution Prevention Plan (SWPPP), monitoring at sub-watershed scale 'USGS like' gage stations, and inspection and maintenance of erosion controls. In 2001, the Cerro Grande Fire destroyed many Laboratory structures, residential homes and over 80,000 acres of forested lands in the upper watershed above Los Alamos that significantly changed the local hydrology. Several years later, a Federal Facilities Compliance Agreement (FFCA) was issued by U.S. Environmental Protection Agency (USEPA) that was followed by a Clean Water Act lawsuit filed by concerned citizens, the result of which required more focus on stormwater discharges from individual SWMUs and an IP covering over 400 Sites. The IP contains non-numeric technology-based effluent limitations, coupled with a comprehensive, coordinated inspection and monitoring program, to minimize pollutants in LANL's storm water discharges associated with historical industrial activities from specified Sites. Non-numeric technology-based effluent limitations include minimizing pollutants in discharges through erosion and sedimentation controls, management of run-on and runoff, employee training, inspection and maintenance of controls, annual reporting and public involvement. The IP establishes Target Action Levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the effectiveness of control measures implemented under the IP. That is, storm water quality sample results from SWMU discharges are compared with applicable TALs. If one or more sample results exceed a TAL, LANL must take additional corrective action. The TAL results are also confounded by high levels of naturally occurring constituents such as aluminum and gross alpha, and urban constituents such as copper, zinc and PCBs which may not be a source from the regulated SWMU. Due to the remote rugged terrain, security access issues, number of monitoring locations, stringent TALs, reporting requirements and public involvement requirements, this permit is likely one of the most stringent and complex in the country. The Laboratory has implemented this permit in a compliant manner for the past seven years and is anticipating the issuance of a new permit in the next few months. This paper will cover permit requirements related to control measure installations, monitoring, reporting and public involvement as well as process improvements and remaining water quality initiatives such as developing studies to address issues such as discriminating between natural background levels and LANL-related contaminants during the execution of this unique permit. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dual Alpha/Gamma Imaging Tool to Manage Decommissioning Operations

The knowledge of the radiological state of a nuclear plant under decommissioning is a key factor at any stage of the project: from the initial characterization (to define the best scenario and the main dismantling steps), during the monitoring of the decontamination operations, for the waste management and, last but not least, for the final controls. During a facility's operation, a clear view of the process radiological level is equally necessary, in order to plan maintenance scheduling and optimize interventions by personnel. Radiation protection teams generally ensure worker radiological safety, and also supply dose mappings for each of the areas associated with typical spectra. In most cases, this mapping does not give enough information to be used as input data when preparing maintenance or clean-up work. With advances in activity modeling calculation codes (using 3D), the way measurements are made to recover the best input radiological data on site is a key factor. Nuclear instrumentation is still in progress and the evolution of the technologies and software allow us to get imaging information in real time. The gamma camera is going to evolve and to become more compact and more sensitive. New portable gamma cameras have to be tested under high level dose rate. The alpha camera is also evolving: from the first prototype tested on site to solar blind alpha camera (to reduce the influence of light) to the new dual alpha/gamma prototype. (authors)

42 ENGINEERING↗