Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Modular Power Electronics Approach for High Power Dynamic Wireless Charging System

Dynamic wireless power transfer (DWPT) can provide energy to EVs in motion and extend the drive range. Upscaling the charging power to 200 kW (High Power DWPT) reduces the percentage of electrified roadway required, and the solution becomes cost-effective. To smooth the power at the battery and grid, a secondary regulation stage must be added. The DWPT system therefore relies on power electronics to interface with the coils and regulate the power flow. Designing this high power system using wide bandgap devices makes ensuring high efficiency, small size, and reliable operation very challenging, and significant engineering effort is required to build such complicated systems for large-scale installation and deployment. Here, this paper describes a modular design approach for the power electronics to achieve the 200 kW wireless power transfer. As described, the SiC power electronics building block is designed, simulated, and characterized. The approach is validated in the DWPT system to build the inverter, the rectifier, and the DC/DC converter, which demonstrated high performance and reliable operation with 188 kW power.

42 ENGINEERING↗

Progress Towards RF Conditioning of Low-Loss Couplers for a Conduction-Cooled Cryomodule

This work presents current progress on the conditioning of two new 25 kW couplers optimized for use in a compact, conduction-cooled SRF cryomodule. A connecting waveguide, previously used for conditioning the 805 MHz SNS couplers, was altered for use at 915 MHz. The necessary modifications were determined via RF modeling, while thermal analysis results identified additional cooling requirements during RF conditioning and provided insight about potential higher-power operation. Initial low-power conditioning will be performed with a 2.5 kW solid-state amplifier, with plans to use an industrial magnetron for RF conditioning at 25 kW in the near future.

Stilin, N. [Thomas Jefferson National Accelerator ↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Performance of Photovoltaic Systems Recorded by Open Solar Performance and Reliability Clearinghouse (oSPARC)

This article analyzes data from 2,200 photovoltaic systems collected through the Open Solar Performance and Reliability Clearinghouse (oSPARC, 2018) to draw conclusions about the measured performance of the systems, how it compares to expectations, and how wide the variation is. The systems range in size from 2 kW to 1,200 kW, with an average size of 229 kW, and were activated in oSPARC between March 13, 2007 and Dec. 16, 2016. Data regarding co-incident insolation and ambient temperature are provided through the oSPARC platform for the population of systems and summarized here. Results indicate that - after correcting for measured insolation, derating for temperature, and correcting for balance-of-system efficiency and degradation as a result of system age - the performance ratio of these 2,200 systems averages 91.7%. Adjusting for known parameters such as age and efficiency, the ratio would ideally be 100%. Thus, the 'underperformance' of this system sample is measured at 9.3% and suggests that as much as 9.3% could be recovered if the systems were caused to perform as expected through optimal operation and maintenance. Efforts to correlate the performance ratio with environmental conditions resulted in very low coefficients of regression, but the method already normalizes for actual site insolation and temperature, which are responsible for much of the site-specific variation. An exemption is air-quality nonattainment areas, where the measured performance of plants averages 86.9% and is consistently lower than the average of 95.9% in areas that are in compliance with air quality standards, likely because of particulate matter such as diesel soot exacerbating the soiling rate.

14 SOLAR ENERGY↗

Blind Modeling Validation Exercises Using the Horizontal Dry Cask Simulator

The U.S. Department of Energy (DOE) established a need to understand the thermal-hydraulic properties of dry storage systems for commercial spent nuclear fuel (SNF) in response to a shift towards the storage of high-burnup (HBU) fuel (> 45 gigawatt days per metric ton of uranium, or GWd/MTU). This shift raises concerns regarding cladding integrity, which faces increased risk at the higher temperatures within spent fuel assemblies present within HBU fuel compared to low-burnup fuel (≤ 45 GWd/MTU). A dry cask simulator (DCS) was built at Sandia National Laboratories (SNL) in Albuquerque, New Mexico to produce validation-quality data that can be used to test the accuracy of the modeling used to predict cladding temperatures. These temperatures are critical to evaluating cladding integrity throughout the storage cycle of commercial spent nuclear fuel. A model validation exercise was previously carried out for the DCS in a vertical configuration. Lessons learned during the previous validation exercise have been applied to a new, blind study using a horizontal dry cask simulator (HDCS). Three modeling institutions – the Nuclear Regulatory Commission (NRC), Pacific Northwest National Laboratory (PNNL), and Empresa Nacional del Uranio, S.A., S.M.E. (ENUSA) – were granted access to the input parameters from the DCS Handbook, SAND2017-13058R, and results from a limited data set from the horizontal BWR dry cask simulator tests reported in the HDCS update report, SAND2019-11688R. With this information, each institution was tasked to calculate peak cladding temperatures and air mass flow rates for ten HDCS test cases. Axial as well as vertical and horizontal transverse temperature profiles were also calculated. These calculations were done using modeling codes (ANSYS/Fluent, STAR-CCM+, or COBRA-SFS), each with their own unique combination of modeling assumptions and boundary conditions. For this validation study, the ten test cases of the horizontal dry cask simulator were defined by three independent variables – fuel assembly decay heat (0.5 kW, 1 kW, 2.5 W, and 5 kW), internal backfill pressure (100 kPa and 800 kPa), and backfill gas (helium and air). The plots provided in Chapter 3 of this report show the axial, vertical, and horizontal temperature profiles obtained from the dry cask simulator experiments in the horizontal configuration and the corresponding models used to describe the thermal-hydraulic behavior of this system. The tables provided in Chapter 3 illustrate the closeness of fit of the model data to the experiment data through root mean square (RMS) calculations of the error in peak cladding temperatures (PCTs), PCT axial locations, axial temperature profiles, vertical and horizontal temperature profiles at two different axial locations, and air mass flow rates for the ten test cases, normalized by the experimental results. The model results are assigned arbitrary model numbers to retain anonymity. Due to the relatively flat axial temperature profiles, small temperature gradients resulted in large deviations of all models’ PCT axial location from the experimental PCT axial location. When the PCT axial location error is excluded in the calculation of the combined RMS of the normalized errors that considers PCT, the temperature profiles, and the air mass flow rates, the model data fits the experimental data to within 5%. When the vault information is excluded, the model data fits the experimental data to within 2.5%. An error analysis was developed further for one model, using the model and experimental uncertainties in each validation parameter to calculate validation uncertainties. The uncertainties for each parameter were used to define quantifiable validation criteria. For this analysis, the model was considered validated for a given comparison metric if the normalized error in that metric divided by the validation uncertainty was less than or equal to 1. When considering the combined RMS of the normalized errors of all metrics divided by their validation uncertainties, the model was found to have satisfied the criterion for model validation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems (Final Report)

This is the end of project report for the DOE Project DE-FE-0027844 “Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems”. The objectives of the project were to develop several technologies required for the mass adoption of Solid Oxide Fuel Cell systems for medium to large power generation applications. The key achievements of this project were: 1) Development of fuel cells with complete internal fuel reforming capability. 2) Fuel cell power scale up with production of cells with larger active areas. 3) Assembly of an integrated 5 kW modular stack platform capable of installation into medium to large power systems. 4) Demonstration of a 10 kW Fuel Cell Power System utilizing the integrated 5 kW modular stack platform. 5) Cost modelling to show system cost of $1,500/kW are achievable at production volumes. 6) Development of cathode air poison getters for reduced degradation and extended fuel cell life. 7) Assessment of fuel poison on anode degradation, particularly poisons frequently produced from the process of gasification of coal. The Cummins led Voice of Customer (VOC) work identified several significant markets for natural gas powered fuel cell systems, where the end customer is interested in reducing energy consumption and emissions, or increasing reliability of electrical supply. Data centers and truck Auxiliary Power Units (APU) were highlighted as 2 key future markets for fuel cell systems.

30 DIRECT ENERGY CONVERSION↗

Deployment of Community Scale Solar Photovoltaic Energy Systems in Forest County Potawatomi Community

FCPC is a federally recognized tribe with a membership of more than 1400. The Tribe has a reservation in Forest County, Wisconsin, and tribal trust lands in Milwaukee County, Wisconsin, with significant governmental and business operations in both areas. Until relatively recently, FCPC was one of the poorest tribes in the Midwest. Due to its successful gaming operations, it now has improved its financial situation and is using its resources to benefit both its members and the general public through environmental and other community efforts, many of which are long-delayed because of the extended period of abject poverty. The Tribe has developed the long-term goal of becoming energy independent using renewable resources. In order to meet this goal, the Tribe has taken several important steps. As an interim step, FCPC is purchasing nearly 55 million kilowatt hours of renewable energy certificates (“RECs”) annually from certified renewable energy facilities in the United States. These RECs offset more than 100% of the present electricity use at all of the Tribe’s facilities. The Tribe is currently ranked number 11 on the Environmental Protection Agency’s (EPA) Top 20 Local Government list of green power purchasers and is a member of the EPA’s Green Power Partnership. The original project suggested small scale installations on tribal homes and certain government buildings. The Tribe suggested that the project would result in 730 kw installed. By revising the project, the Tribe was able to install 938 kw and owns the largest installation in Northern Wisconsin with the 800 kW installation at the Potawatomi Carter Casino Hotel (“PCCH”). The PCCH installation, in summer months, can provide near 90% of the use during daylight hours. Although tracking was not immediately available FCPC has since confirmed significant production with certain quarterly savings nearing $210,000. These installations provide a reduction in facility costs providing more revenue for Tribal services including cultural, health, sustainable food sources, environmental preservation and other Tribal initiatives. Further, the installations have resulted in positive steps towards the Tribe’s goals of energy sovereignty and the use of 100% renewable clean energy. Finally, the PCCH project, specifically, has had the additional benefit of providing a likely area for a microgrid. The size of the installation and offset achieved have pushed the Tribe toward planning for storage and a microgrid system that would both further the Tribe’s energy goals and provide a safe haven for the Community during times of need.

14 SOLAR ENERGY↗

Niowave Flow Testing of the High Power Converter - FY 21

Design work for a 100 kW converter to produce a neutron flux via electron impact on a flowing stream of liquid metal lead-bismuth (LBE) was conducted in FY20. In FY21, the focus shifted to a 20 kW converter which was designed in collaboration with Niowave engineers. A flow visualization model is needed to validate model results for the 20 kW converter and ensure adequate coolant flow over containment structures. This work highlights the mockup that was made with quartz side plates by LANL.

42 ENGINEERING↗

Bad River Band of Lake Superior Chippewa Indians Solar Project

The Bad River Band of Lake Superior Chippewa (the Tribe) implemented its first phase of energy independence through the installation of approximately 520 kW DC of solar photovoltaic (PV) at three tribal buildings: 200kW DC at the Wastewater Treatment Plant (WWTP), 300 kW DC at the Health & Wellness Center (Health Clinic), and 20 kW AC at the Chief Blackbird Administration Building (Administration Building). The solar PV systems were integrated with the existing utility grid and can operate independent of the grid using Battery Energy Storage Systems (BESS) in combination with solar and existing back-up gas generators. The BESS also creates resiliency, providing power when the grid is down. All three buildings are essential Tribal buildings.

14 SOLAR ENERGY↗

Characterizing the Performance of Fission Chambers for Local Neutron Flux and Spectrum Measurement

Three fission chambers were tested at The Ohio State University Research Reactor (OSURR) to evaluate fission chambers for neutron flux and spectrum measurements. Two of the fission chambers are commercial Photonis CFUR43 fission chambers—one utilizing highly enriched uranium-235 fissile deposits for thermal neutron detection and the other with highly depleted uranium-238 for fast neutron detection. This experiment was also performed in collaboration with French Alternative Energies and Atomic Energy Commission (CEA) with CEA suppling a uranium-235 loaded fission chamber built from the Photonis CFPR CE8/9 kit. The fission chambers were irradiated in a movable 6.5 inch dry tube at reactor powers of 50 kW, 200 kW, and 450 kW at ambient temperature and at 350°C. While all sensors demonstrated good linear sensitivity to reactor power, a leakage current of 6 nA was measured for the CFUR43 detectors. Additionally, the measured signal ratios of the two CFUR43 detectors did not match the theoretical values and are subject to further investigation on individual signal contributors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Port of New York and New Jersey Drayage Electrification Analysis

The National Renewable Energy Laboratory (NREL) evaluated the potential for drayage electrification in the Port of New York and New Jersey (PoNYNJ), with a focus on operators: Harbor Freight Transport (HF), Safeway Trucking (SWT), and International Motor Freight Inc (IMF). This report summarizes the data collection and electrification evaluation of all three drayage operators, includes detailed operational data, and identifies the performance requirements for battery electric tractors (BETs) and corresponding infrastructure operated within the context of PoNYNJ drayage operation. This report also details a methodology to evaluate opportunities, strategies, and challenges associated with future expansions of BETs in meeting PANYNJ emissions goals. The Port Authority has established a goal of achieving Net Zero carbon emissions by 2050 across all facilities, including from tenant and stakeholder sources such as drayage trucks. NREL used real-world performance data collected on the three PoNYNJ drayage operations, along with modeling and analysis tools to compare BET to diesel trucks. From March to July 2021, NREL collected 1Hz vehicle and engine data from 46 drayage trucks at the three operators totaling nearly 121,000 miles of operation, providing enough information to assess vehicle operations for electrification potential. A Future Automotive Systems Technology Simulator (FASTSim) electric truck powertrain model was validated using PoNYNJ data and scenarios were run to evaluate drayage truck electrification requirements over the real-world cycles. The first scenario examined BET viability with minimal changes to existing operations. This assumes the trucks charge when stopped for two hours or longer, have a functional battery size of 375 kWh, and can charge at 270 kilowatts (kW) average which are the specification of the commercially available Freightliner eCascadia. The second scenario looked at what operational, charging infrastructure, and BET technology changes would be needed to fully electrify. Finally, detailed analysis was run on charging rate structure to understand operational costs to the fleets. The studied drayage trucks averaged 5.1 MPG, spent roughly 9% of their energy at idle, and drove an average of 140 miles per day with a maximum daily distance of 573 miles. The FASTSim model results indicate a comparable BET would use 417 kWh of energy per day on average accounting for cargo weight, which is close to the full usable capacity of the eCascadia currently available on the market. Based on the daily average operating data, partial fleet electrification is possible with current technology. However, some specific days of operation would require over 1,600 kWh of energy due to longer distances traveled by the trucks and more intense operation. Trucks used for long distance and intense operation cannot be readily electrified with current technology without operational changes. Full adoption of BETs could reduce CO 2 emissions from these fleets by roughly 75% today, eliminating 76 metric tons of CO 2 (MTCO 2 ) per vehicle each year, which equates to 24,100 MTCO 2 per year for all three operators. Commercially available direct current fast chargers (DCFC) have charge rates up to 350 kW. Based on the average daily modeled energy use for each operator, current industrial rate structures, and the assumption of 350 kW peak charging, full drayage electrification would increase electricity consumption. In addition, peak demand usage would increase with unmanaged charging along with cost of electricity having a direct impact on cost per mile for electric vehicles. The resulting cost per mile for BETs along with comparable cost per mile for conventional diesel trucks are also examined at $\$$4.00 per gallon of diesel. It will be important for PANYNJ and the drayage operators within the PoNYNJ to consider these load impacts to their existing electrical infrastructure and devise operational strategies that avoid coincident charging of vehicles to mitigate demand charges. Despite these electricity cost increases, savings from reductions in diesel consumption will help offset the costs of this increased electricity consumption. However, prices of both electricity and diesel are subject to change based on various factors meaning the realized savings will vary over time. This shows BETs could be cost-competitive on an energy cost per mile basis for all scenarios while diesel is above $\$$3.00/gal. Further, if diesel prices dropped to the 15-year low of $2.33/gal, it would still be cost competitive to operate the EVs with electricity costs of 16.3 ¢/kWh or less.

33 ADVANCED PROPULSION SYSTEMS↗

A High-Voltage High-Reliability Scalable Architecture for Electric Vehicle Power Electronics (Final Report)

This project developed and demonstrated new composite converter technologies that lead to high power density (> 20 kW/L) at power levels of 10s of kW, 100s of kW, or possibly higher, with fundamental advances in converter efficiency and Q that lead to substantial increases in mean time to failure (MTTF). These advantages were realized through development of new composite converter topologies that perform buck, boost, or other conversion functions and that are scalable to higher voltage and power levels through sharing of voltage and current stresses among multiple dissimilar partial-power converter modules. The project led to experimental demonstration of a125 kW multifunction electric vehicle power conversion system having in-creased dc bus voltage (950 V nominal, 1200 V peak) that interfaces a 200 V to 400 V battery pack, and that includes integrated level 2 wired charging and wireless charging functions. The project incorporated SiC MOSFET modules having switching frequencies in excess of 100 kHz, planar magnetics, a hierarchical control architecture that enables scaling to higher voltages and powers with additional converter modules, and a high-power density in excess of 20 kW/L. The research demonstrated how a more complex converter approach can increase mean-time-to-failure, even though the number of elements is increased. This is achieved through significant reduction of temperature rise through fundamentally superior converter circuit topologies. The research also demonstrated new high power planar magnetics that increase power density. The technology is appropriate to a variety of applications including EV power trains, EV charging, PV inverters, battery storage, and similar areas. These systems potentially can be manufactured in the U.S.

33 ADVANCED PROPULSION SYSTEMS↗

Compact, high-power superconducting radio-frequency accelerators for environmental applications

Electron-beam irradiation has been proven to destructively reduce or eliminate a wide variety of organic chemicals, viruses and bacteria from wastewater, as well as reducing sulfur and nitrous oxides emission from coal-fired power plants. It is estimated that there are approximately 30,000 such particle accelerators in use worldwide for industrial processes including surface and bulk processing of material, medical sterilization, and environmental remediation. Maximum beam power from accelerators used in these applications is currently limited to less than 500 kW, and a higher beam power is needed to reduce treatment costs. The market availability of continuous-wave (CW) electron-beam accelerators with power of the order of ~100 kW is also very limited. Superconducting radio-frequency (SRF) linear accelerators (linacs) are commonly used at basic research laboratories throughout the world due to their exceptionally high efficiency as compared to current industrial varieties. Recent advances in cryogenics, SRF thin films and high-power magnetrons allow for the design of increasingly compact and efficient CW SRF electron linacs in the energy range 1-10 MeV, with up to 1 MW of beam power. A new class of compact, high-efficiency electron-beam accelerators may provide cost-effective solutions for a range of industrial and environmental remediation applications, particularly with respect to tackling one such class of contaminants so-called “forever chemicals”, including per- and polyfluoroalkyl substances (PFASs), which are ubiquitous in a wide range of products and for which there is currently no effective destruction technology. We have recently demonstrated the key technologies required for such accelerators by: 1) operating a Nb3Sn SRF accelerating cavity cooled by commercial cryocoolers up to an accelerating gradient of 12.4 MV/m and 2) demonstrating the phase-locking as well as a high-efficiency power combining scheme for industrial magnetron transmitters. In this presentation, we will introduce the principles and benefits of MW-class SRF linacs, based on the conduction-cooled SRF technology that we have demonstrated for environmental remediation. We propose the development of a 4 MeV, 20 kW prototype to be built at Jefferson Lab as a first accelerator demonstrator unit. We will also present the results from samples study on the effect of electron-beam irradiation on so-called “forever chemicals” such as 1,4-dioxane and PFAS, using an existing multi-purpose 10 MeV, low-power, CW SRF linac at Jefferson Lab.

Ciovati, Gianluigi↗

San Xavier District Solar Energy Project for Administration Building and Education Center

The San Xavier District of the Tohono O’odham Nation (District) developed grid-tied solar photovoltaic (PV) systems for two tribal buildings: the San Xavier District Administration Building and Education Center. For the Administration Building, an approximately 182-kilowatt (kW) solar PV system is projected to produce roughly 310,000 kilowatt-hours (kWh) per year and displace about 80% of the energy use of the building. For the Education Center, an approximately 73.5-kw system is projected to produce roughly 130,000 kWh per year and displace about 95% of the building’s energy use. The anticipated 25-year cost savings from the combined 255-kW systems are estimated to be approximately $1,750,000 and $820,000 for the Administration Building and the Education Center, respectively.

14 SOLAR ENERGY↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

Community-Scale Solar Photovoltaic for the Forest County Potawatomi Community

Forest County Potawatomi Community will install and operate 1,228 kW of solar photovoltaic (PV) energy systems at approximately nine (9) tribal facilities in Milwaukee, WI and on the Tribe's Forest County reservation lands. The individual installations will range in size from 8 kW to 280 kW, and will displace between 4.2 and 99.9% of total current energy usage from those buildings and save $105,996 annually.

14 SOLAR ENERGY↗

On High-Temperature Dynamometer Test Stand Development

RePED is a novel prototype alternator that has been designed and built to operate at 35 kW under 250 degrees C ambient temperature conditions. The operating efficiency will be measured using a 225-kW motor to drive the machine in a back-to-back configuration. The goal is to determine if the RePED alternator can deliver 35 kW at a rotational speed of 1,000 rpm while operating in 250 degrees C ambient temperature and have a minimum efficiency of 60%. Dynamometer testing of a high-temperature alternator for geothermal drilling presents several unique challenges, especially around maintaining and managing the various sources and types of energy passing through the system without impacting data quality. The objectives of this report are to (1) describe the test stand in detail, the relative orientation of each major component, and the data acquisition system and (2) discuss the behavior of the test stand components such that this report can serve as a reference document for future projects.

15 GEOTHERMAL ENERGY↗

PROGRESS TOWARDS RF CONDITIONING OF LOW-LOSS COUPLERS FOR A CONDUCTION-COOLED CRYOMODULE

This work presents current progress on the conditioning of two new 25 kW couplers optimized for use in a compact, conduction-cooled SRF cryomodule. A connecting waveguide, previously used for conditioning the 805 MHz SNS couplers, was altered for use at 915 MHz. The necessary modifications were determined via RF modeling, while thermal analysis results identified additional cooling requirements during RF conditioning and provided insight about potential higher-power operation. Initial low-power conditioning will be performed with a 2.5 kW solid-state amplifier, with plans to use an industrial magnetron for RF conditioning at 25 kW in the near future.

Wilson, Christiana [Thomas Jefferson National Acce↗