Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “simulation testbed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

A Testbed Environment for Buildings-to-Grid Cyber Resilience Research and Development

The Smart Grid is characterized by the proliferation of advanced digital controllers at all levels of its operational hierarchy from generation to end consumption. Such controllers within modern residential and commercial buildings enable grid operators to exercise fine-grained control over energy consumption through several emerging Buildings-to-Grid (B2G) applications. Though this capability promises significant benefits in terms of operational economics and improved reliability, cybersecurity weaknesses in the supporting infrastructure could be exploited to cause a detrimental effect and this necessitates focused research efforts on two fronts. First, the understanding of how cyber attacks in the B2G space could impact grid reliability and to what extent. Second, the development and validation of cyber-physical application-specific countermeasures that are complementary to traditional infrastructure cybersecurity mechanisms for enhanced cyber attack detection and mitigation. The PNNL B2G testbed is currently being developed to address these core research needs. Specifically, the B2G testbed combines high-fidelity buildings+grid simulators, industry-grade building automation and Supervisory Control and Data Acquisition (SCADA) systems in an integrated, realistic, and reconfigurable environment capable of supporting attack-impact-detection-mitigation experimentation. In this paper, we articulate the need for research testbeds to model various B2G applications broadly by looking at the end-to-end operational hierarchy of the Smart Grid. Finally, the paper not only describes the architecture of the B2G testbed in detail, but also addresses the broad spectrum of B2G resilience research it is capable of supporting based on the smart grid operational hierarchy identified earlier.

Sridhar, Siddharth↗

Exploring GlideinWMS and HTCondor scalability frontiers for an expanding CMS Global Pool

The CMS Submission Infrastructure Global Pool, built on Glidein-WMS andHTCondor, is a worldwide distributed dynamic pool responsible for the allocation of resources for all CMS computing workloads. Matching the continuously increasing demand for computing resources by CMS requires the anticipated assessment of its scalability limitations. In addition, the Global Plmust be able to expand in a more heterogeneous environment, in terms of resource provisioning (combining Grid, HPC and Cloud) and workload submissi.A dedicated testbed has been set up to simulate such conditions with the purpose of finding potential bottlenecks in the software or its configuration. This report provides a thorough description of the various scalabilitydimensions in size and complexity that are being explored for the future Global Pool, along with the analysis and solutions to the limitations proposed with the support of the GlideinWMS and HTCondor developer teams.

97 MATHEMATICS AND COMPUTING↗

A Comparison of Battery Charge Controller Technologies for Wave Energy Converters

Wave energy is a uniquely challenging field for electrical system designers. High peak and low average power potential with a constantly varying energy input is difficult to harness and control through conventional means. To power the blue economy, low-powered wave energy converters (WECs) need batteries for energy storage. Safely and effectively charging batteries from waves requires a charge controller to properly monitor and control voltage and current going to the battery. Currently, off-the-shelf charge controllers exist for other renewable generation such as wind, hydro, and solar. Two topologies were validated: a buck converter and a pulse width modulation (PWM) charge controller. Using an in-lab dry testbed, wave energy power inputs were simulated to properly validate the effectiveness of existing charge controller technologies, identifying the shortcomings and improvements needed to effectively harness wave energy.

battery storage↗

Analysis of the Impact of Installation Parameters and System Size on Bifacial Gain and Energy Yield of PV Systems

In this work, we present the combined effect of installation parameters (tilt angle, height above ground, and albedo) on the bifacial gain and energy yield of three photovoltaic (PV) system configurations: a single module, a row of five modules, and five rows of five modules utilizing RADIANCE based ray tracing model. We show that optimum tilt angle is dependent on parameters such as height, albedo, size of the system, and time of the year. For a single bifacial module installed in Albuquerque, NM, the optimum tilt angle is lowest (~5 degree) for summer solstice and highest (~65 degree) for winter solstice. For larger systems, optimum tilt angle can be up to 200 more than that for a single module system. We also show that modules in large scale systems, generate lower energy due to large shadowing areas cast by the modules on the ground. For albedo of 21 %, middle module in a large array generates up to 7% less energy than a single bifacial module. To validate our model, we utilize measured data from Sandia's fixed tilt bifacial PV testbed and compare it with our simulations. We find that due to higher non-uniformity, lower tilt angles demonstrate high normalized root mean square deviation (NRMSD) between measured and simulated values than high tilt angles.

14 SOLAR ENERGY↗

A Comparison of Battery Charge Controller Technologies for Wave Energy Converters: Preprint

Wave energy is a uniquely challenging field for electrical system designers. High peak and low average power potential with a constantly varying energy input is difficult to harness and control through conventional means. To power the blue economy, low-powered wave energy converters (WECs) need batteries for energy storage. Safely and effectively charging batteries from waves requires a charge controller to properly monitor and control voltage and current going to the battery. Currently, off-the-shelf charge controllers exist for other renewable generation such as wind, hydro, and solar. Two topologies were validated: a buck converter and a pulse width modulation (PWM) charge controller. Using an in-lab dry testbed, wave energy power inputs were simulated to properly validate the effectiveness of existing charge controller technologies, identifying the shortcomings and improvements needed to effectively harness wave energy.

battery storage↗

Development of a water source heat pump hardware-in-the-loop (HIL) testing facility for smart building applications

Over the last decade, the global fight against climate change through electrification has led to an increase in research on building heating, ventilation, and air conditioning (HVAC) systems that utilize intelligent control algorithms to provide demand-side grid service while maintaining the thermal comfort of building occupants. As the pivotalpoint between building electricity consumption and indoor thermal comfort, high-efficiency electrical heatpumps are at the center of these emerging studies, and various grid-interactive and occupant-comfort control algorithms have been developed for them. The impact of these algorithms on the heatpump operation andperformance under different weather, building load, and grid requests calls for investigation and verification via experimental tests with actual heat pumps integrated with real-time building and grid responses. This study presents a Water-Source Heat Pump Hardware-in-The-Loop (HIL) Test Facility developed with the capability to perform such tests. The hardware configuration for this testfacility introduces a hydronic system that emulates the conditions for the heat pump water-side, and a duct system that emulates conditions for the heat pump airside. Both data acquisition and emulator control are implemented through the National Instruments (NI) LabVIEW software running on an NI PXIplatform. The HIL mechanism based on the hardware-software integration that allows the testbed to communicate with a generic simulation environment is also discussed. Currently, the test facility setup includes a single heatpump and virtual building model in EnergyPlus coupled with an occupant behavioral model in MATLAB. Preliminary test results of the current setup demonstrate the building load emulator's ability to track the simulated gone temperature with a Root Mean Square Deviation (RSME) below 0.12°C (0.216°F). An uncertainty analysis based on sensor accuracies shows that the heat pump coefficient of performance (COP) can be measured with a relative uncertainty of 10.4% in cooling and 3.7% in heating. Apartfrom the current testing on a single heat pump, the test facility also provides the flexibility to include additional heat pumps to form a heat pump cluster, as well as coupling the heat pump with active thermal storage to provide enhanced demandflexibility.

Calfa, Caleb↗

PRIME: a real-time cyber-physical systems testbed: from wide-area monitoring, protection, and control prototyping to operator training and beyond

As the power grid continues to evolve with advanced wide-area monitoring, protection, and control (WAMPAC) algorithms, there is an increasing need for realistic testbed environments with industry-grade software and hardware-in-the-loop (HIL) to perform verification and validation studies. Such testbed environments serve as ideal platforms to perform WAMPAC prototyping, operator training, and also to study the impacts of different types of cyberattack scenarios on the operation of the grid. In this paper, we introduce PRIME (PNNL cybeR physIcal systeMs tEstbed): the testbed that integrates real-time transmission system simulator with commercial industry grade energy management system (EMS) software and remote hardware-in-the-loop (RHIL). PRIME is an end-to-end, modular testbed that allows high-fidelity RHIL experimentation of a power system. We present two detailed case studies (fault location and clearing in transmission system, and operator training) to showcase the capabilities of our PRIME testbed. Finally, we briefly discuss some of the potential limitations of our testbed in terms of scalability and flexibility to setup larger test systems and identify directions for future work to address those limitations.

42 ENGINEERING↗

Cyber-Physical Test Platform for Microgrids: Combining Hardware, Hardware-in-the-Loop, and Network-Simulator-in-the-Loop

This paper presents a cyber-physical testbed, developed to investigate the complex interactions between emerging microgrid technologies such as grid-interactive power sources, control systems, and a wide variety of communication platforms and bandwidths. The cyber-physical testbed consists of three major components for testing and validation: real time models of a distribution feeder model with microgrid assets that are integrated into the National Renewable Energy Laboratory's (NREL) power hardware-in-the-loop (PHIL) platform; real-time capable network-simulator-in-the-loop (NSIL) models; and physical hardware including inverters and a simple system controller. Several load profiles and microgrid configurations were tested to examine the effect on system performance with increasing channel delays and router processing delays in the network simulator. Testing demonstrated that the controller's ability to maintain a target grid import power band was severely diminished with increasing network delays and laid the foundation for future testing of more complex cyber-physical systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Controller-Hardware-in-the-Loop Test Bed for Fast-Switching SiC-Based 50-kW PV Inverter

The recent advent of wideband gap power semiconductor devices will lay the path to the future power converters. These devices provide the advantage of high switching speed and lower losses. The high cost and high switching speeds of these devices provide a challenge in the development and validation of the fast switching inverter controls with accuracy of that of a hardware setup. In this paper an FPGA real-time simulator-based controller-hardware-in-the-loop (CHIL) testbed is used to verify the low-level and advanced inverter controls fast switching wide bandgap-based string photovoltaic inverter. The paper also includes development of the CHIL testbed, which is run at a time-step of 500 ns in order to implement 20 kHz switching frequency. The developed CHIL testbed is validated through experimental results from a three-phase, 50 kW, 480 VLLrms SiC devices based inverter.

14 SOLAR ENERGY↗

The G4Foam Experiment: Global climate impacts of regional ocean albedo modification

Reducing insolation has been proposed as a geoengineering response to global warming. Here we present the results of climate model simulations of a unique Geoengineering Model Intercomparison Project Testbed experiment to investigate the benefits and risks of a scheme that would brighten certain oceanic regions. The National Center for Atmospheric Research CESM CAM4-Chem global climate model was modified to simulate a scheme in which the albedo of the ocean surface is increased over the subtropical ocean gyres in the Southern Hemisphere. In theory, this could be accomplished using a stable, nondispersive foam, comprised of tiny, highly reflective microbubbles. Such a foam has been developed under idealized conditions, although deployment at a large scale is presently infeasible. We conducted three ensemble members of a simulation (G4Foam) from 2020 through to 2069 in which the albedo of the ocean surface is set to 0.15 (an increase of 150%) over the three subtropical ocean gyres in the Southern Hemisphere, against a background of the RCP6.0 (representative concentration pathway resulting in +6Wm -2 radiative forcing by 2100) scenario. After 2069, geoengineering is ceased, and the simulation is run for an additional 20 years. Global mean surface temperature in G4Foam is 0.6 K lower than RCP6.0, with statistically significant cooling relative to RCP6.0 south of 30°N. There is an increase in rainfall over land, most pronouncedly in the tropics during the June–July–August season, relative to both G4SSA (specified stratospheric aerosols) and RCP6.0. Heavily populated and highly cultivated regions throughout the tropics, including the Sahel, southern Asia, the Maritime Continent, Central America, and much of the Amazon experience a statistically significant increase in precipitation minus evaporation. The temperature response to the relatively modest global average forcing of -1.5 W m -2 is amplified through a series of positive cloud feedbacks, in which more shortwave radiation is reflected. Finally, the precipitation response is primarily the result of the intensification of the southern Hadley cell, as its mean position migrates northward and away from the Equator in response to the asymmetric cooling.

54 ENVIRONMENTAL SCIENCES↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Testbed Demonstration of a Microgrid Building Block Prototype

With the adoption of ambitious climate action goals, the penetration level of distributed energy resources (DERs) is rapidly increasing. Microgrids are an efficient way to integrate these DERs, facilitating their operation and control. Additionally, microgrids enhance the overall resilience of the distribution system by serving critical loads both within and outside their boundaries. However, the need for substantial customized engineering leads to a high cost of development, installation and maintenance of microgrids. To address this challenge, Microgrid Building Blocks (MBB) are proposed to reduce the deployment cost of microgrids through modular, standardized design and implementation. This work presents a testbed demonstrating the integrated power conversion, control, and communication functionalities of an MBB. The testbed is formed by a real-time electromagnetic transient (EMT) simulation combined with a hardware and software prototype of MBB. The use cases supported by the MBB testbed are enumerated. The islanded operation, voltage regulation, and optimal dispatch capabilities of an MBB-based microgrid controller are validated through a case study.

Somda, Baza [Virginia Tech]↗

Efficient Modeling of HIL Multi-Grid System for Scalability & Concurrency in CPS Security Testbed

Cyber-event-triggered power grid blackout compels utility operators to intensify cyber-aware and physics-constrained recovery and restoration process. Recently, coordinated cyber attacks on the Ukrainian grid witnessed such a cyber-event-triggered power system blackout. Various cyber-physical system (CPS) testbeds have attempted with multitude designs to analyze such interdependent events and evaluate remedy measures. However, resource constraints and modular integration designs have been significant barriers while modeling large-scale grid models (scalability) and multi-grid isolated models (concurrency) under a single real-time execution environment for the hardware-in-the-loop (HIL) CPS security testbeds. This paper proposes a meticulous design and effective modeling for simulating large-scale grid models and multi-grid isolated models in a HIL realtime digital simulator environment integrated with industry-grade hardware and software systems. We have used our existing HIL CPS security testbed to demonstrate scalability by the realtime performance of a Texas-2000 bus US synthetic grid model and concurrency by the real-time performance of simultaneous ten IEEE-39 bus grid models and an IEEE-118 bus grid model. The experiments demonstrated significant results by 100% realtime performance with zero overruns, low latency while receiving and executing control signals from SEL Relays via IEC-61850 protocol and low latency while computing and transmitting grid data streams including stability measures via IEEE C37.118 synchrophasor data protocol to SEL Phasor Data Concentrators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigating coastal backwater effects and flooding in the coastal zone using a global river transport model on an unstructured mesh

Abstract. Coastal backwater effects are caused by the downstream water level increase as a result of elevated sea level, high river discharge and their compounding influence. Such effects have crucial impacts on floods in densely populated regions but have not been well represented in large-scale river models used in Earth system models (ESMs), partly due to model mesh deficiency and oversimplifications of river hydrodynamics. Using two mid-Atlantic river basins as a testbed, we perform the first attempt to simulate the backwater effects comprehensively over a coastal region using the MOSART river transport model under an ESM framework, i.e., Energy Exascale Earth System Model (E3SM) configured on a regionally refined unstructured mesh, with a focus on understanding the backwater drivers and their long-term variations. By including sea level variations at the river downstream boundary, the model performance in capturing backwaters is greatly improved. We also propose a new flood event selection scheme to facilitate the decomposition of backwater drivers into different components. Our results show that while storm surge is a key driver, the influence of extreme discharge cannot be neglected, particularly when the river drains to a narrow river-like estuary. Compound flooding, while not necessarily increasing the flood peaks, exacerbates the flood risk by extending the duration of multiple coastal and fluvial processes. Furthermore, our simulations and analysis highlight the increasing strength of backwater effects due to sea level rise and more frequent storm surge during 1990–2019. Thus, backwaters need to be properly represented in ESMs to improve the predictive understanding of coastal flooding.

54 ENVIRONMENTAL SCIENCES↗

Exploring the Psychometrics of Common Post-Scenario Human Factors Questionnaires of Workload, Situation Awareness, and Perceived Difficulty

Abstract: The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program has the primary mission of sustaining operation of the existing commercial nuclear power plants (NPPs) through a multi-pathway approach in conducting research and development (R&D). In this effort, the role of human factors engineering (HFE) has been an integral in ensuring new digital upgrades that are part of the overall main control room modernization strategy for various U.S. NPPs optimize human-system performance and do not introduce new human failure modes. In this process, testing and evaluation of concept (i.e., prototype) human machine interfaces (HMIs) are done in operator-in-the-loop studies at various stages of the HFE modification process, such as during design and verification and validation (V&V) [1]. During these studies, licensed operators go through select scenarios using a testbed, such as a full-scale simulator or at a NPP’s training simulator, to identify potential usability issues and provide general design feedback regarding the new digital HMIs. Human-system performance is measured and evaluated through a range of objective and self-report measures that capture aspects of plant performance, task performance, workload, situation awareness, and anthropometric and ergonomic concerns [2]. The use of post-scenario questionnaires is an acceptable method for gathering measures of workload and situation awareness. To this end, the NASA-Task Load Index (TLX) [e.g., 3, 4, & 5] and Situation Awareness Rating Technique (SART) [e.g., 6 & 7] are common standardized questionnaires used for evaluating workload and situation awareness, respectively. When combined, these questionnaires consist of a total of 15 questions, each using a different rating scale. Debriefs are also done through interviews with operators to gather design insight after each scenario. Since operator- and training simulator-time is limited, a concern during this post-scenario period of operator-in-the-loop studies is the limited time available to run scenarios, administer post-scenario questionnaires, and debrief within the allotted simulator time. To address this potential problem, this paper explores the psychometric characteristics of NASA-TLX, SART, and a common one-question post-scenario usability questionnaire (i.e., the single ease question – SEQ [8]) in effort to inform future development of a condensed questionnaire that captures aspects of workload and situation awareness. This exploratory work uses data from four different operator-in-the-loop studies completed under prior LWRS operator-in-the-loop studies. Findings from this paper should support future development of a consolidated questionnaire that may be used in operator-in-the-loop studies, when time is compressed, that conforms to the HFE scientific and regulatory requirements set for NPP control room modernization.

99 GENERAL AND MISCELLANEOUS↗