Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Laboratory Directed Research and Development Annual Report FY 2017

A national laboratory must establish and maintain an environment in which creativity and innovation are encouraged and supported in order to fulfill its missions and remain viable in the long term. As such, multiprogram laboratories are given discretion to allocate a percentage of their operating budgets to support research and development projects that align to PNNL’s and DOE’s missions and support the missions of other federal agencies, including DHS, DOD, and others. DOE Order 413.2C sets forth DOE’s Laboratory Directed Research and Development (LDRD) policy and guidelines for DOE multiprogram laboratories, and it authorizes the national laboratories to allocate up to 6 percent of their operating budgets to fund the program. LDRD is innovative research and development, selected by the Laboratory Director or his/her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory. The projects supported by LDRD funding all have demonstrable ties to DOE/DHS missions and may also be relevant to the missions of other federal agencies that sponsor work at the Laboratory. The program plays a key role in attracting the best and brightest scientific staff, which is needed to serve the highest priority DOE mission objectives. Individual project reports comprise the bulk of this LDRD report. The Laboratory focuses its LDRD research on scientific assets that often address more than one scientific discipline.

99 GENERAL AND MISCELLANEOUS↗

Board on Earth Sciences and Resources and Its Activities Final Technical Report

The National Academies of Sciences, Engineering, and Medicine’s Board on Earth Sciences and Resources (BESR) is the locus for earth science activities, including critical aspects of energy science, for the institution and provides independent, unbiased, scientific and engineering advice to the nation on a broad range of earth science issues and in response to requests and needs expressed by Congress, federal and state agencies, the science community, the private sector, and others. The core level support provided by the Department of Energy’s Basic Energy Sciences was essential to allow BESR to maintain its service to the nation as a privileged interface between the government and the earth science community and to support scientific and engineering advances related to earth sciences and engineering, including basic energy science. This technical report outlines the volunteer board membership, primary activities, products, impacts, and work in development by the Board during the award period. Primarily, the Board served as a forum for advancing the understanding and communication of earth sciences and resource topics related to the geosciences and energy resource engineering and science; developed and oversaw a range of consensus studies, workshops, and other convening activities related to the earth sciences; over saw the Board’s five standing committees; and continued to develop a communication and outreach approach to provide information to federal and state government, the private sector, academia, non-governmental organizations, and the public to support policy and decision making.

02 PETROLEUM↗

Soils Activity Quality Assurance Plan, Revision 1

This Quality Assurance Plan (QAP) provides the overall Quality Assurance (QA) program requirements, technical planning, and general quality practices to be applied to the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program Soils Activity. The QAP requirements are consistent with the Quality Systems for Environmental Data and Technology Programs–Requirements with Guidance for Use (ANSI/ASQ, 2004); the Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans (IDQTF, 2005); and 10 Code of Federal Regulations (CFR) 830.120, Quality Assurance (CFR, 2017a), which apply to specific activities performed under the Soils Activity. The EM Nevada Program owns and is responsible for maintaining this QAP. Individual participants are responsible for implementing the requirements of this QAP in accordance with their own approved programs, processes, plans, and procedures. If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence.

54 ENVIRONMENTAL SCIENCES↗

2017 Wind Technologies Market Report

The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. Highlights of this year’s report include: -Wind power capacity additions continued at a rapid pace in 2017: $11 billion was invested in new wind power plants in 2017. In 2017, wind energy contributed 6.3% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and more than 30% in four of those states—Iowa, Kansas, Oklahoma, and South Dakota. -Bigger turbines are enhancing wind project performance: Increased blade lengths have dramatically increased wind project capacity factors, one measure of project performance, and taller towers appear to be on the horizon. The average 2017 capacity factor among projects built from 2014 through 2016 was 42%, compared to an average of 31.5% among projects built from 2004 to 2011 and 23.5% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008 to $750–$950/kW. Overall, the average installed cost of wind projects in 2017 was $1,610/kW, down $795/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Oklahoma, Nebraska, Kansas). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The domestic supply chain for wind equipment is diverse: Wind sector employment reached a new high of more than 105,000 full-time workers at the end of 2017. For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (70-90%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the turbine. -Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, various forecasts for the domestic market show expected wind power capacity additions of 8,000 to 11,000 MW/year from 2018 to 2020, with market contraction anticipated beginning in 2021 as those tax incentives are phased out.

17 WIND ENERGY↗

Grassland Ecosystem Management Plan for the Oak Ridge Reservation

Land managers at the Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) in East Tennessee are restoring native warm-season grasses and wildflowers to various sites across the Oak Ridge Reservation (ORR). Some of the numerous benefits to planting native grasses and forbs include improved habitat quality for wildlife, improved aesthetic values, and lower long-term maintenance costs. Native grassland restorations also help meet the goals of two recent presidential memorandums: “Incorporating Ecosystem Services into Federal Decision Making” and “Creating a Federal Strategy to Promote the Health of Honey Bees and Other Pollinators.”

54 ENVIRONMENTAL SCIENCES↗

Advanced Vehicle Testing and Evaluation Final Technical Report Encompassing Project Activities From October 1, 2011 to April 30, 2018

The Advanced Vehicle Testing and Evaluation (AVTE) project incorporated the conduct of advanced technology vehicle and infrastructure testing in the U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA). It was the only activity tasked by DOE to conduct independent field evaluations of vehicle technologies that use advanced technology systems and subsystems in vehicles that reduce petroleum consumption. The results are available through reports published on the AVTA website at http://avt.inl.gov/. The AVTE project provided insight into advanced vehicle technology's long-term performance, durability, maintenance, and lifecycle costs that cannot be found elsewhere. The site is a resource for DOE stakeholders and the public to gain knowledge on advanced technology vehicle progress and innovation. Vehicles tested included light and heavy-duty vehicles with conventional, hybrid, plug-in hybrid, and all-electric propulsion systems. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: Development and refinement of test procedures, which established testing procedures; Baseline performance testing, which established a performance baseline; Accelerated reliability testing, which determined vehicle reliability; Fleet testing, used to evaluate vehicle economics in fleet operation, and End of test performance evaluation. Test results from all aspects of testing were posted by Idaho National Laboratory (INL) to their website. This final report documents work conducted for the entirety of contract DE-EE0005501 by Intertek Testing Services NA, Inc. (Intertek). The contract was performed from October 1, 2011 through April 30, 2018, and includes 18 amendments to the original award with the most recent Amendment 18 dated March 28, 2018. The final budget for the AVTE project totaled 20,220,873 dollars. As a cooperative agreement, Intertek was obligated to provide cost share of 4,044,175 dollars, leaving 16,176,698 dollars as the Federal share of the agreement. Actual total expenditure for the AVTE project was 20,286,850 dollars. The full 16,176,698 dollars Federal share was expended and 4,110,152 dollars of cost share was provided by Intertek. This resulted in an over-share of 65,977 dollars. There were 106 light-duty on-road vehicles vehicles tested in both fleet and accelerated reliability testing. One additional vehicle was rented to obtain performance testing only. Three heavy-duty truck and trailer combinations were tested as part of the semi-autonomous driving with heavy-duty vehicles in a platoon. Overall project scope and direction was determined between Intertek, DOE, and technical teams from Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and National Renewable Energy Laboratory (NREL). The project was administered by the DOE’s National Energy Technology Laboratory (NETL).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Idaho National Laboratory's FY15 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during Fiscal Year (FY) 2015 by Idaho National Laboratory (INL), a Department of Energy (DOE) sponsored entity, located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13693 requires that federal agencies and institutions document reductions in GHG emissions. INL’s GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries, but are a consequence of INL’s activities). This inventory found that INL generated 58,330 metric tons (MT) of CO 2 equivalent (CO 2 e ) emissions during FY15. The following conclusions were made from looking at the results of the individual contributors to INL’s FY15 GHG inventory: • Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO 2 e emissions • Other sources with high emissions were employee commuting, mobile combustion (fleet fuels), stationary combustion (facility fuels), business air travel, and waste disposal (including fugitive emissions from the onsite landfill and contracted disposal) • Sources with low emissions were wastewater treatment (onsite and contracted), business ground travel (in personal and rental vehicles), and fugitive emissions from refrigerants. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only the Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

99 GENERAL AND MISCELLANEOUS↗

Pre-Event Recovery Sampling and Analysis Framework for Blue Grass CSEPP Community

Congress created the Chemical Stockpile Emergency Preparedness Program (CSEPP) in 1985 (U.S. Department of Defense [DOD] Authorization Act, 1986, Public Law 99-145) to provide emergency preparedness assistance and resources to communities surrounding Army chemical warfare agent stockpiles. CSEPP is a partnership between the Federal Emergency Management Agency (FEMA) and the U.S. Department of the Army (Army), and includes elements of the federal, state, and local government at each of the stockpile sites.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Draft Technical Impracticability Evaluation for Iodine-129 in Groundwater at Hanford: 200-UP-1 Operable Unit

Target restoration cleanup levels for contaminated groundwater are established by applicable or relevant and appropriate requirements (ARARs) determined by federal and state drinking water quality standards. When these standards cannot be met within a reasonable timeframe due to limitations of available remediation technologies or other factors, the U.S. Environmental Protection Agency (EPA) may evaluate the technical impracticability (TI) of attaining the required groundwater cleanup levels, and establish alternative, protective remedial strategies. This report provides information relevant to consideration of a TI waiver on the current federal 1 pCi/L drinking water standard (DWS) for iodine-129 in the 200-UP-1 Groundwater Operable Unit (OU) of the Hanford Site if ongoing evaluations of treatment options do not identify a feasible treatment technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FERC Hydropower Licensing: A Review of Utilization of the ILP, TLP, and ALP

A preliminary consideration for license applicants seeking to develop non-federal hydropower projects includes determining whether the Federal Energy Regulatory Commission (FERC) has authority over the development, and if so, what licensing procedures are required or may be an option for authorizing the project. Projects subject to FERC jurisdiction, which do not meet the qualification requirements for an exemption from FERC hydropower licensing, must complete the FERC hydropower licensing process utilizing one of FERC's three licensing processes: The Integrated Licensing Process (ILP), Traditional Licensing Process (TLP), or Alternative Licensing Process (ALP). Effective after July 23, 2005, the ILP became the default hydropower licensing process under the FPA [18 CFR Section 5.3(a)(2)] and any license applicant seeking to use the TLP or ALP is now required to submit to FERC a request to use the TLP or ALP with their Notice of Intent (NOI) and Pre-Application Document (PAD) and receive approval before initiating either of those processes.

13 HYDRO ENERGY↗

Risk Management Framework Process Map

The purpose of this document is to provide an overview of the Risk Management Framework (RMF) codified in National Institute of Standards & Technology (NIST) Special Publication (SP) 800-37r1 for the Federal Energy Management Program (FEMP). This document, while accurate, is not an authoritative source on the management of federal information systems. However, the concepts and process discussed herein are representative of the data points used to compare the RMF with NIST’s Framework for Improving Critical Infrastructure Cybersecurity , otherwise known as the cybersecurity framework .

97 MATHEMATICS AND COMPUTING↗

Marine Sciences Laboratory Radionuclide Air Emissions

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Marine Sciences Laboratory (MSL), located on Battelle Land-Sequim. The facility has two buildings with the potential to emit low levels of radioactive materials. DOE-SC contracted for exclusive use of its radiological operations effective October 1, 2012. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants , Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, Radiation Protection–Air Emissions . Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The MSL has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the MSL MEI due to routine operations in 2016 was 5.7E-04 mrem (5.7E-06 mSv). No non-routine emissions occurred in 2016. The MSL is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2016

This report documents radionuclide air emissions that result in the 2016 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code (WAC) Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2016 from PNNL Richland Campus sources is 5.8E-4 mrem (5.8E-6 mSv) EDE. The dose from all fugitive sources is 1.9E-6 mrem (1.9E-8 mSv) EDE. The dose from radon emissions is 1.3E-8 mrem (1.3E-10 mSv) EDE. No nonroutine emissions occurred in 2016. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 5.8E-4 mrem (5.8E-6 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Marine Sciences Laboratory Radionuclide Air Emissions Report for Calendar Year 2017

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Marine Sciences Laboratory (MSL), located on Battelle Land-Sequim. The facility has two buildings with the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, Radiation Protection–Air Emissions. Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The MSL has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the MSL MEI due to routine operations in 2017 was 1.6E-04 mrem (1.6E-06 mSv). No non-routine emissions occurred in 2017. The MSL is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2017

This report documents radionuclide air emissions that result in the 2017 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2017 from PNNL Richland Campus sources is 2.1E-5 mrem (2.1E-7 mSv) EDE. The dose from all fugitive sources is 2.1E-6 mrem (2.1E-8 mSv) EDE. The dose from radon emissions is 3.9E-10 mrem (3.9E-12 mSv) EDE. No nonroutine emissions occurred in 2017. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 2.3E-5 mrem (2.3E-7 mSv) EDE, or more than 10,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

Resilience Roadmap: A Collaborative Approach to Multi-Jurisdictional Resilience Planning

Extreme weather and aging infrastructure are creating unprecedented challenges in the United States and around the globe. Many communities have suffered damages from a variety of weather-related events, such as severe weather such as hurricanes, droughts, increasing temperatures, wildfires, and storm surges. Numerous efforts exist to improve resilience to protect national security, energy and water security, economic well-being, and quality of life. As severe weather events increase in frequency and severity, many cities, states, tribes, and federal agencies are addressing the impacts through resilience planning and measures. In an effort to support communities with resilience planning, the White House Council on Environmental Quality (CEQ) initiated preparedness pilot projects designed to showcase community resilience planning in the City of Houston and the State of Colorado. This publication is the full, technical document, for the Colorado pilot project. The process is also summarized in a user-friendly web-version on NREL's website (visit www.nrel.gov/resilience-planning-roadmap) for easier access and replicability. NASA's pilot project with the City of Houston is summarized separately (visit https://toolkit.climate.gov/case-studies/climate-resilience to learn more). water security, economic well-being, and quality of life. As severe weather events increase in frequency and severity, many cities, states, tribes, and federal agencies are addressing the impacts through resilience planning and measures. In an effort to support communities with resilience planning, the White House Council on Environmental Quality (CEQ) initiated preparedness pilot projects designed to showcase community resilience planning in the City of Houston and the State of Colorado. This publication is the full, technical document, for the Colorado pilot project. The process is also summarized in a user-friendly web-version on NREL's website (visit www.nrel.gov/resilience-planning-roadmap) for easier access and replicability. NASA's pilot project with the City of Houston is summarized separately (visit https://toolkit.climate.gov/case-studies/climate-resilience to learn more).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power Market Primers

The National Energy Technology Laboratory (NETL) has developed a series of primers on independent system operators (ISOs) and regional transmission organizations (RTOs). The primers primarily explore the history, workings, and types of electricity markets composing the seven ISOs/RTOs in the United States (U.S.) (Exhibit 1-1). The primer series includes sixteen documents. A general introduction to ISOs/RTOs is given in Independent System Operators and Regional Transmission Organizations. Specific details about the seven existing ISOs/RTOs in the United States are given in seven additional primers: California Independent System Operator, ERCOT Independent System Operator, ISO New England Regional Transmission Operator, MISO Regional Transmission Operator, New York Independent System Operator, PJM Regional Transmission Operator, and Southwest Power Pool, Inc. These primers provide a history of each ISO/RTO, short explanations of products and services (different types of electricity markets) offered by ISO/RTO, and the ISO/RTO generation mix. Readers who are not familiar with the different types of markets and their mechanisms can find basic information in six additional primers titled: Power Markets, Energy Market, Capacity Market, Comparisons of Different ISO/RTO Capacity Market Structures, Ancillary Services, and Financial Transmission Rights. Additionally, the primer North American Electric Reliability Corporation introduces the electric reliability organization, which is responsible for reliability of the bulk power system and Federal Energy Regulatory Commission introduces the federal commission responsible for overseeing the nation's electric power markets and related energy and financial markets and issuing market related rules and regulations. All the primers are very short and concise documents. They are accompanied by a Glossary of Terms in which many of the technical terms used in these primers are defined.

24 POWER TRANSMISSION AND DISTRIBUTION↗