Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

EVAL system concept definition. Partial spacelab payload, appendices

Tables and charts are presented for experiment schematics, mission opportunities, mission timelines, crew time line and power profile. The methodology being developed to evaluate cost effective vibroacoustic test plans for a representative EVAL shuttle spacelab payload is analyzed. Statistical decision theory is used to quantitatively evaluate seven alternate test plans which include component, subassembly, or payload testing and combinations of component assembly testing.

Source record↗

Space station: Cost and benefits

Costs for developing, producing, operating, and supporting the initial space station, a 4 to 8 man space station, and a 4 to 24 man space station are estimated and compared. These costs include contractor hardware; space station assembly and logistics flight costs; and payload support elements. Transportation system options examined include orbiter modules; standard and extended duration STS fights; reusable spacebased perigee kick motor OTV; and upper stages. Space station service charges assessed include crew hours; energy requirements; payload support module storage; pressurized port usage; and OTV service facility. Graphs show costs for science missions, space processing research, small communication satellites; large GEO transportation; OVT launch costs; DOD payload costs, and user costs.

Source record↗

Global change technology architecture trade study

Described here is an architecture trade study conducted by the Langley Research Center to develop a representative mix of advanced space science instrumentation, spacecraft, and mission orbits to assist in the technology selection processes. The analyses concentrated on the highest priority classes of global change measurements which are the global climate changes. Issues addressed in the tradeoffs includes assessments of the economics of scale of large platforms with multiple instruments relative to smaller spacecraft; the influences of current and possible future launch vehicles on payload sizes, and on-orbit assembly decisions; and the respective roles of low-Earth versus geostationary Earth orbiting systems.

Garrett, L. Bernard↗

Mars Sample Return mission: Two alternate scenarios

Two scenarios for accomplishing a Mars Sample Return mission are presented herein. Mission A is a low cost, low mass scenario, while Mission B is a high technology, high science alternative. Mission A begins with the launch of one Titan IV rocket with a Centaur G' upper stage. The Centaur performs the trans-Mars injection burn and is then released. The payload consists of two lander packages and the Orbital Transfer Vehicle, which is responsible for supporting the landers during launch and interplanetary cruise. After descending to the surface, the landers deploy small, local rovers to collect samples. Mission B starts with 4 Titan IV launches, used to place the parts of the Planetary Transfer Vehicle (PTV) into orbit. The fourth launch payload is able to move to assemble the entire vehicle by simple docking routines. Once complete, the PTV begins a low thrust trajectory out from low Earth orbit, through interplanetary space, and into low Martian orbit. It deploys a communication satellite into a 1/2 sol orbit and then releases the lander package at 500 km altitude. The lander package contains the lander, the Mars Ascent Vehicle (MAV), two lighter than air rovers (called Aereons), and one conventional land rover. The entire package is contained with a biconic aeroshell. After release from the PTV, the lander package descends to the surface, where all three rovers are released to collect samples and map the terrain.

Source record↗

STS-42 Space Shuttle mission report

The STS-42 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-fifth flight of the Space Shuttle Program and the fourteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Discovery vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-52 (LWT-45); three Space Shuttle main engines (SSME's), which were serial numbers 2026, 2022, and 2027 in positions 1, 2, and 3, respectively; and two Solid Rocket Boosters (SRB's) designated as BI-048. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L020A for the left SRM and 360Q020B for the right SRM. The primary objective of the STS-42 mission was to complete the objectives of the first International Microgravity Laboratory (IML-1). Secondary objectives were to perform all operations necessary to support the requirements of the following: Gelation of Sols: Applied Microgravity Research (GOSAMR); Student Experiment 81-09 (Convection in Zero Gravity); Student Experiment 83-02 (Capillary Rise of Liquid Through Granular Porous Media); the Investigation into Polymer Membrane Processing (IPMP); the Radiation Monitoring Equipment-3 (RME-3); and Get-Away Special (GAS) payloads carried on the GAS Beam Assembly.

Fricke, Robert W.↗

Mars sample return mission: Two alternate scenarios

Two scenarios for accomplishing a Mars Sample Return mission are presented. Mission A is a low-cost, low-mass scenario, while Mission B is a high-technology, high-science alternative. Mission A begins with the launch of one Titan 4 rocket with a Centaur G' upper stage. The Centaur performs the trans-Mars injection burn and is then released. The payload consists of two lander packages and the orbital transfer vehicle, which is responsible for supporting the landers during launch and interplanetary cruise. Near Mars, the landers separate - one bound for a polar site and the other for an equatorial site. After descending to the surface, the landers deploy small, local rovers to collect samples. The rovers return these samples to the landers for loading on the direct return rockets, which return the samples directly to the Earth's surface. Mission B starts with four Titan 4 launches, used to place the components of the planetary transfer vehicle (PTV) into orbit. The fourth launch payload is able to move to assemble the entire vehicle by simple docking routines. Once complete, the PTV begins a low-thrust trajectory out from low Earth orbit, through interplanetary space, and into low Mars orbit. It deploys a communications satellite into a one half sol orbit and then releases the lander pad cage at 500 km altitude. The lander package contains the lander, the Mars ascent vehicle (MAV), two lighter-than-air rovers (called Aereons), and one conventional land rover. The entire package is contained within a biconic aeroshell. After release from the PTV the lander package descends to the surface, where all three rovers are released to collect samples and map the terrain. The Aereons attempt to circumnavigate Mars and collect samples from a wide variety of sites, while the land rover examines a local area more thoroughly. The Aereons are equipped with small sample return rockets that can return their samples to the lander in the event that an Aereon is incapable of returning to the lander itself. Once all samples have been collected they are loaded onto the MAV and launched into orbit. The PTV then collects the samples and returns them to Earth orbit for recovery.

Source record↗

Spacecraft System Integration and Test: SSTI Lewis critical design audit

The Critical Design Audit package is the final detailed design package which provides a comprehensive description of the SSTI mission. This package includes the program overview, the system requirements, the science and applications activities, the ground segment development, the assembly, integration and test description, the payload and technology demonstrations, and the spacecraft bus subsystems. Publication and presentation of this document marks the final requirements and design freeze for SSTI.

Brooks, R. P.↗

Delay/Disruption Tolerance Networking (DTN) Implementation and Utilization Options on the International Space Station

The International Space Station (ISS) is in an operational configuration and nearing final assembly. With its maturity and diverse payloads onboard, the opportunity exists to extend the orbital lab into a facility to exercise and demonstrate Delay/Disruption Tolerant Networking (DTN). DTN is an end-to-end network service providing communications through environments characterized by intermittent connectivity, variable delays, high bit error rates, asymmetric links and simplex links. The DTN protocols, also known as bundle protocols, provide a store-and-forward capability to accommodate end-to-end network services. Key capabilities of the bundling protocols include: the Ability to cope with intermittent connectivity, the Ability to take advantage of scheduled and opportunistic connectivity (in addition to always up connectivity), Custody Transfer, and end-to-end security. Colorado University at Boulder and the Huntsville Operational Support Center (HOSC) have been developing a DTN capability utilizing the Commercial Generic Bioprocessing Apparatus (CGBA) payload resources onboard the ISS, at the Boulder Payload Operations Center (POC) and at the HOSC. The DTN capability is in parallel with and is designed to augment current capabilities. The architecture consists of DTN endpoint nodes on the ISS and at the Boulder POC, and a DTN node at the HOSC. The DTN network is composed of two implementations; the Interplanetary Overlay Network (ION) and the open source DTN2 implementation. This paper presents the architecture, implementation, and lessons learned. By being able to handle the types of environments described above, the DTN technology will be instrumental in extending networks into deep space to support future missions to other planets and other solar system points of interest. Thus, this paper also discusses how this technology will be applicable to these types of deep space exploration missions.

Holbrook, Mark↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Design and Functional Validation of a Mechanism for Dual-Spinning CubeSats

The mission of the Micro-sized Microwave Atmospheric Satellite (MicroMAS) is to collect useful atmospheric images using a miniature passive microwave radiometer payload hosted on a low-cost CubeSat platform. In order to collect this data, the microwave radiometer payload must rotate to scan the ground-track perpendicular to the satellite's direction of travel. A custom motor assembly was developed to facilitate the rotation of the payload while allowing the spacecraft bus to remained fixed in the local-vertical, local-horizontal (LVLH) frame for increased pointing accuracy. This paper describes the mechanism used to enable this dual-spinning operation for CubeSats, and the lessons learned during the design, fabrication, integration, and testing phases of the mechanism's development lifecycle.

Peters, Eric↗

Shuttle demonstration of large space structure fabrication and assembly

This paper describes a program aimed at the early on-orbit demonstration of a large-space-structure fabrication and assembly capability. Requirements for the demonstration concept have been formulated. The concept selected to meet these requirements is a Large Space Structure Platform consisting of a triangular prism of 31.5 m length. Sensors can be mounted on this platform to perform earth-observation measurements from space. Structural elements of the platform are fabricated using an automated beam builder in the Shuttle Orbiter payload bay. Special fixtures are designed to assemble the structure with the aid of the remote manipulator system and two astroworkers in an EVA mode. Results of the platform preliminary design are presented in terms of a design layout with related structural, thermal, mass-properties, and control-dynamics data. The assembly scenario is described. Estimates of the total construction time and Orbiter support requirements are also presented.

Fleisig, R.↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Spaceflight payload design flight experience G-408

Worcester Polytechnic Institute's first payload of spaceflight experiments flew aboard Columbia, STS-40, during June of 1991 and culminated eight years of work by students and faculty. The Get Away Special (GAS) payload was installed on the GAS bridge assembly at the aft end of the cargo bay behind the Spacelab Life Sciences (SLS-1) laboratory. The Experiments were turned on by astronaut signal after reaching orbit and then functioned for 72 hours. Environmental and experimental measurements were recorded on three cassette tapes which, together with zeolite crystals grown on orbit, formed the basis of subsequent analyses. The experiments were developed over a number of years by undergraduate students meeting their project requirements for graduation. The experiments included zeolite crystal growth, fluid behavior, and microgravity acceleration measurement in addition to environmental data acquisition. Preparation also included structural design, thermal design, payload integration, and experiment control. All of the experiments functioned on orbit and the payload system performed within design estimates.

Durgin, William W.↗

California Student Get Away Special Payload GAS-450

The California Student Get Away Special Payload GAS-450, recently went into orbit on the STS-57 Mission, Space Shuttle, Endeavour, 21 June 1993, 6:14 AM and landed on the 29 June 1993 at Kennedy Space Center (KSC). Fifty students from 13 California Central Coast Schools and one in San Francisco designed and built 13 active experiments (6 modules) for this mission. Preliminary analysis of our completely reusable payload bus system indicated that the structure, power system, microprocessor, and sensor systems in each experiment module worked flawlessly. The experiments themselves performed exceptionally well with a 60 percent success ratio. The students are thoroughly documenting their own experiments and results via a standard research paper guideline generated by the GAS-450 technical staff. Lessons learned (program management and technical) are documented at the end of the paper. If any other organization needs payload/experiment development or NASA documentation assistance, then please contact us. We can help make your idea a space tested reality. Three years of intense effort culminated on 3 February 1993, the GSFC field operations team at Kennedy Space Center performed the final pressure decay and electrical tests upon the fully integrated GAS-450 flight canister. Subsequently, the payload was integrated with its parent GAS Bridge Assembly in mid-February and the bridge was transferred to the KSC orbiter team in late February 1993. The STS-57 mission originally scheduled to launch on the 29 April 1993 slipped until 21 June 1993. Our Payload shared the cargo bay with ten other GAS Canisters, the EUREKA experiment, the SHOOT experiment, and the SPACEHAB-1 module. The SIL technical staff retrieved the GAS-450 payload after flight from the NASA Spin Test Facility at KSC and shipped it back to California on the 22 July 1993 for student analysis at Allan Hancock College this summer.

Ray, Glen↗

A path to in-space welding and to other in-space metal processing technologies using Space Shuttle small payloads

As we venture into space, it becomes necessary to assemble, expand, and repair space-based structures for our housing, research, and manufacturing. The zero gravity-vacuum of space challenges us to employ construction options which are commonplace on Earth. Rockwell International (RI) has begun to undertake the challenge of space-based construction via numerous options, of which one is welding. As of today, RI divisions have developed appropriate resources and technologies to bring space-based welding within our grasp. Further work, specifically in the area of developing space experiments to test RI technology, is required. RI Space Welding Project's achievements to date, from research and development (R&E) efforts in the areas of microgravity, vacuum, intra- / extra- vehicular activity and spinoff technologies, are reviewed. Special emphasis is given to results for G-169's (Get Away Special) microgravity flights aboard a NASA KC-135. Based on these achievements, a path to actual development of a space welding system is proposed with options to explore spinoff in-space metal processing technologies. This path is constructed by following a series of milestone experiments, of which several are to utilize NASA's Shuttle Small Payload Programs. Conceptual designs of the proposed shuttle payload experiments are discussed with application of lessons learned from G-169's design, development, integration, testing, safety approval process, and KC-135 flights.

Tamir, David↗

Space Congress, 29th, Cocoa Beach, FL, Apr. 21-24, 1992, Proceedings

The present volume on the quest for new frontiers in space discusses weather impacts on space operations, planning for the performance of future space bases, a new guidance and control unit for the Titan IV vehicle, and nondestructive evaluation of Shuttle Columbia tiles. Attention is given to Space Shuttle payload accommodations and trends in customer demands, a generic propellants transfer unit, making space part of general education, space station on-orbit solar array loads during assembly, and dimensional stability of the attitude reference assembly on SSF. Topics addressed include National Launch System payload accommodations and launch operations, the integrated factory/launch site processing concept, Pioneer 10 interstellar studies, and the role of advanced nuclear propulsion systems in precursor interstellar missions. Also discussed are legal challenges in realizing interstellar initiatives, Mars transportation system synthesis, and NASA's commercial space program.

Source record↗

Payload retention device

A payload retention device for grappling and retaining a payload in docked position on a supporting structure in the cargo bay of a space vehicle is presented. The device comprises a two-fault tolerant electromagnetic grappling system comprising electromagnets for attracting and grappling a grapple strike plate affixed to the payload when in proximity thereto and an electromechanical latching assembly comprising a pair of independent latching subassemblies. Each subassembly comprises a set of latching pawls which are driven into latching and unlatching positions relative to a grappled payload by a pair of gearmotors, each equipped with a ratchet clutch drive mechanism which is two-fault tolerant with respect to latching such that only one gearmotor of the four needs to be operational to effect a latch of the payload but is single fault tolerant with respect to release of a latched payload. Sensors are included for automatically sensing the magnetic grappling of a payload and for automatically de-energizing the gearmotors of the latching subassemblies when a latch condition is achieved.

Monford, Leo G., Jr.↗