Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Idaho National Laboratory Quarterly Performance Analysis

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INL from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.

99 GENERAL AND MISCELLANEOUS↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

BOCC Blueprint

The Pacific Northwest National Laboratory (PNNL) Facility and Operations (F&O) Division strives to manage performance, to assure long-term health and sustainability for the organization and our staff through innovation and learning. The F&O organization is committed to achieving five strategic outcomes over the next several years. The strategic outcomes are aligned with the Department of Energy (DOE) and PNNL mission and vision. One key outcome important to enabling our vision is to integrate the smartest facilities, connected to the smartest people, by the smartest systems. We call this our SMART3 Initiative. The F&O SMART3 Initiative will connect human capital with intelligent systems, resulting in a best-in-class, integrated facility-operations strategy that improves productivity and optimizes operational costs. The Building Operations Control Center (BOCC) Blueprint is a key deliverable in this effort and will define near-term and long-term objectives aligned with the SMART3 Initiative. The BOCC Blueprint provides a plan to successfully position the BOCC and assure full integration into the new Systems Engineering Laboratory (SEL). The BOCC Blueprint near-term objectives will satisfy each of the three elements of the SMART3 Initiative. 1. The facilities element will be achieved by defining the minimum set of smart sensors for deployment, establishing dashboards and metrics, and initiating a Real-Time Commissioning Program (RT-Cx). 2. The people element will be achieved as F&O and the Energy and Environment Directorate (EED) collaborate, mentor, and cross-train within F&O. The collaboration effort will provide proof of concept by testing, applying and sharing information on facility systems through smart grid, facility re-tuning & audits, and DSOM fault detection and diagnostics. The mentoring and cross-training will be realized by integrating air balance operators, power operators and FMCS specialists within the BOCC. 3. The systems element will be achieved by standardizing the Facility Management Control Systems (FMCS) and Decision Support for Operations and Maintenance (DSOM) development, specifically by implementing facility dashboards and tools. The long-term objectives are to enhance reliability, reduce cost, and demonstrate the “Living Laboratory,” as defined by the way facilities are used to advance research from theoretical to practical applications through scientific collaboration among PNNL’s research and development (R&D) staff. With the BOCC Blueprint defining the objectives to meet the SMART3 Initiative, the BOCC will become a valuable PNNL core competency, and allow for additional R&D opportunities.

99 GENERAL AND MISCELLANEOUS↗

Field trials reveal the complexities of deploying and evaluating the impacts of yeast-baited ovitraps on Aedes mosquito densities in Trinidad, West Indies

The use of lure-and-kill, large-volume ovitraps to control Aedes aegypti and Aedes albopictus populations has shown promise across multiple designs that target gravid females (adulticidal) or larvae post-oviposition (larvicidal). Here we report on a pilot trial to deploy 10 L yeast-baited ovitraps at select sites in Curepe, Trinidad, West Indies during July to December, 2019. Oviposition rates among ovitraps placed in three Treatment sites were compared to a limited number of traps placed in three Control areas (no Aedes management performed), and three Vector areas (subjected to standard Ministry of Health, Insect Vector Control efforts). Our goal was to gain baseline information on efforts to saturate the Treatment sites with ovitraps within 20–25 m of each other and compare oviposition rates at these sites with background oviposition rates in Control and Vector Areas. Although yeast-baited ovitraps were highly attractive to gravid Aedes females, a primary limitation encountered within the Treatment sites was the inability to gain access to residential compounds for trap placement, primarily due to residents being absent during the day. This severely limited our intent to saturate these areas with ovitraps, indicating that future studies must include plans to account for these inaccessible zones during trap placement.

60 APPLIED LIFE SCIENCES↗

Cumulative Spatial Impact Layers: A Novel Multivariate Spatio-Temporal Analytical Summarization Tool

Scientific inquiry often requires analysis of multiple spatio-temporal datasets, ranging in type and size, using complex multi-step processes demanding an understanding of GIS theory and software. Cumulative Spatial Impact Layers (CSIL) is a GIS-based tool that summarizes spatio-temporal datasets based on overlapping features and attributes. Leveraging a recursive quadtree method, and applying multiple additive frameworks, the CSIL tool allows users to analyze raster and vector datasets by calculating data, record, or attribute density. Providing an efficient and robust method for summarizing disparate, multi-format, multi-source geospatial data, CSIL addresses the need for a new integration approach and resulting geospatial product. The built-in flexibility of the CSIL tool allows users to answer a range of spatially-driven questions. Example applications are provided in this paper to illustrate the versatility and variety of uses for this CSIL tool and method. Use cases include addressing regulatory decision-making needs, economic modeling, and resource management. Performance reviews for each use case are also presented, demonstrating how CSILs provides a more efficient and robust approach to assess a range of multivariate spatial data for a variety of uses.

58 GEOSCIENCES↗

The Practical Obstacles of Data Transfer: Why researchers still love scp

The importance of computing facilities is heralded every six months with the announcement of the new Top500 list, showcasing the world s fastest supercomputers. Unfortu- nately, with great computing capability does not come great long-term data storage capacity, which often means users must move their data to their local site archive, to remote sites where they may be doing future computation or anal- ysis, or back to their home institution, else face the dreaded data purge that most HPC centers employ to keep utiliza- tion of large parallel filesystems low to manage performance and capacity. At HPC centers, data transfer is crucial to the scientific workflow and will increase in importance as computing systems grow in size. The Energy Sciences Net- work (ESnet) recently launched its fifth generation network, a 100 Gbps high-performance, unclassified national network connecting more than 40 DOE research sites to support scientific research and collaboration. Despite the tenfold increase in bandwidth to DOE research sites amenable to multiple data transfer streams and high throughput, in prac- tice, researchers often under-utilize the network and resort to painfully-slow single stream transfer methods such as scp to avoid the complexity of using multiple stream tools such as GridFTP and bbcp, and contend with frustration from the lack of consistency of available tools between sites. In this study we survey and assess the data transfer methods pro- vided at several DOE supported computing facilities, includ- ing both leadership-computing facilities, connected through ESnet. We present observed transfer rates, suggested opti- mizations, and discuss the obstacles the tools must overcome to receive wide-spread adoption over scp.

Nam, Hai Ah↗

DMS Analysis Tool Manager

The DMS Analysis Tool Manager is a part of PRISM, the Proteomics Research Information and Management System. The analysis manager performs automated processing of available job steps, tracked by the in the DMS_Pipeline database. Plugin DLLs implement the processing details for each analysis tool.

Gibbons, Bryson↗

Exascale models of stellar explosions: Quintessential multi-physics simulation

The ExaStar project aims to deliver an efficient, versatile, and portable software ecosystem for multi-physics astrophysics simulations run on exascale machines. The code suite is a component-based multi-physics toolkit, built on the capabilities of current simulation codes (in particular Flash-X and Castro), and based on the massively parallel adaptive mesh refinement framework AMReX. It includes modules for hydrodynamics, advanced radiation transport, thermonuclear kinetics, and nuclear microphysics. The code will reach exascale efficiency by building upon current multi- and many-core packages integrated into an orchestration system that uses a combination of configuration tools, code translators, and a domain-specific asynchronous runtime to manage performance across a range of platform architectures. The target science includes multi-physics simulations of astrophysical explosions (such as supernovae and neutron star mergers) to understand the cosmic origin of the elements and the fundamental physics of matter and neutrinos under extreme conditions.

79 ASTRONOMY AND ASTROPHYSICS↗

Site Environmental Report for 2010 Sandia National Laboratories, California.

Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, manages and operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2010 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2010. General site and environmental program information is also included. The Site Environmental Report is divided into ten chapters. Chapter 1, the Executive Summary, highlights compliance and monitoring results obtained in 2010. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2010. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.

54 ENVIRONMENTAL SCIENCES↗

Savannah River Site Environmental Report Summary For 2012

This report's purpose is to: Present summary environmental data that characterize Site environmental management performance, Describe compliance status with respect to environmental standards and requirements, and Highlight significant programs and efforts. Environmental monitoring is conducted extensively with a 2,000-square-mile network extending 25 miles from SRS, with some monitoring performed as far as 100 miles from the Site. The area includes neighboring cities, towns, and counties in Georgia (GA) and South Carolina (SC). Thousands of samples of air, rainwater, surface water, drinking water, groundwater, food products, wildlife, soil, sediment, and vegetation are collected by SRS and analyzed for the presence of radioactive and nonradioactive contaminants. During 2012, SRS accomplished several significant milestones while maintaining its record of environmental excellence, as its operations continued to result in minimal impact to the public and the environment. The Site's radioactive and chemical discharges to air and water were well below regulatory standards for environmental and public health protection; its air and water quality met applicable requirements; and the potential radiation dose to the public was well below the DOE public dose limit.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Quarterly Performance Analysis for the 2nd Quarter FY 2015

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of events for the 2nd Qtr FY-15.

99 GENERAL AND MISCELLANEOUS↗

Idaho National Laboratory Quarterly Occurrence Analysis

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 85 reportable events (18 from the 4th Qtr FY-15 and 67 from the prior three reporting quarters), as well as 25 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (8 from this quarter and 17 from the prior three quarters).

99 GENERAL AND MISCELLANEOUS↗

Synthesis Study on Transitions in Signal Infrastructure and Control Algorithms for Connected and Automated Transportation

Documenting existing state of practice is an initial step in developing future control infrastructure to be co-deployed for heterogeneous mix of connected and automated vehicles with human drivers while leveraging benefits to safety, congestion, and energy. With advances in information technology and extensive deployment of connected and automated vehicle technology anticipated over the coming decades, cities globally are making efforts to plan and prepare for these transitions. CAVs not only offer opportunities to improve transportation systems through enhanced safety and efficient operations of vehicles. There are also significant needs in terms of exploring how best to leverage vehicle-to-vehicle (V2V) technology, vehicle-to-infrastructure (V2I) technology and vehicle-to-everything (V2X) technology. Both Connected Vehicle (CV) and Connected and Automated Vehicle (CAV) paradigms feature bi-directional connectivity and share similar applications in terms of signal control algorithm and infrastructure implementation. The discussion in our synthesis study assumes the CAV/CV context where connectivity exists with or without automated vehicles. Our synthesis study explores the current state of signal control algorithms and infrastructure, reports the completed and newly proposed CV/CAV deployment studies regarding signal control schemes, reviews the deployment costs for CAV/AV signal infrastructure, and concludes with a discussion on the opportunities such as detector free signal control schemes and dynamic performance management for intersections, and challenges such as dependency on market adaptation and the need to build a fault-tolerant signal system deployment in a CAV/CV environment. The study will serve as an initial critical assessment of existing signal control infrastructure (devices, control instruments, and firmware) and control schemes (actuated, adaptive, and coordinated-green wave). Also, the report will help to identify the future needs for the signal infrastructure to act as the nervous system for urban transportation networks, providing not only signaling, but also observability, surveillance, and measurement capacity. The discussion of the opportunities space includes network optimization and control theory perspectives, and the current states of observability for key system parameters (what can be detected, how frequently can it be reported) as well as controllability of dynamic parameters (this includes adjusting not only the signal phase and timing, but also the ability to alter vehicle trajectories through information or direct control). The perspective of observability and controllability of the dynamic systems provides an appropriate lens to discuss future directions as CAV/CV become more prevalent in the future.

33 ADVANCED PROPULSION SYSTEMS↗

Idaho National Laboratory Quarterly Occurrence Analysis 3rd Quarter FY2017

This report is published quarterly by the Idaho National Laboratory (INL) Nuclear Safety, Quality, and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable events for the previous 12 months. This report is the analysis of 91 reportable events (25 from 3rd quarter [Qtr] of fiscal year [FY]-2017 and 66 from the prior three reporting quarters), as well as 38 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (22 from this quarter and 16 from the prior three quarters).

99 GENERAL AND MISCELLANEOUS↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2016

This report provides a synopsis of ongoing environmental management performance and compliance activities conducted during 2016, to meet the requirements of DOE Order 231.1B, Admin Chg 1, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment. The report addresses the operations that occur on the PNNL Richland Campus in Richland, Washington, and at the PNNL Marine Sciences Laboratory (MSL) near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with all applicable DOE, federal, state, and local regulations and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification.

54 ENVIRONMENTAL SCIENCES↗