Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “met”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Report for the Regulatory Testing of the Welded Isotek-SFC-W-3 Special Form Capsule

Two prototypes the welded ISOTEK-SFC-W-3 special form capsules (SFCs) of the same design were evaluated to determine if the requirements of Title 49, Code of Federal Regulations (CFR), Part 173.469, Tests for Special Form Class 7 (Radioactive) Materials, were met. The results of the special form tests are documented in this test report. This report describes the special form testing activities performed on the two welded ISOTEK-SFC-W-3 capsules. The test units were designated as TU-1 and TU-2. TU-1 was subjected to leak testing, percussion testing, and impact testing. TU-1 was leak tested using the leak rate test specified in 49 CFR 173.469(a)(4)(i). The impact test on TU-1 was conducted according to the requirements in 49 CFR 173.469 (b)(1). The percussion test that was carried out on TU-1 was conducted in accordance with 49 CFR 173.469 (b)(2). TU-2 was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests, as specified in American National Standards Institute (ANSI) N14.5-2014. The measured leak rates were converted to standard condition leak rates as specified in American Society for Testing and Measurement (ASTM) E 493. The determined standardized leak rates obtained from the test and the calculations for all the test units met the requirements for special form certification. The testing was performed under the direction of the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Novel Manufacturing Process of Lightweight Automotive Seats (Integration of Additive Manufacturing and Reinforced Polymer Composite)

Lightweight automotive seats offer multiple benefits to original equipment manufacturers in terms of cost savings from various aspects, including less material usage, more integrated processes, and compliance with Corporate Average Fuel Economy Standards. Original equipment manufacturers have been focusing on innovative ways to produce light weight automotive seats. The commercially available automotive seats are currently made of multiple metal components combined through welding and fasteners. The use of additive manufacturing and composite structures is particularly useful for light weighting the automotive components. Additive manufacturing (AM) offers multiple advantages over traditional manufacturing processes such as freedom of design thereby enabling complex structural geometries, mass customization and waste minimization, and control over the fiber alignment through deposition in a predetermined pattern. Combining metal inserts with polymer composites through a novel manufacturing process allows design of lightweight and high-performance materials for automotive components. However, fabricating these metal polymer composite structures through traditional manufacturing processes limits their mechanical properties due to limited design freedom, lack of control over fiber orientation in composite parts, and poor interfacial bonding between the constituent materials. It is essential to develop a novel manufacturing process to enable high throughput production of lightweight automotive seats using metal and polymer composites. As such it is important to design the automotive seat suitable for manufacturing via this process and perform mechanical characterization on various subcomponents of the seat to ensure that the design and performance requirements provided by the auto manufacturer are met. The aim of this project is to develop a novel manufacturing technique to produce lightweight automotive seat by combining AM with conventional manufacturing processes. The car seat back panel will be designed via topology optimization and numerical simulations to minimize the overall weight while ensuring it meets all the performance requirements. The optimization of the seat back structure will be based on computational stress analysis to maximize the stiffness and minimize the weight. Materials currently used by Ford Motor Company will be adopted for a few subcomponents while the in-house composite materials will be used for the rest of the seat back. The composite and metallic materials will be tested to determine their mechanical properties as these are necessary for simulations. A novel manufacturing process will be developed to integrate AM metal inserts with discontinuous reinforced composite through large scale additive manufacturing and compression overmolding processes. The developed manufacturing technique will be used to fabricated various subcomponents suitable for the seat back design and mechanically tested to determine their properties. The manufacturing of the lightweight seat back design through this process involves integrated AM metal inserts with the composite structure for recliner connection. The manufacturing of the entire seat back which is lightweight through the novel manufacturing process will be discussed. The performance of the designed seat back will be investigated through numerical simulations and shown to meet all the requirements provided by the auto manufacturer. The final goal of developing a novel manufacturing process for lightweight automotive seats is met through design optimization of seat back, manufacturing of subcomponents, mechanical characterization, and validation through numerical simulations. The routes to achieve the final goal of the project and the depth in which they were investigated changed throughout the project due to personnel changes and the COVID-19 pandemic. The project resulted in the development of a novel manufacturing process to integrate metal inserts with tailored polymer composite preforms through overmolding. Leveraging this proven manufacturing process, a lightweight seat back was designed through topology optimization and numerical simulations. The designed seat back uses AM metal inserts and compression overmolding of tailored polymer composite preforms obtained via large scale additive manufacturing. The metal polymer composite structures fabricated through this process exhibited enhancement in stiffness and improved ductility upon testing. Overall, the project provided an alternative design and manufacturing technique for automotive seat back that enables weight saving while meeting the safety and performance requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

King City Asbestos Corporation (KCAC) Mine Carbon Mineralization Field Test (Final Combined Report)

The overall objective of the KCAC carbon mineralization project is to determine the most successful approaches to CO 2 mineralization of asbestos-bearing serpentinite rocks and mine waste at the closed KCAC asbestos mine. The objectives of Budget Period 1 (BP1) are to characterize the site including, mineralogical and geochemical variability in site materials, baseline conditions including CO 2 flux and local climate, and to establish the designs for the second, experimental phase of the project. As described in Section 3 of this report, all tasks outlined in the Statement of Project Objective (SOPO) have been completed or are on schedule to be completed by the end of BP1. As described in Section 4, all success criteria and milestones have been met or will be met by the end of BP1. We conclude that the findings of BP1 strongly support moving to the second phase of the project to investigate methods to increase the rate of CO 2 mineralization. CO 2 flux monitoring during BP1 established an estimated baseline uptake of CO 2 over the 142,193 m 2 KCAC mine site of 147 and 179 metric tons CO 2 /yr using dynamic closed chamber and eddy covariance monitoring methods, respectively. Mineralogical analysis shows that the loose surficial waste material contains pyroaurite and minor hydromagnesite, indicating past carbon mineralization. Sediment samples at depths below 60 cm contained ~3 wt% brucite and localized high brucite contents of ~24 wt% were measured at depth, indicating significant unreacted material at relatively shallow depths. Together, these results demonstrate that despite prolonged exposure to the atmosphere, reactive material is still present and accessible and is naturally taking up atmospheric CO 2 . However, these natural rates are still well below rates that can be achieved by applying practices that can accelerate the CO 2 mineralization reaction. Designs for the Field-Testing Phase (BP2) of the project have been established, incorporating the findings of BP1. Based on results to date we have selected two methods to accelerate the rate of CO 2 mineralization, which we refer to as the Tilling Method and the Greenhouse Method. We hypothesize that these methods can increase the CO 2 mineralization rate by up to 5 times greater than the natural background rate measured in BP1. An Initial Lifecyle Assessment (LCA) and techno-economic analysis (TEA) were conducted for these two methods. The LCA concluded that the baseline version of the Greenhouse and Tilling methods at commercial scale are expected to achieve a CDR efficiency of 97% and 71%, respectively (cumulative, over 30 years of operation). Incorporating the net CO 2 removal rates calculated in the LCA, the TEA found the levelized, 30-year costs of the baseline Greenhouse and Tilling methods to be $\$$95/t-CO 2 and $\$$119/t-CO 2 , respectively, and that costs could be brought to well below $\$$100/t-CO 2 for either method by scaling up the volume of rock utilized. An initial EH&S Risk Assessment, evaluating the potential EH&S risks of the proposed carbon mineralization methods at commercial scale, was completed by LLNL EH&S professionals for these two methods.

58 GEOSCIENCES↗

April 2025 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Production Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Disposal Facility waste form was prepared at Savannah River National Laboratory using the Salt Waste Processing Facility Decontaminated Salt Solution and Z-area premix material for the April 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 43 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The April 2025 semiannual Cement-Free grout sample met the South Carolina Code of Regulations for Hazardous Waste Management Regulations 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents, and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commercial Building HVAC Technology Challenge - Carrier (Final Report)

The purpose of this Cooperative Research and Development Agreement (CRADA) was to test two rooftop commercial heating, ventilation, and air conditioning (HVAC) systems supplied by Carrier Corporation to determine if they met the laboratory test requirements of the United States Department of Energy (DOE) Commercial Building HVAC Technology Challenge (hereafter noted as “the Challenge”). Results of the laboratory testing completed at Oak Ridge National Laboratory (ORNL) demonstrated that the systems met all requirements of the Challenge. Carrier Corporation has successfully completed this aspect of the Challenge. This CRADA report will briefly describe the Challenge, the test plan created to measure the success of systems provided by Challenge participants, and the results of laboratory testing of the Carrier commercial rooftop systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

October 2025 Semiannual Composite Salt Waste Processing Facility Decontaminated Salt Solution Toxicity Characteristic Leaching Procedure Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Disposal Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Processing Facility Decontaminated Salt Solution and Z area premix material for the October 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 51 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The October 2025 Semiannual Cement-Free grout sample met 61 79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

Hsieh, Madison [Savannah River National Laboratory↗

Magnesium production by molten salt electrolysis with liquid tin cathode and multiple effect distillation

Low-cost clean primary production of magnesium metal is important for its use in many applications, from light-weight structural components to energy technologies. This work describes new experiments and cost and emissions analysis for a magnesium metal production process. The process combines molten salt electrolysis of MgO using MgF₂-CaF₂ electrolyte and a reactive liquid tin cathode, with gravity-driven multiple effect thermal system (G-METS) distillation to separate out the magnesium product, and re-use of the tin. Electrolysis experiments with carbon anodes showed current yield above 90%, while a yttria-stabilized zirconia solid oxide membrane (SOM) anode experiment showed 84% current yield. G-METS distillation is an important component of the envisioned process. It can potentially lower costs and energy use considerably compared with conventional magnesium distillation. Techno-economic analysis including detailed mass and energy balances shows that this electrolyte composition could lower costs by utilizing CaO, which is the primary impurity in MgO, as the Hall-Héroult process uses the sodium impurity in alumina. Analysis options include: raw material types (magnesite rock vs. brine or seawater), drying and calcining using electricity vs. natural gas, and carbon vs. SOM anode type. Using SOM inert anodes results in a cost premium around 10%–15%, mostly due to higher electrical energy usage resulting from membrane resistance, and reduces GHG emissions by approximately 1 kg CO₂/kg Mg product. Capital and operating cost estimates, and cradle to gate greenhouse gas (GHG) emissions analysis under several raw material and process technology scenarios, show comparable costs and emissions to those of aluminum production.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Field-Scale Testing of a High-Efficiency Membrane Reactor (MR)—Adsorptive Reactor (AR) Process for H2 Generation and Pre-Combustion CO2 Capture

The study objective was to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift reaction process employing a carbon molecular sieve membrane (CMSM)-based membrane reactor (MR) followed by an adsorptive reactor (AR) for pre-combustion CO2 capture. The project was carried out in two different phases. In Phase I, the field-scale experimental MR-AR system was designed and constructed, the membranes, and adsorbents were prepared, and the unit was tested with simulated syngas to validate functionality. In Phase II, the unit was installed at the test site, field-tested using real syngas, and a technoeconomic analysis (TEA) of the technology was completed. All project milestones were met. Specifically, (i) high-performance CMSMs were prepared meeting the target H2 permeance (>1 m3/(m2.hbar) and H2/CO selectivity of >80 at temperatures of up to 300 °C and pressures of up to 25 bar with a <10% performance decline over the testing period; (ii) pelletized adsorbents were prepared for use in relevant conditions (250 °C < T < 450 °C, pressures up to 25 bar) with a working capacity of >2.5 wt.% and an attrition rate of <0.2; (iii) TEA showed that the MR-AR technology met the CO2 capture goals of 95% CO2 purity at a cost of electricity (COE) 30% less than baseline approaches.

42 ENGINEERING↗

Nonlinear Reconnection in Magnetized Turbulence

Recent analytical works on strong magnetized plasma turbulence have hypothesized the existence of a range of scales where the tearing instability may govern the energy cascade. In this paper, we estimate the conditions under which such tearing may give rise to full nonlinear magnetic reconnection in the turbulent eddies. When those conditions are met, a new turbulence regime is accessed where reconnection-driven energy dissipation becomes common, rather than the rare feature that it must be when they are not. We conclude that while such conditions are very stringent for fluid-scale eddies, they are easily met for kinetic-scale eddies; in particular, we suggest that our arguments may help explain recent Magnetospheric Multiscale (MMS) observations of (so-called) electron-only reconnection and of energy dissipation via electron Landau damping in the Earthʼs magnetosheath.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Monitor support on accelerated processing device

A technique for implementing synchronization monitors on an accelerated processing device (“APD”) is provided. Work on an APD includes workgroups that include one or more wavefronts. All wavefronts of a workgroup execute on a single compute unit. A monitor is a synchronization construct that allows workgroups to stall until a particular condition is met. Responsive to all wavefronts of a workgroup executing a wait instruction, the monitor coordinator records the workgroup in an “entry queue.” The workgroup begins saving its state to a general APD memory and, when such saving is complete, the monitor coordinator moves the workgroup to a “condition queue.” When the condition specified by the wait instruction is met, the monitor coordinator moves the workgroup to a “ready queue,” and, when sufficient resources are available on a compute unit, the APD schedules the ready workgroup for execution on a compute unit.

42 ENGINEERING↗

Energy-harvesting chromogenic devices

The present disclosure relates to devices that include a perovskite, where, when a first condition is met, at least a portion of the perovskite is in a first phase that substantially transmits light, when a second condition is met, at least a portion of the perovskite is in a second phase that substantially absorbs light, and the perovskite is reversibly switchable between the first phase and the second phase by reversibly switching between the first condition and the second condition.

Wheeler, Lance Michael↗

Byte select cache compression

Techniques are disclosed for designing cache compression algorithms that control how data in caches are compressed. The techniques generate a custom “byte select algorithm” by applying repeated transforms applied to an initial compression algorithm until a set of suitability criteria is met. The suitability criteria include that the “cost” is below a threshold and that a metadata constraint is met. The “cost” is the number of blocks that can be compressed by an algorithm as compared with the “ideal” algorithm. The metadata constraint is the number of bits required for metadata.

Das, Shomit N.↗

U-10Mo Monolithic Fuel Qualification Plan

The Material Management and Minimization (M3) Program’s primary objective within the U.S. Department of Energy/National Nuclear Security Administration is to achieve permanent threat reduction by minimizing and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project, is pursuing a fuel qualification and licensing effort focused on converting high-performance research reactors in the United States from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. The body of this document is focused on defining the activities required for generic qualification of high density, LEU fuel that then allows reactor conversions to proceed for the four high-performance research reactors and the critical assembly that will operate using the U-10Mo monolithic fuel design (see Subsection 1.3): MITR, MURR, NBSR, ATR, and ATRC. Fuel qualification in this report means generic fuel acceptance of the U-10Mo monolithic fuel form by the NRC for use in reactor conversions in the United States, which allows the fuel to be used in subsequent reactor specific licensing requests. The U 10Mo Monolithic Fuel Research, Development, and Qualification Plan utilizes the functions and requirements of the USHPRR Project that was established in the Functions and Requirements Document (F&RD) [1] and expands on these requirements to ensure that planned tests have traceable results that will ensure the requirement has been met. The methods by which data will be collected to show that these requirements have been met are described in this document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System and method for obfuscation of electronic circuits

A computer-implemented method of generating randomized electrical interconnects for an electronic circuit comprises steps of receiving a netlist of nodes of electronic components to be connected, each connection between the nodes forming an electrical interconnect; determining a list of one or more path directions for each electrical interconnect; determining a plurality of path direction distances for each electrical interconnect; generating a plurality of segments for each electrical interconnect, each segment having one path direction and a length which are selected at random; calculating a sum of the lengths of all of the segments in each path direction each time a segment is generated for each electrical interconnect; removing one path direction from the list of path directions when a first condition is met; and stopping the generating a plurality of segments for each electrical interconnect when a second condition is met.

Trujillo, Joshua↗

System and method for obfuscation of electronic circuits

A computer-implemented method of generating randomized electrical interconnects for an electronic circuit comprises steps of receiving a netlist of nodes of electronic components to be connected, each connection between the nodes forming an electrical interconnect; determining a list of one or more path directions for each electrical interconnect; determining a plurality of path direction distances for each electrical interconnect; generating a plurality of segments for each electrical interconnect, each segment having one path direction and a length which are selected at random; calculating a sum of the lengths of all segments of the plurality of segments in each path direction each time a segment is generated for each electrical interconnect; removing one path direction from the list of path directions when a first condition is met; and stopping the generating a plurality of segments for each electrical interconnect when a second condition is met.

Trujillo, Joshua↗

Nonsteady Load Responses to Daytime Atmospheric Turbulence Eddies on the DOE 1.5 MW Wind Turbine at NREL

Field data collected from the NREL/GE 1.5MW wind turbine (WT) and met tower (MetT) at the NREL Wind Technology Center near Boulder, CO June-October 2018 were analyzed to quantify the impacts of turbulence eddies on the load responses measured from sensors on the main shaft, blade and tower. The passage of individual mountain-generated eddies from the met tower to the WT were critically determined by correlating the optimal time shifts in signal between MetT and nacelle anemometers with mean advection time. Loading responses from mountain eddy passage were compared with atmospheric eddies from the north/south, unimpeded by the mountains, and found to be similar. Whereas time variations in torque were highly correlated with time changes in horizontal eddy velocity, the out-of-plane bending moments on the main shaft (directly forcing the main bearing) were uncorrelated with horizontal eddy velocity. This result is consistent with a previous LES study indicating that the main bearing is forced by asymmetrical interactions between the WT rotor and turbulence eddies, while power fluctuations respond primarily to advective eddy velocity. Surprisingly, the nacelle anemometer produced statistics very similar to the MetT.

ENGINEERING,WIND ENERGY↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of LEU fuels to support the high-performance reactors. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel. The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR. The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-licensed reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗