Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Solar Electric Propulsion Technologies Being Designed for Orbit Transfer Vehicle Applications

There is increasing interest in employing Solar Electric Propulsion (SEP) for new missions requiring transfer from low Earth orbit to the Earth-Moon Lagrange point, L1. Mission architecture plans place the Gateway Habitat at L1 in the 2011 to 2016 timeframe. The Gateway Habitat is envisioned to be used for Lunar exploration, space telescopes, and planetary mission staging. In these scenarios, an SEP stage, or "tug," is used to transport payloads to L1--such as the habitat module, lunar excursion and return vehicles, and chemical propellant for return crew trips. SEP tugs are attractive because they are able to efficiently transport large (less than 10,000 kg) payloads while minimizing propellant requirements. To meet the needs of these missions, a preliminary conceptual design for a general-purpose SEP tug was developed that incorporates several of the advanced space power and in-space propulsion technologies (such as high-power gridded ion and Hall thrusters, high-performance thin-film photovoltaics, lithium-ion batteries, and advanced high-voltage power processing) being developed at the NASA Glenn Research Center. A spreadsheet-based vehicle system model was developed for component sizing and is currently being used for mission planning. This model incorporates a low-thrust orbit transfer algorithm to make preliminary determinations of transfer times and propellant requirements. Results from this combined tug mass estimation and orbit transfer model will be used in a higher fidelity trajectory model to refine the analysis.

Sarver-Verhey, Timothy R.↗

The dynamics of orbital maneuvering: Design and evaluation of a visual display aid for human controllers

An interactive proximity operations planning system, which allows on-site planning of fuel-efficient, multi-burn maneuvers in a potential multi-spacecraft environment was developed and tested. Though this display system most directly assists planning by providing visual feedback to aid visualization of the trajectories and constraints, its most significant features include an inverse dynamics algorithm that removes control nonlinearities facing the operator and a trajectory planning technique that reduces the order of control and creates, through a geometric spread-sheet the illusion of an inertially stable environment. This synthetic environment provides the user with control of relevant static and dynamic properties of way-points during small orbital changes allowing independent solutions to the normally coupled problems of orbital maneuvering. An experiment was carried out in which experienced operators were required to plan a trajectory to retrieve an object accidently separated from a dual-keel space station. The time required to plan these maneuvers was found to be predicted by the direction of the insertion thrust and did not depend on the point of separation from the space station.

Ellis, Stephen R.↗

Dawn's final mission at Ceres: navigation and mission design experience

On Oct. 31st, 2018, the Dawn spacecraft completed its space journey covering more than 11 years including exploration of Vesta and Ceres, two protoplanets in the main asteroid belt. After successfully completing its prime mission at the dwarf planet Ceres, the Dawn mission was extended twice to pursue new scientific objectives. The second extended mission at Ceres, and the final mission for Dawn, presented a series of challenges that were new to the experienced and accomplished Dawn navigation team. This paper discusses mission design and navigational experiences and challenges during Dawn’s final transfer and orbit at Ceres. Topics include reference orbit design of the final science orbit, mission design and planning for the transfer, periapsis targeting over a surface feature, and analysis for planetary protection requirements.

Karimi, Reza↗

Trajectory Design and Orbit Determination for the Lunar CRater Observation and Sensing Satellite (LCROSS)

The Lunar CRater Observation and Sensing Satellite (LCROSS) was competitively selected by the National Aeronautical and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) as a low-cost (< $80M) 1000 kg secondary payload to be launched with the Lunar Reconnaissance Orbiter (LRO) in October of 2008. LCROSS is a lunar impactor mission that will investigate the presence or absence of water in a permanently shadowed crater. Following launch, trans-lunar injection (TLI) and separation from LRO, LCROSS will remain attached to the launch vehicle's approximately 2300 kg spent Earth Departure Upper Stage (EDUS) and will guide it toward an impact of a permanently shadowed crater at the lunar South Pole. Hours prior to impact, LCROSS will separate from the EDUS and perform a braking maneuver that will allow the spacecraft to take measurements of the resulting EDUS impact ejecta cloud for several minutes, before impacting the crater as well. As a cost-capped secondary mission that must accommodate specific LRO launch dates, LCROSS faces unique challenges and constraints that must be carefully reconciled in order to satisfy an ambitious set of science observation requirements. This paper examines driving mission requirements and constraints and describes the trajectory design and navigation strategy that shape the LCROSS mission.

Galal, Ken↗

Small Displacement, Long Life On-Orbit Compressor Design and Fabrication

The focus is the generation of technology and fabrication of prototype hardware applicable to seven Space Station compressor system applications. The compressors are of the single acting reciprocating piston type and, in general, may be termed miniature in size compared with normal commercially available equipment. The initial technology development is focused on improved valve designs, and the control of pulsations and heating effects in order to increase compressor efficiency and reduce cycle temperatures, thus permitting significantly increased stage pressure ratios. The initial test compressor was successfully operated at pressure ratios of up to 50:1, and this significant extension of allowable pressure ratio will result in a reduction of the number of required stages and, hence, total hardware thereby reducing system weight and volume. These experiments have also identified the need to employ low shaft speeds, on the order of 250 to 500 rpm, to enhance heat transfer and increase life. The prototype compressor currently being designed, is to be driven by a low-speed brushless dc motor sealed in a case common to the compressor drive mechanism case. The compressor and motor case will communicate with stage suction pressure so that any minor gas leakage past the piston rings will be returned to the suction. Emphasis in this prototype design is being placed on simplicity, durability, commonality of components, and high efficiency.

Gerlach, C. R.↗

Galileo System Design for Orbital Operations

In April 1991, Galileo's X-band high gain antenna failed to deploy. An alternate approach which utilizes the spacecraft's S-band low gain antenna was conceived and is in development.

Galileo↗

TOPEX/Poseidon orbit acquisition maneuver design

The current baseline injection orbit for the jointly sponsored NASA/CNES TOPEX/Poseidon mission is near-circular, approximately 30 km below the desired operational orbit altitude and at the operational orbit inclination. A baseline maneuver sequence to retarget from this injection orbit to the desired operational orbit has been designed based upon the expected worst-case 3-sigma injection and maneuver execution errors. The sequence requires seven maneuvers, including an initial calibration burn, and achieves the operational orbit with the desired ground track pattern in 30 days. A delay sensitivity analysis has been conducted to estimate the allowable operational delay for each maneuver without increasing the total orbit acquisition period. The baseline sequence provides back-ups for a one-revolution delay for each maneuver and one-day delay for most maneuvers. It is also shown that a higher injection orbit allows the maneuver sequence to achieve the operational orbit in 26 days under a worst-case scenario.

Bhat, Ramachandra S.↗