Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “trench”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Temperature-Agnostic Pt/Au Ohmic Contacts on n -Type Gallium Nitride for Self-Aligned MOSFETs

Five alternative metals are investigated as ohmic contacts to n-GaN including Cr/Au, Mo/Au, Pt/Au, Pd/Au, and Ge/Au. Ti-based contacts are traditionally used for ohmic contacts on n-GaN. However, conventional Ti/Al/Ni/Au metallization is found to be incompatible with a self-aligned process for GaN trench MOSFETs due to wet etch restrictions. Therefore, an alternative metallization is needed that is unreactive to the etch chemistry used in the self-aligned process. Additionally, the contact should remain ohmic following anneal at 900 °C so that contact formation can precede the anneal required for p-dopant activation. Here, in the present work, an n-GaN bilayer, consisting of a thin heavily doped contact layer (n 0 = 1 × 10 20 cm −3 ) atop a thick lesser doped layer, is used to demonstrate ohmic contacts of alternative metals with low specific contact resistance and extended thermal budget. Cr/Au ohmic contacts are demonstrated up to anneal temperatures of 800 °C, an increase of 200 °C compared to the highest known reports for Cr/Au contacts on n-GaN. Pt/Au metallization is demonstrated as an ohmic contact to n-GaN for the first time and exhibits true temperature-agnostic behavior up to anneal temperatures of 900 °C with specific contact resistance that is near parity with Ti/Al/Ni/Au. The temperature-agnostic behavior of Pt/Au ohmic contacts on the n-GaN bilayer, in addition to chemical compatibility with the self-aligned process, positions Pt/Au contacts as a key enabling element for self-aligned trench MOSFETs on GaN.

Reilly, Kevin James [Sandia National Laboratories ↗

Understanding and reducing mid-spatial frequency ripples during hemispherical sub-aperture tool glass polishing

We report during sub-aperture tool polishing of glass optics, mid-spatial surface ripples are generated because of material removal non-uniformities during tool linear translation (resulting in feed ripples) and tool pathway step overlaps (resulting in pitch ripples). A variety of tool influence function (TIF) spots, trenches, and patches were created to understand and minimize such ripples on fused silica workpieces after polishing with cerium oxide slurry using a rotating hemispherical pad-foam tool. The feed ripple amplitude can be decreased by reducing the non-uniformities in the pad texture and/or by minimizing a derived feed ripple metric ($r_f = V^{0.5}_{max}V_f/R_t$) via adjustments in processing parameters. Pitch ripples can be minimized by reducing relative step distance to spot radius ratio ($x_s/a_t$) and by achieving a flat bottom trench shape cross section or by reducing the material removal per pass. Using the combined methods, an overall ripple error of ~1.2nm rms has been achieved.

47 OTHER INSTRUMENTATION↗

Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds (FY2019 Annual Status Report)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730) and are compared with U.S. Department of Energy requirements (DOE O 435.1 and performance objectives defined in companion documents DOE M 435.1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations, indicating that potential impacts are well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. A new PA study has been initiated in this fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 West and East Areas (Trenches 31 and 34 in 200 West; Trench 94 in 200 East) because extended time has elapsed between the current annual status report and the original PA (WHC-SD-WM-TI-370) for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E-Area Low-Level Waste Facility GoldSim System Model

This report documents the development of the E-Area Low-Level Waste Facility (ELLWF) trench system model. The GoldSim® Monte Carlo simulation software is utilized to model the release and transport of radiological inventory disposed (both currently and in the future) within Engineered and Slit Trenches. This model is in support of the sensitivity and uncertainty analysis for the ELLWF Performance Assessment. The ELLWF system model utilizes a hybrid-approach to accurately describe the disposal system. The Hydrologic Evaluation of Landfill Performance model provides the infiltration data to both PORFLOW and GoldSim. PORFLOW is used to calibrate the GoldSim model to ensure confidence in the stochastic results. Finally, the concentrations from GoldSim transport simulations are fed into the SRNL Dose Toolkit to calculate dose impacts and assess plume interaction

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Component-In-Grout Model Implementation for the E-Area Low-Level Waste Facility's Performance Assessment

The component-in-grout (CIG) disposal units are below grade earthen trenches that contain grout encapsulated waste components. Components disposed of within the CIG segments consist of large radioactively contaminated equipment and smaller waste forms (e.g., B-25 boxes and SeaLand containers) to fill the space around and above the large equipment. In the 2022 revision of the E-Area Low-Level Waste Facility’s (ELLWF) performance assessment, groundwater radionuclide contaminant transport through the vadose zone will be modeled using the PORFLOW software package for nine existing CIG segments located within the Slit Trench (ST) 23 footprint - no additional CIG segments are planned for at this time. The nine CIG segments have been placed within two of the nominally 20-foot-wide by 656-foot-long ST segments and are surrounded by no less than 1 foot of grout on all sides and up to 4 feet of backfill material. The two most recently placed CIG segments have an additional reinforced concrete mat to improve structural stability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Well Locations for Saturated Zone Monitoring at the E-Area Low Level Waste Facility

Savannah River Site (SRS) has adopted a revised approach to performance monitoring of the E- Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised monitoring approach specifies that eight additional water table wells be installed near Slit Trench 1 (ST1) and Engineered Trench 2 (ET2). Six wells will be installed at locations characterized in 2017 and 2018. These include four wells near ET2 (ELF001D, ELF002D, ELF003D, and ELF004D) at locations identified by Kubilius (2019) and two wells north of ST1 (ELF005D and ELF006D) at locations finalized in this report. Additionally, two wells (ELF007D and ELF008D) are to be installed at locations south of ST1 based on characterization work completed in 2020 and documented in this report. This area is near well cluster BGX-2 between the Mixed Waste Management Facility (MWMF) and the ELLWF. The area is upgradient of ELLWF and, contamination in the water table aquifer is sourced from MWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Inventory Sensitivity Case

The Plateau to River (P2R) Model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in Washington State. The model simulates contaminants of concern within the saturated zone of the uppermost aquifer beneath the Central Plateau and downgradient to the Columbia River. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe an inventory sensitivity case of the CA base case. The inventory sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium (H-3) and iodine-129 (I-129)), BC Cribs and Trenches model (for I-129 and technetium-99 (Tc-99)), and the PUREX Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of F&T of contaminants reported in this case will support dose predictions as part of the Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Recharge Sensitivity Case

The Plateau-to-River (P2R) model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in south-central Washington State. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe a recharge sensitivity case of the CA base case. The recharge sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium [H-3] and iodine-129 [I-129]), BC Cribs and Trenches model (for I-129 and technetium-99 [Tc-99]), or the Plutonium Uranium Extraction (PUREX) Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of fate and transport of contaminants reported in this case will support dose predictions as part of the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the E-Area Low-Level Radioactive Waste Disposal Facility at the Savannah River Site: Chapter 4

This chapter describes the GW flow and transport conceptual models in the VZ for both generic and special waste forms in STs, ETs, LAWV, ILV, and NRCDAs. The development and implementation of the GoldSim® system model for trenches is also introduced. The Trench System Model is used for sensitivity analysis and uncertainty quantification as reported in Chapter 6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

SMART SiC Power ICs: Scalable, Manufacturable, and Robust Technology for SiC Power Integrated Circuits (Final Technical Report)

This collaborative project was initiated with the goal of developing Scalable, Manufacturable, and Robust Technology for SiC Power Integrated Circuits (SMART SiC Power ICs). In pursuit of this objective, innovative designs and fabrication processes were implemented, enabling the development of large-scale (>1 cm²) SiC Complementary Metal-Oxide-Semiconductor (CMOS) integrated circuits and high-voltage (400–600 V) lateral power MOSFETs (HV-LDMOS) on 150 mm 4H-SiC substrates. The resulting SMART SiC Power ICs are tailored to support a wide range of applications requiring diverse voltage and power levels, including automotive systems, industrial equipment, electronic data processing, energy harvesting, and power conditioning. To achieve the proposed ‘SMART’ technology for SiC ICs, the team focused on 1) the Development of highly scalable CMOS (with high channel mobilities for n-type and p-type MOSFETs), LDMOS (~600V, 10A rated), and IC technologies, 2) Establishment of a manufacturable process baseline in a production-grade-, 150mm, SiC fabrication facility, and 3) Demonstration of SMART SiC ICs. The project initially comprised of fabricating 5 lots. In lot 1 monolithic integration using a single process was achieved. Here, we were able to successfully accomplish Integrated HV NMOSFET with LV CMOS on N-epi/N+ Substrate. The HV NMOS demonstrated a Breakdown Voltage (BV) more than 600V. Circuit demonstration of CMOS was also another achievement from this lot. In lot 2, priority was in place for isolation and integration. Here we addressed the isolation concerns and integrated the HV NMOS and LV CMOS using the N-epi/P-epi/N+ substrate. Similar to the lot 1, we were able to achieve a BV of 600 V for HV NMOS. Optimized gate oxide process with high channel mobilities, better gate oxide reliability, development of SPICE models, successful ohmic process development, novel wafer area saving design layouts, P+ isolation schemes with channeling implantations and high temperature operational circuits demonstrations are some of the key highlights from lot 1 and lot2. In lot 3, discrete device performances of HV NMOS with a BV ~700V and reliable LV CMOS performances were achieved. Also, novel architectural solutions were successfully implemented to suppress the electric field crowding at the gate oxide for reliable operations. In lot 4, half bridge power driver ICs with a conversion efficiency of (target 90% to 95%) in the 1-5MHz switching frequency range for output power between 25 W to 3 kW have been included in. However, due to the unfortunate events of sudden foundry shutdown (SiCamore Semi) the processing of lot 4 wafers came to a complete stop (January 2024). Arrangements have recently been made to shift the fabrication to another foundry, General Electric Aerospace. The fabrication process now on course (as of December 2024). Characterizations are delayed due to this unfortunate circumstance. The proposed trench architectural-based devices and ICs (lot 5) underwent modifications from the original project proposal. This change was necessitated by limitations in the availability of trench-based processes at commercial production-grade fabrication facilities in the US. Apart from above achievements, a Process Development Kit (PDK) was successfully developed for planar type SiC CMOS/LDMOS.

42 ENGINEERING↗

Array of Graphene Variable Capacitors on 100 mm Silicon Wafers for Vibration-Based Applications

Highly flexible, electrically conductive freestanding graphene membranes hold great promise for vibration-based applications. This study focuses on their integration into mainstream semiconductor manufacturing methods. We designed a two-mask lithography process that creates an array of freestanding graphene-based variable capacitors on 100 mm silicon wafers. The first mask forms long trenches terminated by square wells featuring cone-shaped tips at their centers. The second mask fabricates metal traces from each tip to its contact pad along the trench and a second contact pad opposite the square well. A graphene membrane is then suspended over the square well to form a variable capacitor. The same capacitor structures were also built on 5 mm by 5 mm bare dies containing an integrated circuit underneath. We used atomic force microscopy, optical microscopy, and capacitance measurements in time to characterize the samples.

36 MATERIALS SCIENCE↗

Iron-absorption band analysis for the discrimination of iron-rich zones

The author has identified the following significant results. Lineament analysis of the area was initiated on individual images and then expanded areally by the use of mosaics at the 1:1,000,000 scale. Principal trends are NE, NW, NNE-NNW, and ENE. Several previously unrecognized lineaments are mapped which may be the surface manifestations of major fault or fracture zones. Three lineaments are especially noteworthy. Two of these, the Walker Lane and the Midas Trench lineament system, transect the prediominantly NNE-NNW trending mountain ranges for more than 500 km. A third major lineament, formed by the alinement of several topographic escarpments 10-20 km long, is orthogonal to the Midas Trench lineament. This lineament is marked by a distinct positive magnetic anomaly for approximately 200 km. Further visual analysis of ERTS-1 images has resulted in the delineation of 50 circular or elliptical features which are presumed to be volcanic or intrusive centers. A comparison with the 78 Tertiary volcanic centers mapped in the study area in 1970 indicates some good agreement between the proposed and known volcanic centers. The coincidence of some major lineaments and productive ore bodies implies a genetic relationship.

Rowan, L. C.↗

Surface history of some Apollo 17 lunar soils

Cosmic ray track densities in Apollo 17 soil samples are used to infer surface exposure times of soils from a trench at Van Serg Crater, from on and near a boulder at Camelot Crater, and from the position of the heat flow and neutron flux experiments (the ALSEP site). The topmost 2 cm of soil at Van Serg was exposed for 11 m.y., the top cm at Camelot for 36 m.y. A layering chronology and average deposition rate are proposed for the trench. For all soils the median track densities imply predispositional irradiation in the top 15 cm of the lunar surface for times that were long compared with the actual residence in the stratigraphic positions from which the soils were collected. Van Serg crater is inferred to have been formed approximately 24 m.y. ago.

Fleischer, R. L.↗

Space Shuttle noise suppression concepts for the Eastern Test Range

The basic objectives of the Space Shuttle noise suppression program for the Eastern Test Range were the definition of the acoustic environment of the Shuttle and the adjacent ground plane for both on-pad and liftoff conditions and the definition of realistic noise suppression techniques and modification of the launch facility that could reduce engine noise associated with supersonic flow. Scaling considerations for acoustic model testing based on the principle of dynamic similarity are detailed. Suppression approaches are described with emphasis placed on barriers and shields: exhaust flow trench covers, solid dividers between the SSME and SRB exhaust flows and a crossed pipe water injection system over the SSME exhaust flow trench. Graphs are presented summarizing noise data gathered for various noise sources and using different suppression approaches.

Guest, S. H.↗

Gravimetric geoid in the Northwest Pacific Ocean

A total of 3708 1 x 1 deg free-air gravity anomaly averages have been used to construct a new 1 x 1 deg gravimetric geoid of the Northwest Pacific Ocean. The 1 x 1 deg averages are based on a compilation of 147,000 surface ship and pendulum gravity measurements. Difference geoid undulations range from a maximum of +19 m over the Hawaiian ridge to a minimum of -31 m over the junction of the Kuril and Aleutian trenches. The Hawaiian swell is associated with a geoidal high of up to +15 m with wavelengths of about 2200 km and the topographic rises seaward of deep-sea trenches are associated with geoidal highs of up to 4 m with wavelengths of about 220-900 km. The agreement between the gravimetric geoid and Skylab-4 and Geos-3 altimeter data is close for wavelengths greater than about 300 km but poor for shorter wavelengths.

Watts, A. B.↗