Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER

The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.

Anderson, Herbert A.↗

W8 Test Plans with StreamVanes

This presentation documents the use of the GRC Low Speed Compressor Facility in the Engine Research Building (ERB) W8 to test low pressure ratio fans. Current capabilities are detailed as well as upgrades underway to better understand low pressure ratio fans. Additionally, the use of StreamVanes for studying boundary layer ingestion in to fans is discussed.

Stephens, Julia↗

Recent Developments in the Alignment and Test Plans for the James Webb Space Telescope Integrated Science Instrument Module

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approximately 40K). The JWST Observatory architecture includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The SIs and Guider are mounted to a composite metering structure with outer dimensions of 2.1 x 2.2 x 1.9m. The SI and Guider units are integrated to the ISIM structure and optically tested at NASA/Goddard Space Flight Center as an instrument suite using an OTE SIMulator (OSIM). OSIM is a high-fidelity, cryogenic JWST telescope simulator that features a approximately 1.5m diameter powered mirror. The SIs are aligned to the structure's coordinate system under ambient, clean room conditions using laser tracker and theodolite metrology. Temperature-induced mechanical SI alignment and structural changes are measured using a photogrammetric measurement system at ambient and cryogenic temperatures. OSIM is aligned to the ISIM mechanical coordinate system at the cryogenic operating temperature via internal mechanisms and feedback from alignment sensors in six degrees of freedom. SI performance, including focus, pupil shear and wavefront error, is evaluated at the operating temperature using OSIM. We present an updated plan for the assembly and ambient and cryogenic optical alignment, test and verification of the ISIM element.

Ohl, Raymond↗

Test plan. GCPS task 7, subtask 7.1: IHM development

The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.

Greenberg, H. S.↗

Kodak AMSD Cryogenic Test Plans

NGST will be an IR based optical system that will operate at cryogenic temperatures. As part of the AMSD program, Kodak must demonstrate the ability of our system to perform at these very cold temperatures. Kodak will discuss the test approach that will be used for cryogenic testing at MSFC's XRCF.

Matthews, Gary↗

NASA electronic message experiment and study: Detailed test plans

A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.

Source record↗

Space shuttle maneuvering engine reusable thrust chamber program. Task 11: Low Epsilon stability test plan

The performance and heat transfer characteristics of a doublet element type injector for the space shuttle orbiter maneuvering engine thrust chamber were investigated. Ths stability characteristics were evaluated over a range of chamber pressures and mixture ratios. The specific objectives of the test were: (1) to determine whether stability has been influenced by injection of boundary layer coolant across the cavity entrance, (2) if the injector is stable, to determine the minimum cavity area required to maintain stability, and (3) if the injector is unstable, to determine the effects of entrance geometry and increased area on stability.

Pauckert, R. P.↗

Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures

Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.

Martin, J. J.↗

Mod-2 wind turbine project assessment and cluster test plans

An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

Gordon, L. H.↗

Application of earth resources technology satellite data to urban and regional planning: Test site, County of Los Angeles

The author has identified the following significant results. The County of Los Angeles photointerpreted ERTS film products to define problems of interest, coordinated ground truth over the complex test site including interfaces with secondary users as well as participated in on-line analyses of the GE multispectral information extraction systems. Interactive machine analyses were carried out, developing techniques and procedures as well as evaluating the outputs for community and regional planning. Extensive aircraft underflight coverage was provided that was valuable both in inputs preparation and outputs evaluation of the machine-aided analyses. One of the nonstandard ERTS images led to the discovery of a major new fault lineament on the northern slope of the Santa Monica Mountains.

Raje, S.↗

Advanced turboprop testbed systems study. Volume 1: Testbed program objectives and priorities, drive system and aircraft design studies, evaluation and recommendations and wind tunnel test plans

The establishment of propfan technology readiness was determined and candidate drive systems for propfan application were identified. Candidate testbed aircraft were investigated for testbed aircraft suitability and four aircraft selected as possible propfan testbed vehicles. An evaluation of the four candidates was performed and the Boeing KC-135A and the Gulfstream American Gulfstream II recommended as the most suitable aircraft for test application. Conceptual designs of the two recommended aircraft were performed and cost and schedule data for the entire testbed program were generated. The program total cost was estimated and a wind tunnel program cost and schedule is generated in support of the testbed program.

Bradley, E. S.↗

Orbit attitude processor. STS-1 bench program verification test plan

A plan for the static verification of the STS-1 ATT PROC ORBIT software requirements is presented. The orbit version of the SAPIENS bench program is used to generate the verification data. A brief discussion of the simulation software and flight software modules is presented along with a description of the test cases.

Mcclain, C. R.↗

Thermal test plan for large variable conductance heat pipe

The procedure to be followed in determining the thermal performance of a variable conductance heat pipe is documented. The nominal one-inch-diameter aluminum pipe is of a cold reservoir type whose overall length is nine feet. It has a capacity of 2 to 4 kW's equivalent to 8 to 16 kW-ft and an overall temperature control range of 50 to 95 F. Initial tests will be conducted with the pipe charged with ammonia to determine its capacity limits. Following introduction of the noncondensible gas (nitrogen), the variable conductance features of the pipe will be used.

Edelstein, F.↗

APU diaphragm testing. Test plan

Auxiliary Power Unit (APU) fuel (hydrazine) tanks have had to be removed from the Columbia Shuttle (OV-102) because they have been in service for 11 years, which is the limit of their useful life. As part of an effort to determine whether the useful life of the fuel tanks can be extended, examination of the ethylene propylene rubber (EPR) diaphragm and the metal from one of the APU tanks is required. The JSC Propulsion and Power Division has requested White Sands Test Facility (WSTF) to examine the EPR diaphragm thoroughly and the metal casing generally from one tank. The objective is to examine the EPR diaphragm for signs of degradation that may limit the life of its function in the APU propellant tank. The metal casing will also be examined for signs of surface corrosion.

Shelley, Richard↗

Application of Earth Resources Technology Satellite data to urban development and regional planning: Test site, County of Los Angeles

The author has identified the following significant results. Signigicant results have been obtained from the analyses of ERTS-1 imagery from five cycles over Test Site SR 124 by classical photointerpretation and by an interactive hybrid multispectral information extraction system (GEMS). Photointerpretation has produced over 25 overlays at 1:1,000,000 scale depicting regional relations and urban structure in terms of several hundred linear and areal features. A possible new fault lineament has been discovered on the northern slope of the Santa Monica mountains. GEMS analysis of the ERTS-1 products has provided new or improved information in the following planning data categories: urban vegetation; land cover segregation; manmade and natural impact monitoring; urban design; land suitability. ERTS-1 data analysis has allowed planners to establish trends that directly impact planning policies. For example, detectable grading and new construction sites quantitatively indicated the extent, direction, and rate of urban expansion which enable planners to forecast demand and growth patterns on a regional scale. This new source of information will not only assist current methods to be more efficient, but permits entirely new planning methodologies to be employed.

Raje, S.↗

Integrated Test and Evaluation Flight Test 3 Flight Test Plan

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

Unmanned↗