Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Beyond 'Inop': Logbook Communication Between Airline Mechanics and Pilots

When mechanical discrepancies occur on aircraft, effective communication between pilots and mechanics can facilitate identification of the problem. A survey of pilots and mechanics was conducted to determine how often they were able to discuss discrepancies directly and to identify factors that influenced the detail they provided about discrepancies in the aircraft logbook. Logistical factors such as short turn times between flights and crew schedules appeared to present barriers to face-to-face meetings between pilots and mechanics. Guidelines for pilot logbook entries. Pilots reported receiving significantly less training on writing logbook entries and spent significantly less time making individual entries than mechanics. Mechanics indicated greater concern about the Federal Aviation Administration reading their entries than pilots. Mechanics indicated they had little opportunity to follow up with pilots to clarify a logbook entry once pilots departed the aircraft.

Munro, Pamela A.↗

Conflict Resolution Automation and Pilot Situation Awareness

This study compared pilot situation awareness across three traffic management concepts. The Concepts varied in terms of the allocation of traffic avoidance responsibility between the pilot on the flight deck, the air traffic controllers, and a conflict resolution automation system. In Concept 1, the flight deck was equipped with conflict resolution tools that enable them to fully handle the responsibility of weather avoidance and maintaining separation between ownship and surrounding traffic. In Concept 2, pilots were not responsible for traffic separation, but were provided tools for weather and traffic avoidance. In Concept 3, flight deck tools allowed pilots to deviate for weather, but conflict detection tools were disabled. In this concept pilots were dependent on ground based automation for conflict detection and resolution. Situation awareness of the pilots was measured using online probes. Results showed that individual situation awareness was highest in Concept 1, where the pilots were most engaged, and lowest in Concept 3, where automation was heavily used. These findings suggest that for conflict resolution tasks, situation awareness is improved when pilots remain in the decision-making loop.

Dao, Arik-Quang V.↗

Estimation of Time-Varying Pilot Model Parameters

Human control behavior is rarely completely stationary over time due to fatigue or loss of attention. In addition, there are many control tasks for which human operators need to adapt their control strategy to vehicle dynamics that vary in time. In previous studies on the identification of time-varying pilot control behavior wavelets were used to estimate the time-varying frequency response functions. However, the estimation of time-varying pilot model parameters was not considered. Estimating these parameters can be a valuable tool for the quantification of different aspects of human time-varying manual control. This paper presents two methods for the estimation of time-varying pilot model parameters, a two-step method using wavelets and a windowed maximum likelihood estimation method. The methods are evaluated using simulations of a closed-loop control task with time-varying pilot equalization and vehicle dynamics. Simulations are performed with and without remnant. Both methods give accurate results when no pilot remnant is present. The wavelet transform is very sensitive to measurement noise, resulting in inaccurate parameter estimates when considerable pilot remnant is present. Maximum likelihood estimation is less sensitive to pilot remnant, but cannot detect fast changes in pilot control behavior.

Zaal, Peter M. T.↗

Simulation Evaluation of Pilot Inputs for Real Time Modeling During Commercial Flight Operations

Aircraft dynamics characteristics can only be identified from flight data when the aircraft dynamics are excited sufficiently. A preliminary study was conducted into what types and levels of manual piloted control excitation would be required for accurate Real-Time Parameter IDentification (RTPID) results by commercial airline pilots. This includes assessing the practicality for the pilot to provide this excitation when cued, and to further understand if pilot inputs during various phases of flight provide sufficient excitation naturally. An operationally representative task was evaluated by 5 commercial airline pilots using the NASA Ice Contamination Effects Flight Training Device (ICEFTD). Results showed that it is practical to use manual pilot inputs only as a means of achieving good RTPID in all phases of flight and in flight turbulence conditions. All pilots were effective in satisfying excitation requirements when cued. Much of the time, cueing was not even necessary, as just performing the required task provided enough excitation for accurate RTPID estimation. Pilot opinion surveys reported that the additional control inputs required when prompted by the excitation cueing were easy to make, quickly mastered, and required minimal training.

Martos, Borja↗

Savannah River National Laboratory Collaborative Innovation Pilot Team - 17560

The Collaborative Innovation (COIN) program was established by the Savannah River National Laboratory (SRNL) in March 2016. The goal of the SRNL COIN program is to identify innovative options to significantly reduce program and project risks (improve safety, reduce schedule and cost) of high priority Department of Energy Environmental Management, National Nuclear Security Administration, and Nuclear Energy missions. The COIN Advisory Board selected as the target outcome of the first COIN effort a 50% improvement to the Savannah River Site (SRS) H-Canyon spent nuclear fuel (SNF) processing 'baseline,' or current plan, as defined in the SRS Nuclear Materials Planning Roadmap. A small team of SRNL and Savannah River Nuclear Solutions personnel with pertinent experience and expertise was co-located and largely sequestered for eight weeks to identify improvements to H-Canyon processing of SNF. Following the process defined in the SRNL COIN Charter, the COIN Pilot Team analyzed the baseline for processing SNF through H Canyon; generated alternative ideas; tested seemingly viable ideas by reaching out to other subject-matter experts; and identified options for consideration for implementation by the COIN Advisory Board. The COIN Pilot produced a number of important outcomes, including important lessons learned for subsequent COIN efforts. The two principal outcomes are these: 1. The COIN Pilot Team conducted a comprehensive examination of the individual unit operations, the integrated system, and external interfaces to produce a timeline of H-Canyon processing and sampling times that had not previously existed. The general timeline served as the baseline from which the Pilot Team identified processing improvements. In addition, the timeline has already been employed in other planning efforts. 2. The COIN Pilot Team determined that innovations to the H-Canyon Dissolving unit operation alone could increase the number of SNF bundles processed through H Canyon by the target of 50%, but with little margin for error. To ensure that the gains in throughput in the Dissolving unit operation would be maintained throughout the facility, the Pilot Team identified four additional improvements to create greater efficiency and flexibility in downstream H-Canyon unit operations. The COIN Pilot Team's innovations reduce the processing time of a single batch of SNF through H Canyon from about 70 days to about 50 days. This talk will review the COIN process and the results of the pilot of the process. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-zone modelling of partially premixed low-temperature combustion in pilot-ignited natural-gas engines

Detailed results from a multi-zone phenomenological simulation of partially premixed advanced-injection low-pilot-ignited natural-gas low-temperature combustion are presented with a focus on early injection timings (the beginning of (pilot) injection (BOI)) and very small diesel quantities (2-3 per cent of total fuel energy). Combining several aspects of diesel and spark ignition engine combustion models, the closed-cycle simulation accounted for diesel autoignition, diesel spray combustion, and natural-gas combustion by premixed turbulent flame propagation. The cylinder contents were divided into an unburned zone, several pilot fuel zones (or 'packets') that modelled diesel evaporation and ignition, a flame zone for natural-gas combustion, and a burned zone. The simulation predicted the onset of ignition, cylinder pressures, and heat release rate profiles satisfactorily over a wide range of BOIs (20-60° before top dead centre (before TDC)) but especially well at early BOIs. Strong coupling was observed between pilot spray combustion in the packets and premixed turbulent combustion in the flame zone and, therefore, the number of ignition centres (packets) profoundly affected flame combustion. The highest local peak temperatures (greater than 2000 K) were observed in the packets, while the flame zone was much cooler (about 1650 K), indicating that pilot diesel spray combustion is probably the dominant source of engine-out emissions of nitrogen oxide (NO x ). Further, the 60° before TDC BOI yielded the lowest average peak packet temperatures (about 1720 K) compared with the 20° before TDC BOI (about 2480 K) and 40° before TDC BOI (about 2700 K). These trends support experimental NO x trends, which showed the lowest NO x emissions for the 60°, 20°, and 40° before TDC BOIs in that order. Parametric studies showed that increasing the intake charge temperature, pilot quantity, and natural-gas equivalence ratio all led to higher peak heat release rates and hotter packets but the pilot quantity and intake temperature affected the potential for NO x formation to a greater extent.

33 ADVANCED PROPULSION SYSTEMS↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study

Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has the potential to substantially reduce the energy penalty and the cost of electricity (COE) for coal-fired power generation with CO₂ capture. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been collaborating on the development of an iron oxide oxygen-carrier based chemical looping technology for clean power generation with inherent carbon capture. In this process, coal is dried and pulverized prior to being transported into a moving-bed reducer. In the reducer, coal reacts with the oxygen-carrier particles, forming combustion byproducts, predominantly CO₂ and H₂O, while reducing the iron oxide oxidation state from Fe₂O₃ to a mixture of FeO and Fe. The reduced state particles are then transported to a combustor reactor and re-oxidized with air. Following the oxidation, the oxygen-carrier particles are regenerated, and a large amount of heat is released for steam production. The produced steam is sent to a turbine for electricity generation. Meanwhile, the CO₂–rich stream leaving the reducer is cooled, cleaned, and compressed for subsequent pipeline transportation and sequestration. By combining air separation and fuel conversion into a single system, the CDCL technology enables the intensification of oxy-combustion processes by eliminating the energy and cost intensive cryogenic air separation unit and thereby results in higher overall plant efficiencies and lower COE’s. The use of a moving-bed reducer results in high conversions of volatile hydrocarbons and high CO₂ purity, which reduces the cost of downstream CO₂ purification for sequestration or utilization. The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and Dover Light & Power completed a Preliminary Front-End Engineering and Design (Pre-FEED) study of a 10 MWe coal-direct chemical looping (CDCL) pilot plant. The planned system is a modular 10 MWe CDCL large pilot facility consisting in 4 modules of 2.5 MWe each, working in parallel and to be hosted within the current structure at the City of Dover’s Municipal Power Plant. The CDCL system can achieve auto-thermal operation and includes a sub-critical steam cycle for power generation. The pilot system was designed to demonstrate full commercial operation at a reduced scale. The coal distribution per plan area is a representative slice of larger commercial arrangements. The system includes a CO₂ recycle system, but it does not include a compression system. The large pilot includes all the environmental control equipment and oxygen carrier and ash handling systems. As part of the project, the Team performed laboratory testing and carried out multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Team demonstrated sustained operations at designed coal inputs, high coal conversion, high CO₂ purity, heat generation on the combustor, low carbon carryover between reactors and low particle attrition. Emissions generated in the reducer reactor were identified as SO₂ and NO x . The commercial manufacturing cost of oxygen carrier particle was evaluated by JM. A particle manufacturing report was generated and submitted to the DOE. Based on the results from the pilot tests and the pre-FEED design efforts, a techno-economic analysis was performed. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with high efficiency. The estimated COE of the supercritical CDCL plant is $83.3 / MWh, which meets DOE’s target of less than 30% increase in COE when compared to a supercritical PC plant without CO₂ capture. This is the lowest among the existing carbon capture technologies (post-combustion and oxy-combustion) for fossil fuel power plant. CDCL is evaluated to be the most promising technology for carbon capture from the economic aspect.

01 COAL, LIGNITE, AND PEAT↗

DEVELOPMENT OF A 25 MWTH FLAMELESS PRESSURIZED OXY-COMBUSTION PILOT

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

20 FOSSIL-FUELED POWER PLANTS↗

Well Clear: General Aviation and Commercial Pilots' Perceptioin of Unmanned Aerial Vehicles in the National Airspace System

This research explored how different pilots perceived the concept of the Well Clear Boundary (WCB) and observed if that boundary changed when dealing with manned versus unmanned aircraft systems (UAS), and the effects of other variables. Pilots' WCB perceptions were collected objectively through simulator recordings and subjectively through questionnaires. Objectively, significant differences were found in WCB perception between two pilot types (general aviation [GA], and Airline Transport Pilots [ATPs]), and significant WCB differences were evident when comparing two intruder types (manned versus unmanned aircraft). Differences were dependent on other manipulated variables (intruder approach angle, ownship speed, and background traffic levels). Subjectively, there were differences in WCB perception across pilot types; GA pilots trusted UAS aircraft higher than the more experienced ATPs. Conclusions indicate pilots' WCB mental models are more easily perceived as time-based boundaries in front of ownship, and more easily perceived as distance-based boundaries to the rear of ownship.

unmanned aerial systems↗

Pilot Workload is Associated with Long Duty Days and Multiple Flight Legs

Pilot workload is a real concern throughout aviation, especially in short-haul operations due to short flights and multiple flight legs. Our goal was to examine the workload experienced by pilots during normal operations in a short-haul airline. Thirty pilots flew a roster consisting of a cycle of five days of mid-day start time duty hours with many flight legs (baseline block) followed by four days off, five early start time duty hours followed by three days off, five mid-day time starts with many legs followed by three days off and then five early start time followed by one day off. The pilots provided evaluations of workload by scoring the six subscales of NASA-TLX (i.e., Mental Demand, Performance, Physical Demand, Effort, Temporal Demand, and Frustration) on their duty days during each flight and once during rest days. The analyses included the raw TLX scores for each demand, the mean raw TLX, and the overall weighted TLX mean for duty days and rest days. We found that mental demand was significantly lower for each duty schedule and rest relative to baseline (early start 1st block p = 0.016, late duty p = 0.017, early start 2nd block p < 0.001, rest p < 0.001). Temporal demand was significantly lower than baseline on early duty 1st block (p = 0.02), early start 2nd block (p < 0.001), and rest (p < 0.001). Effort was significantly lower than baseline only during early start 1st block (p = 0.014) and early start 2nd block (p < 0.001). Frustration was significantly lower during early start 2nd block relative to baseline (p = 0. 039). Physical demand and performance were higher relative to baseline during rest days (p < 0.001). Mean raw TLX showed significantly lower workload for early start 1st block (p = 0.011) and early start 2nd block (p < 0.001). The overall weighted TLX showed significantly lower workload for early start 1st block (p = 0.004), early start 2nd block (p < 0.001) and rest (p < 0.001). We found that pilots experienced higher workload on longer duty days with multiple flight legs. Pilots experienced lower mental demand, temporal demand, and effort on short duty days even though when their duty started earlier in the day. During days off pilots experienced higher physical demand and higher performance.

short-haul↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

PanDA Pilot Submission using Condor-G: Experience and Improvements

PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison. In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

First Ever Polymer Flood Field Pilot To Enhance The Recovery Of Heavy Oils On Alaska’s North Slope - Pushing Ahead One Year Later

In June 2018 the team embarked on an ambitious project to address the slow development pace of Alaska’s 20+ billion barrels heavy oil resource via the first ever polymer flood pilot. Following the successful commencement of the pilot in August 2018, the field demonstration, supporting laboratory experiments and numerical simulation have steadily progressed. A significant amount of valuable data and lessons learned have been collected, and are reported in this paper. The ongoing pilot and the research activities is making headway toward the primary objective of validating the use of polymer flooding for extracting heavy oil in Alaska’s challenging environment. The pilot is conducted in two pre-existing pairs of horizontal injectors and producers in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field. A customized polymer blending and pumping unit injects HPAM polymer at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP. Supporting coreflood laboratory experiments have focused on quantification of polymer retention in the rock, and effect of injection water salinity, polymer, and their combinations on oil recovery. The injection and production response of the pilot flood pattern is utilized to develop a history matched reservoir simulation model for forecasting oil recovery beyond the pilot. Finally, specially designed laboratory experiments address anticipated operating concerns regarding post-polymer breakthrough such as oil-water separation efficiency and polymer induced fouling of heater tubes. Polymer has been injected continuously since startup except for two short equipment modification shutdowns, and more recently a prolonged disruption due to polymer hydration issues at the J-pad field site. Cumulatively, over 600,000 lbs. of polymer has been injected, corresponding to ~7%PV. The two producers show significant decrease in the water cut, gradually increasing oil rate, and no polymer breakthrough. Two main observations from the coreflood are a significant uncertainty in polymer retention values, and positive oil recovery response to low salinity water (2,600 mg/liter TDS). The heterogeneity in the flood pattern presents some challenges in obtaining a robust history matched simulation model. Experimental results on produced fluids treatment indicate the formation of a dense polymer deposit, at certain conditions, on heating tubes that can negatively impact the heat transfer efficiency. The scientific knowledge, including the lessons learned during unanticipated shutdowns, quality control, logistics and field data that is being acquired from this effort has referential value for other planned EOR projects. Finally, by all indications, the polymer field pilot is steadily progressing toward achieving the ultimate goal of unlocking the massive heavy oil resources on Alaska North Slope (ANS).

Dandekar, Abhijit↗

Large Pilot Scale Testing of Linde/BASF Post-Combustion CO 2 Capture Technology at the Abbott Coal-Fired Power Plant

The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO 2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO 2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact at the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO 2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO 2 . Towards the larger project goal, the UI-led team, together with Linde, has completed a preliminary design for the carbon capture pilot plant with basic engineering and cost estimates, established permitting needs, identified approaches to address Environmental, Health, and Safety concerns related to pilot plant installation and operation, developed approaches for long-term use of the captured carbon, and established strategies for workforce development and job creation that will re-train coal operators to operate carbon capture plants. This report describes Phase I accomplishments and demonstrates that the project team is well-prepared for full implementation of Phase 2, to design, build, and operate the carbon capture pilot plant.

01 COAL, LIGNITE, AND PEAT↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Single pilot IFR operating problems determined from accidental data analysis

The accident reports examined were restricted to instrument rated pilots flying in IFR weather. A brief examination was made of accidents which occurred during all phases of flight and which were due to all causes. A detailed examination was made of those accidents which involved a single pilot which occurred during the landing phases of flight, and were due to pilot error. Problem areas found include: (1) landing phase operations especially final approach, (2) pilot weather briefings, (3) night approaches in low IFR weather, (4) below minimum approaches, (5) aircraft icing, (6) imprecise navigation, (7) descending below minimum IFR altitudes, (8) fuel mismanagement, (9) pilot overconfidence, and (10) high pilot workload especially in twins. Some suggested areas of research included: (1) low cost deicing systems, (2) standardized navigation displays, (3) low cost low-altitude warning systems, (4) improved fuel management systems, (5) improved ATC communications, (6) more effective pilot training and experience acquisition methods, and (7) better weather data dissemination techniques.

Forsyth, D. L.↗

Identification of multiloop pilot describing functions obtained from simulated approaches to an aircraft carrier

Predicted results of a simulation of the pilot's approach control strategy in the presence of pilot remnant are presented. The aircraft dynamics and the turbulence environment are representative of a trainer-type aircraft. The non-intrusive pilot identification program (NIPIP) was used to identify the pilot's control strategy required by this highly-coupled, multiloop control task. The results are presented in terms of frequency responses of the individual elements of the pilot's control strategy and indicate that NIPIP can identify the pilot's describing functions even in the presence of significant amounts of pilot remnant.

Jewell, W. F.↗

Time Domain Identification of an Optimal Control Pilot Model with Emphasis on the Objective Function

A method for the identification of the pilot's control compensation using time domain techniques is proposed. From this information we hope to infer a quadratic cost function, supported by the data, that represents a reasonable expression for the pilot's control objective in the task being performed, or an inferred piloting strategy. The objectives for this method are: (1) obtain a better understanding of the fundamental piloting techniques in complex tasks, such as landing approach; (2) the development of a metric measurable in simulations and flight test that correlate with subjective pilot opinion; and (3) to further validate pilot models and pilot vehicle analysis methods.

Schmidt, D. K.↗