Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tactical planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center (GRC) with contractor Sunpower Inc. to develop high efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems. Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or Engineering Units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA Engineering Units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F Pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in FY2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA GRC that demonstrate the capabilities of the ASC.

radioisotope↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center with contractor Sunpower, Inc., to develop high-efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems (RPSs). Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or engineering units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA engineering units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in fiscal year 2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA Glenn that demonstrate the capabilities of the ASC.

Stirling cycle↗

Hawaii Threat Brief

The Digital Energy Transformation is redefining how power systems operate, integrating physical infrastructure with digital technologies to enhance efficiency, visibility, and resilience. For islanded and digitally modernizing systems like Hawai‘i’s, this shift presents both new opportunities and evolving challenges in cybersecurity, supply chain assurance, and environmental resilience. This brief provides an overview of critical infrastructure dependencies and systemic risks associated with increasing digital integration. It summarizes recent energy-sector threat activity and case studies that illustrate adversary tactics and supply chain vulnerabilities, and identifies pathways to strengthen resilience.

25 - ENERGY STORAGE↗

CBRN Situational Awareness Tools for the Modern Age

CBRN Situational awareness (SA) should be a key operational requirement in the CNI area of discussion, not only for the “boots-on-the-ground” warfighter, but at a strategic level. For example, maneuver plans will need to be developed for contamination avoidance and battlefield survivability. Large datasets from instruments dispersed across the battlefield will thus need to be collected and processed into a holistic assessment of the radiological hazard. From there, hazard maps then must be distributed at the tactical level, all while continuing to effectively engage a peer adversary. This vision represents a network of sensors, software tools, data processing algorithms, communications suites, and common operational picture (COP) platforms working in concert to inform warfighters and command echelons alike of evolving nuclear and radiological hazards. This complex system-of-systems and the ultimate goal of effective engagement in a nuclear or radiological-hazard battlefield can be achieved through pursuit of improvement in collaborative SA tools.

Becker, Eric M.↗

Integration of Automated Systems Test Campaign NC-IAS

NASA’s 2022 strategic plan included the goal to catalyze economic growth and drive innovation in the aviation industry, and to address challenges in air transportation and airspace management within the National Airspace System (NAS). The Aeronautics Research Mission Directorate (ARMD) specifically was tasked with leading aviation innovation to enable safe and sustainable air transportation through revolutionary vehicle advances and efficient flight operations. As a part of meeting these objectives and advancing air mobility concepts, NASA initiated the National Campaign (NC) in the Advanced Air Mobility (AAM) Project within the Airspace Operations and Safety Program (AOSP). The NC was designed to support operational demonstrations with industry as well as the research and development needed to support NASA-led research flight demonstrations. Within NC, the Integration of Automated Systems (IAS), an NC activity, tested and evaluated flight deck automation and airspace operations management functions needed to enable Urban Air Mobility (UAM) operations. This was accomplished through a partnership with Sikorsky Aircraft (specifically Sikorsky Innovations), a Lockheed Martin company, and DARPA (Defense Advanced Research Projects Agency), by leveraging two automation-enabled helicopters equipped with unique capabilities that enabled NASA to develop and test two-ship conflict encounters to demonstrate flight path management and hazard avoidance technologies. The enabler in this testing was NASA-developed “Middleware” (MW) software (also known as Expandable Variable Autonomy Architecture, or EVAA), which among other things allowed multiple algorithms to be incorporated into one software build that was hosted on the dissimilar-type Sikorsky helicopters. The IAS test campaign period of performance was from March 2022 through October 2023 and was structured as a phased, or spiral, approach that ultimately led to the first-ever demonstration of two-ship UAM/AAM operations designed to safely choreograph specific conflict encounters and mission scenarios to test the research algorithms for strategic and tactical aircraft deconfliction. Lessons learned are included in the body of the report. Data collected will be used to inform FAA and industry standards groups on the increasingly automated systems needed for future AAM operations. The test encounters developed for these flight tests were proven to be highly predictable, repeatable, and safely exercised flight path planning and Detect and Avoid (DAA) algorithms. These same test encounters should be leveraged by future flight test campaigns to verify that operational safety is not compromised as the AAM architecture matures. Next steps include repeating similar encounters using unmanned aircraft carrying DAA sensors in the National Airspace.

AAM↗

Real-time artificial intelligence issues in the development of the adaptive tactical navigator

Adaptive Tactical Navigation (ATN) is a laboratory prototype of a knowledge based system to provide navigation system management and decision aiding in the next generation of tactical aircraft. ATN's purpose is to manage a set of multimode navigation equipment, dynamically selecting the best equipment to use in accordance with mission goals and phase, threat environment, equipment malfunction status, and battle damage. ATN encompasses functions as diverse as sensor data interpretation, diagnosis, and planning. Real time issues that were identified in ATN and the approaches used to address them are addressed. Functional requirements and a global architecture for the ATN system are described. Decision making with time constraints are discussed. Two subproblems are identified; making decisions with incomplete information and with limited resources. Approaches used in ATN to address real time performance are described and simulation results are discussed.

Green, Peter E.↗

Tactical Scientific Decision-Making during Crewed Astrobiology Mars Missions

The limitations placed upon human explorers on the surface of Mars will necessitate a methodology for scientific exploration that is different from standard approaches to terrestrial fieldwork and prior crewed exploration of the Moon. In particular, the data transmission limitations and communication latency between Earth and Mars create a unique situation for surface crew in contact with a terrestrial science team. The BASALT research program simulated a series of extravehicular activities (EVAs) in Mars analog terrains under various Mars-relevant bandwidth and latency conditions to investigate how best to approach this problem. Here we discuss tactical decision-making under these conditions, that is, how the crew on Mars interacts with a team of scientists and support personnel on Earth to collect samples of maximum scientific interest. We describe the strategies, protocols, and tools tested in BASALT EVAs and give recommendations on how best to conduct human exploration of Mars with support from Earth-based scientists. We find that even with scientists supporting them, the crew performing the exploration must be trained in the appropriate scientific disciplines in order to provide the terrestrial scientists with enough information to make decisions, but that with appropriate planning and structure, and tools such as a ‘‘dynamic leaderboard,’’ terrestrial scientists can add scientific value to an EVA, even under Mars communication latency

Decision-making↗

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

Advanced information processing system: The Army Fault-Tolerant Architecture detailed design overview

The Army Avionics Research and Development Activity (AVRADA) is pursuing programs that would enable effective and efficient management of large amounts of situational data that occurs during tactical rotorcraft missions. The Computer Aided Low Altitude Night Helicopter Flight Program has identified automated Terrain Following/Terrain Avoidance, Nap of the Earth (TF/TA, NOE) operation as key enabling technology for advanced tactical rotorcraft to enhance mission survivability and mission effectiveness. The processing of critical information at low altitudes with short reaction times is life-critical and mission-critical necessitating an ultra-reliable/high throughput computing platform for dependable service for flight control, fusion of sensor data, route planning, near-field/far-field navigation, and obstacle avoidance operations. To address these needs the Army Fault Tolerant Architecture (AFTA) is being designed and developed. This computer system is based upon the Fault Tolerant Parallel Processor (FTPP) developed by Charles Stark Draper Labs (CSDL). AFTA is hard real-time, Byzantine, fault-tolerant parallel processor which is programmed in the ADA language. This document describes the results of the Detailed Design (Phase 2 and 3 of a 3-year project) of the AFTA development. This document contains detailed descriptions of the program objectives, the TF/TA NOE application requirements, architecture, hardware design, operating systems design, systems performance measurements and analytical models.

Harper, Richard E.↗

CABINS: Case-based interactive scheduler

In this paper we discuss the need for interactive factory schedule repair and improvement, and we identify case-based reasoning (CBR) as an appropriate methodology. Case-based reasoning is the problem solving paradigm that relies on a memory for past problem solving experiences (cases) to guide current problem solving. Cases similar to the current case are retrieved from the case memory, and similarities and differences of the current case to past cases are identified. Then a best case is selected, and its repair plan is adapted to fit the current problem description. If a repair solution fails, an explanation for the failure is stored along with the case in memory, so that the user can avoid repeating similar failures in the future. So far we have identified a number of repair strategies and tactics for factory scheduling and have implemented a part of our approach in a prototype system, called CABINS. As a future work, we are going to scale up CABINS to evaluate its usefulness in a real manufacturing environment.

Miyashita, Kazuo↗

Comparing and Reconciling Traditional Field and Photogeologic Mapping Techniques: Lessons from the San Francisco Volcanic Field, Arizona

Cartographic products and - specifically - geologic maps provide critical assistance for establishing physical and temporal frameworks of planetary surfaces. The technical methods that result in the creation of geologic maps vary depending on how observations are made as well as the overall intent of the final products [1-3]. These methods tend to follow a common linear work flow, including the identification and delineation of spatially and temporally discrete materials (units), the documentation of their primary (emplacement) and secondary (erosional) characteristics, analysis of the relative and absolute age relationships between these materials, and the collation of observations and interpretations into an objective map product. The "objectivity" of a map is critical cross comparison with overlapping maps and topical studies as well as its relevance to scientific posterity. However, the "accuracy" and "correctness" of a geologic map is very subject to debate. This can be evidenced by comparison of existing geologic maps at various scales, particularly those compiled through field- and remote-based mapped efforts. Our study focuses on comparing the fidelity of (1) "Apollo-style" geologic investigations, where typically non-geologist crew members follow static traverse routes established through pre-mission planning, and (2) "traditional" field-based investigations, where geologists are given free rein to observe without preplanned routes. This abstract summarizes the regional geology wherein our study was conducted, presents the geologic map created from traditional field mapping techniques, and offers basic insights into how geologic maps created from different tactics can be reconciled in support of exploratory missions. Additional abstracts [4-6] from this study discuss various exploration and science results of these efforts.

Skinner, J. A., Jr.↗

A Concept for Robust, High Density Terminal Air Traffic Operations

This paper describes a concept for future high-density, terminal air traffic operations that has been developed by interpreting the Joint Planning and Development Office s vision for the Next Generation (NextGen) Air Transportation System and coupling it with emergent NASA and other technologies and procedures during the NextGen timeframe. The concept described in this paper includes five core capabilities: 1) Extended Terminal Area Routing, 2) Precision Scheduling Along Routes, 3) Merging and Spacing, 4) Tactical Separation, and 5) Off-Nominal Recovery. Gradual changes are introduced to the National Airspace System (NAS) by phased enhancements to the core capabilities in the form of increased levels of automation and decision support as well as targeted task delegation. NASA will be evaluating these conceptual technological enhancements in a series of human-in-the-loop simulations and will accelerate development of the most promising capabilities in cooperation with the FAA through the Efficient Flows Into Congested Airspace Research Transition Team.

Isaacson, Douglas R.↗

Sensing and Virtual Worlds - A Survey of Research Opportunities

Virtual Worlds (VWs) have been used effectively in live and constructive military training. An area that remains fertile ground for exploration and a new vision involves integrating various traditional and now non-traditional sensors into virtual worlds. In this paper, we will assert that the benefits of this integration are several. First, we maintain that virtual worlds offer improved sensor deployment planning through improved visualization and stimulation of the model, using geo-specific terrain and structure. Secondly, we assert that VWs enhance the mission rehearsal process, and that using a mix of live avatars, non-player characters, and live sensor feeds (e.g. real time meteorology) can help visualization of the area of operations. Finally, tactical operations are improved via better collaboration and integration of real world sensing capabilities, and in most situations, 30 VWs improve the state of the art over current "dots on a map" 20 geospatial visualization. However, several capability gaps preclude a fuller realization of this vision. In this paper, we identify many of these gaps and suggest research directions

Moore, Dana↗

A Safe Response to Renewable Energy Hazards

The International Association of Fire Fighters (IAFF) and Underwriters Laboratories, LLC (UL) in conjunction with UL Solutions initiated a joint project in 2022 under an agreement with the United States Department of Energy-Office of Energy Efficiency and Renewable Energy (DOE-EERE). This project focused on two separate and important initiatives related to energy efficiency in residential buildings. Initiative 1: Fire Performance on Energy Efficient Exterior Walls. Initiative 2: Firefighting Tactics in Residential Properties with Building Energy Storage Systems (BESS). The project’s first initiative addresses concerns surrounding new technologies with enhanced, energy-efficient exterior walls installed on residential properties. The concerns of fire rapidly traveling vertically up the exterior of these walls were examined. This addressed a growing concern from the first responder community that many times, the fires on the exterior of residential buildings have already evolved into an attic fire by the time of arrival – making it problematic to address the fire scenario. The test plan for Initiative 1 incorporated a modified version of an American Society for Testing and Materials (ASTM) test method, ASTM E2707, Standard Test Method for Determining Fire Penetration of Exterior Wall Assemblies Using a Direct Flame Impingement Exposure, as the foundation of the research. The test method involved a wall structure intended to represent retrofit construction to evaluate how fire would spread vertically or laterally. The second aspect of the UL-IAFF Project focuses on the fire service response to Residential Battery Energy Storage System (RBESS) incidents. These simulation tests were constructed in the large-scale fire test facility at UL Solutions’ Northbrook, IL campus. A baseline test was conducted that involved a test structure with no batteries—shelving units populated with standardized commodities, representing a typical garage with cellulosic and plastic contents. Three additional tests have been conducted to generate data with the contribution of energy storage system (ESS) batteries to compare fire and explosion hazards against the baseline test. Through this work, fire service tactical considerations can be explored. From the data, the team can determine 1) the visual indicators of a residential fire that has involved an RBESS (or, potentially, other large batteries) and 2) the impact of fire service-initiated ventilation of the structure on the fire conditions and explosion risks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of thrusting ejectors to tactical aircraft having vertical lift and short-field capability

The status of ejector development in terms of application to V/STOL aircraft is reported in three categories: aircraft systems and ejector concepts; ejector performance including prediction techniques and experimental data base available; and, integration of the ejector with complete aircraft configurations. Available prediction techniques are reviewed and performance of three ejector designs with vertical lift capability is summarized. Applications of the 'fuselage' and 'short diffuser' ejectors to fighter aircraft are related to current and planned research programs. Recommendations are listed for effort needed to evaluate installed performance.

Koenig, D. G.↗

A Simulation Based Approach for Contingency Planning for Aircraft Turnaround Operation System Activities in Airline Hubs

Commercial aircraft undergo a significant number of maintenance and logistical activities during the turnaround operation at the departure gate. By analyzing the sequencing of these activities, more effective turnaround contingency plans may be developed for logistical and maintenance disruptions. Turnaround contingency plans are particularly important as any kind of delay in a hub based system may cascade into further delays with subsequent connections. The contingency sequencing of the maintenance and logistical turnaround activities were analyzed using a combined network and computer simulation modeling approach. Experimental analysis of both current and alternative policies provides a framework to aid in more effective tactical decision making.

Adeleye, Sanya↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗