Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Advanced launch system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

A Model-based Approach to Controlling the ST-5 Constellation Lights-Out Using the GMSEC Message Bus and Simulink

Space Technology 5 (ST-5) is a three-satellite constellation, technology validation mission under the New Millennium Program at NASA to be launched in March 2006. One of the key technologies to be validated is a lights-out, model-based operations approach to be used for one week to control the ST-5 constellation with no manual intervention. The ground architecture features the GSFC Mission Services Evolution Center (GMSEC) middleware, which allows easy plugging in of software components and a standardized messaging protocol over a software bus. A predictive modeling tool built on MatLab's Simulink software package makes use of the GMSEC standard messaging protocol to interface to the Advanced Mission Planning System (AMPS) Scenario Scheduler which controls all activities, resource allocation and real-time re-profiling of constellation resources when non-nominal events occur. The key features of this system, which we refer to as the ST-5 Simulink system, are as follows: Original daily plan is checked to make sure that predicted resources needed are available by comparing the plan against the model. As the plan is run in real-time, the system re-profiles future activities in real-time if planned activities do not occur in the predicted timeframe or fashion. Alert messages are sent out on the GMSEC bus by the system if future predicted problems are detected. This will allow the Scenario Scheduler to correct the situation before the problem happens. The predictive model is evolved automatically over time via telemetry updates thus reducing the cost of implementing and maintaining the models by an order of magnitude from previous efforts at GSFC such as the model-based system built for MAP in the mid-1990's. This paper will describe the key features, lessons learned and implications for future missions once this system is successfully validated on-orbit in 2006.

Witt, Kenneth J.↗

Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its associated centers across the US. KSC has found itself at the blunt end of change as the entire center has transitioned from an operations mindset to a development mentality. The author of this paper has had the fortunate privilege and opportunity to be part of a transforming NASA during the fall months of 2014. The following is a high level account of projects that he had the chance to work on including the Spaceport Command and Control System, the Advanced Ground System and Maintenance Program Project, Customer Avionics Development & Analysis (CAIDA) Lab and Swamp Works.

Advanced Ground System Maintenance↗

Astrobee Guest Science Interface

At the end of 2018, Astrobee will launch three free-flying robots that will navigate the entire US segment of the ISS (International Space Station) and serve as a payload facility. The mechanical and electrical interfaces are now established and several payloads are being developed. Payload Interface: Astrobee is designed to host third party guest science program payloads (GSP payloads). Some GSP payloads may be software only, such as the Zero Robotics Finals Competition, which is currently hosted on SPHERES, and which will transition to Astrobee in 2019. Several GSP payloads with custom hardware, such as the Advanced Exploration Systems (AES) Logistics Reduction and Repurposing (LRR) Project RFID reader, are already under development. These payloads will attach in the Astrobee payload bay.

Barlow, J.↗

Application of hybrid propulsion systems to planetary missions

The feasibility and application of hybrid rocket propulsion to outer-planet orbiter missions is assessed in this study and guidelines regarding future development are provided. A Jupiter Orbiter Mission was selected for evaluation because it is the earliest planetary mission which may require advanced chemical propulsion. Mission and spacecraft characteristics which affect the selection and design of propulsion subsystems are presented. Alternative propulsion subsystems, including space-storable bipropellant liquids, a solid/monopropellant vernier, and a hybrid, are compared on the basis of performance, reliability, and cost. Cost-effectiveness comparisons are made for a range of assumptions including variation in (1) the level of need for spacecraft performance (determined in part by launch vehicle injected mass capability), and (2) achievable reliability at corresponding costs. The results indicated that the hybrid and space-storable bipropellant mechanizations are competitive.

Don, J. P.↗

Advanced Reusable Foam Cryogenic Insulation

Lightweight, reusable cryogenic containers reduce costs of operation of advanced hypersonic airplanes and space launch vehicles. Specimens demonstrated in temperature range of negative 420 to positive 400 degrees F (negative 251 to positive 204 degrees C). Prototype reusable cryogenic foam insulation developed. Consists of two discrete layers of closed-cell polymethacrylimide foam of density 6.9 lb/ft to the 3rd power (111 kg/m to the 3rd power) bonded together with epoxy adhesive. Additionally reinforced with 0.003-in. (0.08-mm)-thick layer of fiberglass cloth. Wrapped with precut and preformed vapor-barrier cover. Such containers useful on Earth in laboratories, factories, and transportation systems.

Taylor, Allan H.↗

The Deep Space 1 and Space Technology 4/Champollion Missions

NASA's New Millennium Program (NMP) is designed to develop, test, and flight validate new, advanced technologies for planetary and Earth exploration missions, using a series of low cost spacecraft. Two of NMP's current missions include encounters with comets and asteroids. The Deep Space 1 mission was launched on October 24, 1998 and will fly by asteroid 1992 KD on July 29, 1999, and possibly Comet Wilson-Harrington and/or Comet Borrelly in 2001. The Space Technology 4/Champollion mission will be launched in April, 2003 and will rendezvous with, orbit and land on periodic Comet Tempel 1 in 2006. ST-4/Champollion is a joint project with CNES, the French space agency. The DS-1 mission is going well since launch and has already validated several major technologies, including solar electric propulsion (SEP), solar concentrator arrays, a small deep space transponder, and autonomous navigation. The spacecraft carries two scientific instruments: MICAS, a combined visible camera and UV and IR spectrometers, and PEPE, an ion and electron spectrometer. Testing of the science instruments is ongoing. Following the asteroid encounter in July, 1999, DS-1 will go on to encounters with one or both comets if NASA approves funding for an extended mission. The ST-4/Champollion mission will use an advanced, multi-engine SEP system to effect a rendezvous with Comet P/Tempel 1 in February, 2006, after a flight time of 2.8 years. After orbiting the comet for several months in order to map its surface and determine its gravity field, ST-4/Champollion will descend to the comet's surface and will anchor itself with a 3-meter long harpoon. Scientific experiments include narrow and wide angle cameras for orbital mapping, panoramic and near-field cameras for landing site mapping, a gas chromatograph/mass spectrometer, a combined microscope and infrared spectrometer, and physical properties probes. Cometary samples will be obtained from depths up to 1.4 meters. The spacecraft is solar powered with rechargeable batteries, thus allowing a long duration mission on the nucleus surface. At the time of this writing, the ST-4/Champollion spacecraft was undergoing a major redesign to fit within NASA cost constraints, and approval of the mission is pending.

Weissman, Paul R.↗

Comet and Asteroid Missions in NASA's New Millennium Program

NASA's New Millennium Program (NMP) is designed to develop, test, and flight validate new, advanced technologies for planetary and Earth exploration missions, using a series of low cost spacecraft. Two of NMP's current missions include encounters with comets and asteroids. The Deep Space 1 mission was launched on October 24, 1998 and will fly by asteroid 1992 KD on July 29, 1999, and possibly Comet Wilson-Harrington and/or Comet Borrelly in 2001. The Space Technology 4/Champollion mission will be launched in April, 2003 and will rendezvous with, orbit and land on periodic Comet Tempel 1 in 2006. ST-4/Champollion is a joint project with CNES, the French space agency. The DS-1 mission is going well since launch and has already validated several major technologies, including solar electric propulsion (SEP), solar concentrator arrays, a small deep space transponder, and autonomous navigation. The spacecraft carries two scientific instruments: MICAS, a combined visible camera and UV and IR spectrometers, and PEPE, an ion and electron spectrometer. Testing of the science instruments is ongoing. Following the asteroid encounter in July, 1999, DS-1 will go on to encounters with one or both comets if NASA approves funding for an extended mission. The ST-4/Champollion mission will use an advanced, multi-engine SEP system to effect a rendezvous with Comet P/Tempel 1 in February, 2006, after a flight time of 2.8 years. After orbiting the comet for several months in order to map its surface and determine its gravity field, ST-4/Chainpollion will descend to the comet's surface and will anchor itself with a 3-meter long harpoon. Scientific experiments include narrow and wide angle cameras for orbital mapping, panoramic and near-field cameras for landing site mapping, a gas chromatograph/mass spectrometer, a combined microscope and infrared spectrometer, and physical properties probes. Cometary samples will be obtained from depths up to 1.4 meters. The spacecraft is solar powered with rechargeable batteries, thus allowing a long duration mission on the nucleus surface. At the time of this writing, the ST-4/Champollion spacecraft was undergoing a major redesign to fit within NASA cost constraints, and approval of the mission is pending.

Weissman, Paul R.↗

Telemetry Tracking and Control Through Commercial LEO Satellites

Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF in Virginia have successfully tested commercial LEO communications satellites for sounding rocket, balloon and aircraft flight TT&C. The Flight Modern became a GSFC/WFF Advanced Range Technology Initiative (ARTI) in an effort to streamline TT&C capability to the user community at low cost. Ground tests of the Flight Modem verified duplex communications quality of service and measured transmission latencies. These tests were completed last year and results reported in the John Hopkins University (JHU) Applied Physics Laboratory (APL) 4th International Symposium on Reducing Spacecraft Costs for Ground Systems and Operations. The second phase of the Flight Modem baseline test program was a demonstration of the ruggedized version of the WFF Flight Modem flown on a sounding rocket launched it the Swedish rocket range (Esrangc) near Kiruna, Sweden, with results contained in this paper. Aircraft flight tests have been and continue to be conducted. Flights of opportunity are being actively pursued with other centers, ranges and users at universities. The WFF Flight Modem contains a CPS receiver to provide vehicle position for tracking and vehicle recovery. The system architecture, which integrates antennas, CPS receiver, commercial satellite packet data modem and a single board computer with custom software, is described. Small satellite use of the WFF Flight Modem is also being investigated, The Flight Modem provides an independent vehicle position source for Range Safety applications. The LEO communication system contains a coarse position location system, which is compared to GPS ace acy. This comparison allows users, to determine the need for a CPS receiver in addition to the satellite packet data modem for their application.

Streich, Ronald C.↗

Cutting More than Metal: Breaking Through the Development Cycle

NASA is advancing a new development approach and new technologies in the design construction, and testing of the next great launch vehicle for space exploration. The ability to use these new tools is made possible by a learning culture able to embrace innovation, flexibility, and prudent risk tolerance, while retaining the hard-won lessons learned through the successes and failures of the past. This paper provides an overview of the Marshall Space Flight Center's new approach to launch vehicle development, as well as examples of how that approach has been leveraged by NASA's Space Launch System (SLS) Program to achieve its key goals to safety, affordability, and sustainability.

Singer, Christopher E.↗

Government Personnel Participation in Suborbital Space Flight

In 2020, NASA issued a Request for Information (RFI) from potential sources for Suborbital Crew (SubC) space transportation services. NASA recognizes the advancement of the commercial suborbital space flight industry and is currently working to develop suborbital transportation for Government personnel that could fly on commercially available suborbital vehicles and determine a systems qualification approach for flight risk acceptance. Prior examples of risk assessment such as the purchase of Soyuz missions serve as a foundation for how the US Government’s best technical experts can partner with a successfully flying industry provider to understand risks. More recently, NASA, the FAA, and industry have successfully demonstrated that a company-owned operation with government oversight can successfully launch Government Astronauts safely. This paper explores the challenges and opportunities presented with the use of suborbital vehicles by Government personnel and how industry might leverage the Government’s efforts to maximize the success of the suborbital space industry.

Risk Management↗

ECS Artemis II Upgrades

The National Aeronautics and Space Administration (NASA) actively works to further the expectations of space exploration and research. NASA has been able to develop innovative technology and methods that has allowed for continued discovery and innovation. NASA is in the midst of work for the Artemis mission, which is to return to the moon in an effort to prepare for future Mars exploration. After the successful launch of Artemis I last November, our sights have shifted to Artemis II, which is set to launch next year and bring humans into the lunar orbit for the first time in over fifty years. Artemis II will be the first crewed mission for the program and will represent another step forward in our mission to advance our knowledge of the universe around us. From there, the Artemis program will move onto building a permanent site on the moon that will allow us to eventually reach Mars. During my time at NASA, I was able to work with the NE-XF Branch, also known as the Environmental and Life Support Systems Branch. I specifically worked with the Environmental Control Systems (ECS) team. During my time here, construction on the system in the Vehicle Assembly Building (VAB) and at Launchpad 39B have been progressing at full force. ECS is used to provide processed and purged air at specific temperatures, pressures, and humidity’s to fulfill requirements necessary to support Orion and the SLS. While the Pad has been undergoing upgrades from the original Artemis I configuration, the VAB has a completely new ECS very similar to it. While both systems have been undergoing upgrades, we have been able to transition into testing the systems as we prepare for stacking in the VAB early next year. My role has allowed me to learn about how the systems work and function through walkdowns and visits out to both the Pad and the VAB. I’ve been able to see firsthand how the system operates and have learned how the system affects the vehicle. I’ve been able to shadow my mentor, my coworkers, and COMET operators to oversee the construction efforts of the system along with the testing of the software and the system itself. I even was able to aid in testing at the console myself at Pad 39B. Additionally, I am also revising and reviewing displays for Artemis IV that will be used to remotely control parts of the system. Eventually these displays will be used to support the future of Artemis.

Monique Toon↗

Exploring the Potential of Hydrogen as a Lift Gas for Nasa’s Scientific Balloon Program

The United States National Aeronautics and Space Administration (NASA) Balloon Program has a rich history of conducting scientific research in the stratosphere, offering a unique platform for experiments in the near-space environment. One critical component of these high-altitude balloons is the choice of lift gas, which is pivotal to achieving the desired altitude and, thus, mission objectives. Traditionally, helium has been the preferred lift gas due to its inert properties and safety considerations. However, the increasing demand and limited global helium reserves have prompted NASA to explore alternative lift gases, with hydrogen emerging as the most logical choice. Hydrogen boasts several advantages, including its abundant availability, cost-effectiveness, and enhanced lift capability compared to helium. Moreover, it can support a wide range of scientific payloads, enabling extended mission durations and increased payload capacities, ultimately strengthening the program’s scientific potential. However, adopting hydrogen as a lift gas is not without challenges. Safety concerns, especially during the launch and recovery phases, are paramount. NASA and the other major players in the scientific ballooning community have been developing stringent safety protocols and engineering solutions to mitigate these risks. This development includes specialized support systems, leak detection mechanisms, and enhanced launch and recovery procedures. Additionally, environmental considerations must be carefully evaluated. Hydrogen release has the potential to increase concentrations of various greenhouse gases, and its usage must be balanced against the benefits it offers to scientific research and exploration. This paper delves into the ongoing research and development efforts to ensure balloon-based research’s long-term sustainability and its ability to continue pushing the boundaries of scientific discovery. This research demonstrates NASA’s commitment to innovation, safety, and environmental responsibility while maintaining its mission to advance our understanding of the Earth and the cosmos.

balloon↗

Doubling off-axis electron cyclotron current drive efficiency via velocity space engineering

For the first time, experiments on the DIII-D tokamak have demonstrated electron cyclotron current drive with more than double the conventional efficiency by tailoring the wave–particle interactions in velocity space using a novel ‘top launch’ geometry. Steering the EC waves to propagate nearly parallel to the resonance drives current more efficiently by (1) selective damping on electrons with higher parallel velocity v ||, and (2) longer absorption path to compensate for inherently weaker absorption at higher v ||. Experiments using a fixed-injection top launch system find an optimal velocity space interaction for maximum current drive efficiency at ρ ~ 0.5 where the ease of drawing out a high v || electron tail is balanced by sufficient absorption.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Second AIAA/NASA USAF Symposium on Automation, Robotics and Advanced Computing for the National Space Program

An introduction is given to NASA goals in the development of automation (expert systems) and robotics technologies in the Space Station program. Artificial intelligence (AI) has been identified as a means to lowering ground support costs. Telerobotics will enhance space assembly, servicing and repair capabilities, and will be used for an estimated half of the necessary EVA tasks. The general principles guiding NASA in the design, development, ground-testing, interactions with industry and construction of the Space Station component systems are summarized. The telerobotics program has progressed to a point where a telerobot servicer is a firm component of the first Space Station element launch, to support assembly, maintenance and servicing of the Station. The University of Wisconsin has been selected for the establishment of a Center for the Commercial Development of Space, specializing in space automation and robotics.

Myers, Dale↗

Analysis of Gaps in Techno-Economic Analysis to Advance Heliostat Technologies for Concentrating Solar-Thermal Power

The Heliostat Consortium (HelioCon) was launched in 2021 to advance heliostat technology. One of its first efforts was to do a detailed analysis of gaps in technology and capabilities in the heliostat industry and complete a roadmap study describing high-priority gaps. HelioCon gathered gaps through a series of outreach activities with representatives and experts from industries and research institutes. Here, this paper discusses the gap analysis for the techno-economic analysis (TEA) topic. One of the main objectives of the TEA topic is to relate the cost and performance of heliostats and heliostat components to the overall system performance. In this study, we limit the scope of this topic to the heliostat field, tower, and receiver and do not consider downstream applications or uses of thermal energy. We conducted a thorough review of existing models and compiled a list of the state of the art in open-source tools currently available to researchers. We collected an initial list of gaps for the TEA of heliostats from industry developers and experts. Each gap is briefly described, and the heliostat development cycle stages that the gap impacts are indicated. We ranked the initial list of TEA gaps into tiers depending on their potential impact. For TEA, most of the gaps identified are related to developing models or data. Strictly speaking, none of these gaps are essential for heliostat development, but all would aid in the heliostat development process.

14 SOLAR ENERGY↗

Enhanced EOS photovoltaic power system capability with InP solar cells

The Earth Observing System (EOS), which is part of the International Mission to Planet Earth, is NASA's main contribution to the Global Change Research Program which opens a new era in international cooperation to study the Earth's environment. Five large platforms are to be launched into polar orbit, two by NASA, two by ESA, and one by the Japanese. In such an orbit the radiation resistance of indium phosphide solar cells combined with the potential of utilizing five micron cell structures yields an increase of 10 percent in the payload capability. If further combined with the advanced photovoltaic solar array the payload savings approaches 12 percent.

Bailey, Sheila G.↗

Performance of a Fuel-Cell-Powered, Small Electric Airplane Assessed

Rapidly emerging fuel-cell-power technologies may be used to launch a new revolution of electric propulsion systems for light aircraft. Future small electric airplanes using fuel cell technologies hold the promise of high reliability, low maintenance, low noise, and - with the exception of water vapor - zero emissions. An analytical feasibility and performance assessment was conducted by NASA Glenn Research Center's Airbreathing Systems Analysis Office of a fuel-cell-powered, propeller-driven, small electric airplane based on a model of the MCR-01 two-place kitplane (Dyn'Aero, Darois, France). This assessment was conducted in parallel with an ongoing effort by the Advanced Technology Products Corporation and the Foundation for Advancing Science and Technology Education. Their project - partially funded by a NASA grant - is to design, build, and fly the first manned, continuously propelled, nongliding electric airplane. In our study, an analytical performance model of a proton exchange membrane (PEM) fuel cell propulsion system was developed and applied to a notional, two-place light airplane modeled after the MCR-01 kitplane. The PEM fuel cell stack was fed pure hydrogen fuel and humidified ambient air via a small automotive centrifugal supercharger. The fuel cell performance models were based on chemical reaction analyses calibrated with published data from the fledgling U.S. automotive fuel cell industry. Electric propeller motors, rated at two shaft power levels in separate assessments, were used to directly drive a two-bladed, variable-pitch propeller. Fuel sources considered were compressed hydrogen gas and cryogenic liquid hydrogen. Both of these fuel sources provided pure, contaminant-free hydrogen for the PEM cells.

Berton, Jeffrey J.↗

Visible Nulling Coronagraph Testbed Results

The Extrasolar Planetary Imaging Coronagraph (EPIC) is a NASA Astrophysics Strategic Mission Concept study and a proposed NASA Discovery mission to image and characterize extrasolar giant planets in orbits with semi-major axes between 2 and 10 AU. EPIC would provide insights into the physical nature of a variety of planets in other solar systems complimenting radial velocity (RV) and astrometric planet searches. It will detect and characterize the atmospheres of planets identified by radial velocity surveys, determine orbital inclinations and masses, characterize the atmospheres around A and F stars, observed the inner spatial structure and colors of inner Spitzer selected debris disks. EPIC would be launched to heliocentric Earth trailing drift-away orbit, with a 5-year mission lifetime. The starlight suppression approach consists of a visible nulling coronagraph (VNC) that enables starlight suppression in broadband light from 480-960 nm. To demonstrate the VNC approach and advance it's technology readiness we have developed a laboratory VNC and have demonstrated white light nulling. We will discuss our ongoing VNC work and show the latest results from the VNC testbed.

Lyon, Richard G.↗