Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “uncertainty qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Balloon launched Viking decelerator test program

Four BLDT flights were conducted during the summer of 1972. The purpose of these tests was to qualify the Viking parachute system behind the full-scale Viking entry vehicle over the maximum range of entry conditions anticipated in the Viking '75 soft landing on Mars. A summary of the test series is presented. Test conditions ranged from a Mach number of 2.0 to 0.5 and dynamic pressure from 11.7 to 4.4 psf. This range of conditions covers the uncertainty in entry conditions at Mars due to atmospheric and entry performance uncertainties. Emphasis is placed on parachute performance and simulated Mars entry vehicle motions as influenced by the parachute performance. Conclusions are presented regarding the ability of the parachute to perform within the operational parameters required for a successful soft Martian landing. A list of references which covers all reports in the qualification test program is included.

Moog, R. D.↗

Completion of the Long Duration Wear Test of the NASA HERMeS Hall Thruster

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster has been the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this effort, a series of wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This work presents a summary of the results obtained during the Long Duration Wear Test (LDWT), which was the third in this wear test series. The LDWT accumulated approximately 3,570 hours of operation and had the overall goal to identify and correct design or facility issues prior to the flight qualification campaign. Thruster performance, stability, and plume properties were invariant throughout the duration of the LDWT and consistent with measurements acquired during previous HERMeS performance and wear characterizations. Average erosion rates of a carbon-carbon composite pole cover were found to match those measured with graphite to within the empirical uncertainty while the previously observed time-dependence of pole cover erosion rates was linked to changes in pole cover roughness. Azimuthal variations in keeper wear rate were observed including deposition on one of the azimuthal-facing sides of the keeper mask. This strongly suggests the presence of an azimuthal component in the process driving keeper erosion.

Frieman, Jason D.↗

Completion of the Long Duration Wear Test of the NASA HERMeS Hall Thruster

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster has been the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this effort, a series of wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This work presents a summary of the results obtained during the Long Duration Wear Test (LDWT), which was the third in this wear test series. The LDWT accumulated approximately 3,570 hours of operation and had the overall goal to identify and correct design or facility issues prior to the flight qualification campaign. Thruster performance, stability, and plume properties were invariant throughout the duration of the LDWT and consistent with measurements acquired during previous HERMeS performance and wear characterizations. Average erosion rates of a carbon-carbon composite pole cover were found to match those measured with graphite to within the empirical uncertainty while the previously observed time-dependence of pole cover erosion rates was linked to changes in pole cover roughness. Azimuthal variations in keeper wear rate were observed including deposition on one of the azimuthal-facing sides of the keeper mask. This strongly suggests the presence of an azimuthal component in the process driving keeper erosion.

Frieman, Jason D.↗

Completion of the Long Duration Wear Test of the NASA HERMeS Hall Thruster

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster has been the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this effort, a series of wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This work presents a summary of the results obtained during the Long Duration Wear Test (LDWT), which was the third in this wear test series. The LDWT accumulated approximately 3,570 hours of operation and had the overall goal to identify and correct design or facility issues prior to the flight qualification campaign. Thruster performance, stability, and plume properties were invariant throughout the duration of the LDWT and consistent with measurements acquired during previous HERMeS performance and wear characterizations. Average erosion rates of a carbon-carbon composite pole cover were found to match those measured with graphite to within the empirical uncertainty while the previously observed time-dependence of pole cover erosion rates was linked to changes in pole cover roughness. Azimuthal variations in keeper wear rate were observed including deposition on one of the azimuthal-facing sides of the keeper mask. This strongly suggests the presence of an azimuthal component in the process driving keeper erosion.

Jason David Frieman↗

Promoting the regulatory acceptance of combined ion and neutron irradiation for material degradation in nuclear reactors

The Advanced Materials and Manufacturing Technologies (AMMT) program within the Department of Energy (DOE) Office of Nuclear Energy has developed its current recommendation for promoting the use of combined ion irradiation and neutron irradiation for the accelerated qualification of materials to be deployed in nuclear reactors. This plan is intended to provide a collaborative path forward that can be adopted by academia, national laboratories, and industry, and has been developed with input from the regulatory research arm of the U.S. Nuclear Regulatory Commission (NRC). To deploy new materials or materials manufactured with new technologies, such as additive manufacturing, materials must be evaluated for reactor-induced degradation from the combination of harsh temperatures, corrosive environments, and radiation fields. However, rapid deployment of materials necessitates accelerated testing methods rather than relying on years of neutron irradiation in a material test reactor. Ion irradiation has demonstrated success in reproducing material microstructure and select property evolution resulting from neutron irradiation with three to four orders of magnitude reduction in time and cost, making it an ideal candidate for accelerated irradiation testing. This presentation provides context governing both the scientific and regulatory aspects of the proposed goal. The discussion is aimed at a broad audience including researchers from industry, national laboratories, and academia. The recommended path forward is presented as a conceptual framework of specific steps. In brief, the strategy entails developing an integrated ion and neutron irradiation test plan for the material property of interest based on the fundamental tenet of the linkage of microstructure and properties in materials. Physics-based modeling interprets ion irradiation data and predicts neutron irradiation microstructure and properties with uncertainty bounds. The first round of testing is sufficient for an initial licensing application using a risk-informed approach, while a minimum required neutron irradiation test plan reduces cost and time requirements. A surveillance program with witness specimens in-reactor provides additional data over time to improve model predictions to higher damage levels and further reduce uncertainty bounds, which can be used for license extensions or longer lifetimes in new license applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Technology and Mitigation (ATDM) SPARC Re-Entry Code Fiscal Year 2017 Progress and Accomplishments for ECP.

The SPARC (Sandia Parallel Aerodynamics and Reentry Code) will provide nuclear weapon qualification evidence for the random vibration and thermal environments created by re-entry of a warhead into the earth’s atmosphere. SPARC incorporates the innovative approaches of ATDM projects on several fronts including: effective harnessing of heterogeneous compute nodes using Kokkos, exascale-ready parallel scalability through asynchronous multi-tasking, uncertainty quantification through Sacado integration, implementation of state-of-the-art reentry physics and multiscale models, use of advanced verification and validation methods, and enabling of improved workflows for users. SPARC is being developed primarily for the Department of Energy nuclear weapon program, with additional development and use of the code is being supported by the Department of Defense for conventional weapons programs.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Computational Modeling of Photovoltaic Mini-Modules Undergoing Accelerated Stress Testing

A finite element model of a four-cell photovoltaic mini-module was developed and compared to experimental results from an accelerated stress test protocol in order to validate that computational models can accurately represent their physical counterparts when subjected to mechanical loading and to assess mini-module representativeness against full scale photovoltaic modules. Deflected shapes across the simulated mini-modules were compared to measured mini-module shapes when subjected to various pressure loads. Displaced mini-module shape results constrained to the experimental protocols of 0.4 mm and 1.1 mm of displacement at the mini-module center were compared to experimental results of full-size modules subjected to module qualification test load levels of 1.0 kPa and 2.4 kPa, to assess if the bending of mini-modules was representative of full-sized modules under the load. Temperature cycling was incorporated into the model to simulate the impacts of stress due to thermal expansion of the backsheet and cells. A preliminary uncertainty analysis was performed to show how variations in material properties and geometric parameters change the simulation results.

computational modeling↗

Compositional Models of Glass/Melt Properties and their Use for Glass Formulation

Nuclear waste glasses must simultaneously meet a number of criteria related to their processability, product quality, and cost factors. The properties that must be controlled in glass formulation and waste vitrification plant operation tend to vary smoothly with composition allowing for glass property-composition models to be developed and used. Models have been fit to the key glass properties. The properties are transformed so that simple functions of composition (e.g., linear, polynomial, or component ratios) can be used as model forms. The model forms are fit to experimental data designed statistically to efficiently cover the composition space of interest. Examples of these models are found in literature. The glass property-composition models, their uncertainty definitions, property constraints, and optimality criteria are combined to formulate optimal glass compositions, control composition in vitrification plants, and to qualify waste glasses for disposal. An overview of current glass property-composition modeling techniques is summarized in this paper along with an example of how those models are applied to glass formulation and product qualification at the planned Hanford high-level waste vitrification plant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Rod Sensor System Overview, Benefits and Recent Irradiation Test Results

Westinghouse is developing an In-Rod Sensor (IRS) System capable of measuring critical fuel rod parameters such as center-line fuel temperature, rod internal pressure and axial fuel pellet stack elongation without having penetrations to the fuel rod. The technology is similar to the Halden Reactor instrumentation, but the IRS system focuses on commercial fuel rod instrumentation. Both systems circumvent fuel rod penetrations, however the IRS system overcomes unique geometric challenges found in commercial fuel rod assemblies. The IRS could also play a key role in accelerated fuel qualification by allowing real-time measurements during separate effects tests, integral fuel testing or during irradiation of lead test rods or lead test assemblies. Combining these measurements with data acquired from targeted separate effects testing and multi-scale modelling could significantly reduce the time required to qualify new fuel and reduce the safety margin uncertainty of operating plants. The IRS is actively in development for Light Water Reactors (LWR) based fuel assemblies but can also be applied to Gen IV reactor designs with minimal modifications.

Carvajal, Jorge↗

Analysis of gamma-ray dosimetry experiments in the zero power MINERVE facility

The objective of this study is to develop nuclear heating measurement methods in zero power experimental reactors. These developments contribute to the qualification of photonics calculation schemes for the assessment of gamma heating in the future Jules Horowitz Material Testing Reactor. This paper presents the analysis of thermoluminescent detector (TLD) experiments in the UO{sub 2} core of the MINERVE Research Reactor at the French Alternative Energies and Atomic Energy Commission center in Cadarache. The experimental sources of uncertainty in the gamma dose have been reduced by improving the measurement conditions and the repeatability of the calibration step for each individual TLD. The interpretation of these measurements needs to take into account the calculation of cavity correction factors related to calibration and irradiation configurations, as well as neutron correction calculations. These calculations are based on Monte Carlo simulations of neutron-gamma and gamma-electron transport coupled particles. The comparison between calculated and measured integral gamma-ray absorbed doses in the aluminum material surrounding the TLD shows that calculations slightly overestimate the measurement, with a calculated versus experimental ratio equal to 1.04 {+-} 5.7 % (k=2). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sierra/SD – Verification Test Manual – 5.22

Verification and validation (V&V) of scientific computing programs are important at Sandia National Labs due to the expanding role of computational simulation in managing the United States nuclear stockpile. The complexities of structural response calculations used to analyze physical problems, the varieties of codes applied to the calculations, and the importance of accurate predictions when assessing field conditions demand confidence in the consistency and accuracy of computer codes. Confidence in the accuracy of the predictions arising from computer simulations must ultimately be gained through verification and validation. The Sierra salinas structural dynamics analysis code, Sierra/SD, is used at the DOE Laboratories, and in several DOD projects. The roles of Sierra/SD in the qualification of weapon systems and components for normal and hostile environments throughout the Stockpile-to-Target Sequence include to, • Redesign weapon components. • Certify weapon components and systems for target environments such as hypersonic vehicles. • Certify that components will survive the thermal mechanical shock loads associated with hostile environments. • Evaluate current stockpile issues, including issues associated with uncertainty quantification. • Address many other problems that are encountered in stockpile management. The Sierra/SD verification plan is described, and an evolving set of key verification tests are described in detail. The verification tests ensure the correctness of the mathematics and numerical algorithms associated with functionality describing engineering phenomena. Development is in accordance with a set of tailored Software Quality Engineering (SQE) practices. SQE practices guide the overall verification and validation effort.

97 MATHEMATICS AND COMPUTING↗

SRNL Report on Vendor Solicitation and Selective Ion-Electrode Testing

Effective operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require information collected from sampling and/or monitoring to maintain environmental compliance, product quality, and operating efficiency. The U.S. Department of Energy (DOE) – Office of River Protection (ORP) recognizes the potential long-term benefit of developing real-time, in-line monitoring (RTIM) at the WTP to improve the current strategy of collecting tens of thousands of samples and analyzing them. In-line monitoring can decrease processing time associated with waiting for sample analysis, reduce workers’ exposure to radiation and chemical hazards, decrease secondary waste volumes, potentially improve product quality, and provide production support and enhance overall operational control. The Assistant Manager, WTP chartered an Integrated Technical Team (ITT), which includes personnel from the Savannah River National Laboratory (SRNL), Bechtel National, Inc., and DOE-ORP, to evaluate the capability and potential benefits of replacing routine sample collection requirements with real-time, in-line monitoring. The initial focus of the ITT is the Direct Feed Low Activity Waste (DFLAW) Program. This work scope is being performed in multiple phases. Phase 1 is Requirements and Opportunities Analysis, Phase 2 is Applications and Benefits Determination, and Phase 3 is Qualification and Demonstration. Phase 1 included 6 tasks and was completed by SRNL in 2017. The tasks in Phase 1 were: (1) determining the functional requirements for determining analytes and properties of streams, (2) determining the technical basis for process control, (3) determining the sampling points within the Low Activity Waste (LAW) facility and Effluent Management Facility (EMF), (4) data quality and management, (5) process control challenges, and (6) preparing a Preliminary Analysis Plan. DOE-ORP was briefed on the findings from the Phase 1 tasks and requested that Phase 2 work focus on establishing a basis for a materials balance approach that minimized process sampling. The Phase 2 work scope contains tasks to evaluate a materials balance only approach as well as continuing scoping evaluations for instruments that could be used for RTIM. The Phase 2 work scope was completed by both SRNL and Pacific Northwest National Laboratory (PNNL). The tasks performed in Phase 2 were: 1. Overall program administration and technical oversight 2. Evaluation of a Material Balance Approach, a. Evaluation of uncertainty of this approach compared to uncertainty of current methods b. Evaluation of automating the material balance within the framework of existing control software, c. Development of the methodology to obtain and evaluate data during cold commissioning to support a material balance approach, and d. Development of a framework to utilize during presentation of the revised approach to stakeholders and regulators. 3. Screening Evaluations of Instruments to Supplement the Material Balance Approach, a. AP-105 melter condensate evaluations, and b. Screening testing with simulants. 4. Evaluation of the current DFLAW feed qualification program to identify analytes that could be eliminated, a. Inorganic analytes, b. Radionuclides, and c. Organic analytes. This report describes the results of Task 3b, Screening testing with simulants. The Savannah River National Laboratory requested demonstrations of commercially available analytical instruments by the vendors or laboratory demonstration. The techniques tested included: Raman spectroscopy, Infrared spectroscopy (IR), laser induced breakdown spectroscopy (LIBS), X-Ray Fluorescence Spectroscopy (XRF), and ion-selective electrochemical probes. Additionally, the instrumentation would need to be durable enough to withstand the environment of the plant, preferably with little to no maintenance. The insertion point of the instrument would be dependent upon the instrumentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRUST Contact Thermal Conductance (TRUST-CTC) Report: FY25

The objective of the Delivery Environments (DE) Testbeds to Reduce Uncertainties in Simulations and Tests (TRUST) project is to quantify and help increase confidence in specific areas of computational and experimental capabilities that are applicable to current and future delivery environments [1]. More complete quantification of confidence in experimental and computational capabilities and the sufficient increase of confidence in those capabilities is critical to improving weapons engineering design, qualification, and assessment efforts that are critical to the current and future stockpile. Staff development will include cross-discipline collaboration to provide engineers with experience in both numerical simulations and experimental methods. This work uses and provides feedback on analysis tools and experimental results databases for efficient and responsive engineering which are currently under development.

42 ENGINEERING↗

Base Flow Investigation of the Apollo AS-202 Command Module

In recent years, both Europe and the US are developing hypersonic research and operational vehicles. These include (re)entry capsules (both ballistic and lifting) and lifting bodies such as ExoMars, EXPERT, ARV, CEV and IXV. The research programs are meant to enable technology and engineering capabilities to support during the next decade the development of affordable (possibly reusable) space transportation systems as well as hypersonic weapons systems for time critical targets. These programs have a broad range of goals, ranging from the qualification of thermal protection systems, the assessment of RCS performances, the development of GNC algorithms, to the full demonstration of the performance and operability of the integrated vehicles. Since the aerothermodynamic characteristics influence nearly all elements of the vehicle design, the accurate prediction of the aerothermal environment is a prerequisite for the design of efficient hypersonic systems. Significant uncertainties in the prediction of the hypersonic aerodynamic and the aerothermal loads can lead to conservative margins in the design of the vehicle including its Outer Mould Line (OML), thermal protection system, structure, and required control system robustness. The current level of aerothermal prediction uncertainties results therefore in reduced vehicle performances (e.g., sub-optimal payload to mass ratio, increased operational constraints). On the other hand, present computational capabilities enable the simulation of three dimensional flow fields with complex thermo-chemical models over complete trajectories and ease the validation of these tools by, e.g., reconstruction of detailed wind tunnel tests performed under identified and controlled conditions (flow properties and vehicle attitude in particular). These controlled conditions are typically difficult to achieve when performing in flight measurements which in turn results in large associated measurement uncertainties. Similar problems arise when attempting to rebuild measurements performed in "hot" ground facilities, where the difficulty level is increased by the addition of the free-flow characterization itself. The implementation of ever more sophisticated thermochemical models is no obvious cure to the aforementioned problems since their effect is often overwhelmed by the large measurement uncertainties incurred in both flight and ground high enthalpy facilities. Concurrent to the previous considerations, a major contributor to the overall vehicle mass of re-entry vehicles is the afterbody thermal protection system. This is due to the large acreage (equal or bigger than that of the forebody) to be protected. The present predictive capabilities for base flows are comparatively lower than those for windward flowfields and offer therefore a substantial potential for improving the design of future re-entry vehicles. To that end, it is essential to address the accuracy of high fidelity CFD tools exercised in the US and EU, which motivates a thorough investigation of the present status of hypersonic flight afterbody heating. This paper addresses the predictive capabilities of after body flow fields of re-entry vehicles investigated in the frame of the NATO/RTO - RTG-043 Task Group and is structured as follows: First, the verification of base flow topologies on the basis of available wind-tunnel results performed under controlled supersonic conditions (i.e., cold flows devoid of reactive effects) is performed. Such tests address the detailed characterization of the base flow with particular emphasis on separation/reattachment and their relation to Mach number effects. The tests have been performed on an Apollo-like re-entry capsule configuration. Second, the tools validated in the frame of the previous effort are exercised and appraised against flight-test data collected during the Apollo AS-202 re-entry.

Walpot, Louis M. G.↗

Extended Wear Testing of the 12-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12 kW Advanced Electric Propulsion System (AEPS) intended to isolate the impact of discharge current on component wear rates. Testing was led by Aerojet Rocketdyne and performed with the AEPS Engineering Test Unit 2 (ETU-2) thruster. In total, approximately 860 hours of operation were accumulated split between operating conditions of 600 V/9 kW, 600 V/11 kW, and 600 V/12 kW. Thruster performance and stability were invariant throughout the wear test for all thruster throttle conditions and shown to be equal to the values previously measured with ETU-2. Inner front pole cover erosion rates were found to be invariant to discharge current as the measurements at all three operating conditions were equal to within the empirical uncertainty. Outer front pole cover erosion rates were found to be equal for the 600 V/9 kW and 600 V/12 kW conditions with operation at 600 V/11 kW yielding elevated erosion rates. Overall, the data shows that the AEPS thruster design has a high probability of meeting lifetime and performance requirements as the design proceeds to flight production and qualification.

Jason D Frieman↗

Evaluation of Material Balance Approaches for Hanford Direct-Feed Low Activity Waste Processing - 20022

The Hanford Site has accumulated millions of gallons of tank waste from reprocessing spent fuel to recover plutonium, uranium, cesium, and strontium. The supernatant from the accumulated tank waste will be treated using a Direct Feed Low-Activity Waste approach. The supernatant will be treated to remove solids and cesium in the Tank-Side Cesium Removal process in the Hanford tank farm, then vitrified in a semi-batch process in the Hanford Waste Treatment and Immobilization Plant (WTP). Currently, each batch of feed is sampled at three locations prior to being fed to the melter: the feed qualification tank in the Hanford tank farm as well as the concentrate receipt vessel (CRV) and melter feed preparation vessel (MFPV) in the WTP. The feed qualification sample is taken from a large batch of accumulated feed, only two to three samples are expected each year. Approximately 275 samples from the CRVs and 1100 samples from the MFPV are expected each year. An evaluation was performed to determine if a material balance based on the feed qualification sample could replace most of the sampling in the CRVs and MFPVs. The evaluation consisted of three elements: (1) determination of the practicality of using a material balance to estimate the stream composition of the CRV and MFPV contents, (2) evaluation of whether the material balance could be automated using the existing process control system, and (3) determination of the uncertainty in glass composition using the material balance approach. It is assumed that periodic sampling at the CRV and MFPV would be performed periodically to re-baseline the material balance, evaluations are in progress to determine the frequency of this periodic sampling. Process sample locations downstream of the melter were reviewed as well, but the partitioning of semi-volatile species in the melter was determined to preclude extending the material balance approach past the melter. It was determined that replacement of the CRV sample location was feasible and did not increase process uncertainty or significantly impact waste loading. Replacement of the MFPV sample was also determined to be feasible, but that measurement of the glass former chemical addition may be needed prior to addition of these chemicals to the MFPV. This measurement could be performed by an in situ laser-induced breakdown spectroscopy (LIBS) system. Limited tests were performed to evaluate LIBS for direct measurements of the low-activity waste melter feed. The use of a material balance would eliminate over 1200 samples each year if only 10% of the CRV and MFPV batches are sampled and could likely allow the WTP laboratory to operate on days only versus 24/7 operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Orion Crew-Service Module Umbilical Retention and Release Mechanism

The Orion CSM umbilical retention and release mechanism supports and protects all of the cross-module commodities between the spacecrafts crew and service modules. These commodities include explosive transfer lines, wiring for power and data, and flexible hoses for ground purge and life support systems. The mechanism employs a single separation interface which is retained with pyrotechnically actuated separation bolts and supports roughly two dozen electrical and fluid connectors. When module separation is commanded, either for nominal on-orbit CONOPS or in the event of an abort, the mechanism must release the separation interface and sever all commodity connections within milliseconds of command receipt. There are a number of unique and novel aspects of the design solution developed by the Orion mechanisms team. The design is highly modular and can easily be adapted to other vehiclesmodules and alternate commodity sets. It will be flight tested during Orions Exploration Flight Test 1 (EFT-1) in 2014, and the Orion team anticipates reuse of the design for all future missions. The design packages fluid, electrical, and ordnance disconnects in a single separation interface. It supports abort separations even in cases where aerodynamic loading prevents the deployment of the umbilical arm. Unlike the Apollo CSM umbilical which was a destructive separation device, the Orion design is resettable and flight units can be tested for separation performance prior to flight.Initial development testing of the mechanisms separation interface resulted in binding failures due to connector misalignments. The separation interface was redesigned with a robust linear guide system, and the connector separation and boom deployment were separated into two discretely sequenced events. These changes addressed the root cause of the binding failure by providing better control of connector alignment. The new design was tuned and validated analytically via Monte Carlo simulation. The analytical validation was followed by a repeat of the initial test suite plus test cases at thermal extremes and test cases with imposed mechanical failures demonstrating fault tolerance. The mechanism was then exposed to the qualification vibration environment. Finally, separation testing was performed at full speed with live ordnance.All tests of the redesigned mechanism resulted in successful separation of the umbilical interface with adequate force margins and timing. The test data showed good agreement with the predictions of the Monte Carlo simulation. The simulation proved invaluable due to the number of variables affecting the separation and the uncertainty associated with each. The simulation allowed for rapid assessment of numerous trades and contingency scenarios, and can be easily reconfigured for varying commodity sets and connector layouts.

Separation↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗