Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power generation dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Estimating Energy Market Schedules Using Historical Price Data: Preprint

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets increases uncertainty and creates new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. This is orders of magnitude less data than required for a market clearing calculation with a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cognitive Grid Optimization

This project laid the foundation to include a security constrained economic dispatch (SCED) within one of the leading simulators which is used to train system operators who keep the lights on for over 150 million people in USA. The SCED is designed to handle very high penetrations of renewable generation as well as battery storage. As a follow on the this project, a Trusted Source Model of the North American Electric Interconnections will be built from public GIS data. The various North American Markets will be emulated. This Trusted Source Model will grow the software developers for the next generation of power applications that are needed to transition to all green generation while everything is electrified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating Energy Market Schedules using Historical Price Data

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets creates uncertainty as well as new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. The proposed algorithm is approximately 100 times faster and uses orders of magnitude less data than a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (Final Technical Report)

Solar photovoltaic (PV) resources are the most common form of distributed generation in residential and commercial customer premises within electric distribution networks. A higher penetration of PV generation in distribution circuits will impose challenges on maintaining service voltages within the range of industry standards, power quality, and power flow. Buildings consume 74% of the electricity produced in the United States, and a significant portion of the building load is dispatchable, making them responsive to electrical grid needs. Oak Ridge National Laboratory—in collaboration with Southern Company; the University of Tennessee, Knoxville; and the Georgia Institute of Technology—is examining the PV integration issues in distribution-level electrical grids and developing integrated demand-side control and communication systems to enable responsive loads. The proposed responsive loads mechanism performs renewable generation following to increase the penetration of solar PV within each feeder. The specific objectives of this project are to (1) examine distribution-level PV integration scenarios to understand requirements, (2) undertake an end-to-end simulation-based design of a distributed control strategy of loads geographically near the PV generation asset to minimize the effect on the distribution feeder, (3) deploy and demonstrate the control technology developed in partnership with utilities, and (4) perform a scalability analysis at the utility scale. This 3-year integrated project aims to develop, demonstrate, and validate demand-side control technology to enable increased the penetration of renewables while mitigating challenges that arise due to their intermittency. Activities in Budget Period (BP) 1 focused on a literature review and the formal design of a control system for integrating local distribution with generation and loads. The team used modeling and simulation to evaluate the impact of varying buildings loads, variable PV generation, and power flow dynamics on the distribution circuit. The dynamic models developed in BP 1 were used in BP 2 to develop a model-based control design and a test bed. The test bed has enabled the simulation-based testing and comparison of different control designs and formulations applied to different configurations of the distribution grid, PVs, and building loads. The control approaches developed in BP 2 were implemented in BP 3 in the form of hardware deployed at the Central Baptist Church (CBC) in Knoxville, Tennessee, for testing and evaluation. The outcome of this project was the development and demonstration of open-source, low-cost, low-touch sensing and control retrofits to distributed PV generation and building loads that, in a coordinated fashion, provide the load-shaping response needed to integrate high levels of renewable penetration. This research addresses the target metrics by dynamically controlling a load with solar generation variability to minimize the extent of two-way power flow, enhance reliability, facilitate high PV penetration (>100% of peak load in a line segment), and generate scalable software and hardware solutions adaptable to any penetration levels. The research and development activities are focused and designed to be impactful within the relevant 2020 targets time frame.An accurate open-source integration simulation framework for end-to-end control design was developed and deployed at the CBC facility for testing and evaluation. This final report provides a detailed review of the technical results achieved during this 3-year integrated project. A novel spectral analysis of PV data is demonstrated to derive the requirements of the control design. A detailed simulation-based analysis of PV integration at increasing penetration levels is presented using 1 year of PV data to demonstrate the impact on the distribution circuits. Two different control strategies were developed and demonstrated via simulation to track variable PV generation with adaptive load dispatch. The report concludes with a summary of accomplishments and recommendations for a path forward.

14 SOLAR ENERGY↗

A Two-Level Model Predictive Control-Based Approach for Building Energy Management including Photovoltaics, Energy Storage, Solar Forecasting and Building Loads

This paper uses a two-level model predictive control-based approach for the coordinated control and energy management of an integrated system that includes photovoltaic (PV) generation, energy storage, and building loads. Novel features of the proposed local controller include (1) the ability to simultaneously manage building loads and energy storage to achieve different operational objectives such as energy efficiency, economic cost efficiency, demand response and grid optimization through the design of specific power trajectory tracking performance functionals, (2) an energy trim function that minimizes the impact of solar forecasting errors on system performance, and (3) the design of a state of charge controller that uses day-ahead forecast of solar power and building loads to intialize energy storage at the start of each day. The local controller is tested in simulation using an exemplary system with PV generation, energy storage and dispatchable building loads. Two sample days with different PV forecasts and multiple case scenarios are considered, and the performance of the algorithm in managing the real and reactive net building load trajectories and the ramp rate of PV injections into the utility network are evaluated. The simulations are based on actual forecasted and measured PV data, and the results show that the local controller meets the tracking requirements for real and reactive power within the operating constraints of the building.

14 SOLAR ENERGY↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Thoughts and Hypotheses on the Metrics and Needs for the Stability of Highly Inverter-Based Island Systems

As levels of wind, photovoltaics (PVs), and battery energy storage on power systems rise, it is useful to be able to quickly compare how much generation (instantaneous power and annual energy) comes from these inverter-based resources (IBRs). A commonly used metric is the percentage of inverter-based generation (% IBR) in a dispatch scenario (as a percentage of the total generation or total load), which can be useful for estimating when certain operational challenges arise (high rates of change of frequency, underdamped control interactions, low system strength, low fault current availability, and so on). Another similar and commonly used metric pioneered on the relatively large island of Ireland, system nonsynchronous penetration (SNSP), is similar to the % IBR and is subject to similar limitations. SNSP has the advantage of handling high-voltage dc in a defined way.

fault currents↗

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal↗

Active Learning of Microgrid Frequency Dynamics Using Neural Ordinary Differential Equations

Accurate frequency modelling of inverter‐based resource (IBR)‐dominated power systems is crucial for ensuring stable, reliable and resilient operations, particularly given their inherent low‐inertia characteristics and fast dynamics that traditional swing equation‐based models inadequately capture. This paper explores neural ordinary differential equations (Neural ODEs) as a computationally efficient, data‐driven framework for modelling power system frequency dynamics, specifically within microgrids integrating high penetrations of distributed energy resources (DERs). The developed neural ODEs framework incorporates a neural network architecture designed to capture input dynamics. By actively perturbing the system with a known signal, the Python‐based neural ODEs framework was trained using measured system states and inputs, without the need for detailed system information. The framework, tested on a model of the Cordova, AK, microgrid, achieved a goodness of fit ranging from 60% to 99% across different state variables and maintained a mean square error in the 10 -6 p.u. range under square and step excitation signals. The proposed approach demonstrated robustness to measurement noise and initial condition variations while maintaining low computational complexity suitable for real‐time power system control applications. Furthermore, transfer learning enabled the neural ODEs model to adapt to the following changes in system topology or generator dispatch, highlighting its effectiveness for dynamic microgrids with frequently evolving configurations and diverse DERs.

Aryal, Tara [South Dakota State Univ., Brookings, ↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

Simulation of 15% and 50% Thermal Power Dispatch to an Industrial Facility Using a Flexible Generic Full-Scope Pressurized Water Reactor Plant Simulator

Nuclear power plants in the United States are increasingly challenged to compete in wholesale electricity markets due to the low electricity costs and increasingly dynamic grid conditions from competing generation sources. An alternative market for nuclear power is industrial facilities that can use the thermal and/or electrical power generated by a nuclear power plant to offset the economic losses incurred by electricity market challenges. A generic pressurized water reactor (PWR) simulator was used to show the results of a basic design for a generic thermal power extraction system and tests were run using a set of procedures to show what happens when a nuclear power plant transitions from full electrical power dispatch to 15% and 50% thermal power dispatch. This type of operation leads to losses in turbine performance efficiency due to the deviation from the design operating point, but because the thermal power is also used by the industry load without conversion losses, the combined thermal efficiency of the PWR increases. For the 15% case, the thermal efficiency increased from 32% to 41.9%, while for the 50% case, the efficiency increased up to 60.1%. In addition, for 50% thermal power dispatch, the power dissipated by the condenser decreased from approximately 2000 to approximately 1300 MW (thermal), indicating a substantially diminished impact on the environment in terms of releasing heat into the cooling water reservoir.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Dispatch optimization of electric thermal energy storage within System Advisor Model

A stand-alone electric thermal energy storage (ETES) system converts low-value electricity into heat using resistance heating elements. During periods of high-value electricity, an ETES system uses a thermodynamic power cycle to convert stored thermal energy back to electricity. These dispatchable systems derive value from their ability to store energy when prices are low and generate electricity when prices are favorable, i.e., energy arbitrage. Consequently, dispatch optimization of system operations, through maximizing revenue subject to system constraints, is essential to evaluate the economic value of a particular system design. While stand-alone ETES systems offer potential advantages as dispatchable grid storage technologies, there is a lack of a neutral third-party, publicly available, open-source model to evaluate the performance, dispatch, and financial viability of these systems. To address this problem, we have developed a techno-economic model for stand-alone ETES systems, within National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). We implement a mixed-integer linear program to determine an ETES optimal operating schedule that maximizes electricity sales less maintenance costs caused by operation and cycling given temporal-varying grid electricity prices. Our contributions include a mixed-integer linear program for energy arbitrage of an ETES system, an ETES performance model through a publicly-available software (i.e., SAM), and an exercise of our model through case studies that compare ETES operational strategies and annual financial metrics. With our dispatch optimization model, we were able to improve revenue by 20% compared to a myopic heuristic while reducing the operational cost of the ETES system through decreases in cycle starts, cycles per day, and heater starts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Congestion Management Solutions for Enhanced Distribution System Operations with Aggregated Distribution Grid Resources Providing Grid Services and Market Participation

Microgrids and other aggregations of distribution grid resources (DGRs) are poised to actively participate in electricity markets and provide essential grid services in the coming years. In fact, DGRs already play such a role through behind-the-meter (BTM) demand response programs and small-scale BTM dispatchable generation initiatives. At the same time, the rapid growth of artificial intelligence (AI) and cryptocurrency datacenters imposes significant, often unpredictable, demands on the power distribution system. Aggregated DGRs can serve as flexible resources that help mitigate these pressures by using available transmission and distribution capacity more efficiently, supporting resource adequacy and other reliability services, and providing bridge strategies while long-term transmission infrastructure is being developed. The impacts this activity will have on distribution networks are not fully understood and could present significant challenges for distribution utilities due to capacity constraints and the need for congestion management. Technical issues include reverse power flow, variability and possible degradation of equipment integrity, voltage violations, and customer power quality concerns. These issues will likely intensify as electricity market operators across the United States implement Federal Energy Regulatory Commission Order 2222 over the next few years.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand Response Optimization and Management System for Real-TIme (DROMS-RT)

To design and demonstrate DROMS-RT, a highly distributed Demand Response Optimization and Management System for Real-Time (DROMS-RT) power flow control to support large scale integration of distributed renewable generation into the grid. AutoGrid developed a novel control and communications platform to allow highly dispatchable demand response (DR) services in time frames suitable for providing ancillary services to the transmission grid. These services will be substantially less expensive and more efficient than other forms of ancillary services options currently available to manage the intermittency associated with large-scale renewable integration. DROMSRT successfully leveraged Automated Demand Response (ADR) by fundamentally re-thinking the architecture of the DR platform from the ground up and by developing innovative new technologies in a number of areas related to DR. DROMS-RT leveraged the low-cost, open, interoperable DR signaling technology, OpenADR, and low-cost, internet-protocol based telemetry solutions to reduce the cost of hardware. This allowed DROMS-RT to provide dynamic price signals to millions of OpenADR clients. Statistically rigorous signal processing techniques were developed to reliably detect even small load reductions in the presence of noisy baseline profiles. Novel forecasting engines based on modern online machine learning algorithms enabled accurate individualized forecasts for customer loads in the presence of dynamic pricing signals, and a real-time decision engines enabled continuous optimization and optimal dispatch of DR resources across a large portfolio of heterogeneous loads that respond at varying time-scales. Moreover, the real-time optimization conducted by the decision engine can utilize grid physics to maximize load reduction at the transmission system in addition to the distribution sites, for more efficient grid operation. Finally, the Software-as-a-Service (SaaS) availability of the DROMS-RT platform has reduced the cost of deployment and enable participation of small commercial and residential customers in DR who otherwise would not be able to do so.

24 POWER TRANSMISSION AND DISTRIBUTION↗