Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Application of Multihop Relay for Performance Enhancement of AeroMACS Networks

A new transmission technology, based on IEEE 802.16-2009 (WiMAX), is currently being developed for airport surface communications. A C-band spectrum allocation at 5091 to 5150 MHz has been created by International Telecommunications Union (ITU) to carry this application. The proposed technology, known as AeroMACS, will be used to support fixed and mobile ground to ground applications and services. This article proposes and demonstrates that IEEE 802.16j-amendment-based WiMAX is most feasible for AeroMACS applications. This amendment introduces multihop relay as an optional deployment that may be used to provide additional coverage and/or enhance the capacity of the network. Particular airport surface radio coverage situations for which IEEE 802.16-2009-WiMAX provides resolutions that are inefficient, costly, or excessively power consuming are discussed. In all these cases, it is argued that 16j technology offers a much better alternative. A major concern about deployment of AeroMACS is interference to co-allocated applications such as the Mobile Satellite Service (MSS) feeder link. Our initial simulation results suggest that no additional interference to MSS feeder link is caused by deployment of IEEE 802.16j-based AeroMACS.

Kamali, Behnam↗

Experience with the UKIRT InSb array camera

The cryogenic infrared camera, IRCAM, has been operating routinely on the 3.8 m UK Infrared Telescope on Mauna Kea, Hawaii for over two years. The camera, which uses a 62x58 element Indium Antimonide array from Santa Barbara Research Center, was designed and built at the Royal Observatory, Edinburgh which operates UKIRT on behalf of the UK Science and Engineering Research Council. Over the past two years at least 60% of the available time on UKIRT has been allocated for IRCAM observations. Described here are some of the properties of this instrument and its detector which influence astronomical performance. Observational techniques and the power of IR arrays with some recent astronomical results are discussed.

Mclean, Ian S.↗

Economical Production of Pu-238: NIAC Phase I Final Report

All space exploration missions traveling beyond Jupiter must use radioisotopic power sources for electrical power. The best isotope to power these sources is plutonium-238 (Pu-238). The US supply of Pu-238 is almost exhausted and will be gone within the next decade. The Department of Energy has initiated a production program with a $10M allocation from NASA but the cost is estimated at over $100M to get to production levels. The Center for Space Nuclear Research (CSNR) has conceived of a potentially better process to produce Pu-238 earlier and for significantly less cost. Potentially, the front end capital costs could be provided by private industry such that the government only had to pay for the product produced. In the Phase I NIAC (NASA Innovative Advanced Concepts) grant, the CSNR has evaluated the feasibility of using a low power, commercially available nuclear reactor to produce 1.5 kg of Pu-238 per year. The impact on the neutronics of the reactor have been assessed, the amount of Neptunium target material estimated, and the production rates calculated. In addition, the size of the post-irradiation processing facility has been established. Finally, as the study progressed, a new method for fabricating the Pu-238 product into the form used for power sources has been identified to reduce the cost of the final product. In short, the concept appears to be viable, can produce the amount of Pu-238 needed to support the NASA missions, can be available within a few years, and will cost significantly less than the current DOE program.

Plutonium↗

Tethered Satellite System (TSS-1R)-Post Flight (STS-75) Engineering Performance Report

The first mission of the Tethered Satellite deployer was flown onboard Atlantis in 1992 during the Space Transportation System (STS) flight STS-46. Due to a mechanical interference with the level wind mechanism the satellite was only Deployed to 256 m rather than the planned 20,000 m. Other problems were also experienced during the STS-46 flight and several modifications were made to the Deployer and Satellite. STS-75 was a reflight of the Tethered Satellite System 1 (TSS-1) designated as Tethered Satellite System 1 Reflight (TSS-1 R) onboard Columbia. As on STS-46, the TSS payload consisted of the Deployer, the Satellite, 3 cargo bay mounted experiments: Shuttle Electrodynamic Tether System (SETS), Shuttle Potential and Return Electron Experiment (SPREE), Deployer Core Equipment (DCORE) 4 Satellite mounted experiments: Research on Electrodynamics Tether Effects (RETE), Research on Orbital Plasma Electrodynamics (ROPE), Satellite Core Instruments (SCORE), Tether Magnetic Field Experiment (TEMAG) and an aft flight deck camera: Tether Optical Phenomena Experiment (TOP). Following successful pre-launch, launch and pre-deployment orbital operations, the Deployer deployed the Tethered Satellite to 19,695 m at which point the tether broke within the Satellite Deployment Boom (SDB). The planned length for On-Station I (OST1) was 20,700 m The Satellite flew away from the Orbiter with the tether attached. The satellite was "safed" and placed in a limited power mode via the RF link. The Satellite was contacted periodically during overflights of ground stations. Cargo bay science activities continued for the period of time allocated to TSS-1 R operations.

Lavoie, Anthony R.↗

The Role of the NASA Global Hawk Link Module as an Information Nexus For Atmospheric Mapping Missions

The Link Module described in this paper was developed for the NASA Uninhabited Aerial System (UAS) Global Hawk Pacific Mission (GloPAC) Airborne Science Campaign; four flights of 30 hour duration, supporting the Aura Validation Experiment (AVE). It was used again during the Genesis and Rapid Intensification Processes (GRIP) experiment, a NASA Earth Science field experiment to better understand how tropical storms form and develop into major hurricanes. In these missions, the Link Module negotiated all communication over the high bandwidth Ku satellite link, archived all the science data from onboard experiments in a spatially enabled database, routed command and control of the instruments from the Global Hawk Operations Center, and re-transmitted select data sets directly to experimenters control and analysis systems. The availability of aggregated information from collections of sensors, and remote control capabilities, in real-time, is revolutionizing the way Airborne Science is being conducted. The Link Module NG now being flown in support of the NASA Earth Venture missions, the Hurricane and Severe Storm Sentinel (HS3) mission, and Airborne Tropical Tropopause Experiment (A TTREX) mission, has advanced data fusion technologies that are further advancing the Scientific productivity, flexibility and robustness of these systems. On-the-fly traffic shaping has been developed to allow the high definition video, used for critical flight control segments, to dynamically allocate variable bandwidth on demand. Historically, the Link Module evolved from the instrument and communication interface controller used by NASA's Pathfinder and Pathfinder plus solar powered UAS's in the late 1990' s. It later was expanded for use in the AIRDAS four channel scanner flown on the NASA Altus UAS, and then again to a module in the AMS twelve channel multispectral scanner flying on the NASA (Predator-b) Ikhana UAS. The current system is the answer to the challenges imposed by extremely long duration UASs, with on-board multi-instrument (>= 12) Sensor Webs.

Hurricanes↗

Internal Acoustics of the ISS and Other Spacecraft

It is important to control the acoustic environment inside spacecraft and space habitats to protect for astronaut communications, alarm audibility, and habitability, and to reduce astronauts' risk for sleep disturbance, and hear-ing loss. But this is not an easy task, given the various design trade-offs, and it has been difficult, historically, to achieve. Over time it has been found that successful control of spacecraft acoustic levels is achieved by levying firm requirements at the system-level, using a systems engineering approach for design and development, and then validating these requirements with acoustic testing. In the systems engineering method, the system-level requirements must be flowed down to sub-systems and component noise sources, using acoustic analysis and acoustic modelling to develop allocated requirements for the sub-systems and components. Noise controls must also be developed, tested, and implemented so the sub-systems and components can achieve their allocated limits. It is also important to have management support for acoustics efforts to maintain their priority against the various trade-offs, including mass, volume, power, cost, and schedule. In this extended abstract and companion presentation, the requirements, approach, and results for controlling acoustic levels in most US spacecraft since Apollo will be briefly discussed. The approach for controlling acoustic levels in the future US space vehicle, Orion Multipurpose Crew Vehicle (MPCV), will also be briefly discussed. These discussions will be limited to the control of continuous noise inside the space vehicles. Other types of noise, such as launch, landing, and abort noise, intermittent noise, Extra-Vehicular Activity (EVA) noise, emergency operations/off-nominal noise, noise exposure, and impulse noise are important, but will not be discussed because of time limitations.

Allen, Christopher S.↗

Modeling arson - An exercise in qualitative model building

A detailed example is given of the role of von Neumann and Morgenstern's 1944 'expected utility theorem' (in the theory of games and economic behavior) in qualitative model building. Specifically, an arsonist's decision as to the amount of time to allocate to arson and related activities is modeled, and the responsiveness of this time allocation to changes in various policy parameters is examined. Both the activity modeled and the method of presentation are intended to provide an introduction to the scope and power of the expected utility theorem in modeling situations of 'choice under uncertainty'. The robustness of such a model is shown to vary inversely with the number of preference restrictions used in the analysis. The fewer the restrictions, the wider is the class of agents to which the model is applicable, and accordingly more confidence is put in the derived results. A methodological discussion on modeling human behavior is included.

Heineke, J. M.↗

The Conference Proceedings of the 1997 Air Transport Research Group (ATRG) of the WCTR Society

This paper covers topics such as: Safety and Air Fares; International Airline Safety; Multi-fare Seat Allocation Problem; Dynamic Allocation of Airline Seat Inventory; Seat Allocation on Flights with Two Fares; Effects of Intercontinental Alliances; Domestic Airline Mergers; Simulating the Effects of Airline Deregulation on Frequency Choice; and Firm Size Inequality and Market Power.

Oum, T. H.↗

Explanation of random experiment sheduling and its application to space station analysis

The capability of the McDonnell-Douglas Phase B space station concept to complete the Blue Book Experiment program is analyzed and the Random experiment program with Resource Impact (REPRI) which was used to generate the data is described. The results indicate that station manpower and electrical power are the two resources which will constrain the amount of the Blue Book program that the station can complete. The station experiment program and its resource requirements are sensitive to levels of manpower and electrical power 13.5 men and 11 kilowatts. Continuous artificial gravity experiments have much less impact on the experiment program than experiments using separate artificial gravity periods. Station storage volume presently allocated for the FPE's and their supplies (1600 cu ft) is more than adequate. The REPRI program uses the Monte Carlo technique to generate a set of feasible experiment schedules for a space station. The schedules are statistically analyzed to determine the impact of the station experiment program resource requirements on the station concept. Also, the sensitivity of the station concept to one or more resources is assessed.

Moore, J. E.↗

DVB-S2 Demonstration Testing for Enhancing Data Rates for CubeSat/SmallSat Missions

The number of National Aeronautics and Space Administration (NASA) CubeSat/SmallSat missions is expected to grow rapidly in the next decade. High data rate is in increasing demanded for science missions, especially for mother/daughter CubeSat constellations. As the number of spacecraft on a ground network grows, loading could be reduced by limiting contact time per day, which is enabled by higher data rates. There is also a need to communicate direct to earth from space from longer distances than low earth orbit (LEO) with CubeSats. These challenges motivate the need for bandwidth and power efficient modulation and coding techniques. Today, DVB-S2 is an industry communications standard for larger satellites. DVB-S2 uses power and bandwidth efficient modulation and coding techniques to deliver performance approaching theoretical limits of RF channels. NASA Near Earth Network (NEN) is conducting demonstration testing at Wallops Flight Facility (WFF) in spring 2019 for CubeSat/SmallSat missions for enhancing data rate performance in NASAs allocated S-band 5 MHz channel. The ultimate goal is to upgrade NEN with DVB-S2 for increasing science data return, and enabling of greater numbers of CubeSats.This paper describes NEN DVB-S2 demonstration testing objectives and performance measurement results. DVB-S2 data rate performance in the NEN S-band 5 MHz channel is presented. Simulation analysis for the expected maximum data rate performance with the DVB-S2 signal family including multiple modulations and codes are presented. Link margin analysis for a typical CubeSat/SmallSat with a 1W/2W power amplifier/patch antenna using DVB-S2 for NEN S-band is discussed. The demonstration testing configurations at NEN Wallops station is described. Results of the demonstration testing are compared with other evolving radios for SmallSats and CubeSats in term of data rate and performance. There are a number of evolving S-band and X-band radios that are compatible with NEN. Some are integrated with commercial CubeSat/SmallSat busses. Some are flying for the first time with NEN in early 2019. The USRP B200mini transceiver S-band radio is one such radio. Results of streamlined compatibility testing with NEN in 2018, performance with the Technology Educational Satellite (TechEdSat-8) in flight in early 2019, potential to add DVB-S2 to the radio, and plans for a CubeSat using the radio for communication from 10 million kilometers from earth are discussed. Another evolving radio is the Syrlinks X-band radio. Results of compatibility testing with NEN in 2018, performance with the Sustained Ocean Color Observations using Nanosatellites (SOCON) in flight in early 2019, and potential for a future SOCON constellation are discussed.

Wong, Yen↗

Integrated cockpit design for the Army helicopter improvement program

The main Army Helicopter Improvement Program (AHIP) mission is to navigate precisely, locate targets accurately, communicate their position to other battlefield elements, and to designate them for laser guided weapons. The onboard navigation and mast-mounted sight (MMS) avionics enable accurate tracking of current aircraft position and subsequent target location. The AHIP crewstation development was based on extensive mission/task analysis, function allocation, total system design, and test and verification. The avionics requirements to meet the mission was limited by the existing aircraft structural and performance characteristics and resultant space, weight, and power restrictions. These limitations and night operations requirement led to the use of night vision goggles. The combination of these requirements and limitations dictated an integrated control/display approach using multifunction displays and controls.

Drennen, T.↗

Error analysis in the measurement of average power with application to switching controllers

Power measurement errors due to the bandwidth of a power meter and the sampling of the input voltage and current of a power meter were investigated assuming sinusoidal excitation and periodic signals generated by a model of a simple chopper system. Errors incurred in measuring power using a microcomputer with limited data storage were also considered. The behavior of the power measurement error due to the frequency responses of first order transfer functions between the input sinusoidal voltage, input sinusoidal current, and the signal multiplier was studied. Results indicate that this power measurement error can be minimized if the frequency responses of the first order transfer functions are identical. The power error analysis was extended to include the power measurement error for a model of a simple chopper system with a power source and an ideal shunt motor acting as an electrical load for the chopper. The behavior of the power measurement error was determined as a function of the chopper's duty cycle and back EMF of the shunt motor. Results indicate that the error is large when the duty cycle or back EMF is small. Theoretical and experimental results indicate that the power measurement error due to sampling of sinusoidal voltages and currents becomes excessively large when the number of observation periods approaches one-half the size of the microcomputer data memory allocated to the storage of either the input sinusoidal voltage or current.

Maisel, J. E.↗

Control and Non-Payload Communications Generation 1 Prototype Radio Flight Test Report

Unmanned aircraft (UA) represent a new capability that will provide a variety of services in the Government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized because of the lack of a common understanding of what is required to safely operate Unmanned Aircraft Systems in the National Airspace System (UAS in the NAS). The desire and ability to fly UA is of increasing urgency. The application of UA to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UA to the NAS. Existing Federal Aviation Regulations, procedures, and technologies do not allow routine UA access to the NAS. Access to the NAS is hampered by challenges such as the lack of an onboard pilot to see and avoid other aircraft; the ability of a single pilot or operator to control multiple UA; the reliance on command and control (C2) links; the altitudes, speeds, and duration at which the aircraft fly; and the wide variation in UA size and performance. NASA is working with other Government agencies to provide solutions that reduce technical barriers and make access to the NAS routine. This goal will be accomplished through system-level integration of key concepts, technologies, or procedures and through demonstrations of these integrated capabilities in an operationally relevant environment. This project provides an opportunity to transition the acquired empirical data and knowledge to the Federal Aviation Administration and other stakeholders to help them define the requirements for routine UA access to the NAS.Radio communications channels for UA are currently managed through exceptions and use either Department of Defense frequencies for line-of-sight (LOS) and satellite-based communications links, low-power LOS links in amateur bands, or unlicensed Industrial/Scientific/Medical (ISM) frequencies. None of these frequency bands are designated for safety and regularity of flight. Only recently has radiofrequency (RF) spectrum been allocated by the International Telecommunications Union specifically for commercial UA C2, LOS communication (L-Band: 960 to 1164 MHz, and C-Band: 5030 to 5091 MHz). The safe and efficient integration of UA into the NAS requires the use of protected RF spectrum allocations and a new data communications system that is both secure and scalable to accommodate the potential growth of these new aircraft. Data communications for UA-referred to as control and non-payload communications (CNPC)-will be used to exchange information between a UA and a ground station (GS) to ensure safe, reliable, and effective UA flight operation. The focus of this effort is on validating and allocating new RF spectrum and data link communications to enable civil UA integration into the NAS. Through a cost-sharing cooperative agreement with Rockwell Collins, Inc., the NASA Glenn Research Center is exploring and performing the necessary development steps to realize a prototype UA CNPC system. These activities include investigating signal waveforms and access techniques, developing representative CNPC radio hardware, and executing relevant testing and validation activities. There is no intent to manufacture the CNPC end product, rather the goals are to study, demonstrate, and validate a typical CNPC system that will allow safe and efficient communications within the L-Band and C-Band spectrum allocations. The system is addressing initial "seed" requirements from RTCA, Inc., Special Committee 203 (SC-203) and is on a path to Federal Aviation Administration certification. This report provides results from the flight testing campaign of the Rockwell Collins Generation 1 prototype radio, referred hereafter as the "radio." The radio sets operate within the 960- to 977-MHz frequency band with both air and ground radios using identical hardware. Flight tests involved one aircraft and one GS. Results include discussion of aircraft flight paths and associated radio performance.

Shalkhauser, Kurt A.↗

Use of the 37-38 GHz and 40-40.5 GHz Ka-bands for Deep Space Communications

This paper covers a wide variety of issues associated with the implementation and use of these frequency bands for deep space communications. Performance issues, such as ground station pointing stability, ground antenna gain, antenna pattern, and propagation effects such as due to atmospheric, charged-particle and space loss at 37 GHz, will be addressed in comparison to the 32 GHz Ka-band deep space allocation. Issues with the use of and competition for this spectrum also will be covered. The state of the hardware developed (or proposed) for operating in this frequency band will be covered from the standpoint of the prospects for achieving higher data rates that could be accommodated in the available bandwidth. Hardware areas to be explored include modulators, digital-to-analog converters, filters, power amplifiers, receivers, and antennas. The potential users of the frequency band will be explored as well as their anticipated methods to achieve the potential high data rates and the implications of the competition for bandwidth.

telecommunications↗

Satellite-aided mobile radio concepts study: Concept definition of a satellite-aided mobile and personal radio communication system

The satellite system requires the use of a large satellite antenna and spacecraft array power of about 12 kW or more depending on the operating frequency. Technology developments needed include large offset reflector multibeam antennas, satellite electrical power sybsystems providing greater than 12 kW of power, signal switching hardware, and linearized efficient solid state amplifiers for the satellite-aided mobile band. Presently there is no frequency assignment for this service, and it is recommended that an allocation be pursued. The satellite system appears to be within reasonable extrapolation of the state of the art. It is further recommended that the satellite-aided system spacecraft definition studies and supporting technology development be initiated.

Anderson, R. E.↗

Communication

NASA s communication work for the UAS Command and Control area will build upon work currently being conducted under NASA Recovery Act funds. Communication portions of UAS NextGen ConOps, Stateof- the-Art assessment, and Gap Analysis. Preliminary simulations for UAS CNPC link scalability assessment. Surrogate UAS aircraft upgrades. This work will also leverage FY10 in-guide funding for communication link model development. UAS are currently managed through exceptions and are operating using DoD frequencies for line-of-sight (LOS) and satellite-based communications links, low-power LOS links in amateur bands, or unlicensed Instrument/Scientific/Medical (ISM) frequencies. None of these frequency bands are designated for Safety and Regularity of Flight. No radio-frequency (RF) spectrum has been allocated by the International Telecommunications Union (ITU) specifically for UAS command and control links, for either LOS or Beyond LOS (BLOS) communication.

Griner, James↗

Solar concentrator technology development for space based applications, volume 1

Thermoelectric conversion using a radio-isotope heat source has been used where outer planetary space craft are too far away for absorbing significant solar energy. Solar dynamic power (SDP) conversion is one technology that offers advantages for applications within the inner planet region. Since SDP conversion efficiency can be 2 to 3 times higher than photovoltaic, the collecting surfaces are much reduced in area and therefore lighter. This becomes an advantage in allocating more weight to launched payloads. A second advantage results for low earth orbit applications. The reduced area results in lower drag forces on the spacecraft and requires less reboost propellant to maintain orbit. A third advantage occurs because of the sun-to-shade cycling while in earth orbit. Photovoltaic systems require batteries to store energy for use when in the shade, and battery life for periods of 10 to 15 years is not presently achievable. For these reasons the Solar Dynamics and Thermal Systems Branch at NASA LeRC has funded work in developing SDP systems. The generic SDP system uses a large parabolic solar concentrator to focus solar energy onto a power conversion device. The concentrators are large areas and must therefore be efficient and have low specific weights. Yet these surfaces must be precise and capable of being stowed in a launch vehicle and then deployed and sometimes unfurled in space. There are significant technical challenges in engineering such structures, and considerable investigation has been made to date. This is the first of two volumes reporting on the research done by the Advanced Manufacturing Center at Cleveland State University to assist NASA LeRC in evaluating this technology. The objective of the grant was to restore the solar concentrator development technology of the 1960s while improving it with advances that have occurred since then. This report summarizes the work done from January 1989 through December 1991.

Pintz, A.↗

Solar concentrator technology development for space based applications, volume 2

Thermoelectric conversion using a radio-isotope heat source has been used where outer planetary space craft are too far away for absorbing significant solar energy. Solar dynamic power (SDP) conversion is one technology that offers advantages for applications within the inner planet region. Since SDP conversion efficiency can be 2 to 3 times higher than photovoltaic, the collecting surfaces are much reduced in area and therefore lighter. This becomes an advantage in allocating more weight to launched payloads. A second advantage results for low earth orbit applications. The reduced area results in lower drag forces on the spacecraft and requires less reboost propellant to maintain orbit. A third advantage occurs because of the sun-to-shade cycling while in earth orbit. Photovoltaic systems require batteries to store energy for use when in the shade, and battery life for periods of 10 to 15 years is not presently achievable. For these reasons the Solar Dynamics and Thermal Systems Branch at NASA LeRC has funded work in developing SDP systems. The generic SDP system uses a large parabolic solar concentrator to focus solar energy onto a power conversion device. The concentrators are large areas and must therefore be efficient and have low specific weights. Yet these surfaces must be precise and capable of being stowed in a launch vehicle and then deployed and sometimes unfurled in space. There are significant technical challenges in engineering such structures, and considerable investigation has been made to date. This is the second of two volumes reporting on the research done by the Advanced Manufacturing Center at Cleveland State University to assist NASA LeRC in evaluating this technology. This volume includes the appendices of selected data sets, drawings, and procedures. The objective of the grant was to restore the solar concentrator development technology of the 1960s while improving it with advances that have occurred since then. This report summarizes the work done from January 1989 through December 1991.

Pintz, A.↗