Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “permanent magnet machines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

146 records · Page 9

Concept of circular-linear energy recovery accelerator to probe the energy frontier

Energy-frontier accelerators provide powerful tools performing high precision measurements confirming the fundamentals of the physics and broadening new research horizons. Such machines are either driven by circular or linear accelerators. The circular machines, having the centre-of-mass (CM) energy values reaching 200 GeV (for leptons) and above, experience beam energy loss and quality dilution, for example, due to synchrotron radiation, limiting the overall CM energy achievable and requiring a constant energy top-up to compensate the loss and the beam quality dilution. Linear colliders overcome these limitations, while the finite capabilities of generating high average current beams limits the luminosity. This is partially compensated by the quality of the colliding beams. In this work, we suggest a novel design of circular-linear accelerator based on the merging of the “non-emitting”, low-energy storage rings and energy recovery linear accelerators. We suggest using the recently considered dual-axis asymmetric cavities to enable the operation of such a system, and in particular the energy recovery from spent, high-intensity beams. The machine considered, under the scope of the SNOWMASS-2021 initiative, can be potentially used to reach ultimate energy frontiers in high-energy physics as well as to drive next generation light sources. The merging of circular and linear systems, and applications of dual axes cavities, should allow the maintaining of high beam quality, high luminosity, and high energy efficiency, while offering a flexible energy management and opening clear opportunity for reducing the running cost. We note that the numbers shown in the paper are for illustration purpose and can be improved further.

43 PARTICLE ACCELERATORS↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗