Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

Operational Workflow in a Sample Receiving Facility: Input from the MSR Operation Definition Team

The return of scientifically selected samples from Mars would provide a rare opportunity for investigation with the full range of the latest technology available. To take full advantage of this opportunity, it is important to plan ahead to ensure the pristine nature of the samples upon arrival within the Earth environment until scientific investigations can begin. The NASA/ESA science community-driven MSR Science Planning Group – Phase 2 (MSPG2) delivered recommendations and guidance regarding curation (1) and science (2,3) activities to be performed on the samples under containment. High-level requirements for the infrastructure were also developed by MSPG2 (4). In order to prepare infrastructure-targeted input for the ESA and NASA facility studies planned in the 2022-2023 timeframe, the MSR agency-led Operational Scenarios Definition Team (MOSDT) was assembled to conceptualize the sample operations that will inform future architecture teams. Emphasis was placed on the responsibility of MOSDT to use community-defined requirements and to represent the view of the international scientific community. The main deliverable of MOSDT was an operational workflow for a Sample Receiving Facility (SRF). Two other deliverables were produced: a report to narrate the workflow, and a list of instruments (see Hutzler et al., this conference). Activities described in the main sequence of the workflow range from engineering operations to curation to science, with the latter term being used here as the science to be done within a SRF. Side sequences (e.g. engineering inspection of hardware, head gas extraction) were also identified, and detailed when they would have a significant impact on the infrastructure of a SRF. It was necessary for the MOSDT to rely on assumptions for some steps and activities, and though these were kept to a minimum (and are described in both the report supporting the workflow and in the full presentation), in general, the assumptions and overall work were very conservative, as the impact of underestimating the scope of the SRF infrastructure was considered more detrimental than overestimating it. It is expected that future work will be able to confirm or inform these assumptions. The community was consulted during the course of the MOSDT work. This abstract’s aim is two-fold: on one hand, inform the scientific community and overall MSR stakeholders, to make the infrastructure studies and trade-off more understandable; on the other hand, to solicit feedback from a larger community audience for the next iterations planning for SRF design and activities.

Mars Sample Return↗

Development of a Ground Multi-Mission Low-Cost Optical Terminal (LCOT) for Free-Space Optical Communications

Once confined to the realm of laboratory experiments and theoretical papers, space-based laser communications (lasercomm) are on the verge of achieving mainstream status. Organizations from Facebook to NASA, and missions from cubesats to Orion are employing lasercomm to achieve gigabit communication speeds at mass and power requirements lower than that of traditional radio frequency (RF) methods. Since first demonstrating free-space optical communications services with Lunar Laser Communications Demonstration (LLCD) in 2013, NASA has invested in developing optical communications technologies and capabilities to enhancing its space communications networks. Along with evolving optical space terminals, NASA is also developing lasercomm grounds stations capable of meeting the rapidly increasing data volume demands of upcoming missions, from low-earth to lunar orbits and beyond and integrating these advanced capabilities into its Near-Space and Deep Space Networks. To meet this emerging need, the Low-Cost Optical Terminal (LCOT) project at NASA’s Goddard Space Flight Center (GSFC) is designing, building and validating a prototype for a flexible, multi-mission, and economical optical ground terminal that could be used as a blueprint for a global network of optical ground stations, capable of supporting a wide variety of missions. To date a major impediment to widespread adoption of laser communication has been the lack of an existing ground network infrastructure. A mission that wishes to take advantage of laser communication not only needs to invest in an optical space terminal, but it must also finance the creation of ground terminals to receive the downlink signal. This adds significant additional cost. Missions that do decide to incur the cost of financing a network of ground terminals end up building highly specialized optical receivers that are operable as receivers for that specific mission only. Significant Non-Recurring Engineering (NRE) cost is invested to build highly specialized one-of-a-kind ground terminals that go into storage after that particular mission is over. This is not an economical approach and does nothing to grow the number of optical ground stations available to future missions. In essence each mission that wants to take advantage of the benefits of lasercom has to start from scratch to provide a ground terminal network to support it. As long as this is the case, the cost for using laser communications will be too high for most missions to consider. LCOT intends to close this gap in technology by designing and developing a standard optical ground terminal design that is flexible enough to serve as a receiver for a wide range of future missions – a ground terminal that can be quickly reconfigured to receive downlinks at different wavelengths using different signal formats. Not only does LCOT have the industry-building objectives of utilizing commercial-off-the-shelf (COTS) components to the maximum extent possible, but also spurs the commercial development of other necessary lasercomm components not currently offered by industry. Finally, LCOT will give NASA scientists and engineers a facility where they can gain real-world experience with optical communications. It will give engineers a cost-effective way to try out new concepts and processes by providing the infrastructure for such testing. In this way it is hoped LCOT will serve as a stimulus for innovation in optical communications and speed its widespread adoption by future missions. The LCOT is comprised of five subsystems: Free-Space Optical, Transceiver, Amplifier, Monitor and Control, and Observatory Infrastructure. In August 2021, the LCOT team installed a 70 cm telescope, developed by Planewave Instruments that was optimized for optical communications. Free-Space Optical subsystem comprises of the telescope and its associated hardware, including a transmitter optical assembly, wide field cameras, two optical benches, and an adaptive optics subsystem. The transmit optical assembly, a unique concept design, is a cluster of four functionally independent transmit subassemblies located on the receive telescope. In addition to receiving optical signals and directing the expanded beam with high precision to the space terminal, it also performs tracking functions. The transmit optical assembly will support operations from Low Earth Orbit (LEO) through lunar and will be used as a template for industry manufacturing. The Optical Infrastructure subsystem is responsible for providing environmentally controlled shelters for LCOT equipment and various other systems. To maintain the safety and proper functionality of the telescope, a 16 ft Astrohaven clamshell dome procured which provides all-sky coverage without the need to rotate the dome. Additionally, Atmospheric Monitoring Assembly (AMA) will be part of optical infrastructure subsystem to ensure accurate performance of the LCOT. Like existing optical ground stations, LCOT will measure standard weather station parameters, infrared all sky image of cloud cover, and cloud height. LCOT, however, adds requirements for measuring night time seeing and, in the future, daytime seeing. Unlike other optical ground terminals, the LCOT is transceiver agnostic; user transceivers may be duplex transceivers, standalone receivers, or standalone transmitters with or without acquisition beacon functionality. As such, the LCOT project accommodates testing with external customer transceivers in a flexible manor, further complimenting its intended multi-mission goals. Another unique component of LCOT is the use of a new amplifier technology – the Very Large Mode Area (VLMA) amplifiers. This new technology allows LCOT to avoid the issues faced by previous laser communications ground terminals, gives users more flexibility and modular capability, and is capable of reaching an order of magnitude higher peak power than traditional High Power Optical Amplifiers (HPOA). One drawback of the VLMA HPOA approach is that the amplified light is output into free-space. The solution developed by LCOT is an optics train that couples the output of the VLMA amplifier into a short fiber for transport to the transmit telescopes with high efficiency. Like many of the LCOT components, a set of detailed manufacturing drawings have been created for the optics train to allow any machine shop with a multi-axis Computer Numerical Control (CNC) machine to fabricate the piece parts from commonly available materials. In line with the goals of LCOT, the monitor and control functions are developed as a modular and flexible system with the ability to support future hardware or algorithm changes, minimizing disruptions. A main priority of development in the Monitor and Control Subsystem (MCS) is the safety monitor system.

laser communication↗

Development of a Ground Multi-mission Low Cost Optical Terminal(LCOT) for Free-Space Optical Communication

Once confined to the realm of laboratory experiments and theoretical papers, space-based laser communications (lasercomm) are on the verge of achieving mainstream status. Organizations from Facebook to NASA, and missions from cubesats to Orion are employing lasercomm to achieve gigabit communication speeds at mass and power requirements lower than that of traditional radio frequency (RF) methods. Since first demonstrating free-space optical communications services with Lunar Laser Communications Demonstration (LLCD) in 2013, NASA has invested in developing optical communications technologies and capabilities to enhancing its space communications networks. Along with evolving optical space terminals, NASA is also developing lasercomm grounds stations capable of meeting the rapidly increasing data volume demands of upcoming missions, from low-earth to lunar orbits and beyond and integrating these advanced capabilities into its Near-Space and Deep Space Networks. To meet this emerging need, the Low-Cost Optical Terminal (LCOT) project at NASA’s Goddard Space Flight Center (GSFC) is designing, building and validating a prototype for a flexible, multi-mission, and economical optical ground terminal that could be used as a blueprint for a global network of optical ground stations, capable of supporting a wide variety of missions. To date a major impediment to widespread adoption of laser communication has been the lack of an existing ground network infrastructure. A mission that wishes to take advantage of laser communication not only needs to invest in an optical space terminal, but it must also finance the creation of ground terminals to receive the downlink signal. This adds significant additional cost. Missions that do decide to incur the cost of financing a network of ground terminals end up building highly specialized optical receivers that are operable as receivers for that specific mission only. Significant Non-Recurring Engineering (NRE) cost is invested to build highly specialized one-of-a-kind ground terminals that go into storage after that particular mission is over. This is not an economical approach and does nothing to grow the number of optical ground stations available to future missions. In essence each mission that wants to take advantage of the benefits of lasercom has to start from scratch to provide a ground terminal network to support it. As long as this is the case, the cost for using laser communications will be too high for most missions to consider. LCOT intends to close this gap in technology by designing and developing a standard optical ground terminal design that is flexible enough to serve as a receiver for a wide range of future missions – a ground terminal that can be quickly reconfigured to receive downlinks at different wavelengths using different signal formats. Not only does LCOT have the industry-building objectives of utilizing commercial-off-the-shelf (COTS) components to the maximum extent possible, but also spurs the commercial development of other necessary lasercomm components not currently offered by industry. Finally, LCOT will give NASA scientists and engineers a facility where they can gain real-world experience with optical communications. It will give engineers a cost-effective way to try out new concepts and processes by providing the infrastructure for such testing. In this way it is hoped LCOT will serve as a stimulus for innovation in optical communications and speed its widespread adoption by future missions. The LCOT is comprised of five subsystems: Free-Space Optical, Transceiver, Amplifier, Monitor and Control, and Observatory Infrastructure. In August 2021, the LCOT team installed a 70 cm telescope, developed by Planewave Instruments that was optimized for optical communications. Free-Space Optical subsystem comprises of the telescope and its associated hardware, including a transmitter optical assembly, wide field cameras, two optical benches, and an adaptive optics subsystem. The transmit optical assembly, a unique concept design, is a cluster of four functionally independent transmit subassemblies located on the receive telescope. In addition to receiving optical signals and directing the expanded beam with high precision to the space terminal, it also performs tracking functions. The transmit optical assembly will support operations from Low Earth Orbit (LEO) through lunar and will be used as a template for industry manufacturing. The Optical Infrastructure subsystem is responsible for providing environmentally controlled shelters for LCOT equipment and various other systems. To maintain the safety and proper functionality of the telescope, a 16 ft Astrohaven clamshell dome procured which provides all-sky coverage without the need to rotate the dome. Additionally, Atmospheric Monitoring Assembly (AMA) will be part of optical infrastructure subsystem to ensure accurate performance of the LCOT. Like existing optical ground stations, LCOT will measure standard weather station parameters, infrared all sky image of cloud cover, and cloud height. LCOT, however, adds requirements for measuring night time seeing and, in the future, daytime seeing. Unlike other optical ground terminals, the LCOT is transceiver agnostic; user transceivers may be duplex transceivers, standalone receivers, or standalone transmitters with or without acquisition beacon functionality. As such, the LCOT project accommodates testing with external customer transceivers in a flexible manor, further complimenting its intended multi-mission goals. Another unique component of LCOT is the use of a new amplifier technology – the Very Large Mode Area (VLMA) amplifiers. This new technology allows LCOT to avoid the issues faced by previous laser communications ground terminals, gives users more flexibility and modular capability, and is capable of reaching an order of magnitude higher peak power than traditional High Power Optical Amplifiers (HPOA). One drawback of the VLMA HPOA approach is that the amplified light is output into free-space. The solution developed by LCOT is an optics train that couples the output of the VLMA amplifier into a short fiber for transport to the transmit telescopes with high efficiency. Like many of the LCOT components, a set of detailed manufacturing drawings have been created for the optics train to allow any machine shop with a multi-axis Computer Numerical Control (CNC) machine to fabricate the piece parts from commonly available materials. In line with the goals of LCOT, the monitor and control functions are developed as a modular and flexible system with the ability to support future hardware or algorithm changes, minimizing disruptions. A main priority of development in the Monitor and Control Subsystem (MCS) is the safety monitor system.

Haleh Safavi↗

Cape Hatteras Ecological Conservation: Delineating Shoreline and Mapping Change Along the Cape Hatteras National Seashore for Coastline Management and Transportation Corridor Adaptation Strategies

The National Park Service at Cape Hatteras National Seashore works to protect North Carolina’s Outer Banks where frequent storms bring heavy winds and flooding, leading to overwash events on the main highway, North Carolina Highway 12. Shorelines are susceptible to erosion directly affecting transportation and housing infrastructures. Storm events can disrupt transportation on NC-12 and ferry service from Ocracoke Island to Hatteras Island, leaving inhabitants stranded on Ocracoke Island for indefinite amounts of time. The National Park Service’s current decision-making practices involve mitigating infrastructure damage by enlisting the help of North Carolina’s Department of Transportation and finding ways to relocate this infrastructure, as well as dredging and sediment placement that support beach nourishment efforts. Our NASA DEVELOP team partnered with the National Park Service to explore the use of optical data to delineate shoreline and map coastline change from 2014 to 2024. We used Earth observations collected by Landsat 8 Operational Land Imager, Landsat 9 Operational Land Imager-2, and Sentinel-2 MultiSpectral instrument to support decision-making related to prioritizing strategic planning for transportation corridor adaptations including potential relocation of infrastructure, and beach nourishment efforts. We derived coastline maps by consolidating images from each year to create composite images for winter and summer coastline seasonal oscillation patterns. The results highlight shoreline loss over the ~10-year study period, and the difference in shoreline inundation in the winter and summer seasons. These observations create a better understanding of successful mitigation efforts and allow the National Park Service to continue to focus on plans for infrastructure updates.

Ella Haugen↗

EVSE Cybersecurity and Resilience

Consequence-driven Cybersecurity Analysis for Extreme Fast Charging Electric Vehicle Infrastructure Electric vehicle (EV) development and associated charging infrastructure are expected to advance rapidly. Thirty percent of all global vehicle sales may be EVs and hybrid EVs by 2025, and they will rely on increasingly sophisticated strategies for grid integration. Next-generation EV charging infrastructure is expected to include interconnected renewable resources, such as photovoltaic (PV) arrays and battery storage systems, along with grid-edge devices. Although distributed energy resources (DERs) are useful in several ways, such as peak shaving at high demand times and backup supply for added resilience, the integration of vehicle charging and DERs could create more avenues for cyberattack. Physical and/or remote access to EV charging station components, including charge ports, power electronics, controllers, and local generation (e.g., PV and energy storage) could be paths to cause power fluctuations, leading to altered operations at the charging station, escalated privileges to administrative systems, exfiltration of financial information (including personally identifiable information), and reduced grid stability. One compromised EV supply equipment component can open the door to a variety of exploitable vulnerabilities. Cloud computing and mobile application control have the potential to expand the threat surface to non-repudiation and firmware integrity challenges. Vendor clouds have access to hundreds of chargers, and if compromised, can scale the attack surface exponentially. The high power and voltage levels of xFC infrastructure (e.g., 400 kW at 1000- V DC) increase the hazards and ability to impact the grid and vehicles more than lower-power charging systems. Legacy communications systems and protocols could also put EV infrastructure at risk of cyberattacks requiring a robust patch management process. Communications networks link EVs and chargers to several stakeholders - including charging station operators, grid operators, vendors/manufacturers, and aggregators - who have both physical and network access to share information for control, monitoring, and analytics. Information in these networks that is vulnerable to compromise includes the state of charge, charging duration, payment information, electricity price, and load control. Analyzing and prioritizing these interconnections risks could help address cybersecurity related to data leakage and manipulation.

charging↗

Tool for Developing Integrated Strategies for Decontamination and Waste Management - 20291

Management of waste from chemical, biological, and radiological incidents is complicated by the fact that decontamination decisions have a profound impact on the characteristics of resulting waste streams. Wide-area biological and radiological incidents could produce massive quantities of waste that may need to be treated on-site and sent for subsequent disposal as non-contaminated materials, or else be directly disposed of as contaminated materials. The EPA has developed the Waste Estimation Support Tool (WEST) for characterizing and quantifying biological and radiological waste that may be generated from decontamination efforts. This paper focuses on the WEST's uses for radiological incidents. WEST combines Geographic Information System (GIS)-based analysis of externally-supplied plume data, infrastructure databases derived from the Federal Emergency Management Agency's (FEMA's) Hazus tool [1], and satellite imagery surface recognition algorithms to combine the composition and square footage of the buildings in the plume with estimates of the materials between the buildings in the plume. The resulting GIS data files are then imported into a Microsoft Access database application, where they are combined with information about the nature and concentration of contaminants, and then subjected to decontamination strategies for different contaminated surfaces. The tool provides estimates of the type and quantities of potential wastes resulting from simulated decontamination and/or demolition activities and includes estimates of the remaining contamination levels including residual contamination contained within each waste stream. Estimates are presented at several levels of detail, allowing users to obtain needed data at the desired resolution. These include estimates for the total affected area, estimates by contamination zone, estimates by decontamination method(s), and estimates by building type (occupancy classification). EPA is currently developing the next version of WEST which will include several substantial enhancements. The most significant improvement for the next version of WEST will include the ability for users to develop contamination scenarios and waste estimates based on previously developed, readily available, and geographically specific infrastructure data. Instead of using WEST's default infrastructure data based on FEMA's Hazus tool, users will be able to import their own building data specific to the geographically affected area. This capability may substantially decrease uncertainties in the resulting waste estimates because the results will be based on actual building data (numbers of each type, square footage, building height, etc.). Two other significant enhancements will be the ability to generate waste estimates for vehicles and biomass. In addition to building debris and building decontamination waste, vehicles and biomass will likely constitute a significant percentage of the total waste which may result from wide area contamination events. This presentation will present the most recent version of WEST, which includes such considerations as affected biomass (e.g., trees), vehicles, and the ability to replace the default Hazus infrastructure databases with custom infrastructure databases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Cold Spraying Mild-Steel Powder onto Mild-Steel Substrate for Development of Waste Tank Repair System - 20515

Infrastructure for nuclear waste storage and processing (e.g., waste tanks, transfer pipelines, evaporators) at the U.S. Department of Energy (DOE) Hanford Site has been in service well beyond its original design life. Past corrosion control methods at Hanford for waste tanks have not been fully successful, as evidenced by leaks forming in tank AY-102, the first double-shell tank (DST) constructed, and significant degradation detected in the primary tanks of AP-102 and AY-101. Failure of infrastructure components can pose a significant risk to the environment, worker safety, and project schedules. Therefore, remotely deployable methods for repairing and extending the service life of the existing tank waste infrastructure are needed. Cold spray has been identified as a potential technique for performing in situ repairs and material buildup for life extension of waste storage and processing infrastructure. Cold-spray repair methods and technology are well-established and are used extensively by industry and the military for making repairs using dissimilar materials. Pacific Northwest National Laboratory is evaluating the process of making repairs using mild-steel powder applied to a mild-steel substrate to minimize the galvanic corrosion potential. This paper presents the initial results for a feasibility ('go/no-go') assessment as to whether low-density deposits with sound metallurgic bonds, to build-back steel plate material, can be achieved using existing commercial cold-spray equipment. An assessment of steel-on-steel deposit is necessary to determine if cold spray is a viable candidate for DST carbon steel plate restoration/repair and thus DST service life extension. Powder properties and preparation requirements have been investigated and operating conditions and parameters for depositing a cold-spray buildup of mild steel on a mild-steel substrate have been determined. Soundness of metallurgic bonding as a function of the operating parameters exercised and results from applying cold spray to lay a deposit over simulated small-diameter flaws in 1/2-inch mild-steel plate are presented. Application of in situ cold-spray repair to the DOE complex has the potential to reduce cost and schedule impacts associated with component failures and the need to procure and construct replacement infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Lighting Signals for Safety and Efficiency - Experiments with Addressable LEDs

For enhanced roadway safety, clear and immediate visual cues are essential for preventing accidents between drivers and pedestrians. At intersections, however, the line of sight to other roadway users may be obstructed by vehicles and infrastructure. Additionally, adverse conditions, including low visibility, poor weather, or inadequate lighting can increase the potential for collisions. Distracted drivers and pedestrians can further exacerbate the risk of accidents, particularly when using a smartphone, rather than focusing on roadway surroundings. These issues demonstrate the need for infrastructure upgrades that enhance visibility and awareness at crosswalks. A potential solution is through enhanced lighting signals integrated into the roadway infrastructure. One such example is the use of addressable LEDs, individually controllable lights that can change color and brightness instantaneously through programmable microcontrollers. They can be installed and integrated into crosswalks to maintain visibility in conditions where pedestrians may be difficult to see, while also offering peripheral cues to pedestrians who may be distracted by their phones or other objects rather than the road. Such a system (as one example) that is integrated into a traffic intersection digital twin that tracks all roadway users accurately, has the potential to enhance visibility of vulnerable road users, and thus enhance safety. This paper examines the potential implementation and feasibility of this technology, as well as the safety benefits it could provide. Laboratory experiments with addressable LEDs reveal the capabilities and challenges of this technology for roadway infrastructure safety. These findings could pave the way for more integrated lighting in infrastructure for vehicles and pedestrians at intersections, merge and diverge locations, and other areas where complex interactions present safety hazards. Such lighting solutions, enabled by modern computation and communications, could enhance safety and efficiency in our transportation system and improve overall mobility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysing the usage and evidencing the importance of fast chargers for the adoption of battery electric vehicles

An appropriate charging infrastructure is one of the key aspects needed to support the mass adoption of battery electric vehicles (BEVs), and it is suggested that publically available fast chargers could play a key role in this infrastructure. As fast charging is a relatively new technology, very little research is conducted on the topic using real world datasets, and it is of utmost importance to measure actual usage of this technology and provide evidence on its importance to properly inform infrastructure planning. 90,000 fast charge events collected from the first large-scale roll-outs and evaluation projects of fast charging infrastructure in the UK and the US and 12,700 driving days collected from 35 BEVs in the UK were analysed. Using multiple regression analysis, we examined the relationship between daily driving distance and standard and fast charging and demonstrated that fast chargers are more influential. Fast chargers enabled using BEVs on journeys above their single-charge range that would have been impractical using standard chargers. Fast chargers could help overcome perceived and actual range barriers, making BEVs more attractive to future users. At current BEV market share, there is a vital need for policy support to accelerate the development of fast charge networks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen applications in airport operations: a review using the Port Authority of New York and New Jersey as an illustrative airport system

Airports combine aircraft propulsion, ground operations, stationary power systems, and fuel logistics in ways that make emissions reduction technically and operationally complex. Existing studies often assess hydrogen applications in these areas separately, limiting understanding of the shared infrastructure, safety, and operational constraints that shape airport deployment. This review evaluates hydrogen across three airport-relevant operational domains: aviation propulsion, ground support equipment and vehicles, and stationary power systems. Within aviation propulsion, the review examines sustainable aviation fuel production and hydrogen-powered aircraft as two distinct hydrogen-relevant pathways. The Port Authority of New York and New Jersey is used as an illustrative airport system to relate the literature to a real operating context. Drawing on peer-reviewed studies, technical reports, demonstration projects, and public operational information, the review also includes screening-level calculations of hydrogen demand and potential CO 2 e reductions for selected applications. The findings show that hydrogen's role is highly application-specific. Near-term opportunities are strongest where hydrogen serves as a low-carbon process input, supports selected high-utilization ground equipment, or contributes to resilient stationary power-system configurations. Hydrogen-powered aircraft remain a longer-term option because storage, fueling infrastructure, certification, cost, and NO x management continue to constrain deployment. Across all domains, infrastructure readiness, fuel logistics, safety requirements, and leakage management emerge as recurring determinants of viability. Future research should focus on cross-domain infrastructure planning, comparative assessment of hydrogen against alternative pathways, improved treatment of leakage and non-CO 2 effects, and clearer safety and regulatory frameworks for airport deployment.

08 HYDROGEN↗

Demystifying Cyberattacks: Potential for Securing Energy Systems With Explainable AI : Preprint

Modernization of energy systems has led to in- creased interactions among multiple critical infrastructures and diverse stakeholders making the challenge of operational decision making more complex and at times beyond cognitive capabilities of human operators. The state-of-the-art machine learning and deep learning approaches show promise of supporting users with complex decision-making challenges, such as those occurring in our rapidly transforming cyber-physical energy systems. However, successful adoption of data-driven decision support technology for critical infrastructure will be dependent on the ability of these technologies to be trustworthy and contextually interpretable. In this paper, we investigate the feasibility of implementing XAI for interpretable detection of cyberattacks in the energy system. Leveraging a proof-of-concept simulation use case of detection of a data falsification attack on a photovoltaic system using XGBoost algorithm, we demonstrate how Local Interpretable Model-Agnostic Explanations (LIME), a flavor XAI approach, can help provide contextual and actionable interpretation of cyberattack detection.

artificial intelligence↗

Demonstration of the Cybersecurity Framework through Real-world Cyber Attack

The Cybersecurity Framework (CSF) developed by the National Institute of Standards and Technology Cybersecurity, provides five concurrent and continuous functions to Identify, Protect, Detect, Respond, and Recover from cyber threats and vulnerabilities to buildings. Based on the core architecture and security best practices defined in the CSF guidelines, we developed the CSF webtools. The CSF webtools provide actionable functions that can be easily adopted by a facility operator to enhance their critical infrastructure security. The essence is captured in a set of “how-to” instructions for the facility operators to adopt, adapt, and apply to their critical infrastructure facilities. When considered together, these functions provide a high-level, strategic view of the lifecycle of an organization’s cybersecurity risk management. The CSF webtools provide an easy to follow set of cybersecurity best practices, policies, and procedures to improve the cybersecurity posture of our nation’s buildings and other critical infrastructures. The CSF webtools are also designed to facilitate communication of cybersecurity activities and outcomes across the organization from the executive to operations levels. Finally, the CSF webtools allow the critical infrastructure operators to assess the overall cybersecurity maturity and posture. The goal of this paper is to demonstrate the capabilities of the CSF webtools through an illustrative cyber-attack based on a real-world scenario.

cybersecurity framework, maturity model, critical ↗

Strengthening the Security of Operational Technology: Understanding Contemporary Bill of Materials

The evolution of cyber-physical infrastructure has made its security more challenging. The last few years have witnessed a convergence of hardware and software segments in various domains, including operational technology (OT) which is responsible for carrying out critical tasks such as monitoring and controlling power grids, nuclear plants, transportation, and emergency services. Both hardware and software encapsulate numerous open source and proprietary subcomponents, making it crucial for end-users to understand the composition of the products they are using. For example, wind turbines incorporate thousands of lines of code (software) used for the turbine's design, planning, operation, and analytics in addition to the numerous hardware subcomponents that construct it. Due to the highly complex nature of software and hardware, knowledge of the components and subcomponents is required to mitigate cyber vulnerabilities and defend against cyberattacks. There has also been a transformation from a traditional linear supply chain into a global, dynamic, diverse, and interconnected system. The digitization of the supply chain makes it easier to find and exploit vulnerabilities. Critical infrastructures (e.g., power grids, oil, natural gas, water, and wastewater) rely on OT to function, and if the OT is compromised, equipment damage and potential interruption of services could result. A significant security measure to protect OT systems from disruption is to develop a supply chain bill of materials (BoM) corresponding to the software and hardware used in OT, along with attestations amongst vendors and asset owners. A supply chain BoM is a proactive way to understand the inherent vulnerabilities in the system and mitigate them in advance of being exploited. BoMs bolster the trust placed in the digital infrastructure and enhance software supply chain security by sustaining the management of component obsolescence and compliance, along with the seclusion of unsafe segments of a specific product. Adopting BoM tools is becoming increasingly important across various government sectors, as evidenced by the recent U.S. executive order on cybersecurity (NIST 2021). This paper aims to classify BoMs based on structure, functionality, component type, and architecture. The work also discusses case studies to further highlight the benefits of BoMs. In addition, it identifies missing pieces in existing BoM implementations so that future research may identify bounds on where it could expect to make improvements and directly enable researchers to identify promising areas for exploration. Further, the authors provide valuable recommendations to tool developers, researchers, and standardizing organizations (policymakers), additionally benefitting critical infrastructure owners and government executives. This aids in paving a path for future work, thereby, providing suggestions to determine a tool for consumers that best suit their needs.

97 MATHEMATICS AND COMPUTING↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sites An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 13 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Fort Calhoun, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 14 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State representatives, State Regional Group representatives, Tribal representatives, and a Federal Railroad Administration representatives have participated in eleven of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 14 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Palisades, Pilgrim, Three Mile Island, Oyster Creek, Indian Point, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

From Ensemble Climate to Ensemble Impacts

Many climate-risk tools rely on ensemble mean projections or endpoint climate snapshots to characterize future hazards. Although convenient for communication, these representations remove the statistical, temporal, and physical information that real infrastructure systems respond to. Infrastructure degradation and failure arise from extremes, sequences, cumulative stress, compound hazards, and nonlinear fragility relationships, none of which survive ensemble averaging or temporal compression. Power-system failure statistics and cascading failure models further show that infrastructure risk is dominated by tail events and path-dependent dynamics rather than by mean conditions. This paper demonstrates why ensemble mean or endpoint-only climate representations are mathematically and physically inconsistent with engineering-grade risk analysis. We outline a model-resolved, time-series-based workflow that preserves extremes, variability, and sequencing by propagating each climate-model realization independently through hazard formation, exposure, fragility, and cascading failure mechanisms. Taking the ensemble of impacts—rather than the ensemble of climate—provides a defensible, physically coherent foundation for infrastructure resilience planning, regulatory compliance, and long-term investment decisions.

54 - ENVIRONMENTAL SCIENCES/GLOBAL CLIMATE CHANGE ↗

Data Management for Digital Twin Implementation: Enhancing Existing SCADA Architecture for INL's CITRC Test Distribution System

The United States power grid will continue to experience stress from aging infrastructure, extreme weather, and increasing loads. In order to strengthen resiliency, researchers need to run tests and simulations that model real-life infrastructure. Idaho National Laboratory (INL) is creating a digital twin of its Critical Infrastructure Test Range Complex (CITRC). CITRC is an at-scale grid testbed which can be configured in utility-realistic distribution scenarios for a variety of tests, such as advanced grid protection and control. A digital twin of this infrastructure would support in-depth tests/simulations without risking physical consequences, before trialing devices under test at-scale. This project focuses on the data acquisition part of constructing a digital twin. It investigates the Supervisory Data Acquisition and Control (SCADA) system of CITRC and explores ways to utilize this system for the twin. Future “ideal” at-scale implementations such as upgraded equipment, modern communication protocols, and automation applications are also explored.

24 - POWER TRANSMISSION AND DISTRIBUTION↗