Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “science orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Planetary Protection Trajectory Analysis for the Juno Mission

Juno is an orbiter mission expected to launch in 2011 to Jupiter. Juno's science orbit is a highly eccentric orbit with a period of about 11 days and a nominal duration of one year. Initially, the equatorial crossing near apojove occurs outside Callisto's orbit, but as the mission evolves the apsidal rotation causes this distance to move much closer to Jupiter. This motion could lead to potential impacts with the Galilean satellites as the ascending node crosses the satellite orbits. In this paper, we describe the method to estimate impact probabilities with the satellites and investigate ways of reducing the probabilities for the Juno mission.

Lam, Try↗

Trajectory Design for the Lunar Polar Hydrogen Mapper Mission

The presented trajectory was designed for the Lunar Polar Hydrogen Mapper (LunaH-Map) 6U CubeSat, which was awarded a ride on NASAs Space Launch System (SLS) with Exploration Mission 1 (EM-1) via NASAs 2015 SIMPLEX proposal call. After deployment from EM-1s upper stage (which is planned to enter heliocentric space via a lunar flyby), the LunaH-Map CubeSat will alter its trajectory via its low-thrust ion engine to target a lunar flyby that yields a Sun-Earth-Moon weak stability boundary transfer to set up a ballistic lunar capture. Finally, the orbit energy is lowered to reach the required quasi-frozen science orbit with periselene above the lunar south pole.

lunar polar orbit↗

Planetary protection trajectory analysis for the Juno mission

Juno is an orbiter mission expected to launch in 2011 to Jupiter. Juno’s science orbit is a highly eccentric orbit with a period of about 11 days and a nominal duration of one year. Initially, the equatorial crossing near apojove occurs outside Callisto’s orbit, but as the mission evolves the apsidal rotation causes this distance to move much closer to Jupiter. This motion could lead to potential impacts with the Galilean satellites as the ascending node crosses the satellite orbits. In this paper, we describe the method to estimate impact probabilities with the satellites and investigate ways of reducing the probabilities for the Juno mission.

Kowalkowski, Theresa D.↗

Radio Science Concepts and Approaches for Jupiter Icy Moons Orbiter

Radio Science experiments have been conducted on most deep space missions leading to numerous scientific discoveries. A set of concepts and approaches are proposed for the Jupiter Icy Moons Orbiter (JIMO) to apply Radio Science tools to investigate the interior structures of the Galilean Satellites and address key questions on their thermal and dynamical evolution. Measurements are identified that utilize the spacecraft's telecommunication system. Additional instruments can augment these measurements in order to leverage observational synergies. Experiments are also offered for the purpose of investigating the atmospheres and surfaces of the satellites.

Anderson, J. D.↗

The Mars Reconnaissance Orbiter Mission: Continuing a Record of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter (MRO) has been on station in its low altitude, sun-synchronous, primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. The spacecraft is a very capable remote sensing science platform carrying six science payloads supporting seven investigations and a UHF telecommunications radio (Electra) for surface relay. Developed to support a mix of nadir mapping and targeted, highresolution surface observations, the spacecraft’s powerful telecommunications and command & data handling (C&DH) subsystems communicate an average of 16 hours a day with the Deep Space Network (DSN). To date, more than 300 TB of scientific data has been returned to Earth. All of the original science payloads are active with standard and new observing modes contributing to the advancement of Mars science through peer-reviewed paper publications and the timely dissemination of their data to the science community as a whole. Results from the science teams have revealed an amazing diversity of ancient aqueous environments and ongoing surface change is evident through gully formation, avalanches, and cratering. Extending the MRO-MGS climate record to a decade of Mars years is contributing to a better understanding of current atmospheric and polar processes. In addition to its fundamental scientific objectives, MRO is a critical element of NASA’s Mars Exploration Program (MEP) providing needed infrastructure support for landed and future missions. Using its Electra telecommunications payload, MRO provides landers and rovers critical event coverage during their entry, descent, and landing (EDL) phases and UHF relay support once they are on the Martian surface. MRO’s high-resolution imagers are used to scout potential landing sites and certify safe zones for landing. As MRO begins its Fourth Extended Mission, the spacecraft remains fully capable of carrying out an ambitious science observing plan and the programmatic tasks assigned to it. In addition to highlighting recent discoveries of the mission, this paper describes recent challenges the spacecraft engineers have faced in flight and the plans for extending spacecraft life well into the 2020’s.

Tamppari, Leslie K.↗

Pioneer Venus Orbiter Ultraviolet Spectrometer: Operations and Data Analysis

The Pioneer Venus spacecraft orbited Venus 5,055 times between 4th December 1978 and 6th October 1992, before entering Venus' atmosphere and burning up on the latter date. On 255 of these orbits, science operations were suspended because of superior conjunction (Venus' proximity to the Sun as seen from Earth). Of the remaining 4800 orbits, about 85% yielded good-quality OUVS science data; 15% were lost to various problems, including loss of uplink (commands) to and downlink (data) from the spacecraft, errors in commanding OUVS, and one or other of the two instrument anomalies mentioned below.

Stewart, A. I. F.↗

Early Mission Maneuver Operations for the Deep Space Climate Observatory Sun-Earth L1 Libration Point Mission

The Deep Space Climate Observatory mission launched on February 11, 2015, and inserted onto a transfer trajectory toward a Lissajous orbit around the Sun-Earth L1 libration point. This paper presents an overview of the baseline transfer orbit and early mission maneuver operations leading up to the start of nominal science orbit operations. In particular, the analysis and performance of the spacecraft insertion, mid-course correction maneuvers, and the deep-space Lissajous orbit insertion maneuvers are discussed, com-paring the baseline orbit with actual mission results and highlighting mission and operations constraints..

OPERATIONS↗

DARE Mission Design: Low RFI Observations from a Low-Altitude Frozen Lunar Orbit

The Dark Ages Radio Explorer (DARE) seeks to study the cosmic Dark Ages approximately 80 to 420 million years after the Big Bang. Observations require truly quiet radio conditions, shielded from Sun and Earth electromagnetic (EM) emissions, on the far side of the Moon. DAREs science orbit is a frozen orbit with respect to lunar gravitational perturbations. The altitude and orientation of the orbit remain nearly fixed indefinitely, maximizing science time without the need for maintenance. DAREs observation targets avoid the galactic center and enable investigation of the universes first stars and galaxies.

Plice, Laura↗

Mars-Approach Navigation Using In Situ Orbiters

A document discusses the continuing development of a navigation system that would enable a spacecraft to approach Mars on a trajectory precise enough to enable the spacecraft to land within 1 km of a specified location on the Martian surface. This degree of accuracy would represent an order-of-magnitude improvement over that now obtained in radiometric tracking by use of the Deep Space Network. The navigation system would be implemented largely in software running in digital processors in the Electra transceiver, the Mars Network s standard radio transceiver, that would be in both the approaching spacecraft and Mars Network orbiter. The Mars Network is an ad hoc constellation of existing and future Mars science orbiters and dedicated telecommunication orbiters that has been established as a communication and navigation infrastructure to support the exploration of Mars. The software would exploit the sensory and data-processing capabilities of the Electra transceivers to gather Doppler-shift and other radiometric tracking data and process those data into trajectories data that would be accurate to within 0.3 km at the point of entry into the Martian atmosphere (as needed to land within 1 km of a target surface location).

Duncan, Courtney↗

Study of ballistic mode Mercury Orbiter missions. Volume 1: Summary report

A summary is given of the scope, approach, and major results of the study of ballistic mode Mercury orbit missions (the Mariner Venus-Mercury spacecraft). The performance potential of ballistic flight mode is presented along with a study of alternate flight techniques. Orbit selection considerations are discussed in terms of the thermal environment of Mercury. Orbiter science experiments are summarized. Technology assessments were conducted for major subsystems appropriate to spin-stabilized and three-axis-stabilized spacecraft designs. Conclusions from this study are: ballistic mode Mercury orbiter missions offer adequate performance for effective follow-up of the MVM'73 science findings; the existing and programmed technology base is adequate for implementation of Mercury orbit spacecraft design; and when pending MVM flyby has been accomplished and the results analyzed, the data base will be adequate to support detailed orbiter spacecraft design efforts.

Hollenbeck, G. R.↗

Low Altitude Mapping Orbit Design and Maintenance for the Dawn Discovery Mission at Vesta

NASA's Dawn discovery mission will orbit the giant asteroid Vesta beginning in the summer of 2011. Four different near polar science orbits are planned. The lowest planned orbit at Vesta is called the Low Altitude Mapping Orbit or LAMO and is by far the most challenging to design and maintain due to the strong, nonspherical gravity expected there. This paper describes the orbit selection process. The true gravity field of Vesta remains highly uncertain. The proposed orbit selection process will be applied once sufficient gravity knowledge is obtained at higher orbits. The orbit selection process is applied here to a fictitious gravity field based on a Hubble space telescope shape model for Vesta assuming uniform density. The outcome of the process described here is a variety of stable orbits. However, Initially stable orbits at the LAMO altitude are not expected to remain stable operationally due to the unpredictable impulses resulting from the Dawn spacecraft thruster firings to de-saturate its momentum wheels. As a result, orbital maintenance maneuvers will be probably be necessary. This paper also briefly describes the statistical maneuver design process that resulted in the orbit maintenance plan.

orbit stability↗

Preparing for Dawn's Mission at Ceres: Challenges and Opportunities in the Exploration of a Dwarf Planet

After escaping from Vesta in 2012, Dawn is continuing its 2.5-year flight to dwarf planet Ceres. Investigating this second destination promises to provide a view of an intriguing world of ice and rock, likely displaying fascinating geology entirely unlike any body yet orbited by a spacecraft. Dawn spends the significant majority of the time thrusting with its ion propulsion system to deliver the 3.6 km/s required to rendezvous with Ceres. Meanwhile, the operations team has developed the sequences that will be used there. Following orbit capture in March 2015, Dawn will fly to a series of four circular polar science orbits. The orbits, ranging from about 13,500 km to 375 km in altitude, are designed to optimize the scientific observations. The overall strategy for exploring Ceres is based strongly on the extremely successful 16 months of Vesta operations, during which Dawn met or exceeded all of its objectives. Nevertheless, the loss of two of the spacecraft's four reaction wheels has necessitated some important changes. Based on a very productive hydrazine conservation campaign in the interplanetary cruise and the development of new hydrazine-efficient methods of operating at Ceres, there is good reason to expect that Dawn will be able to accomplish all of its objectives regardless of the health of the reaction wheels. This paper describes the progress in traveling to Ceres as well as the plans for exploring this giant, icy world.

Vesta↗

NASA Operational Simulator for SmallSats (NOS3): Design Reference Mission

The NASA Operational Simulator for Small Satellites (NOS3) has undergone significant advances including updating the framework to be “component” based and expanding the open-source code to include a generic design reference mission to enable advanced technologies. This paper details the changes to the framework as well as a number of innovative use-cases the team is currently supporting such as 1) the expansion of NOS3 to support distributed systems missions in collaboration with NASA GSFC, 2) the integration of NASA JPL’s Science Yield improvement via Onboard Prioritization and Summary of Information Systems (SYNOPSIS) for on-orbit science data prioritization, and 3) the inclusion of NASA IV&V’s software-only CCSDS encryption library (CryptoLib). NOS3 continues to serve the SmallSat community by providing an open-source digital twin that can significantly reduce costs associated with spacecraft software development, test, and operations. The NOS3 team hopes to continue to expand the resources available to the community and partner with others to resolve issues and add new features requested via the NASA GitHub.

SmallSats↗

Execution of the Spitzer In-orbit Checkout and Science Verification Plan

The Spitzer Space Telescope is an 85-cm telescope with three cryogenically cooled instruments. Following launch, the observatory was initialized and commissioned for science operations during the in-orbit checkout (IOC) and science verification (SV) phases, carried out over a total of 98.3 days. The execution of the IOC/SV mission plan progressively established Spitzer capabilities taking into consideration thermal, cryogenic, optical, pointing, communications, and operational designs and constraints. The plan was carried out with high efficiency, making effective use of cryogen-limited flight time. One key component to the success of the plan was the pre-launch allocation of schedule reserve in the timeline of IOC/SV activities, and how it was used in flight both to cover activity redesign and growth due to continually improving spacecraft and instrument knowledge, and to recover from anomalies. This paper describes the adaptive system design and evolution, implementation, and lessons learned from IOC/SV operations. It is hoped that this information will provide guidance to future missions with similar engineering challenges

operations↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

Jovian system science issues and implications for a Mariner Jupiter Orbiter mission

Science goals for missions to Jupiter in the early 1980's are reviewed and a case is made for the science community to play the key role in assigning relative priorities for these goals. A reference set of measurement requirements and their priorities is established and those high priority goals that are most demanding on spacecraft and mission design are used to develop a reference mission concept. An orbiter mission is required to satisfy a majority of the measurements, and a spacecraft data handling capability as least equivalent to the Mariner Jupiter/Saturn spacecraft is the major system design driver. This reference Mission Concept is called Mariner Jupiter Orbiter. The remaining measurement requirements are reviewed in light of the potential science return of this mission, and certain options are developed to augment this science return. Two attractive options fulfill high priority objectives not achieved by the reference Mariner Jupiter Orbiter mission alone: an atmospheric entry probe, released prior to orbit insertion; and a daughter satellite dedicated to particle and fields measurements, ejected into an independent orbit about Jupiter.

Beckman, J. C.↗

Neptune Orbiters Utilizing Solar and Radioisotope Electric Propulsion

In certain cases, Radioisotope Electric Propulsion (REP), used in conjunction with other propulsion systems, could be used to reduce the trip times for outer planetary orbiter spacecraft. It also has the potential to improve the maneuverability and power capabilities of the spacecraft when the target body is reached as compared with non-electric propulsion spacecraft. Current missions under study baseline aerocapture systems to capture into a science orbit after a Solar Electric Propulsion (SEP) stage is jettisoned. Other options under study would use all REP transfers with small payloads. Compared to the SEP stage/Aerocapture scenario, adding REP to the science spacecraft as well as a chemical capture system can replace the aerocapture system but with a trip time penalty. Eliminating both the SEP stage and the aerocapture system and utilizing a slightly larger launch vehicle, Star 48 upper stage, and a combined REP/Chemical capture system, the trip time can nearly be matched while providing over a kilowatt of science power reused from the REP maneuver. A Neptune Orbiter mission is examined utilizing single propulsion systems and combinations of SEP, REP, and chemical systems to compare concepts.

Fiehler, Douglas I.↗

Juno Orbit Determination Experience During First Year At Jupiter

The Juno spacecraft successfully inserted into a polar orbit around Jupiter on 5- July-2016. Since the Jupiter Orbit Insertion (JOI) maneuver, Juno has completed six orbits around Jupiter. The mission plan at the time of JOI was for Juno to perform two 53.5-day capture orbits before executing a Period Reduction Maneuver (PRM) to place the spacecraft into its intended 14-day science orbit. This maneuver was canceled due to a concern with the propulsion system. As a result, the Juno spacecraft will remain in its longer orbit period for rest of its mission. This paper discusses the Navigation Team’s experience: the orbit determination strategy and how it changed due to the cancellation of the PRM, challenges fitting the data during perijove, and how we reconstructed the trajectory during Juno’s first year in orbit.

Thompson, Paul↗