Deer Park Energy Center Natural Gas Combined Cycle Carbon Capture System Front-End Engineering Design Study (Final Scientific/Technical Report – Unlimited)

Calpine Texas CCUS Holdings, LLC (Calpine), Shell Catalysts & Technologies (SCT), Technip Energies (TEN), and Sargent & Lundy, LLC (S&L) have conducted a Front-End Engineering Design (FEED) Study to integrate a new carbon capture system at Calpine’s Deer Park Energy Center (DKEC). The DKEC facility is a nominal 1200 MW gas-fired co-generation power plant situated at the Shell Chemical Manufacturing (Shell) Facility located in Deer Park, Texas. Steam is produced for use by the adjacent Shell Chemical Manufacturing Facility as well as by the onsite steam turbine for electrical generation. The power output from DKEC is provided to the Electric Reliability Council of Texas (ERCOT) operated power grid. DKEC provides power to industrial and commercial customers via this interconnection.

03 NATURAL GAS↗

A ranking methodology for the coupling of pressurized water nuclear reactors and molten salt thermal energy storage

Thermal energy storage (TES) systems are a proposed solution to electricity market demand fluctuations and can be coupled to nuclear power plants to enable load following. Here, this work focuses on developing a methodology for evaluating potential designs for integrating a TES system into an existing pressurized water nuclear power plant. The proposed ranking methodology allows a group of experts to postulate and weigh designs based on ranking criteria derived from literature. The methodology developed in this study can aid in the final selection of a TES design for an existing nuclear power plant. The same process could be used to analyze other TES and nuclear reactor designs. The determined optimum design from this methodology was to place the TES system after the steam generator and to utilize the steam generated from the nuclear power plant to heat a molten salt TES unit. Another conclusion of this research was that human bias is prevalent during design selection, and actions such as standardized ranking criteria and large groups of experts should be used to minimize this error.

25 ENERGY STORAGE↗

Steam Turbines

Turbonetics Energy, Inc.'s steam turbines are used as power generating systems in the oil and gas, chemical, pharmaceuticals, metals and mining, and pulp and paper industries. The Turbonetics line benefited from use of NASA research data on radial inflow steam turbines and from company contact with personnel of Lewis Research Center, also use of Lewis-developed computer programs to determine performance characteristics of turbines.

Source record↗

Comparison of geothermal power conversion cycles

Geothermal power conversion cycles are compared with respect to recovery of the available wellhead power. The cycles compared are flash steam, in which steam turbines are driven by steam separated from one or more flash stages; binary, in which heat is transferred from the brine to an organic turbine cycle; flash binary, in which heat is transferred from flashed steam to an organic turbine cycle; and dual steam, in which two-phase expanders are driven by the flashing steam-brine mixture and steam turbines by the separated steam. Expander efficiencies assumed are 0.7 for steam turbines, 0.8 for organic turbines, and 0.6 for two-phase expanders. The fraction of available wellhead power delivered by each cycle is found to be about the same at all brine temperatures: 0.65 with one stage and 0.7 with four stages for dual stream; 0.4 with one stage and 0.6 with four stages for flash steam; 0.5 for binary; and 0.3 with one stage and 0.5 with four stages for flash binary.

Elliott, D. G.↗

Leak detection in a subcritical boiler

Thermal power plants experience cycling duty leading to the fatigue of the boiler and heat exchanger tubes. As a result, tube failures occur frequently in coal fired fleets leading to forced outages. Furthermore, because the tube leaks have been the major source of unwanted shutdowns and the number of outages is increasing, present work focuses on the detection and isolation of the leak in a subcritical boiler based upon the process data from a commercial coalfired power plant. The mass balance equation around the steam drum was analyzed using timeseries data collected from a 300 MW power plant. The ratio of the feed water mass flow rate to the steam mass flow rate was defined as a key parameter for detecting leaks. The difference in slope between the feedwater and steam mass flow rate during the normal and faulty operations was established as the upper control limit for real time monitoring. To reduce false alarm rates that arise when raw signal is directly compared against the threshold due to common process fluctuations, an optimal filter was derived for smoothing. It was found that the optimal filter reacted much more quickly to process changes than an exponential moving average filter, around 8 h earlier on average. Occurrence of relatively high false alarm rates even in the filtered responses was related to the cycling of the boiler from the base load condition. Variable threshold was established to keep false alarm rates to the minimum while maintaining the leak detection rate. Finally, the leak was located at the economizer and this could readily be isolated by investigating the magnitude of the mass flow rates ratio and the temperature at the economizer outlet.

42 ENGINEERING↗

AN UPDATE ON THE STATUS OF A REDUCED FLOW TEST OF A 10MW 700⁰C SCO2 INTEGRALLY GEARED COMPANDER

In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). One component of solving this problem is reducing the cost of the power block while simultaneously increasing the efficiency of the thermodynamic cycle. One disruptive technology that has the promise to accomplish this is supercritical CO2 based power cycles. These cycles are conceptually similar to steam cycles; however, they have substantially smaller turbomachinery at equivalent power while also delivering more efficiency at turbine inlet temperatures of 500-700℃. This paper will summarize the current status of a US Department of Energy project to develop machinery to support a 10 MW sCO2 power cycle. The team of Southwest Research Institute® (SwRI®) and Hanwha Power Systems America, proposed to develop an integrally-geared (IG) compressor-expander (compander) for use in a nominal 10 MW-scale CSP supercritical carbon dioxide (sCO2) plant application. This integrally-geared compander (IGC) comprises multiple pinion shafts interconnected on a single bull gear to create a compact package, and utilizes a low-cost, low-speed driver. In addition, the integrally-geared architecture allows each pinion to operate at different rotational speeds to optimize performance and easily allow for inter-stage cooling and turbine re-heat to further enhance both stage and cycle efficiency. The close integration of all turbomachinery elements into a single integrally-geared (IG) machine creates a design that lends itself to power block modularization, which makes it suitable for waste heat recovery, fossil fuel power plants, and especially CSP applications.

14 SOLAR ENERGY↗

An Update on the Status of a Reduced Flow Test of a 10MW 700°C sCO2 Integrally Geared Compander

. In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). One component of solving this problem is reducing the cost of the power block while simultaneously increasing the efficiency of the thermodynamic cycle. One disruptive technology that has the promise to accomplish this is supercritical CO2 based power cycles. These cycles are conceptually similar to steam cycles; however, they have substantially smaller turbomachinery at equivalent power while also delivering more efficiency at turbine inlet temperatures of 500-700 degrees Celsius. This paper will summarize the current status of a US Department of Energy project to develop machinery to support a 10 MW sCO2 power cycle. The team of Southwest Research Institute® (SwRI®) and Hanwha Power Systems America, proposed to develop an integrally-geared (IG) compressor-expander (compander) for use in a nominal 10 MW-scale concentrated solar power (CSP) supercritical carbon dioxide (sCO2) plant application. This integrally-geared compander (IGC) comprises multiple pinion shafts interconnected on a single bull gear to create a compact package, and utilizes a low-cost, low-speed driver. In addition, the integrally geared architecture allows each pinion to operate at different rotational speeds to optimize performance and easily allow for inter-stage cooling and turbine re-heat to further enhance both stage and cycle efficiency. The close integration of all turbomachinery elements into a single integrally-geared (IG) machine creates a design that lends itself to power block modularization, which makes it suitable for waste heat recovery, fossil fuel power plants, and especially CSP applications. As part of the commercialization of this technology, it is necessary to reduce risk by validation testing of key components. In the current work, the focus is developing a test loop to enable safe testing of the main compressor stage across a wide range of operating conditions, and to validate the mechanical integrity of the turbine at full pressure, temperature, and speed. Developing a test loop for sCO2 requires balancing a number of design alternatives that impact cost, lead time, safety, and performance. The current work discusses the design process for the reduced flow test loop for the compander, and supporting documentation supporting the viability of the test loop

wilkes, jason↗

Preconceptual Designs of Coupled Power Delivery between a 4-Loop PWR and 100-500 MWe HTSE Plants

This study develops a preconceptual design for the integration between a large-scale high-temperature electrolysis facility and a NPP. Two hydrogen facility sizes are considered: 100 MWnom and 500 MWnom. Both steam supply designs use cold reheat steam extraction as a heat source. A reboiler inside the protected area of the power plant transfers steam heat to the demineralized water supply for the hydrogen plant. After the heat transfer, the extracted steam condenses and returns to the condenser while the process steam routes out of the protected area to the electrolyzers. Electrical power is tapped off from the high voltage side of the GSU transformer, where it is then transported via a 345-kV transmission line to the hydrogen facility. Circuit breakers and disconnects are located at both ends of the transmission line. Step down transformers and miscellaneous switchgear/buses are located at the end of the transmission line inside the HTEF boundary. Control capabilities for the steam interfacing equipment and electrical dispatch are accessible from the Main Control Room, and protective relays for the transmission line are located inside the Relay Room. Computer modeling was performed for the thermal and electrical designs. PEPSE analysis provided the steady-state parameters for thermal extraction from the turbine cycle. These parameters were used to inform transients and size equipment in combination with Applied Flow Technology (AFT) Arrow and AFT Fathom modeling for steam and water piping, respectively. Electrical transients were analyzed using PSCAD. An ETAP model was used to evaluate power flow and short circuit, which enabled the sizing of transformers and protective equipment. A cost estimate was developed for both integration designs when considering plant separation distances of 250 m and 500 m. From these estimates, the modifications for thermal and electrical interfacing of a first-of-a-kind nuclear-integrated hydrogen facility are anticipated to cost between $60–250/kWnom., where the subscript “nom” refers to the nominal size of the hydrogen plant. On a thermal power basis, the thermal power has a cost of approximately $8/MWth for a 500 MWnom high temperature electrolysis plant located 500 m distant from the NPP. That value decreases to approximately $7.5/MWth for a 250 m separation distance between the hydrogen plant and the NPP. This value is lower than previous estimates of the cost of heat extracted from NPPs primarily because in this work the steam is extracted from cold reheat instead of the main steam line, which reduces the cost of the dispatched steam by approximately $3.5/MWth. Nuclear steam extraction can provide a profit avenue for many plants and is not restricted to hydrogen production. Ammonia production, oil refining, and paper production, among other industrial processes all require thermal energy, which can be provided by NPPs. Future work should look further at the details of thermal extraction for a variety of use cases. This can include increased levels of extraction and multiple simultaneous users. Additionally, site-specific studies should be performed to develop industry experience and improve cost accuracy.

08 HYDROGEN↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Power Station Design

Kuljian Corporation provides design engineering and construction management services for power generating plants in more than 20 countries. They used WASP (Calculating Water and Steam Properties), a COSMIC program to optimize power station design. This enabled the company to substantially reduce lead time and software cost in a recent design project.

Source record↗

Quantifying adherence of oxide scales on steels exposed to high temperature and pressure steam

Oxide scale exfoliation is a major concern in fossil fuel power generation because it can cause tube blockages and erode valves and steam turbine components downstream. There is still considerable scientific and commercial interest to improve the mechanistic understanding of oxide failures by developing models to predict exfoliation and the extent of tube blockage as a function of operating conditions and component geometries. Tensile testing inside a scanning electron microscope was conducted on ferritic–martensitic and austenitic steel specimens with the steam side (Fe,Cr)-rich oxides grown after exposures for up to 1000 h in steam with ~100 ppb O 2 at 276 bar and 550°C. Multiple oxide layer cracks and delamination events were observed and analyzed in detail during the tests. Results from the testing agreed well with earlier observations that had identified the failure location at the outer–inner oxide layer for all tested materials. Calculated adhesion energies identified the outer–inner oxide interface of alloy 347HFG as the weakest interface.

36 MATERIALS SCIENCE↗

Modeling and Power-Hardware-in-the-Loop Validation of Synchronous Machine Governor

This paper introduces the development of a high-fidelity gas turbine governor model using a programmable logic controller for power-hardware-in-the-loop (PHIL) validation. The governor model is integrated with the National Renewable Energy Laboratory's (NREL) PHIL test bed, featuring a 2-MVA synchronous machine and a 2.5-MW variable-speed drive, to emulate NG-driven HRSGs and CTs under various operational scenarios. The primary objective of this research is to study the grid-connected and islanding operations of conventional generation sources, with representative startup sequences including turbine purge, ignition, speed ramp-up, synchronization, and breaker closure. Preliminary results of the generator governor model on NREL PHIL platform, particularly using the 2.5-MW dynamometer system, offered significant insights into the modeling techniques, hardware integration, scaling, and real-world simulation dynamics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Rapid Procedure Development Approach for Multi-stage Validation of Novel Nuclear Power Plant Systems

The integration of renewable energy sources into the modern grid introduces variability in generation, challenging nuclear reactors to remain economically viable amid low wholesale electricity prices. To address this, Idaho National Laboratory?s Flexible Plant Operation and Generation program explores alternative revenue streams, including commoditizing excess thermal energy. A Thermal Power Dispatch (TPD) system enables steam extraction from the secondary loop for industrial uses like hydrogen production via high-temperature steam electrolysis.

99 - GENERAL AND MISCELLANEOUS↗

Dry cooler contribution to LCOE in a sCO 2 power cycle for CSP

In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). One component of solving this problem is reducing the cost of the power block while simultaneously increasing the efficiency of the thermodynamic cycle. One disruptive technology that has the promise to accomplish this is supercritical CO 2 (sCO 2 ) based power cycles. Here, these cycles are conceptually similar to steam cycles; however, they have substantially smaller turbomachinery at equivalent power while also delivering more efficiency at turbine inlet temperatures of 500-700 °C.

14 SOLAR ENERGY↗

Field Telemetry of Blade-rotor Coupled Torsional Vibration at Matuura Power Station Number 1 Unit

The quasi-modal reduction technique and finite element model (FEM) were used to construct an analytical model for the blade-rotor coupled torsional vibration of a steam turbine generator of the Matuura Power Station. A single rotor test was executed in order to evaluate umbrella vibration characteristics. Based on the single rotor test results and the quasi-modal procedure, the total rotor system was analyzed to predict coupled torsional frequencies. Finally, field measurement of the vibration of the last stage buckets was made, which confirmed that the double synchronous resonance was 124.2 Hz, meaning that the machine can be safely operated. The measured eigen values are very close to the predicted value. The single rotor test and this analytical procedure thus proved to be a valid technique to estimate coupled torsional vibration.

Isii, Kuniyoshi↗

Energy: An annotated bibliography

This bibliography is a compilation of approximately 4,300 selected references on energy and energy related topics. The references are arranged by date, with the latest works first, in the following subject categories: (1) energy and power - general; resources, supply/demand, and forecasting; policy, legislation, and regulation; research and development; environment; consumption and economics; and conservation, (2) energy and power sources - general, fossil fuels, hydrogen and methanol, organic wastes and waste heat, nuclear, geothermal, solar, wind, ocean/water, magnetohydrodynamics and electrohydrodynamics, and gas and steam turbines, and (3) energy and power storage and transmission. Literature from bibliographic sources dated January 1972 through July 1974 is covered, with some pertinent literature prior to 1972 included.

Blow, S. J.↗

Comparative evaluation of three alternative power cycles for waste heat recovery from the exhaust of adiabatic diesel engines

Three alternative power cycles were compared in application as an exhaust-gas heat-recovery system for use with advanced adiabatic diesel engines. The power cycle alternatives considered were steam Rankine, organic Rankine with RC-1 as the working fluid, and variations of an air Brayton cycle. The comparison was made in terms of fuel economy and economic payback potential for heavy-duty trucks operating in line-haul service. The results indicate that, in terms of engine rated specific fuel consumption, a diesel/alternative-power-cycle engine offers a significant improvement over the turbocompound diesel used as the baseline for comparison. The maximum imporvement resulted from the use of a Rankine cycle heat-recovery system in series with turbocompounding. The air Brayton cycle alternatives studied, which included both simple-cycle and compression-intercooled configurations, were less effective and provided about half the fuel consumption improvement of the Rankine cycle alternatives under the same conditions. Capital and maintenance cost estimates were also developed for each of the heat-recovery power cycle systems. These costs were integrated with the fuel savings to identify the time required for net annual savings to pay back the initial capital investment. The sensitivity of capital payback time to arbitrary increases in fuel price, not accompanied by corresponding hardware cost inflation, was also examined. The results indicate that a fuel price increase is required for the alternative power cycles to pay back capital within an acceptable time period.

Bailey, M. M.↗

A data-driven model for thermodynamic properties of a steam generator under cycling operation

The varying electricity demand from coal power plants due to the intermittent nature of renewable sources leads to load-follow and on/off operations referred to as cycling. Cycling causes transients of properties such as pressure and temperature within various components of the steam generation system.These transients cause increased damage because of fatigue and creep-fatigue interactions shortening the life of components. An algorithm is developed to identify cycling operations from the gross power data. The data-driven model based on artificial neural networks (ANN) is developed using 10 years data from Coal Creek Station power plant located in North Dakota, USA to estimate properties of the steam generator components during cycling operations. Furthermore, the uniqueness of this model is the ability to predict component properties for the cycling as well as base-load operations and is reported for the first time. The ANN model estimates the component properties, for a given gross power profile and initial conditions, as they vary during cycling operations. As a representative example, the ANN estimates are presented for the superheater outlet pressure, reheater inlet temperature, and flue gas temperature at the air heater inlet. The changes in these variables as a function of the gross power over the time duration are compared with measurements to assess the predictive capability of the model. Mean square errors of 4.49E-04 for superheater outlet pressure, 1.62E-03 for reheater inlet temperature, and 4.14E-04 for flue gas temperature at the air heater inlet were observed.