Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

A Parametric Study on Using Active Debris Removal for LEO Environment Remediation

Recent analyses on the instability of the orbital debris population in the low Earth orbit (LEO) region and the collision between Iridium 33 and Cosmos 2251 have reignited the interest in using active debris removal (ADR) to remediate the environment. There are; however, monumental technical, resource, operational, legal, and political challenges in making economically viable ADR a reality. Before a consensus on the need for ADR can be reached, a careful analysis of its effectiveness must be conducted. The goal is to demonstrate the need and feasibility of using ADR to better preserve the future environment and to guide its implementation to maximize the benefit-to-cost ratio. This paper describes a new sensitivity study on using ADR to stabilize the future LEO debris environment. The NASA long-term orbital debris evolutionary model, LEGEND, is used to quantify the effects of several key parameters, including target selection criteria/constraints and the starting epoch of ADR implementation. Additional analyses on potential ADR targets among the currently existing satellites and the benefits of collision avoidance maneuvers are also included.

Source record↗

Remediation Technology Collaboration Development

This slide presentation reviews programs at NASA aimed at development at Remediation Technology development for removal of environmental pollutants from NASA sites. This is challenging because there are many sites with different environments, and various jurisdictions and regulations. There are also multiple contaminants. There must be different approaches based on location and type of contamination. There are other challenges: such as costs, increased need for resources and the amount of resources available, and a regulatory environment that is increasing.

Mahoney, John↗

Mechanical alloying of a hydrogenation catalyst used for the remediation of contaminated compounds

A hydrogenation catalyst including a base material coated with a catalytic metal is made using mechanical milling techniques. The hydrogenation catalysts are used as an excellent catalyst for the dehalogenation of contaminated compounds and the remediation of other industrial compounds. Preferably, the hydrogenation catalyst is a bimetallic particle including zero-valent metal particles coated with a catalytic material. The mechanical milling technique is simpler and cheaper than previously used methods for producing hydrogenation catalysts.

Quinn, Jacqueline W.↗

Remediation Technologies Eliminate Contaminants

All research and development has a story behind it, says Jacqueline Quinn, environmental engineer at Kennedy Space Center. For Quinn, one such story begins with the Saturn 1B launch stand at Kennedy and ends with a unique solution to a challenging environmental problem. Used in a number of Apollo missions and during the Skylab program, the Saturn 1B launch stand was dismantled following the transition to the Space Shuttle Program and stored in an open field at Kennedy. Decades later, the Center s Environmental Program Office discovered evidence of chemicals called polychlorinated biphenyls (PCBs) in the field s soil. The findings were puzzling since PCBs a toxin classified as a probable carcinogen by the Environmental Protection Agency (EPA) have been banned in the United States since 1979. Before the ban, PCBs were commonly used in transformer oils that leached into the ground when the oils were changed out and dumped near transformer sites, but there were no electrical transformers near the dismantled stand. It soon became apparent that the source of the PCBs was the launch stand itself. Prior to the ban, PCBs were used extensively in paints to add elasticity and other desirable characteristics. The PCB-laden paint on the Saturn 1B launch stand was flaking off into the field s soil. Nobody knew there were PCBs in the paint, says Quinn, noting that the ingredient was not monitored carefully when it was in use in 1960s. In fact, she says, the U.S. EPA was not even established until 1970, a year after Neil Armstrong first set foot on the Moon. Nobody knew any better at the time, Quinn says, but today, we have the responsibility to return any natural environmental media to as close to pristine a condition as possible. Quinn, fellow engineer Kathleen Loftin, and other Kennedy colleagues already had experience developing unprecedented solutions for environmental contamination; the team invented the emulsified zero-valent iron (EZVI) technology to safely treat groundwater tainted by chlorinated solvents once used to clean rocket engine components. The award-winning innovation (Spinoff 2010) is now NASA s most licensed technology to date. PCBs in paint presented a new challenge. Removing the launch stand for recycling proved a difficult operation; the toxic paint had to be fully stripped from the steel structure, a lengthy and costly process that required the stripped paint to be treated before disposal. Noting the lack of efficient, environmentally friendly options for dealing with PCBs, Quinn and her colleagues developed the Activated Metal Treatment System (AMTS). AMTS is a paste consisting of a solvent solution containing microscale particles of activated zero-valent metal. When applied to a painted surface, the paste extracts and degrades the PCBs into benign byproducts while leaving the paint on the structure. This provides a superior alternative to other methods for PCB remediation, such as stripping the paint or incinerating the structure, which prevents reuse and can release volatized PCBs into the air. Since its development, AMTS has proven to be a valuable solution for removing PCBs from paint, caulking, and various insulation and filler materials in older buildings, naval ships, and former munitions facilities where the presence of PCBs interferes with methods for removing trace explosive materials. Miles of potentially toxic caulking join sections of runways at airports. Any of these materials installed before 1979 potentially contain PCBs, Quinn says. "This is not just a NASA problem," she says. "It s a global problem."

Source record↗

The Near-Earth Orbital Debris Problem and the Challenges for Environment Remediation

The near-Earth space environment has been gradually polluted with orbital debris (OD) since the beginning of space activities 55 years ago. Although this problem has been known to the research community for decades, the public was, in general, unaware of the issue until the anti-satellite test conducted by China in 2007 and the collision between Cosmos 2251 and the operational Iridium 33 in 2009. The latter also underlined the potential of an ongoing collision cascade effect (the "Kessler Syndrome") in the low Earth orbit (LEO, the region below 2000 km altitude). Recent modeling results have indicated that mitigation measures commonly adopted by the international space community will be insufficient to stabilize the LEO debris population. To better limit the OD population increase, more aggressive actions must be considered. There are three options for OD environment remediation-removal of large/massive intact objects to address the root cause of the OD population growth problem, removal of ~5-mm-to-1 cm debris to mitigate the main mission-ending threats for the majority of operational spacecraft, and prevention of major debris-generating collisions as a temporary means to slow down the OD population increase. The technology, engineering, and cost challenges to carry out any of these three options are monumental. It will require innovative ideas, game-changing technologies, and major collaborations at the international level to address the OD problem and preserve the near-Earth environment for future generations.

Liou, Jer-Chyi↗

Mechanical alloying of a hydrogenation catalyst used for the remediation of contaminated compounds

A hydrogenation catalyst including a base material coated with a catalytic metal is made using mechanical milling techniques. The hydrogenation catalysts are used as an excellent catalyst for the dehalogenation of contaminated compounds and the remediation of other industrial compounds. Preferably, the hydrogenation catalyst is a bimetallic particle including zero-valent metal particles coated with a catalytic material. The mechanical milling technique is simpler and cheaper than previously used methods for producing hydrogenation catalysts.

Quinn, Jacqueline W.↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

Remediating Non-Positive Definite State Covariances for Collision Probability Estimation

The NASA Conjunction Assessment Risk Analysis team estimates the probability of collision (Pc) for a set of Earth-orbiting satellites. The Pc estimation software processes satellite position+velocity states and their associated covariance matri-ces. On occasion, the software encounters non-positive definite (NPD) state co-variances, which can adversely affect or prevent the Pc estimation process. Inter-polation inaccuracies appear to account for the majority of such covariances, alt-hough other mechanisms contribute also. This paper investigates the origin of NPD state covariance matrices, three different methods for remediating these co-variances when and if necessary, and the associated effects on the Pc estimation process.

Hall, Doyle T.↗

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Presentation accompanying the technical report with the same name. The abstract for the report and the full study is repeated below. Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Utilizing the Inflation Reduction Act to Remediate and Redevelop Energy Assets and Sites

There are thousands of retired and operating energy sites located in communities throughout the country waiting to be cleaned up and modernized. Together with other existing federal grants and tax credits, the newly created Energy Infrastructure Reinvestment (EIR) loan guarantees from the Department of Energy can catalyze capital investment in these sites, empowering local communities and reducing carbon pollution. The IRA makes available up to $250 billion in EIR loan guarantees and up to $5 billion in EIR credit subsidy to support remediating, repurposing, and redeveloping eligible sites. EIR provides opportunities for reinvestment in America’s energy communities amid the energy industry’s ongoing transformation to reduce carbon pollution. This resource guide describes four possible redevelopment models that align EIR resources with EPA Brownfield Grants and the energy community tax credit program.

Eisdorfer, Jason G↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating Formal Methods Tools and their Applicability for Hardware Vulnerability Remediation

Formal methods use mathematical logic and equations to prove that a system or code is secure. In this poster, I examine existing formal methods tools and their application for projects working to remediate vulnerabilities in hardware and hardware description language. This poster is focused on the tools ReWire and AutoGenILA and I hope to evaluate their benefits and weaknesses with the intention of creating an internal report on the application and weaknesses of existing formal methods tools and identifying gaps for future formal methods tool creation.

97 - MATHEMATICS AND COMPUTING↗

Multi-physics modeling of injected nanoparticles effect on remediation of CO 2 leakage through cracks

One potential risk in CO 2 sequestration is the leakage of carbon dioxide, which can result in contamination of underground water, creating potential threats to existing ecosystems. The common leakage pathway is through the pre-existing fractures or discontinuities within cement in the wellbore, incurred by the environmental conditions imposed on the cement. Injecting nanoparticles into pre-existing cracks is one of the most recently proposed ideas for mitigating fracture propagation in cement CO 2 sequestration. To demonstrate the feasibility of this new technology, a numerical approach was taken in this work, as it is challenging to investigate it in a laboratory setting. We proposed a coupled ALE (Arbitrary Lagrangian–Eulerian)–DEM (Discrete Element Method)–peridynamic modeling strategy within the LS-Dyna package to investigate the intertwined interaction among the CO 2 fluid flow, native fluid (e.g., brine), particle clusters, and cracks within the cement. The numerical results demonstrate that injected nanoparticles can effectively reduce the pressure exerted on the crack surface. Accordingly, the potential fracture propagation at the crack tip would be reduced compared to corresponding cases without nanoparticels as pressurized by fluid flow. This result verifies the effectiveness of proposed nanoparticle injection technology. Finally, using this established modeling strategy, the effect of filling particles on the fracture mitigation for different crack geometries (e.g. particle cluster patterns, aspect ratio of crack aperture and length) and CO 2 reservoir pressure are examined. The result shows that injected particles successfully reduce the fracture propagation in these scenarios.

42 ENGINEERING↗

Ion-Specific Precipitation of Extractants Enables Rare-Earth Separation and Wastewater Remediation from Solvent Extraction of Critical Elements

The increasing demand for rare-earth elements (REEs) necessitates sustainable recovery strategies, particularly from secondary sources, such as electronic waste. Solvent extraction is the primary industrial method for REE separation; however, the unintentional dissolution of extractants into wastewater poses serious environmental risks, leading to organic contamination and process inefficiencies. Existing wastewater treatment methods struggle to remove these persistent pollutants, underscoring the need for innovative recovery approaches. Herein, we present a ligand-mediated precipitation strategy that simultaneously recovers REEs and removes dissolved extractants from solvent extraction wastewater. We show that residual extractants in the aqueous phase can selectively bind REEs, inducing their precipitation while leaving transition metals in solution. By integrating FTIR spectroscopy, EDS, XPS, EXAFS, and SAXS, we elucidate the mechanism of ion-specific precipitation and the local coordination environment of metal ions in the precipitate. Importantly, we demonstrate that the precipitated extractants can be efficiently recovered and reused, providing a closed-loop solution that enhances sustainability. Applying this method to leachates from samarium–cobalt (Sm–Co) and neodymium–iron–boron (NdFeB) mixed magnets, we achieve highly selective REE precipitation under mild conditions, demonstrating a scalable and cost-effective pathway for REE recovery, wastewater purification, and extractant recycling. In conclusion, by integrating element-specific ligand-mediated precipitation with extractant reuse, this work offers a transformative approach to REE separation that reduces the environmental impact while improving resource efficiency.

E-waste↗