Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

2021-2022 Remote Work Study Final Results

The COVID-19 pandemic has forced many organizations—from national laboratories to private companies—to change their workforce model to incorporate remote work. This study and the summarized results sought to understand the experiences of remote workers and the ways that remote work can impact recruitment and retention, employee engagement, and career development. Sandia, like many companies, has committed to establishing a hybrid work model that will persist postpandemic, and more Sandia employees than ever before have initiated remote work agreements. This parallels the nationwide increase in remote employment and motivates this study on remote work as an enduring part of workforce models.

99 GENERAL AND MISCELLANEOUS↗

The Challenges of Safe Troubleshooting Work

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed. Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident. The primary challenges include: Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state. Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging. Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present. Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency. There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Executive summary of major NuMI lessons learned: a review of relevant meetings of Fermilab's DUSEL Beamline Working Group

We have gained tremendous experience with the NuMI Project on what was a new level of neutrino beams from a high power proton source. We expect to build on that experience for any new long baseline neutrino beam. In particular, we have learned about some things which have worked well and/or where the experience is fairly directly applicable to the next project (e.g., similar civil construction issues including: tunneling, service buildings, outfitting, and potential claims/legal issues). Some things might be done very differently (e.g., decay pipe, windows, target, beam dump, and precision of power supply control/monitoring). The NuMI experience does lead to identification of critical items for any future such project, and what issues it will be important to address. The DUSEL Beamline Working Group established at Fermilab has been meeting weekly to collect and discuss information from that NuMI experience. This document attempts to assemble much of that information in one place. In this Executive Summary, we group relevant discussion of some of the major issues and lessons learned under seven categories: (1) Differences Between the NuMI Project and Any Next Project; (2) The Process of Starting Up the Project; (3) Decision and Review Processes; (4) ES&H: Environment, Safety, and Health; (5) Local Community Buy-In; (6) Transition from Project Status to Operation; and (7) Some Lessons on Technical Elements. We concentrate here on internal project management issues, including technical areas that require special attention. We cannot ignore, however, two major external management problems that plagued the NuMI project. The first problem was the top-down imposition of an unrealistic combination of scope, cost, and schedule. This situation was partially corrected by a rebaselining. However, the full, desirable scope was never achievable. The second problem was a crippling shortage of resources. Critical early design work could not be done in a timely fashion, leading to schedule delays, inefficiencies, and corrective actions. The Working Group discussions emphasized that early planning and up-front appreciation of the problems ahead are very important for minimizing the cost and for the greatest success of any such project. Perhaps part of the project approval process should re-enforce this need. The cost of all this up-front work is now reflected in the DOE cost of any project we do. If we are being held to an upper limit on the project cost, the only thing available for compromise is the eventual project scope.

43 PARTICLE ACCELERATORS↗

Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to manage and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Increasing Extractable Work in Small Qubit Landscapes

An interesting class of physical systems, including those associated with life, demonstrates the ability to hold thermalization at bay and perpetuate states of high free-energy compared to a local environment. In this work we study quantum systems with no external sources or sinks for energy, heat, work, or entropy that allow for high free-energy subsystems to form and persist. We initialize systems of qubits in mixed, uncorrelated states and evolve them subject to a conservation law. We find that four qubits make up the minimal system for which these restricted dynamics and initial conditions allow an increase in extractable work for a subsystem. On landscapes of eight co-evolving qubits, interacting in randomly selected subsystems at each step, we demonstrate that restricted connectivity and an inhomogeneous distribution of initial temperatures both lead to landscapes with longer intervals of increasing extractable work for individual qubits. We demonstrate the role of correlations that develop on the landscape in enabling a positive change in extractable work.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Characterization of Stress Corrosion Cracking Initiation Precursors in Cold-Worked Alloy 690 Using Advanced High-Resolution Microscopy

Although highly cold-worked UNS N06690 has been shown to be susceptible to stress corrosion crack growth in pressurized water reactor primary water, it is unclear whether cold-work promotes stress corrosion crack initiation under constant load test conditions. To evaluate the stress corrosion cracking initiation response, constant load tensile and blunt notch compact tension testing were performed on 21% and 31% cold-worked samples from two thermally treated UNS N06690 materials in 360 °C simulated pressurized water reactor primary water. High-resolution examinations were conducted mid- and post-test to record the evolution of grain boundary precursor damage and intergranular crack nucleation by focused ion beam milling combined with scanning electron microscopy and by transmission electron microscopy. The surface and sub-surface morphology of intergranular cavities, local corrosion and shallow cracks were documented. Nanometer-sized cavities were observed associated with grain boundary carbides in all specimens. The 31% cold-work specimens consistently exhibited shallow intergranular cracks with oxidized crack flanks and a high density of cavities ahead of the oxide front. Three-dimensional distribution of carbides and cavities ahead of the cracked grain boundaries was analyzed to gain mechanistic insights into the processes that lead to crack initiation in highly cold-worked UNS N06690.

36 MATERIALS SCIENCE↗

Closing plenary summary of working group 4 instrumentation and controls for ERL2011

Working group 4 was charged with presentations and discussions on instrumentation and controls with regards to Energy Recovery Linacs (ERL). There were 4 sessions spanning 3.5 hours in which 7 talks were delivered, the first being an invited plenary presentation. The time allotted for each talk was limited to 20-25 minutes in order to allow 5-10 minutes for discussion. Most of the talks were held in joint session with working group 5 (Unwanted Beam Loss). This format was effective for the purpose of this workshop. A final series of discussion sessions were also held with working group 5. Summary of the working group 4 activities, presented in the closing plenary session. We had a plenary presentation on operational performance, experience, and future plans at the existing ERL injector prototype at Cornell. This included instrumentation data, controls system configurations, as well as description of future needs. This was followed by four talks from KEK and RIKEN/SPring-8 that described electron beam instrumentation already in use or under development that can be applied to ERL facilities. The final talks described the ERLs under construction at KEK and BNL. The format of having joint sessions with working group 5 was beneficial as there were a significant number of common topics and concerns with regards to the causes of beam loss, instrumentation hardware, and techniques used to measure and analyze beam loss.

43 PARTICLE ACCELERATORS↗

Working with Workflows: Highlights from 5 years Building Scientific Workflows

In 2006, the SciDAC Scientific Data Management (SDM) Center proposed to continue its work deploying leading edge data management and analysis capabilities to scientific applications. One of three thrust areas within the proposed center was focused on Scientific Process Automation (SPA) using workflow technology. As a founding member of the Kepler consortium [LAB+09], the SDM Center team was well positioned to begin deploying workflows immediately. We were also keenly aware of some of the deficiencies in Kepler when applied to high performance computing workflows, which allowed us to focus our research and development efforts on critical new capabilities which were ultimately integrated into the Kepler open source distribution, benefiting the entire community. Significant work was required to ensure Kepler was capable of supporting large-scale production runs for SciDAC applications. Our work on generic actors and templates have improved the portability of workflows across machines and provided a higher level of abstraction for workflow developers. Fault tolerance and provenance tracking were obvious areas for improvement within Kepler given the longevity and complexity of our target workflows. To monitor workflow execution, we developed and deployed a web-based dashboard. We then generalized this interface and released it so it could be deployed at other locations. Outreach has always been a primary focus of our work and we had many successful deployments across a number of scientific domains while continually publishing and presenting our work. This short paper describes our most significant accomplishments over the past 5 years. Additional information about the SDM Center can be found in the companion paper: The Scientific Data Management Center: Available Technologies and Highlights.

99 GENERAL AND MISCELLANEOUS↗

Heat dissipation systems with hygroscopic working fluid

A heat dissipation system apparatus and method of operation using hygroscopic working fluid for use in a wide variety of environments for absorbed water in the hygroscopic working fluid to be released to minimize water consumption in the heat dissipation system apparatus for effective cooling in environments having little available water for use in cooling systems. The system comprises a low-volatility, hygroscopic working fluid to reject thermal energy directly to ambient air. The low-volatility and hygroscopic nature of the working fluid prevents complete evaporation of the fluid and a net consumption of water for cooling, and direct-contact heat exchange allows for the creation of large interfacial surface areas for effective heat transfer. Specific methods of operation prevent the crystallization of the desiccant from the hygrosopic working fluid under various environmental conditions.

Martin, Christopher L.↗

A Lifeline-Based Approach for Work Requesting and Parallel Particle Advection

Particle advection, a fundamental building block for many flow visualization algorithms, is very difficult to parallelize efficiently. That said, work requesting is a promising technique to improve parallel performance for particle advection. With this work, we introduce a new work requesting-based method which uses the Lifeline scheduling method. To evaluate the impact of this new algorithm, we ran 92 experiments, running at concurrencies as high as 8192 cores, data sets as large as 17 billion cells, and as many as 16 million particles, comparing against other work requesting scheduling methods. Overall, our results show that Lifeline has significantly less idle time than other approaches, since it reduces the number of failed attempts to request work.

Pugmire, Dave↗

Heat dissipation systems with hygroscopic working fluid

A heat dissipation system apparatus and method of operation using hygroscopic working fluid for use in a wide variety of environments for absorbed water in the hygroscopic working fluid to be released to minimize water consumption in the heat dissipation system apparatus for effective cooling in environments having little available water for use in cooling systems. The system comprises a low-volatility, hygroscopic working fluid to reject thermal energy directly to ambient air. The low-volatility and hygroscopic nature of the working fluid prevents complete evaporation of the fluid and a net consumption of water for cooling, and direct-contact heat exchange allows for the creation of large interfacial surface areas for effective heat transfer. Specific methods of operation prevent the crystallization of the desiccant from the hygrosopic working fluid under various environmental conditions.

42 ENGINEERING↗

New work on updating and extending the nuclear data standards

An International Atomic Energy Agency (IAEA) Data Development Project was initiated to provide a mechanism for allowing new experimental data and improvements in evaluation procedures to be incorporated into new evaluations of the standards. The work on this project is ongoing. In the past very long periods sometimes occurred between evaluations of the standards. Through the use of this Project, such long periods should not occur. Work on the cross section standards through this Project has included an update of the experimental data to be used in the cross section standards evaluations, a study of the uncertainties obtained in the international standards evaluation, and improvements in the smoothing procedure for capture cross sections. It was decided that this Project should have a broader range of activities than just the cross section standards and thus encompass standards related activities. The following are being investigated: improvements in the gold cross section at energies below where it is considered a standard and work on certain cross sections that are not as well known as the cross section standards but could be very useful as reference cross sections relative to which certain types of cross section measurements can be made. This work includes prompt gamma-ray production in fast neutron-induced reactions, and work on the {sup 252}Cf spontaneous fission neutron spectrum and the {sup 235}U thermal neutron fission spectrum. Most of the data investigated through this Project are used in dosimetry applications. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Heat dissipation systems with hygroscopic working fluid

A heat dissipation system apparatus and method of operation using hygroscopic working fluid for use in a wide variety of environments for absorbed water in the hygroscopic working fluid to be released to minimize water consumption in the heat dissipation system apparatus for effective cooling in environments having little available water for use in cooling systems. The system comprises a low-volatility, hygroscopic working fluid to reject thermal energy directly to ambient air. The low-volatility and hygroscopic nature of the working fluid prevents complete evaporation of the fluid and a net consumption of water for cooling, and direct-contact heat exchange allows for the creation of large interfacial surface areas for effective heat transfer. Specific methods of operation prevent the crystallization of the desiccant from the hygrosopic working fluid under various environmental conditions.

Martin, Christopher L.↗

Creating and sustaining a safety conscious work environment - 15240

Organizational Culture, Safety Culture, and a Safety Conscious Work Environment (SCWE) are psychological constructs that describe behaviors of organizations, especially with respect to behaviors needed to ensure safe, highly reliable work. These attributes of culture are often singled out in surveys, root cause analyses and management expectations as the basis for being safe or as the cause of an incident. Organizations that wish to improve culture often do not have a framework to measure and act upon tasks or projects that will promote a positive safety culture (and thus a positive SCWE). Combining the work of organizational behavior pioneers with the 'blue collar' approaches to continuous improvement offers framework organizations may use to improve safety culture while devoting efforts to improving conditions that are meaningful and tangible to floor level employees. The framework consists of the use of Safety Culture and SCWE surveys and focus groups to complement each other and offer topical areas that need improvement or study in the organization. A Safety Culture Improvement Panel will then direct specific improvement projects based on these topic areas and relate these projects to causal variables that effect incremental changes in culture. By applying principles of process improvement to the improvement of culture, the framework is formed to have employees work 'day-today' issues while effectively addressing the often vague or abstract notion of improving culture. A case study of the use of these principles is given by following the SCWE Assessment conducted by the Transuranic Waste Processing Center (TWPC) and subsequent improvements derived from data found in the assessment. The attributes of a SCWE and an effective safety culture accomplish much more than just having a safe place to work. These characteristics result in a high performance, continuously improving organization. The experience of commercial nuclear power, the aviation industry, and other high performing endeavors bear this out. Achieving an effective SCWE is not easy, and sustaining it is even more difficult, but the results are surely worth the effort. The techniques discussed in this presentation are effective, available, and cost-effective; they are easily adaptable for use in other organizations to create, sustain and improve a SCWE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applicability of Laser Cutting and Decontamination Technologies for Remote Decommissioning Work - 16115

Recently, various cutting and decontamination technologies for remote decommissioning works have been developed and applied. One of the technologies is a laser technology which has good capabilities for such kinds of works. Remote controllability is one of advantages of a laser system. Because in general the laser head is light and compact compared to the other types of cutting and decontamination tools, the head can be easily handled by remote operation equipment such as manipulators, and thus it gives an effective and flexible remote work. As the other examples of the advantages, there are no parts of a laser system necessary to be replaced so frequently like blades of mechanical methods and also, it does not generate secondary waste so much like contaminated water generated from water jet methods. Additionally, recent laser technology development has increased laser output power which makes it possible to be able to cut thick steel plate more smoothly and speedy, and width of laser irradiation which makes it possible to perform an efficient surface decontamination work. This paper will provide outline of the remote laser cutting system and decontamination system developed by IHI Corporation (IHI) and how those technologies are effective in various kinds of remote decommissioning works. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Glovebox Work-cell Design - 18370

Los Alamos National Laboratory (LANL) is the primary plutonium science and manufacturing facility in the United States supporting multiple national security programs. It is responsible for completing a high variety of small-batch manufacturing tasks requiring the handling and precision machining of Special Nuclear Materials (SNM). Given the myriad of tasks that must be completed in a limited workspace, LANL intends to utilize flexible, multi-use robotic work-cells capable of completing a variety of mission critical tasks in a single glovebox with no re-tooling needed between batch jobs. This approach would allow LANL more flexibility in its production schedule and to meet its future production and research objectives. In this paper, we present a system that integrates multiple sensors and other manufacturing peripherals into existing glovebox infrastructure. Currently, a technician can place an object in the work area where vision sensors and supervisory software identify the object and its pose and automatically determine which manufacturing task to complete. Pose uncertainty is addressed in real-time by the task planner, eliminating the need for fixtures. Grasps are validated using pressure sensors, payload sensors, and grasp quality metrics to ensure that objects are not dropped or damaged during manipulation. The robot, sensors, and peripherals are controlled using open-source software built utilizing ROS (Robot Operating System), which minimizes redevelopment and allows for re-use and extensibility. Established capabilities support vision, collision-free path planning, and more, minimizing development time. For this effort, particular attention was given to the integration of general peripheral devices (drill, chuck, etc.), which is critical to efficiently utilizing ROS in manufacturing environments. This integration is achieved with an in-development framework that allows for quick integration of peripherals, including I/O devices and motors. Contact tasks utilize the Generalized Contact Control Framework (GCCF) previously developed at UT Austin. GCCF allows application developers to easily define multiple contact control tasks for a single robot. This paper summarizes the key software components necessary to develop the multi-use work-cell including existing ROS components. UT-developed software for grasp validation, peripheral integration, and contact control is presented in more depth. Finally the glovebox system is demonstrated completing a set of tasks with no fixturing necessary. Primary tasks include surface preparation/ablation, drilling, press-fitting, and sorting, as well as supporting material transfer and inspection tasks. The glovebox work-cell reduces cost, operator dose, ergonomic issues, and time loss due to material transfer between gloveboxes that only support one task. If multiple glovebox work-cells are in use, they have the potential to eliminate bottlenecks and scale production capabilities beyond current limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ON THE INFLUENCE OF COLD WORK ON RESISTIVITY VARIATIONS WITH THERMAL EXPOSURE IN IN-718 NICKEL-BASE SUPERALLOY

In nickel-base superalloys, irreversible electrical conductivity changes occur above a transition temperature where thermally-activated microstructural evolution initiates. The electrical conductivity first decreases above about 450 deg. C then increases above 600 deg. C. However, the presence of plastic deformation results in accelerated microstructure evolution at an earlier transition temperature. It was recently suggested that this well-known phenomenon might explain the notable conductivity difference between the peened near-surface part and the intact part at sufficiently large depth in surface-treated specimens. The influence of cold work on the electrical conductivity change with thermal exposure offers a probable answer to one of the main remaining questions in eddy current residual stress assessment, namely unusually fast and occasionally even non-monotonic decay of the apparent eddy current conductivity (AECC) change that was observed at temperatures as low as 400 deg. C. To validate this explanation, the present study investigates the influence of cold work on low-frequency Alternating Current Potential Drop (ACPD) resistivity variations with thermal exposure. In-situ resistivity monitoring was conducted throughout various heating cycles using the ACPD technique. IN-718 nickel-base superalloy specimens with different levels of cold work were exposed to gradually increasing peak temperatures from 400 deg. C to 800 deg. C. The results indicate that the initial irreversible rise in resistivity is approximately one order of magnitude higher and occurs at about 50 deg. C lower temperature in cold-worked samples of 30% plastic strain than in the intact material.

36 MATERIALS SCIENCE↗

Effect of Mixed Working Fluid Composition on Binary Cycle Condenser Heat Transfer Coefficients

Effect of Mixed Working Fluid Composition on Binary Cycle Condenser Heat Transfer Coefficients Dan Wendt, Greg Mines Idaho National Laboratory The use of mixed working fluids in binary power plants can provide significant increases in plant performance, provided the heat exchangers are designed to take advantage of these fluids non-isothermal phase changes. In the 1980's testing was conducted at DOE's Heat Cycle Research Facility (HCRF) where mixtures of different compositions were vaporized at supercritical pressures and then condensed. This testing had focused on using the data collected to verify that Heat Transfer Research Incorporated (HTRI) codes were suitable for the design of heat exchangers that could be used with mixtures. The HCRF data includes mixture compositions varying from 0% to 40% isopentane and condenser tube orientations of 15{sup o}, 60{sup o}, and 90{sup o} from horizontal. Testing was performed over a range of working fluid and cooling fluid conditions. Though the condenser used in this testing was water cooled, the working fluid condensation occurred on the tube-side of the heat exchanger. This tube-side condensation is analogous to that in an air-cooled condenser. Tube-side condensing heat transfer coefficient information gleaned from the HCRF testing is used in this study to assess the suitability of air-cooled condenser designs for use with mixtures. Results of an air-cooled binary plant process model performed with Aspen Plus indicate that that the optimal mixture composition (producing the maximum net power for the scenario considered) is within the range of compositions for which data exist. The HCRF data is used to assess the impact of composition, tube orientation, and process parameters on the condensing heat transfer coefficients. The sensitivity of the condensing coefficients to these factors is evaluated and the suitability of air-cooled condenser designs with mixtures is assessed. This paper summarizes the evaluation of the HCRF data and discusses the next steps in the project evaluation of air-cooled condenser designs that can take advantage of the performance gains possible with these fluids.

15 GEOTHERMAL ENERGY↗