Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Development and application of contamination technology for MSFC managed space systems

The second annual report on the development and application of contamination technology for MSFC managed space systems covering the period from 10 Dec. 1992 to 10 Dec. 1993 is presented. During this time period, studies were concluded which proved that in-process corrosion protection is not required during Redesigned Solid Rocket Motor (RSRM) case processing. Also completed were a series of tests evaluating the effects of environmental exposure and contamination on 2219-T87 aluminum (Space Shuttle External Tank) OSEE response and bonding properties. Correlations were developed between OSEE response, contamination type/level, and primer adhesion. The results showed that the wet tape and water break free tests currently employed during ET processing may not detect bond affecting levels of some potential contaminants; however, the contaminants were detected with OSEE analysis. Finally, exposure/contamination studies were initiated with HP9-4-30 steel. HP9-4-30 was selected for evaluation because it represents a class of metals commom to MSFC managed space flight systems which are less prone to oxidation than D6AC steel or aluminum.

Source record↗

Large space systems auxiliary propulsion requirements

To meet the needs of a variety of civilian and military missions objectives large space systems (LSS) will become a greater percentage of our orbiting hardware. These LSS's will be transported to low Earth orbit (LEO) by the space transportation system (STS Shuttle). Concurrently, for LSS missions to orbit higher than LEO, the predominant mission scenario is that the LSS will be deployed or assembled in LEO and then transferred to a higher orbit. In support of the LSS concepts, the Office of Aeronautics and Space Technology (OAST) has sponsored studies to determine LSS mission propulsion requirements. Since the fall of 1979, the Boeing Aerospace Company, under contract to NASA and Lewis Research Center, has been studying the disturbance forces and torques that will be experienced by LSS, and they have identified some of the associated auxiliary propulsion systems (APS) requirements. This presentation provides an insight into the results of some of the APS studies, focusing primarily on the APS requirements of single Shuttle launchable LSS's.

Maloy, J. E.↗

Study of auxiliary propulsion requirements for large space systems, volume 2

A range of single shuttle launched large space systems were identified and characterized including a NASTRAN and loading dynamics analysis. The disturbance environment, characterization of thrust level and APS mass requirements, and a study of APS/LSS interactions were analyzed. State-of-the-art capabilities for chemical and ion propulsion were compared with the generated propulsion requirements to assess the state-of-the-art limitations and benefits of enhancing current technology.

Smith, W. W.↗

Cost estimating methods for advanced space systems

The development of parametric cost estimating methods for advanced space systems in the conceptual design phase is discussed. The process of identifying variables which drive cost and the relationship between weight and cost are discussed. A theoretical model of cost is developed and tested using a historical data base of research and development projects.

Cyr, Kelley↗

Aeritalia Space Systems Group, Turin, Italy

Aeritalia has been involved in European space programs since the early 1960's. Space activities grew to the point that in 1984 Aeritalia established a separate Space Systems Group (SSG), located in Turin. Today, SSG is involved in dozens of projects, some of them jointly with NASA and U.S. aerospace companies. Here, several of the major projects, such as the Tethered Satellite system, HIPPARCOS, Columbus Pressurized Module, Italian Research Interim Stage, and others are briefly described.

Donlan, Vincent↗

Contact-impact analysis of deployable space systems

This paper presents simulation results of a flexible, deployable space system with multiple contact-impact events, using three different modeling approaches. In the first two approaches, the equations of motion of the system are written in terms of generalized coordinates of each component, with modal coordinates used to account for flexibility in the components. Two different methods are used to model contact-impact events in the systems. In the momentum balance method, as contact-impact occurs, momentum equations of the systems are solved for the jump discontinuity in velocity of generalized coordinates. Integration of the system is restarted with the new initial conditions from solutions of momentum equations. In the logical function method, a virtual spring connecting the two contact points is assumed. The virtual spring is active only when impact occurs. No special treatment is needed in the integration algorithm using this method. In the third approach, instead of using modal coordinates, a finite element based formulation for the transient dynamics of mechanical system is used to model flexibility of the components. The logical function method is used to model contact-impact in the third approach.

Wu, Shih-Chin↗

Nanomaterials for Advanced Life Support in Advanced Life Support in Space systems

A viewgraph presentation describing nanomaterial research at NASA Johnson Space Center with a focus on advanced life support in space systems is shown. The topics include: 1) Introduction; 2) Research and accomplishments in Carbon Dioxide Removal; 3) Research and Accomplishments in Water Purification; and 4) Next Steps

Allada, Rama Kumar↗

A Simulation Based Investigation of High Latency Space Systems Operations

This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control systems, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions and assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

Li, Zu Qun↗

A Simulation Based Investigation of High Latency Space Systems Operations

This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control system, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions, and to assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

Li, Zu Qun↗

Handbook for Weight Estimating and Forecasting of Manned Space Systems During Conceptual Design. Volume II

Volume I of the Handbook for Weight Estimating and Forecasting of Manned Space Systems during Conceptual Design contains two manual methods of preliminary weight estimation, plus weight growth data and two methods for forecasting weight growth. The two weight estimation methods in Volume I are recommended for rapid use only during the earliest phases of design when mission knowledge and design parameters are at a minimum. Volume II contains a detailed point design method of preliminary weight estimation, to be used by either manual or computer means. This method enables greater in-depth weight assessments of designs when the necessary mission knowledge and design parameters are available. Volume II also contains the description of an associated or independent (user's option) space transportation system sizing program which has the capability of altering a point design configuration, as necessary, to assure vehicle weight, size and performance compatibility.

Source record↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

Large space system - Charged particle environment interaction technology

Large high-voltage space power systems proposed for future applications in both low earth orbit and geosynchronous altitudes must operate in the space charged-particle environment with possible interactions between this environment and the high-voltage surfaces. The paper reviews the ground experimental work to provide indicators for the interactions that could exist in the space power system. A preliminary analytical model of a large space power system is constructed using the existing NASA Charging Analyzer Program, and its performance in geosynchronous orbit is evaluated. The analytical results are used to illustrate the regions where detrimental interactions could exist and to establish areas where future technology is required.

Stevens, N. J.↗

Large space system: Charged particle environment interaction technology

Large, high voltage space power systems are proposed for future space missions. These systems must operate in the charged-particle environment of space and interactions between this environment and the high voltage surfaces are possible. Ground simulation testing indicated that dielectric surfaces that usually surround biased conductors can influence these interactions. For positive voltages greater than 100 volts, it has been found that the dielectrics contribute to the current collection area. For negative voltages greater than-500 volts, the data indicates that the dielectrics contribute to discharges. A large, high-voltage power system operating in geosynchronous orbit was analyzed. Results of this analysis indicate that very strong electric fields exist in these power systems.