Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

An Update on GPM and TRMM Data Services at NASA GES DISC

The Goddard Earth Sciences (GES) Data and Information Services Center (DISC) is home to data archives of the NASA-JAXA Global Precipitation Measurement (GPM), the Tropical Rainfall Measuring Mission (TRMM), and other NASA missions and projects. To maximize the use of NASA data products in scientific research and applications as well as for societal benefits, we provide data and information services that make datasets easy to find and use through simplification of data access for users at all levels around the world. Over the years, user-friendly data services have been developed at GES DISC, including data subsetting, format conversion, online visualization and analysis (i.e. Giovanni), user support system, etc. We routinely analyze questions, feedback, and use cases from users and algorithm developers around the world as well as best practices and new technology to improve existing services and formulate new data services. Interaction between users and algorithm developers is an important process for identifying issues in products, collecting user requirements, and improving product quality and usability. Staff members regularly communicate with algorithm developers with user questions and concerns through conferences and workshops. We publish peer-reviewed papers and articles in major Earth science journals and book chapters to describe NASA global and regional precipitation datasets and services with examples. News articles about GPM and TRMM datasets associated with significant events are regularly posted in the GES DISC Web portal and social media. We also actively participate in training activities. In this presentation, we present our latest activities about GPM and TRMM data services, data/service metrics, and future plans at GES DISC.

Liu, Z.↗

Interoperability and Concepts of Operation Assessment for Space Relay Services and Partnerships

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.

Eric J Knoblock↗

Zero Trust and Identity Access Management in Support of Service-Based Urban Air Mobility Applications

Urban Air Mobility environments will contain of a collection of service-based services, which will be typically hosted within cloud infrastructures. The underlying data for these UAM services will need to be secured. One approach to securing these UAM services would be to leverage the Zero Trust framework, that focuses on securing services and associated data, instead of securing the network. An early step in moving towards a Zero Trust framework is to standardize identity access manage support for an ever-widening set of services, where users must explicitly be granted access to each service.

UAM↗

Simulation Study for Interoperability of Urban Air Mobility Scheduling and Separation Services in Ideal Conditions

Provision of strategic scheduling and tactical separation services is vital to the safe and efficient operation of vehicles in the urban airspace. This paper describes the efforts made towards the integration of two such services in a simulation environment under ideal conditions and the subsequent studies done on evaluation of system performance. The scheduling and separation services are set up to complement each other to ensure safe separation between airborne aircraft. The utility of these services will become important as the level of traffic increases. This paper describes the simulation experiments conducted to identify cases where the system performance measured by the number of observed losses of separation degrades even with the scheduling and separation services active. From the results obtained, we identify conditions under which the required maneuvers increase and when we observe airborne conflicts even with separation service active. Results obtained will inform requirements for future advancements both in these services independently and in their joint operations.

Urban Air Mobility↗

Simulation Study for Interoperability of Urban Air Mobility Scheduling and Separation Services in Ideal Conditions

Provision of strategic scheduling and tactical separation services is vital to the safe and efficient operation of vehicles in the urban airspace. This paper describes the efforts made towards the integration of two such services in a simulation environment under ideal conditions and the subsequent studies done on evaluation of system performance. The scheduling and separation services are set up to complement each other to ensure safe separation between airborne aircraft. The utility of these services will become important as the level of traffic increases. This paper describes the simulation experiments conducted to identify cases where the system performance measured by the number of observed losses of separation degrades even with the scheduling and separation services active. From the results obtained, we identify conditions under which the required maneuvers increase and when we observe airborne conflicts even with separation service active. Results obtained will inform requirements for future advancements both in these services independently and in their joint operations.

Urban Air Mobility↗

Sustainable Public Transport: Providing Responsive, On-Demand Service with Clean Energy

The National Renewable Energy Laboratory (NREL) uses the Mobility Energy Productivity (MEP) as a metric and a lens to guide applied research into high performance public mobility. In the current initiative to abate global warming, the US needs not only zero-emission vehicles in the transit fleet (such as buses and shuttles) but also time- and cost-effective services to connect people with goods, services and employment toward a high-quality of life. Our current transportation system is overly dependent on personally-owned automobiles for high quality mobility, with public modes being less viable in many areas. Simply electrifying the drivetrains of existing public transit modes will fail to improve the quality of mobility for those that do not have access to private automobiles. The slow rebound by transit from the pandemic reveals the need to reinvent public transit service. Using the MEP lens, NREL researchers have tracked various novel developments in the public mobility space, with the confluence of shared, on-demand transit (ODT) services using light duty vehicles emerging as a key enabler of high-efficiency public mobility. Deployments such as those in Arlington, TX, Dallas, TX, Fort Erie, ON, and Innisfil, ON showcase the use of fleets of light-duty vehicles as the basis for community circulation and first/last mile to intra-regional transit. ODT services have demonstrated improvements in being more time efficient for riders, more energy efficient in operation (even before the introduction of fully electric vehicles), as well as being cost effective. It appears that aspects of the long-awaited promise of Personal Rapid Transit from the 1970s are beginning to be realized through ODT deployments, leveraging transportation network company (TNC) logistics, popularized by Uber and Lyft, but applied to public mobility. Currently, manually driven ODT operations are already cost competitive with traditional transit systems on a cost per ride basis, and full automation promises to reduce costs by 50% while providing additional safety and verified customer service. Connecting these ODT systems with efficient and effective intra-regional backbone transit service is the next step, with transit agencies like DART providing early results. This discussion will walk through the evidence for this postulated outcome and show results from a series of case-studies.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Electricity Markets and Long-Duration Energy Storage: A Survey of Grid Services and Revenue Streams

Purpose of Review Long Duration Energy Storage (LDES) is increasingly viewed as a potential resource for providing grid services that enhance the stability and flexibility of electricity systems. While some LDES services are integrated into existing market frameworks, traditional mechanisms may not fully account for their operational characteristics, potentially leading to undervaluation. Within this context, this paper reviews the literature and industry practices to assess potential grid services for LDES, evaluates existing compensation mechanisms, and identifies challenges to full market integration. Recent Findings We first review existing literature and identify key grid services unique to LDES, including enhancing grid resilience during extreme weather events, enabling long-term energy shifting, and providing flexible and firm energy in systems with limited dispatchable resources. Here, we also review how LDES services are compensated in current market frameworks and the challenges associated with the full realization of LDES values. Additionally, we summarize market mechanisms for storage technologies across U.S. wholesale markets. We find that some markets are adjusting incentive structures, such as incorporating storage duration in capacity accreditation, to better align with system needs and LDES contributions to the grid. However, further refinements in capacity remuneration and dispatch timeframes may be needed for more effective realization of LDES value. Summary This review evaluates potential grid services for LDES, examines existing compensation mechanisms for LDES technologies, and identifies gaps between these mechanisms and LDES operational characteristics. The review concludes by outlining potential market enhancements for more effective LDES integration and articulating additional research needs to support its efficient participation in future power systems.

Flexible resources↗

A Service Portal for the Integrated SCaN Network

The Space Communication and Navigation (SCaN) program office owns the assets and services provided by the Deep Space Network (DSN), Near Earth Network (NEN), and Space Network (SN). At present, these individual networks are operated by different NASA centers--JPL for DSN--and Goddard Space Flight Center (GSFC) for NEN and SN--with separate commitments offices for each center. In the near future, SCaN's program office would like to deploy an integrated service portal which would merge the two commitments offices with the goal of easing the task of user planning for space missions requiring services of two or more of these networks. Following interviews with subject matter experts in this field, use cases were created to include the services and functionality mission users would like to see in this new integrated service portal. These use cases provide a guideline for a mock-up of the design of the user interface for the portal. The benefit of this work will ease the time required and streamline/standardize the process for planning and scheduling SCAN's services for future space missions.

space communications and navigation (SCaN)↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Planning and Monitoring Multi-Job Type Swarm Search and Service Missions

To transition from control theory to real applications, it is important to study missions such as Swarm Search and Service (SSS) where vehicles are not only required to search an area, but also service all jobs that they find. In SSS missions, each type of job requires a group of vehicles to break off from the swarm for a given amount of time to service it. The required number of vehicles and the service rate are unique to each job type. Once a job has been completed, the vehicles are able to return to the swarm for use elsewhere. If not, enough vehicles are present in the swarm at the time that the job is identified, that job is dropped without being serviced. In SSS missions that occur in open environments, the arrival rate of jobs varies dynamically as vehicles move in and out of the swarm to service jobs. Human operators are tasked with effectively planning and managing these complex missions. This paper presents a user study that seeks to test the efficacy and ease-of-use of a prediction model known as the Hybrid Model as an aid in planning and monitoring tasks. Results show that the novel computational model aid allows operators to more effectively choose the necessary swarm size to handle expected mission workload, as well as, maintain sufficient situation awareness to evaluate the performance of the swarm during missions.

swarm search and service↗

Framework for NASA Space Relay Satellite Services Over the Next Decade: “Development and Demonstration of the Commercial Successors to TDRS "

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the Agency has no plans to replenish the Tracking and Data Relay Satellite System (TDRSS) fleet operated by the Space Communication and Navigation Program (SCaN) and will instead pursue commercial services for communications with spacecraft in near-Earth orbit. The Communications Services Project (CSP) at GRC is leading this commercialization effort and in May 2022 it awarded six contracts to commercial SATCOM companies to demonstrate and validate commercial SATCOM capabilities for future NASA and near space user missions. The responses from the vendors indicated a strong interest in providing commercial services to NASA’s missions and included a wide range of proposed architectures and demonstrations concepts. Overall, the responses indicated that a mature and healthy competitive environment exists with traditional satellite operators and constellation developers to provide NASA and future near space users with commercial communication services in the next five years. This paper will present an overview of the proposed capability coverages, risk spread, and US domestic market stimulation, along with common themes and conclusions. The result of these demonstrations will serve as the basis for acquisition and provision of operational SATCOM services for NASA missions.

SATCOM↗

Processes and Methods used for NASA Communications Services Project Conceptualization and Formulation

The U.S. National Aeronautics and Space Administration (NASA) is partnering with the commercial SATCOM industry to demonstrate the industry’s capabilities to provide services to NASA’s near-Earth missions. Leveraging commercial capabilities will become increasingly necessary for NASA, as its incumbent Government-owned-and-operated near-Earth satellite network, the Tracking and Data Relay Satellite System (TDRSS), will approach retirement towards the end of the current decade. NASA is actively taking the first steps to making the vision of using commercial SATCOM a reality. For more than two years, NASA’s Communication Services Project (CSP) has been evaluating the feasibility of employing commercial satellite communication (SATCOM) networks for near-Earth operations. This past April, CSP awarded US$278.5 million in Funded Space Act Agreements to select commercial SATCOM providers, so they may begin developing and demonstrating their specific near-Earth space communication services that may support future agency missions. Each company will match or exceed agency contributions during the five-year development and demonstration period, totaling more than $1.5 billion of cost-share investment. The companies will complete technology development and in-space demonstrations by 2025, after which NASA intends to seek multiple long-term contracts to acquire these kinds of services. The six companies (Inmarsat Government Inc., Kuiper Government Solutions (KGS), SES Government Solutions, Space Exploration Technologies (SpaceX), Telesat U.S. Services and Viasat Inc.) will shortly begin developing and demonstrating their capabilities to provide services, ranging from launch to standard on-orbit operations. The demonstrations will be across multiple spectrum regimes from L-Band to optical, and will utilize Geostationary Orbit (GEO), Medium-Earth Orbit (MEO) and Low-Earth Orbit (LEO) constellations. This paper discusses methodologies and processes used over the past two years to reach the point of entering into these partnerships. It also includes CSP’s goals and objectives going forward, following the award of six Funded Space Act Agreements to commercial SATCOM providers to develop and demonstrate these capabilities.

Communications Services Project↗

Processes and Methods used for Nasa Communications Services Project Conceptualization and Formulation

The U.S. National Aeronautics and Space Administration (NASA) is partnering with the commercial SATCOM industry to demonstrate the industry’s capabilities to provide services to NASA’s near-Earth missions. Leveraging commercial capabilities will become increasingly necessary for NASA, as its incumbent Government-owned-and-operated near-Earth satellite network, the Tracking and Data Relay Satellite System (TDRSS), will approach retirement towards the end of the current decade. NASA is actively taking the first steps to making the vision of using commercial SATCOM a reality. For more than two years, NASA’s Communication Services Project (CSP) has been evaluating the feasibility of employing commercial satellite communication (SATCOM) networks for near-Earth operations. This past April, CSP awarded US$278.5 million in Funded Space Act Agreements to select commercial SATCOM providers, so they may begin developing and demonstrating their specific near-Earth space communication services that may support future agency missions. Each company will match or exceed agency contributions during the five-year development and demonstration period, totaling more than $1.5 billion of cost-share investment. The companies will complete technology development and in-space demonstrations by 2025, after which NASA intends to seek multiple long-term contracts to acquire these kinds of services. The six companies (Inmarsat Government Inc., Kuiper Government Solutions (KGS), SES Government Solutions, Space Exploration Technologies (SpaceX), Telesat U.S. Services and Viasat Inc.) will shortly begin developing and demonstrating their capabilities to provide services, ranging from launch to standard on-orbit operations. The demonstrations will be across multiple spectrum regimes from L-Band to optical, and will utilize Geostationary Orbit (GEO), Medium-Earth Orbit (MEO) and Low-Earth Orbit (LEO) constellations. This paper discusses methodologies and processes used over the past two years to reach the point of entering into these partnerships. It also includes CSP’s goals and objectives going forward, following the award of six Funded Space Act Agreements to commercial SATCOM providers to develop and demonstrate these capabilities.

Communications Services Project↗

Native bee Pollination Ecosystem Services in Agricultural Wetlands and Riparian Protected Lands

Abstract Many freshwater wetlands and riparian systems are protected within agricultural landscapes. Yet, pollinator ecosystem services are seldom considered key ecosystem services provided by these conservation easements. The purpose of this study is to explore the extent of protected aquatic lands to provide pollination ecosystem services by assessing pollinator abundances, crop yield changes, and value estimations of increased soybean yields from a subset of common native solitary bees. We created a novel geodatabase of United States Department of Agriculture (USDA) conservation easements and used this database in the InVEST crop pollination model to model wild solitary bee pollination. We then estimated the monetary value of yield increases provided by pollinators. We found that wetland uplands provided the greatest potential for pollination services for ground nesting bees, followed by herbaceous and forested riparian respectively. Stem nesters preferred forested riparian, then upland habitats. In soybeans fields, we found wild pollinators can provide up to 5.5% yield response from current private aquatic conservation lands. The current landscape is not optimized to use wetlands and riparian conservation lands as pollinator habitat, but these results suggest protected aquatic lands can sustainably increase wild pollination services to agricultural crops if landscapes are managed, protected, and optimized with pollinator services as co-benefit.

Hinson, Audra L. (ORCID:0000000242314820)↗

Developing a Framework for Valuation of Grid Services

The electric system is rapidly evolving and growing, raising new questions about how to define and value grid services delivered by a diverse set of resources, including customer-owned assets. This report advances a service–parameter–value framework that links what a grid service does to why it matters, and how its benefits are evidenced. We build upon prior efforts (Bender et al. 2021) and extend them to include value categories (reliability, resilience, cost & access, and security) with primary and secondary tiers, service-specific value streams that explain how benefits materialize, and metrics that make valuation traceable and comparable. We apply the framework to the six core grid services defined in (Kolln et al. 2023): Frequency Response, Regulation, Reserves, Energy, Voltage Management, and Blackstart and demonstrate it on three use cases to highlight the adaptability of these value streams. Further, we outline how the framework integrates with existing tools such as asset optimization, hosting capacity and cost-benefit analysis, and propose a path to portable qualifications and consistent stacking rules for use in tariffs and filings. Finally, we identify future pathways for research and application research needs to support standardization and decision-ready comparisons across services, assets, and architectures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Public Service Communications Satellite User Requirements Workshop

Information on user requirements for public service communications was acquired to provide the basis of a study to determine the optimum satellite system to satisfy user requirements. The concept for such a system is described: Topics discussed included requirements for data and message services, elementary and secondary education, extension and continuing education, environmental communications, library services, medical education, medical services, public broadcasting, public safety, religious applications, state and local communications, and voluntary services. Information was also obtained on procedures to follow to make the transfer to commercial services.

Wolff, E. A.↗

Integrated orbital servicing study follow-on. Volume 2: Technical analysis and system design

In-orbit service functional and physical requirements to support both low and high Earth orbit servicing/maintenance operations were defined, an optimum servicing system configuration was developed and mockups and early prototype hardware were fabricated to demonstrate and validate the concepts selected. Significant issues addressed include criteria for concept selection; representative mission equipment and approaches to their design for serviceability; significant serviceable spacecraft design aspects; servicer mechanism operation in one-g; approaches for the demonstration/simulation; and service mechanism structure design approach.

Source record↗

NASA service experience with composite components

NASA Langley has been active in sponsoring flight service programs with advanced composites during the past decade. A broad data base and confidence in the durability of composite structures are being developed. Flight service experience is reported for more than 140 composite aircraft components with up to 8 years service and almost two million successful component flight hours. Composite components are being evaluated on Boeing, Douglas, and Lockheed transport aircraft. Components are currently under development for service evaluation on Bell and Sikorsky helicopters. Design concepts and inspection and maintenance results are reported for components currently in service. Components under development in the NASA Aircraft Energy Efficiency (ACEE) program are discussed. Results of flight, outdoor ground, and controlled laboratory environmental tests on composite materials used in the flight service programs are also presented.

Dexter, H. B.↗