Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “obsolescence”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Comparison Testing and Analysis of Braided Cords Constructed from Varying Kevlar Fiber Types

Material advancements move quickly, resulting in material obsolescence issues that require parachute engineers to understand how the material properties change with a material upgrade and if there are expected impacts to overall performance of the parachute. The objective of this test was to measure the elongation of different Kevlar types at both the cord-level and at the yarn-level to determine if a change in Kevlar type impacted parachute performance. An Instron machine with a pin-to-pin connection was used to measure load and displacement time histories for various Kevlar cord and yarn samples in a cyclic load profile. Twenty-four cord samples and twenty-four yarn samples were tested; each sample was cycled five times to the relevant maximum load (either to breaking strength or to the 30% peak load expected in flight). In addition to the Instron measurements, a photogrammetric technique was also implemented to measure elongation of the samples using button targets. Modulus test data shows approximately a 10% difference in elongation between Kevlar 29AP and Kevlar 129, and another 10% difference in elongation between Kevlar 29 and Kevlar 29AP. Although this is a measurable change in modulus, the effect on parachute performance is likely small, particularly for non-primary structure elements of relatively small length. This test campaign provides an example of the type of testing and analysis that parachute engineers could do to understand how material upgrades affect performance of their systems.

Parachutes↗

Comparison Testing and Analysis of Braided Cords Constructed from Varying Kevlar Fiber Types

Material advancements move quickly, resulting in material obsolescence issues that require parachute engineers to understand how the material properties change with a material upgrade and if there are expected impacts to overall performance of the parachute. The objective of this test was to measure the elongation of different Kevlar types at both the cord-level and at the yarn-level to determine if a change in Kevlar type impacted parachute performance. An Instron machine with a pin-to-pin connection was used to measure load and displacement time histories for various Kevlar cord and yarn samples in a cyclic load profile. Twenty-four cord samples and twenty-four yarn samples were tested; each sample was cycled five times to the relevant maximum load (either to breaking strength or to the 30% peak load expected in flight). In addition to the Instron measurements, a photogrammetric technique was also implemented to measure elongation of the samples using button targets. Modulus test data shows approximately a 10% difference in elongation between Kevlar 29AP and Kevlar 129, and another 10% difference in elongation between Kevlar 29 and Kevlar 29AP. Although this is a measurable change in modulus, the effect on parachute performance is likely small, particularly for non-primary structure elements of relatively small length. This test campaign provides an example of the type of testing and analysis that parachute engineers could do to understand how material upgrades affect performance of their systems.

Modulus Testing↗

The FNAL injector upgrade

The present FNAL H{sup -} injector has been operational since the 1970s and consists of two magnetron H{sup -} sources and two 750 keV Cockcroft-Walton Accelerators. In the upgrade, both slit-type magnetron sources will be replaced with circular aperture sources, and the Cockcroft-Waltons with a 200 MHz RFQ (radio frequency quadrupole). Operational experience at BNL (Brookhaven National Laboratory) has shown that the upgraded source and RFQ will be more reliable, improve beam quality and require less manpower than the present system. The present FNAL (Fermi National Accelerator Laboratory) injector has been operational since 1978 and has been a reliable source of H{sup -} beams for the Fermilab program. At present there are two Cockcroft-Walton injectors, each with a magnetron H{sup -} source with a slit aperture. With these two sources in operation, the injector has a reliability of better than 97%. However, issues with maintenance, equipment obsolescence, increased beam quality demands and retirement of critical personnel, have made it more difficult for the continued reliable running of the H{sup -} injector. The recent past has also seen an increase in both downtime and source output issues. With these problems coming to the forefront, a new 750 keV injector is being built to replace the present system. The new system will be similar to the one at BNL (Brookhaven National Laboratory) that has a similar magnetron source with a round aperture and a 200MHz RFQ. This combination has been shown to operate extremely reliably.

43 PARTICLE ACCELERATORS↗

SNS BLM SYSTEM EVOLUTION: DETECTORS, ELECTRONICS AND SOFTWARE

SNS is a high intensity hadron beam facility; so the Beam Loss Monitor (BLM) system is a crucial part of Machine Protection System and an important tool for beam tuning. The paper presents the current status of installed detectors and experimental data obtained during SNS operations. We compare several different types of BLMs and show advantages and disadvantages of each type. The electronic parts obsolescence became a real issue since the original electronics was designed about 10 years ago. The first test of our next generation BLM system is expected to be done by summer 2009. The new system will contribute to significant noise reduction and will follow a modular concept of Smart Device to achieve a higher degree of reliability and maintainability.

Zhukov, Alexander P↗

TRAM v. 1.1 Alpha

TRAM is the Technology Refreshment Assessment Model, a computer software application that provides analysts and executives with the ability to perform optimal Technology Management decision making over the life-cycle of a technologically sophisticated, high value system or system-of-systems. The tool allows for the development of optimal technology management strategies and technology roadmaps over long-term time horizons, factoring in performance, cost, schedule, risk and obsolescence.

EDDY, JOHN↗

Human Factors Principles in Information Dashboard Design

When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state concepts for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.

3D Modeling↗

New controller for high voltage converter modulator at spallation neutron source

The Spallation Neutron Source (SNS) has developed a new control system for the High Voltage Convertor Modulator (HVCM) at the SNS to replace the original control system which is approaching obsolescence. The original system was based on controllers for similar high voltage systems that were already in use [1]. The new controller, based on National Instruments PXI/FlexRIO Field Programmable Gate Array (FPGA) platform, offers enhancements such as modular construction, flexibility and non-proprietary software. The new controller also provides new capabilities like various methods for modulator pulse flattening, waveform capture, and first fault detection. This paper will discuss the design of the system, including the human machine interface, based on lessons learned at the SNS and other projects. It will also discuss performance and other issues related to its operation in an accelerator facility which requires high availability. To date, 73% of the operational HVCMs have been upgraded to with the new controller, and the remainder are scheduled for completion by mid-2017.

Wezensky, Mark W↗

A NOVEL TOOL FOR IMPROVING THE DATA COLLECTION PROCESS DURING CONTROL ROOM MODERNIZATION HUMAN-SYSTEM INTERFACE TESTING AND EVALUATION ACTIVITIES

The U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program is developing a scientific basis to extend the existing U.S. nuclear power plant (NPP) operating life beyond the current 60-year licensing period and to ensure NPP long-term reliability, productivity, safety, and security. Under the Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway, the LWRS Program conducts targeted research and development to address long-term aging and obsolescence of existing instrumentation and control technologies, as well as to implement and test new digital II&C technology that enables broad innovation and business improvement in the NPP operating model. To this end, the role of human factors engineering (HFE) is important as part of ensuring that the control room modernization (CRM) activities account for the operator’s cognitive and physiological characteristics. Part of the HFE process for CRM entails conducting tests and evaluations (T&Es) that will inform the design of new human-system interface (HSI) technologies. Qualitative data that captures operator feedback and important human-system interactions are an important part of T&E. However, the analyzing this qualitative data in order to provide actionable design recommendations can be time-consuming and error prone. This paper presents an early version of a tool that can be used to analyze this qualitative data to (1) sift through freeform text for improved design issue identification, (2) maintain consistency in theme coding conventions, and (3) readily provide actionable design guidance that can be traceable to state-of-the-art HFE guidelines such as NUREG-0700. A description of this tool is discussed next.

99 GENERAL AND MISCELLANEOUS↗

A SUMMARY COMPARISON OF DESIGN EVALUATION TECHNIQUES

The United States’ fleet of Nuclear Reactors is considering modernizing their control rooms and instrumentation as an effort to avoid component obsolescence, keep up with competing industries, and cater to a new work force among others. Multiple technologies have potential to improve the control room. In attempts to evaluate the available options researchers employ a variety of measures to ensure the best candidate is used in a modernizing effort. The NRC is in charge of ensuring any new design has been thoroughly vetted before approving a license. Laid out in NUREG-0711 “Human Factors Engineering Program Review Model” is the review criteria for design validation. As there are a variety of measures currently used to evaluate candidate technologies, this paper seeks to identify weaknesses in the common measures used to design and validate technology in control room modernization efforts. Identifying where measurements are not meeting the criteria will help the control room modernization research platform identify where measurement development needs to occur. This will help ensure that current performance measurements are producing as reliable results as possible to select the right technology to integrate into nuclear operating control rooms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying the Contribution of Individual Display Features on Mental Workload to Support Human-System Interface Design in Nuclear Power Plants

Abstract. The integration of new digital instrumentation and control (I&C) technologies like advanced human-system interfaces in U.S. nuclear power plant main control rooms is important for addressing long-term aging and obsolescence of existing I&C. Nonetheless, attention should be made to ensure these technologies reflect state-of-the-art human factors engineering (HFE) principles. Often, there is conflicting guidance from one guideline to another, requiring the analyst to make a judgment call on addressing these 'tradeoffs.' The objective of this research was to inform the analyst of these tradeoffs through an empirical investigation of how certain display features that characterize common HFE guidelines concerning visual clutter and saliency influence information processing in a naturalistic context. By understanding the unique contribution of each display feature using a multilevel model, the HFE analyst should have an understanding of the interrelations of each feature with its impact on cognitive processes. Results and implications are discussed in this paper.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

Modernizing the SNS Control System

The Spallation Neutron Source at Oak Ridge National Laboratory has been operating since 2006. An upgrade to double the machine power from 1.4 MW to 2.8 MW is currently underway and a project to add a second target station is in the preliminary design phase. While each project will add the controls needed for their specific scope, the existing control system hardware, software, and infrastructure require upgrades to maintain high availability and ensure the system will meet facility requirements into the future. While some systems have received new hardware due to obsolescence, much of the system is original apart from some maintenance and technology refresh. Software will also become obsolete and must be upgraded for sustainability. Further, requirements for system capacity can be expected to increase as more subsystems upgrade to smarter devices capable of higher data rates. This paper covers planned improvements to the integrated control system with a focus on reliability, sustainability, and future capability.

White, Karen S.↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration Strategy

EXECUTIVE SUMMARY The Light Water Reactor Sustainability Program Plant Modernization Pathway has been working with industry for a number of years to leverage digital technology to extend the life and improve the performance of the existing fleet through modernized technologies and improved processes for plant operation and power generation. This includes development of modernization solutions to improve reliability and economic performance while addressing US nuclear industry’s aging and obsolescence challenges. The objective of these efforts is to deliver a sustainable business model that enables US nuclear industry to remain competitive. Digital Infrastructure (DI) research has established a technical foundation for these efforts. This effort began with technical analysis and support for a safety-related instrumentation and control (I&C) pilot upgrade being performed at Constellation Energy Generation’s Limerick Nuclear Plant. The following publicly available reports were produced as part of this effort. • INL/EXT-20-61079, Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade [1] • INL/EXT-20-59371, Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations [2] • INL/EXT-20-59809, “Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation Report and Lessons Learned [3] • INL/RPT-23-72105, Safety-Related Instrumentation and Control Upgrade: Conceptual – Detailed Design Phase Report and Lessons Learned [4]

99 GENERAL AND MISCELLANEOUS↗

Mitsubishi experience on digital I and C and modernization

Digital systems are being applied to instrumentation and control (I and C) systems, including safety and non-safety systems, to accommodate obsolescence of existing analog devices or to obtain the benefits of digital I and C systems in new nuclear power plants as well as existing plants. This paper presents the Mitsubishi experience of digital I and C application and modernization. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Innovative applications of technology for nuclear power plant productivity improvements

The nuclear power industry in several countries is concerned about the ability to maintain high plant performance levels due to aging and obsolescence, knowledge drain, fewer plant staff, and new requirements and commitments. Current plant operations are labor-intensive due to the vast number of operational and support activities required by commonly used technology in most plants. These concerns increase as plants extend their operating life. In addition, there is the goal to further improve performance while reducing human errors and increasingly focus on reducing operations and maintenance costs. New plants are expected to perform more productively than current plants. In order to achieve and increase high productivity, it is necessary to look at innovative applications of modern technologies and new concepts of operation. The Electric Power Research Inst. is exploring and demonstrating modern technologies that enable cost-effectively maintaining current performance levels and shifts to even higher performance levels, as well as provide tools for high performance in new plants. Several modern technologies being explored can provide multiple benefits for a wide range of applications. Examples of these technologies include simulation, visualization, automation, human cognitive engineering, and information and communications technologies. Some applications using modern technologies are described. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗