Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL)-Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems.

54 ENVIRONMENTAL SCIENCES↗

ILAW Container Cost Reduction and Optimization Study

This study, performed on behalf of Washington River Protection Solutions (WRPS), examines the potential for making cost savings for the Immobilized Low Active Waste (ILAW) containers over the mission life of the Waste Treatment and Immobilization Plant (WTP). it builds on earlier study assessments 24590-LAW-RPT-M-01-001 Rev 0 ILAW Product Container Specifications Optimization Study and DOE/ORP-2013-02 Rev 0 Decision Analysis of Low-Active Waste Container Finishing Handling System Alternatives. The WTP design and installed equipment has evolved over an extended period ~20 years. Consequently, some of the existing requirements relating the ILAW containers may no longer be applicable under current mission plans where the glass filled containers are placed into the Integrated Disposal Facility (IDF) rather than stacked in an engineered purpose-built ventilated store as originally envisioned. The study team reviewed available WTP project reference documents to establish the functions the container must perform and assign requirements against each of these functions. With the assumptions that some of the existing WTP contract restrictions would not necessarily apply to the subsequent facility operations contract the container requirements were reviewed to identify those which were ‘hard constraints‘, imposed by regulatory requirements. Initially each of these hard constraints were reviewed, evaluated and documented to see if they precluded the use of an alternate less expensive material of construction, carbon steel, to the existing 304 L stainless steel in the current container specification. That review did not generate any fatal flaws for a change in material of construction to carbon steel allowing the study team to examine the impacts of material cost savings, potential changes to the design and requirements and impacts on interfaces of the containers with the existing WTP process equipment from container receipt, transfers, glass filling, cooling and export. In addition, a change in container target fill level was evaluated and qualitative, and quantitative where feasible, impacts to the container fabrication process assessed. Lastly, additional follow on development or testing activities to support the use of carbon steel were assessed and a recommended path forward with a ROM cost and timescale developed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancing Development of Emissions Detection (Final Report)

This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.

42 ENGINEERING↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

54 ENVIRONMENTAL SCIENCES↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Laser Powder Bed Fusion Additive Manufacture Nb1Zr Development

Next generation fission and fusion nuclear reactors require materials that can withstand operating temperatures greater than 500 °C, neutron irradiation doses of up to 200 displacements per atom (dpa), and potentially corrosive coolants such as the alkali liquid metals sodium, lithium, and NaK (Na33K eutectic alloy). Refractory alloys, such as Nb1Zr (Nb-1wt%Zr) and Molybdenum alloy TZM (Mo-0.5wt%Ti-0.08wt%Zr) have been traditionally considered viable candidates for advanced fission and fusion reactor concepts. However, it is relatively difficult to generate complex geometries of interest from these alloys using traditional manufacturing methods. In addition, there needs to be a concentrated effort to address refractory metal challenges at elevated temperature operation. In order to generate complex geometries of interest, modern manufacturing techniques are considered to increase the technological readiness level (TRL), cost-effectiveness, and schedule savings. This work focused on the continued development of laser powder bed fusion (L-PBF) additive manufacturing (AM) to improve both design flexibility, evaluate microstructure and properties, and ultimately accelerate the TRL and qualification of these processes and alloys for components to potentially be put into service. Niobium alloy Nb1Zr was identified through a down-selection process outlined in previous reports as a candidate to develop in L-PBF AM. Historically, Nb1Zr had been explored for high temperature fast spectrum fission reactors for both terrestrial and space applications. Molybdenum alloy TZM has also been considered for these reactor concepts due to exceptional high-temperature strength, creep resistance, and stability under irradiation. L-PBF AM of TZM has previously been investigated at LANL under the Microreactor program, NASA, ORNL, and in academia. However, due to the crack prone nature of TZM, L-PBF AM of TZM resulted in significant microcracking and additional development is required to pursue viable maturation. Other AM methods have been found to be more successful in printing TZM, and those alternatives approaches are discussed in this effort. The efforts detailed in this report focused on continued development of Nb1Zr through L-PBF and development of TZM via L-PBF and electron powder bed fusion (E-PBF). The objective of this work was to further the development of these AM techniques for the chosen refractory alloys, elucidating and addressing associated challenges through characterization of several demonstration builds. At LANL, Nb1Zr builds were completed using an EOS M290 and M400 machines, and a refractory alloy-dedicated L-PBF system, the Xact Metal XM200G, was installed. The XM200G primary purpose was to do the Nb1Zr parameter development process; however, due to difficulties associated with the machine installation and qualification process, it was decided to pivot development to the larger M400 and M290 machines. Although the supply of Nb1Zr powder was limited, it was sufficient to generate sub-scale metallographic specimens for the purpose of parameter development. This was first accomplished on the EOS M400 then the M290 due to machine schedule availability. Further development of TZM has been initiated at the University of Texas El Paso (UTEP) under contract with LANL to use both a heated build envelope L-PBF machine and E-PBF machine that have been found in the literature to mitigate microcracking. UTEP was provided with TZM powder and build plates to support parallel TZM parameter development across both machines. As part of the contract, UTEP will also be conducting microstructural characterization once optimized process parameters have been identified. The optimized process parameters for each machine will be used to generate a series of metallographic, mechanical, and surface finish specimens for subsequent characterization and testing. In the next section, we provide a detailed discussion of the methodology used for investigating the feasibility of leveraging these alloys for use in advanced reactor applications.

36 MATERIALS SCIENCE↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Richland, Washington. U.S. Department of Energy (DOE) contracts to Battelle include Richland facilities on the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) – Richland Campus that have the potential for radionuclide air emissions. The PNNL contract also includes DOE operations at the PNNL-Sequim Campus, in Sequim, Washington, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems.

54 ENVIRONMENTAL SCIENCES↗

NSTTF Voucher Program RPPR-1 (Final Report)

Sandia issued a Request for Proposals (RFP) to solicit proposals from industry, academia, research laboratories, government agencies, and individuals on the use of the National Solar Thermal Test Facility (NSTTF) to increase CSP technology market adoption across the United States. The voucher funds will be used to cover the cost of NSTTF test facilities usage and technical staff support for analysis, design and test planning and execution. Sandia will collect submitted proposals, coordinate their review through DOE SETO, and work in partnership or under contract with the applicants to complete the funded research. Through this program, participants will be supported in their use of the world class facilities and expertise available at the NSTTF at Sandia in Albuquerque, NM to accelerate the advancement of CST technologies toward meeting 2030 SETO goals for CSP. The goals of this semi-annual reporting period were to complete all administrative tasks and contracting, begin testing on three of the vouchers, and report on initial findings. The fourth voucher (University of Michigan) is predicated on the results of an ongoing heat exchanger test that is expected to conclude by the end of FY22.

14 SOLAR ENERGY↗

Hybrid Combustion-Gasification Chemical Looping

For the past several years Alstom Power Inc. (Alstom), a leading world-wide power system manufacturer and supplier, has been in the initial stages of developing an entirely new, ultra-clean, low cost, high efficiency power plant for the global power market. This new power plant concept is based on a hybrid combustion-gasification process utilizing high temperature chemical and thermal looping technology The process consists of the oxidation, reduction, carbonation, and calcination of calcium-based compounds, which chemically react with coal, biomass, or opportunity fuels in two chemical loops and one thermal loop. The chemical and thermal looping technology can be alternatively configured as (i) a combustion-based steam power plant with CO{sub 2} capture, (ii) a hybrid combustion-gasification process producing a syngas for gas turbines or fuel cells, or (iii) an integrated hybrid combustion-gasification process producing hydrogen for gas turbines, fuel cells or other hydrogen based applications while also producing a separate stream of CO{sub 2} for use or sequestration. In its most advanced configuration, this new concept offers the promise to become the technology link from today's Rankine cycle steam power plants to tomorrow's advanced energy plants. The objective of this work is to develop and verify the high temperature chemical and thermal looping process concept at a small-scale pilot facility in order to enable AL to design, construct and demonstrate a pre-commercial, prototype version of this advanced system. In support of this objective, Alstom and DOE started a multi-year program, under this contract. Before the contract started, in a preliminary phase (Phase 0) Alstom funded and built the required small-scale pilot facility (Process Development Unit, PDU) at its Power Plant Laboratories in Windsor, Connecticut. Construction was completed in calendar year 2003. The objective for Phase I was to develop the indirect combustion loop with CO{sub 2} separation, and also syngas production from coal with the calcium sulfide (CaS)/calcium sulfate (CaSO{sub 4}) loop utilizing the PDU facility. The results of Phase I were reported in Reference 1, 'Hybrid Combustion-Gasification Chemical Looping Coal Power Development Technology Development Phase I Report' The objective for Phase II was to develop the carbonate loop--lime (CaO)/calcium carbonate (CaCO{sub 3}) loop, integrate it with the gasification loop from Phase I, and ultimately demonstrate the feasibility of hydrogen production from the combined loops. The results of this program were reported in Reference 3, 'Hybrid Combustion-Gasification Chemical Looping Coal Power Development Technology Development Phase II Report'. The objective of Phase III is to operate the pilot plant to obtain enough engineering information to design a prototype of the commercial Chemical Looping concept. The activities include modifications to the Phase II Chemical Looping PDU, solids transportation studies, control and instrumentation studies and additional cold flow modeling. The deliverable is a report making recommendations for preliminary design guidelines for the prototype plant, results from the pilot plant testing and an update of the commercial plant economic estimates.

01 COAL, LIGNITE, AND PEAT↗

Adsorption of the Lighter Homologs of Element 104 and Element 105 on DGA Resin from Various Mineral Acids

The goal of studying transactinide elements is to further understand the fundamental principles that govern the periodic table. The current periodic table arrangement allows for the prediction of the chemical behavior of elements. The correct position of a transactinide element can be assessed by investigating its chemical behavior and comparing it to that of the homologs and pseudo-homologs of a transactinide element. Homologs of a transactinide element are the elements in the same group of the periodic table as the transactinide. A pseudo-homolog of a transactinide element is an element with a similar main oxidation state and similar ionic radius to the transactinide element. For example, the homologs of rutherfordium, Rf, are titanium, zirconium and hafnium (Ti, Zr and Hf); the pseudo homologs of Rf are thorium, Th, and plutonium, Pu. Understanding the chemical behavior of a transactinide element compared to its homologs and pseudo-homologs also allows for the assessment of the role of relativistic effects. Relativistic effects occur when the velocity of the s orbital electrons closest to the nucleus approaches the speed of light. These electrons approach the speed of light because they have no orbital momentum. This causes two effects, first there is in a decrease in Bohr radius of the inner electronic orbitals because of this there is an increase in particle mass. A contraction of outer s and p orbitals is also seen. The contraction of these orbitals results in an energy destabilization of the outer most shell, in the case of transactinides this would be the 5f and 6d orbitals. The outer most d shell and all f shells can also experience a radial expansion due to these orbitals being screened from the effective nuclear charge. Another relativistic effect is the 'spin-orbit splitting' for p, d and f orbitals into j = 1 {+-} 1/2 states. Where j is the total angular momentum vector and 1 is angular quantum number. All of these effects have the same order of magnitude and increase roughly according to Z. This feature is what makes studying the heavy elements so interesting because the chemical properties of transactinide elements should strongly exhibit these effects. For this work the terms heavy element and transactinide elements will be used interchangeably and are defined as elements with an atomic number greater than 103, Z > 103. In order to study the transactinide elements they must be isolated once they have been produced and transported to a chemistry apparatus. The transactinide elements are produced either via 'hot' or 'cold' fusion reactions. 'Hot' fusion reactions result in excitation energies of the compound nucleus of 40-50 MeV and occur when an actinide target nuclei fuse with a projectile with A < 40, where A is the atomic mass number. 'Cold' fusion results in excitation energies of 10-15 MeV. Cold fusion conditions tend to occur when a target of a spherical nuclei (Pb or Bi) is bombarded with a heavy projectile (A > 40). Hot fusion generally leads to neutron rich isotopes and cold fusion tends to produce a compound nucleus that emits 1-2 neutrons upon de-excitation. If a sufficiently thin target is employed, then the products of the nuclear reaction will recoil out of the target and can either be transported to the chemistry setup, e.g. using a gas jet, or trapped by implementing them on a catcher. An example for a catcher setup using a copper block as a catcher is described here. The copper block is placed behind the target during the irradiation and all nuclei recoiling from the target position will implant themselves in the block. The copper block is subsequently dismounted and sputter cleaned. It is then shaved with a micro-lathe. The 7-10 {micro}m copper shavings are then subjected to chemical separation. The copper is dissolved in aqua regia. Lanthanum carrier is added to the aqua regia to precipitate tri-, tetra- and penta- valent cations when ammonium hydroxide is added. The precipitate is then washed and converted to the nitrate form. This solution is then added onto a cation exchange column, the eluent is deposited and dried on a polypropylene film and then counted on solid state detectors. There are several challenges when studying the chemical behavior of transactinide elements. The first challenge is the low production rate of transactinides. Transactinides are produced on an atom-at-a-time basis, meaning that only one atom is ever available for chemical study. Because of this the chemical system being used must be selective for only one chemical state. The second challenge in transactinide chemistry is the short half-lives of the elements. Half-lives of the transactinides range from nanoseconds to a few hours. This leads to the need for fast chemistry. Another challenge is the need for a high degree of separation from interfering radionuclides so that the event with the transactinide element can be detected.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

54 ENVIRONMENTAL SCIENCES↗

Environment, Safety, and Health Self-Assessment Report, Fiscal Year 2008

Lawrence Berkeley National Laboratory's Environment, Safety, and Health (ES&H) Self-Assessment Program ensures that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The Self-Assessment Program, managed by the Office of Contract Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The functions of the program are to ensure that work is conducted safely, and with minimal negative impact to workers, the public, and the environment. The Self-Assessment Program is also the mechanism used to institute continuous improvements to the Laboratory's ES&H programs. The program is described in LBNL/PUB 5344, Environment, Safety, and Health Self-Assessment Program and is composed of four distinct assessments: the Division Self-Assessment, the Management of Environment, Safety, and Health (MESH) review, ES&H Technical Assurance, and the Appendix B Self-Assessment. The Division Self-Assessment uses the five core functions and seven guiding principles of ISM as the basis of evaluation. Metrics are created to measure performance in fulfilling ISM core functions and guiding principles, as well as promoting compliance with applicable regulations. The five core functions of ISM are as follows: (1) Define the Scope of Work; (2) Identify and Analyze Hazards; (3) Control the Hazards; (4) Perform the Work; and (5) Feedback and Improvement. The seven guiding principles of ISM are as follows: (1) Line Management Responsibility for ES&H; (2) Clear Roles and Responsibilities; (3) Competence Commensurate with Responsibilities; (4) Balanced Priorities; (5) Identification of ES&H Standards and Requirements; (6) Hazard Controls Tailored to the Work Performed; and (7) Operations Authorization. Performance indicators are developed by consensus with OCA, representatives from each division, and Environment, Health, and Safety (EH&S) Division program managers. Line management of each division performs the Division Self-Assessment annually. The primary focus of the review is workplace safety. The MESH review is an evaluation of division management of ES&H in its research and operations, focusing on implementation and effectiveness of the division's ISM plan. It is a peer review performed by members of the LBNL Safety Review Committee (SRC), with staff support from OCA. Each division receives a MESH review every two to four years, depending on the results of the previous review. The ES&H Technical Assurance Program (TAP) provides the framework for systematic reviews of ES&H programs and processes. The intent of ES&H Technical Assurance assessments is to provide assurance that ES&H programs and processes comply with their guiding regulations, are effective, and are properly implemented by LBNL divisions. The Appendix B Performance Evaluation and Measurement Plan (PEMP) requires that LBNL sustain and enhance the effectiveness of integrated safety, health, and environmental protection through a strong and well-deployed system. Information required for Appendix B is provided by EH&S Division functional managers. The annual Appendix B report is submitted at the close of the fiscal year. This assessment is the Department of Energy's (DOE) primary mechanism for evaluating LBNL's contract performance in ISM.

99 GENERAL AND MISCELLANEOUS↗

Special Report "The American Recovery and Reinvestment Act and the Department of Energy"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was signed into law on February 17, 2009, as a way to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in science and health, and invest in the Nation's energy future. This national effort will require an unprecedented level of transparency and accountability to ensure that U.S. citizens know where their tax dollars are going and how they are being spent. As part of the Recovery Act, the Department of Energy will receive more than $38 billion to support a number of science, energy, and environmental initiatives. Additionally, the Department's authority to make or guarantee energy-related loans has increased to about $127 billion. The Department plans to disburse the vast majority of the funds it receives through grants, cooperative agreements, contracts, and other financial instruments. The supplemental funding provided to the Department of Energy under the Recovery Act dwarfs the Department's annual budget of about $27 billion. The infusion of these funds and the corresponding increase in effort required to ensure that they are properly controlled and disbursed in a timely manner will, without doubt, strain existing resources. It will also have an equally challenging impact on the inherent risks associated with operating the Department's sizable portfolio of missions and activities and, this is complicated by the fact that, in many respects, the Recovery Act requirements represent a fundamental transformation of the Department's mission. If these challenges are to be met successfully, all levels of the Department's structure and its many constituents, including the existing contractor community; the national laboratory system; state and local governments; community action groups and literally thousands of other contract, grant, loan and cooperative agreement recipients throughout the Nation will have to strengthen existing or design new controls to safeguard Recovery Act funds.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Arctic Energy Technology Development Laboratory

The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. In the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.

01 COAL, LIGNITE, AND PEAT↗

This Letter is a Non-Technical Annual Report of Activities on Project 2007-275-00, Impact of American Shad for the Period February 1, 2008 through January 31, 2009.

This letter is a non-technical annual report of activities on Project 2007-275-00, Impact of American Shad for the period February 1, 2008 through January 31, 2009. A non-technical report is appropriate at this time since data collection is ongoing and results are preliminary. This report is intended to highlight accomplishments during this performance period. Progress on administrative work elements in the statement of work has been captured in the periodic status reports provided through Pisces. During this performance period the USGS accomplished the following tasks: (1) Co-chaired a symposium on American shad in the Columbia Basin at the annual meeting of the Western Division, American Fisheries Society. The USGS gave four presentations from work done during this project. Abstracts of the presentations were attached to the 2007 progress report. (2) Continued parameterization of a bioenergetics model for juvenile American shad. We performed a literature review to determine the applicability of the existing adult salmon bioenergetics parameters to juvenile fall Chinook salmon in support of our modeling investigation of diet overlap between juvenile American shad and fall Chinook salmon. We formulated testable hypotheses to investigate using bioenergetics models and conceptually developed model simulations. Held an in-house workshop to obtain feedback on the physiological parameters we selected for the American shad bioenergetics model and to solicit feedback on our modeling approach to address research questions. (3) Received a Section 10 ESA sampling permit based on the application submitted in the 2007 contract period. With the ESA permit in hand, we obtained scientific collection permits from the states of Washington and Oregon that allowed us to use a variety of fisheries sampling techniques to capture juvenile and adult American shad. (4) Conducted field sampling to meet project objectives. Gillnetting efforts to capture adult American shad near Astoria were discontinued in accordance with our ESA permit after encountering a higher-than-expected number of salmonids. Only 30 PIT-tagged adult pre-spawn American shad were released. Another 53 adults were processed for diet and population characterization. Collection objectives for adult pre-spawn fish were met for areas downstream from Bonneville, John Day, and McNary dams. In October we captured 30 post-spawn adult shad from the McNary Dam forebay for diet analysis. Collection objectives for juvenile American shad were met for all four areas. (5) Began laboratory work to enumerate and accomplish dry-weight analysis of prey items from juvenile and adult shad stomachs. (6) Continued to exchange information and develop relations with others interested in American shad research. As an example, at the request of the U.S. Fish and Wildlife Service, Northeast Fishery Center, Lamar, PA, we provided tissue samples from adult Columbia River American shad for use in genetic comparisons with Hudson River fish. Key findings during this contract period: (1) Determined that prevalence of Ichthyophonus infection among adult American shad was the highest level detected in any population of fish throughout the Pacific region. A manuscript describing results is in preparation. (2) Thiaminase specific activity assessed from Columbia River juvenile and adult American shad is higher than that of forage fish of salmonines in the Great Lakes. The consumption of forage fish high in thiaminase can lead to thiamine deficiency in the predator if the diet of the predators contains little other prey. (3) Adult American shad are feeding during their freshwater migration. Plans for next year: (1) Completing laboratory analysis of the gut contents of juvenile and adult American shad collected. (2) Completing bioenergetics model parameterization and testing hypotheses. (3) Describing the age composition of the adult American shad run during the 2008 spawning migration via aging of scales and otoliths. (4) Providing a draft final report describing project tasks and findings.

13 HYDRO ENERGY↗

StreamNet Project : Annual Report Fiscal Year 2008.

Fiscal Year 2008 (FY-08) represents a transitional year for the StreamNet project. While the project continued to acquire/update, standardize, georeference and disseminate fish-related data for the state, some tribal and one federal fisheries agencies, it also took on several new initiatives and is anticipating new regional guidance on data needs. Passage of the Columbia Basin Accords caused an administrative change within the project, separating the work done by the Columbia River Inter-Tribal Fish Commission (CRITFC) out to a separate contract with BPA. This will change the structure of the StreamNet contract but not change the relationship with the StreamNet Library or data developed by CRITFC, and will likely increase the availability of tribal data to StreamNet due to increased funding for tribal data efforts. This change will take effect in FY-09. We also expect that data work will be adjusted in the future in response to executive level policy direction in the Columbia Basin based on efforts to establish priorities under a regional data management framework. Data development emphasis was shifted this year to place highest priority on data that support indicators of fish abundance for the focal species covered in the Status of the Resource (SOTR) report, as requested by the Columbia Basin Fish and Wildlife Authority (CBFWA) Data Management Framework Subcommittee. We instituted an XML based web service allowing direct access to data from the project database for CBFWA to update the SOTR report. The project also increased efforts to work with tribal fisheries managers to provide data related assistance and to include tribal data in the StreamNet database. A primary theme this year was exploring means to speed the flow of data. We had ongoing success in our strategic emphasis on increasing automation of data conversion through development of comprehensive database systems within our partner agencies, as outlined in our Vision and Strategic Plan. By assisting development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project's primary means of disseminating fish data, was completely redesigned this year to improve the user experience and make locating and acquiring data simpler. A primary goal was to significantly reduce the sequence of steps needed. The new site was in final testing at the end of the fiscal year, and will go live in the first quarter of FY-09. Use of the website remained strong, with 941,687 total page views representing 345,855 visits from 123,684 unique visitors. There were 18,797 actual views of tabular datasets from the online query system, plus many interactive map views, not counting downloads of the entire database direct data and information requests.

13 HYDRO ENERGY↗

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.

13 HYDRO ENERGY↗